aŽd praha s.r.o. - railway directory | worldwide rail ... · pdf filecroatia/niš...

22
AŽD Praha s.r.o. INTERNATIONAL REFERENCES

Upload: phungliem

Post on 02-Feb-2018

260 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

AŽD Praha s.r.o.

InternAtIonAlreferences

Page 2: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

Customer:„Metropolitain“ Jsc

Project: Supply and installment of signaling equipment

Description of the Project:Supply and installation of signaling equipment for 8 – 14 station of Sophia metro.

Delivered equipment:Relay based station interlocking equipment ECM (7pcs.)

Value of the Project:3 million Euro

execution years of the Project:2006 – 2009

Implementation term of the Project:32 months

AŽD PrAhA s.r.o. internAtionAl references – BulgAriA

All supplies have been provided through BALKAN SAST, the daughter company of AŽD Praha

Page 3: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

customer:National Company Railway Infrastructure (NCRI)

Project: Reconstruction of Sophia – Karlovo railway line

Description of the Project:Design and reconstruction of station interlocking equipment at 20 railway stations within the frame of Reconstruction of railway line Sophia - Karlovo project.

Delivered equipment:Station interlocking equipment ECM (20 pcs.), level crossings systems APU (25 pcs.), signals

Value of the Project:3.2 million Euro

execution years of the Project:2008 – 2010

Implementation term of the Project:3 years

customer:National Company Railway Infrastructure (NCRI)

Project: Supply of level crossing signaling equipment to NCRI

Description of the Project:Supply and assembly of level crossing signaling equipment including warning boards and barrier drivers

Delivered equipment:Level crossing signaling equipment, warning boards, barrier drivers (61 pcs. of complete LX set)

Value of the Project:3.3 million Euro

execution years of the Project:2007 – 2011

Implementation term of the Project:4 years

Page 4: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

customer:National Company Railway Infrastructure (NCRI)

Project: Supply of warning boards to NCRI

Description of the Project:Framework contract for supply and assembly of warning boards till year 2011

Delivered equipment:Warning boards (300 pcs.)

Value of the Project:0.3 million Euro

execution years of the Project:2008 – 2011

Implementation term of the Project:3 years

customer:National Company Railway Infrastructure (NCRI)

Project: Supply of barrier drives to NCRI

Description of the Project:Framework contract for supply and assembly of barrier drives till year 2011

Delivered equipment:Barrier drives (100 pcs.)

Value of the Project:0.2 million Euro

execution years of the Project:2008 – 2011

Implementation term of the Project:3 years

Page 5: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

customer:Wagon Reconstruction Plant (VRZ) Septemvri

Project: Wagon´s reconstruction

Description of the Project:Framework contract for wagon´s reconstruction

Delivered equipment:Complete electroinstallment

Value of the Project:4 million Euro

execution years of the Project:2009

Implementation term of the Project:6 months

Page 6: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

AŽD PrAhA s.r.o. internAtionAl references – serBiA

customer:Privredno društvo ”Termoelektrane Nikola Tesla” d.o.o. Obrenovac, Ogranak društva Železnički transport (Nikola Tesla Thermal Power Plant)

Project: Modernization of electronic interlocking system at Vreoci/Obrenovac TENT railway station

Description of the Project:The original relay based interlocking equipment has been substituted by electronic interloc-king ESA 11 SR and new wayside signaling elements remotely controlled from station Vreoci/Obrenovac have been delivered and installed.

Delivered equipment:Two station interlocking ESA 11 SR, universal power supply source UNZ, axle counters Frauscher, point machines EP 644, cables, signals.

