Axzion GKS 2013
Straight to the energy.
„Not only wind ...“
© SpanSet Group 2013
![Page 2: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/2.jpg)
Electricity from fossil fuels
01 0il-Gas-Coal
© SpanSet Group 2013
![Page 3: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/3.jpg)
© SpanSet-secutex GmbH
Electricity from fossil fuels 280 ton Spreader Beam: MAN Turbo 01
© SpanSet Group 2013
![Page 4: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/4.jpg)
Electricity from fossil fuels Spreader Beam: Siemens Energy 01
© SpanSet Group 2013
![Page 5: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/5.jpg)
Electricity from fossil fuels 300 ton Spreader Beam: MAN Turbo 01
© SpanSet Group 2013
![Page 6: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/6.jpg)
Electricity from fossil fuels Assembly tool 01
© SpanSet Group 2013
![Page 7: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/7.jpg)
Electricity from fossil fuels 70 ton Spreader Beam for Fuel Burners 01
© SpanSet Group 2013
![Page 8: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/8.jpg)
Electricity from fossil fuels 40 ton Spreader Beam 01
© SpanSet Group 2013
![Page 9: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/9.jpg)
Nuclear Energy 02
© SpanSet Group 2013
![Page 10: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/10.jpg)
02 Nuclear Energy 380 ton Assembly Spreader Beam “Olkiluoto”: Siemens Energy
© SpanSet Group 2013
![Page 11: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/11.jpg)
Assembly Spreader Beam “Olkiluoto”
–Siemens Energy
–Production Year 2008
–WLL 380 ton
–Suspension hydraulical driven under load
04
![Page 12: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/12.jpg)
Water Energy
03 Hydroelectric power station, Tidal power plant
© SpanSet Group 2013
![Page 13: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/13.jpg)
03 Water Energy Rodund II, Austria
© SpanSet Group 2013
![Page 14: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/14.jpg)
© SpanSet Group 2013
03 Water Energy Rodund II, Austria
![Page 15: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/15.jpg)
Assembly Spreader Beam “Rodund II, Austria”
–Voith Hydro
–Production Year 2011
–WLL 300 ton
–Very low dead weight
04
![Page 16: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/16.jpg)
Windenergy
04 Offshore und Onshore
© SpanSet Group 2013
![Page 17: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/17.jpg)
Offshore 04
![Page 18: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/18.jpg)
Windenergy
04 Offshore und Onshore
04 Windenergy Offshore: Construction
© SpanSet Group 2013
![Page 19: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/19.jpg)
Offshore
– Foundation
– Transport
– Construction: Nacelle
– Construction: Rotor head
04
![Page 20: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/20.jpg)
04 Windenergy Offshore: Production: Tripod
© SpanSet Group 2013
![Page 21: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/21.jpg)
04 Windenergy Offshore: Production: Tripod
![Page 22: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/22.jpg)
04 Windenergy Offshore: Production: Tripod
© SpanSet Group 2013
![Page 23: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/23.jpg)
Lifting Equipment Weserwind
–Weserwind
–Production Year 2011
–WLL 150 ton / 70 ton
–Handling of Tripods segments
–Handling of TP`s
04
![Page 24: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/24.jpg)
04 Windenergy Offshore: Foundation: Mono-Pile
© SpanSet Group 2013
![Page 25: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/25.jpg)
04 Windenergy Offshore: Construction: Piles
© SpanSet Group 2013
![Page 26: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/26.jpg)
Spreader Beam Pile Handling
–Bard, RWE, Fred Olsen
–WLL 700 ton / 500 ton / 300 ton
–Handling of Piles
–Length 35 m and 6 m
04
![Page 27: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/27.jpg)
Windenergy Offshore: Foundation: AXZION Spreaderbeam for Piles 04
© SpanSet Group 2013
![Page 28: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/28.jpg)
Windenergy Offshore: Foundation: AXZION Spreaderbeam for Piles 04
© SpanSet Group 2013
![Page 29: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/29.jpg)
© SpanSet-secutex GmbH
Windenergy Offshore: Foundation: AXZION Spreaderbeam for Piles 04
![Page 30: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/30.jpg)
© SpanSet-secutex GmbH
Windenergy Offshore: Foundation: AXZION Spreaderbeam for Piles 04
![Page 31: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/31.jpg)
© SpanSet-secutex GmbH
Windenergy Offshore: Foundation: AXZION Spreaderbeam for Piles 04
![Page 32: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/32.jpg)
© SpanSet-secutex GmbH
Windenergy Offshore: Foundation: AXZION Spreaderbeam for Piles 04
![Page 33: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/33.jpg)
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 34: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/34.jpg)
© SpanSet-secutex GmbH
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 35: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/35.jpg)
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 36: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/36.jpg)
Windenergy Offshore: Foundation: AXZION Uppending Tool 04
![Page 37: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/37.jpg)
Windenergy Offshore: Foundation: AXZION Uppending Tool 04
10:25 © SpanSet Group 2013
![Page 38: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/38.jpg)
10:27
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 39: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/39.jpg