Value of the Project:2.2 million Euro

execution years of the Project:2007 – 2009

Implementation term of the Project:2 years

Page 7: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

customer:JP Železnice Srbije (Serbian Railways)

Project: Improvement of safety level of level crossings on lines Subotica – Bogojevo – state border Croatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš – state border/Subotica – Senta/Stalač – Kraljevo – Požega/ Stubline – Vorbis/Obrenovac – Stubline

Description of the Project:Supply and installation of 11 pcs of complete electronic level crossing systems PZZ-EA with power supply from local net

Delivered equipment:Electronic level crossing system PZZ-EA, cabling, signals, warning boards, barrier drives, half-barriers, concrete house, axle counters Frauscher

Value of the Project:1.1 million Euro

execution years of the Project:2005 – 2010

Implementation term of the Project:5 years

customer:JP Železnice Srbije (Serbian Railways)

Project: Supply of 90 pcs. of electromotive point machines incl. accessories

Description of the Project:Supply and installation of 90 pcs. of electromotive point machines incl. accessories

Delivered equipment:Electromotive point machines type EP 644, connecting and checking rods and toggle moun-ting set

Value of the Project:0.4 million Euro

execution years of the Project:2005 – 2009

Implementation term of the Project:4 years

Page 8: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

AŽD PrAhA s.r.o. internAtionAl references – BelorussiA

customer:Belorussian Railway

Project: Station Interlocking System for Polock/Stepjanka/Novopolock Railway Stations

Description of the Project:Delivery of 3 interlocking systems without wayside elements (266 points, 393 signals) includ-ing track circuits 25 Hz, special type of track closure, blowing of points.

Delivered equipment:ESA 11-BC (with PRV) interlocking system, certified in Belorussia

Value of the Project:9.1 million Euro

execution years of the Project:2006 – 2010

Implementation term of the Project:4 years

Page 9: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

AŽD PrAhA s.r.o. internAtionAl references – Montenegro

customer:Montenegro Railways

Project: Reconstruction and modernization of railway line Podgorica – Nikšič

Description of the Project:Delivery and installation of telecommunication, telemechanical and signaling equipment on the railway line Podgorica - Nikšič

Delivered equipment:Electronic interlocking ESA 11– 4 pcs., Electronic level crossing system PZZ-EA – 13 pcs., Inter-locking system remote control DOZ-1, point machines EP 600 38 pcs. GTN, diagnostics

Value of the Project:22 million Euro

execution years of the Project:2004 – 2009

Implementation term of the Project:5 years

Page 10: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

AŽD PrAhA s.r.o. internAtionAl references – itAly

customer: Alstom Ferroviaria

Project: Compensators of Dangerous Currents CDC-1 for Pendolino Train Sets

Description of the Project:Pendolino trains supplied to Czech Railways had a high rate of dangerous currents which could dangerously influence track circuits and general function of signaling systems. AŽD Praha developed compensator of these dangerous currents for 7 Pendolino train sets valuing 4,6 billion CZK (in 2004) in quite short time; 2 compensators were supplied for each unit.

Delivered equipment:14 pcs. of compensators of endangering currents CDC-1

Value of the Project:2 million Euro

execution years of the Project:2004 – 2006

Implementation term of the Project:2 years

Page 11: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

AŽD PrAhA s.r.o. internAtionAl references – MAlAysiA

customer:Keretapi Tanah Melayu Berhad (KTMB) - Malaysia Railway

Project: Upgrade for main line railway track in areas Sentul Batu Caves, Batang Melaka and Rembau – Tampin

Description of the Project:Delivery of mainline Point machines and primary or secondary Jaw-Lock systems, modified to suit demanding operational condition on Malay railways. Modification of supervisory functi-ons for integration with existing interlocking control systems.

Delivered equipment:AZD point machines type EP600; AZD Jaw Lock type VZ200 with integrated control and mo-nitoring circuitry.

Value of the Project:1.5 million Euro

execution years of the Project:2008 – 2009

Implementation term of the Project:14 months

Page 12: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

AŽD PrAhA s.r.o. internAtionAl references – PolAnD

customer:Metro Warszawa (Warsaw Metro)

Project: Supply of the line I. of Warsaw Metro with automatic train protection (ATP) system type SOP-2

Description of the Project:

• Elaboration of technical documentation enabling to prepare design for installation of the system• Manufacture of the ATP equipment of SOP-2 type for metro • Installation of the system at line I. of Warsaw Metro• Installation of the system at trains of Russian origin and Alstom trains• Debugging and operational tests• Commissioning

Delivered equipment:Stationary and mobile automatic train protection system SOP-2

Value of the Project:12 million Euro

execution years of the Project:1994 – 2000

Implementation term of the Project:6 years

Page 13: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

AŽD PrAhA s.r.o. internAtionAl references – slovAkiA

customer: Slovak Republic Railways (ŽSR)

Project: KIA MOTORS Slovakia - branch line Váh/ Slovak Railways, Kúty/ Railway corridor No. V. – Bra-tislava – Žilina – Košice – Čierna nad Tisou – Modernization of Poprad Tatry railway station/ Railway corridor No. V. – Bratislava – Žilina – Košice – Čierna nad Tisou – Modernization of Rača railway station/Railway corridor No. IX. – Plaveč – Prešov – Kysak – Čaňa – Modernizati-on of Prešov railway station/Electrification and modernization of Railway line Zvolen – Ban-ská Bystrica.

Description of the Project:Construction of signaling equipment within the frame of railway lines modernization

Delivered equipment:Station electronic interlocking equipment ESA 11 – 6 pieces and level crossing equipment PZZ RE/SK – 11 pieces

Value of the Project:28,5 million Euro

execution years of the Project:2002 – 2008

Implementation term of the Project:6 years

Page 14: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

customer:Slovak Republic Railways (ŽSR)

Project: Reconstruction of signaling equipment and completion of remote control at Podunajské Biskupice – Komárno railway line

Description of the Project:Line section Podunajské Biskupice – Komárno was provided with interlocking equipment of 3rd category for secondary lines – type ESA 11. Stations Podunajské Biskupice, Nové Košariská, Kvetoslavov, Lehnice, Orechová Potôň, Dunajská Streda, Dolný Štál, Veľký Meder, Zemianska Olča, Zlatná na Ostrove are controlled from remote dispatcher’s post placed at Dunajská Streda railway station (CTC centre).

Delivered equipment:Electronic interlocking ESA 11 for secondary railways stations – 10 pcs., signaling equipment AHP-03 – 1 piece, interlocking AHP-ESA04 – 9 pcs., level crossing system PZZ-RE/SK – 13 pcs., level crossing system PZZ-AC – 4 pcs., GTN, DOZ-1 (CTC), fiber optic and line cables, automa-tic telephone switchboard.

Value of the Project:11.6 million Euro

execution years of the Project:2002 – 2007

Implementation term of the Project:6 years

customer:Slovak Railways (ŽSR)

Project: Reconstruction of signaling equipment and completion of remote control (CTC) at Trnava - Kúty railway line

Description of the Project:Line section Trnava - Kúty was provided with signaling equipment of 3rd category, type ETS-SK, specially developed for secondary lines. Stations Šaštín–Stráže, Šajdíkove Humence, Seni-ca, Hlboké, Jablonica, traffic turnout point Dúbrava, Smolenice, Boleráz, Šelpice and Nemčan-ka are controlled from dispatcher’s post located at Jablonica railway station (CTC centre).

Delivered equipment:Interlocking ETS-SK – 8 pcs., automatic line block AHP-03 – 9 pcs., level crossing system PZZ-RE/SK – 17 pcs., level crossing system PZZ-AC – 1 pc., GTN at Jablonica station.

Value of the Project:7.4 million Euro

execution years of the Project:2002 – 2004

Page 15: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

Implementation term of the Project:2 years

customer:Slovak Republic Railways (ŽSR)

Project: Railway corridor No. V. - Bratislava – Žilina – Košice – Čierna nad TisouModernization of railway line Trnava – Nové Mesto nad Váhom, 2nd phase

Description of the Project:Supply and assembly of wayside elements and their connection to electronic interlocking SIMIS, cable distribution, dismantling of existing interlocking equipment at Pieštany station and line section Piešťany-Brunovce and Brunovce-Nové Mesto n/V. Delivered equipment:Signals, electromotive point machines, axle counters, cable distributors

Value of the Project:4.8 million Euro

execution years of the Project:2006 – 2008

Implementation term of the Project:31 months

customer:Slovak Republic Railways (ŽST)

Project: Level crossing systems PZZ-RE/SK installation

Description of the Project:Replacement of mechanical level crossing systems and build - up of modern level crossing systems with electronic elements Delivered equipment:Level crossing system PZZ-RE/SK – 35 pcs

Value of the Project:6,7 million Euro

execution years of the Project:2001 – 2008

Implementation term of the Project:7 years

Page 16: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

AŽD PrAhA s.r.o. internAtionAl references – inDiA

customer:South-Central Railways (IR-SCR) of India

Project: Realization of 11 SSI (Solid State Interlocking) in railway stations Uppal, Nekonda, Kesa-mudram, Kolanur, Potkapalli, Chintapalli, Yelgur, Mahaboobabad, Gundratimadugu, Madhira, Pedapalli

Description of the Project:Installation of ESA 11-IR interlocking (application for India) adopted to comply with Indian signaling rules (British signaling rules) duly re-validated by local notified body (RDSO). ESA 11-IR was supplied in fully electronic design upgraded to withstand adverse climatic condition (temperature range up to 75˚C, relative humidity 95%).

Delivered equipment:Electronic interlocking ESA 11-IR

Value of the Project:3.4 million Euro

execution years of the Project:2004 – 2006

Implementation term of the Project:2 years

Page 17: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

AŽD PrAhA s.r.o. internAtionAl references – turkey

customer:Istanbul Municipality

Project: Realization of signaling system at Istanbul Metro

Description of the Project:Delivery of 30 pcs. of light signals AZD 70 with red and green signal lamps with 2.3 m mast and cantilevers.

Delivered equipment:AZD 70 railway signalsLight signal mastsCantilevers

Value of the Project:0.4 million Euro

execution year of the Project:2008

Implementation term of the Project:3 months

Page 18: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

customer:Soke - Izmir

Project: Delivery and installation of level crossing equipment PZZ-EA

Description of the Project:Delivery and installation of level crossing equipment PZZ-EA

Delivered equipment:Level crossing equipment PZZ-EA

Value of the Project:0.3 million Euro

execution year of the Project:2010

Implementation term of the Project:1 year

Page 19: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

AŽD PrAhA s.r.o. internAtionAl references – greece

customer:ERGA OSE (subsidiary of the Hellenic Railways Organization (OSE)

Project: Level crossing interlocking equipment for logistical centre Thriasio Pedio

Description of the Project:Supply and installation of 12 level crossing interlocking equipment within logistical centre Thriasio Pedio.

Delivered equipment:12 pieces of level crossing interlocking equipment PZZ-EA, axle counter, wayside elements

Value of the Project:1.12 million Euro

execution years of the Project:03/2009 - 06/2010

Implementation term of the Project:16 months

Page 20: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

customer:EDISY (subsidiary of the Hellenic Railways Organization (OSE)

Project: Replacement of two and installation of one new level crossing interlocking equipment on the line Thesaloniki-Alexandroupolis

Description of the Project:Replacement of two and installation of one new level crossing interlocking equipment on the line Thesaloniki-Alexandroupolis Delivered equipment:3 pieces of level crossing interlocking equipment PZZ-EA, axle counter, EON-8, ASE5, wayside elements

Value of the Project:0.3 million Euro

execution years of the Project:07/2009 - 03/2010

Implementation term of the Project:9 monthsAŽD PRAHA S.R.O. INTERNATIONAL REFERENCE - SYRIA

customer: Nokia Siemens Networks

Project: Delivery of signals

Description of the Project:Delivery of light signals

Delivered equipment:923 pieces of AZD light signals modified according to local technical standards

Value of the Project:1,7 million Euro

execution years of the Project:2011

Implementation term of the Project:1 year

Page 21: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

AŽD PrAhA s.r.o. internAtionAl references – usA

customer: Nashville Eastern Railroad - NERR

Project: Delivery and installation of level crossing equipment PZZ-EA

Description of the Project:Delivery and installation of level crossing equipment PZZ-EA in Tennessee – Lebanon

Delivered equipment:Level crossing equipment PZZ-EA

Value of the Project:0,1 million USD

execution years of the Project:2010

Implementation term of the Project:1 year

Page 22: AŽD Praha s.r.o. - Railway Directory | Worldwide Rail ... · PDF fileCroatia/Niš – Crveni krst – Zaječar – Prahovo pristanište/Subotica – Bogojevo/Beograd – Niš

contacts: AŽD Praha s.r.o. Žirovnická 2/3146, 106 17 Praha 10, Zahradní Město Phone: +420 267 287 111, Fax: +420 272 650 831, E-mail: [email protected] Internet: www.azd.cz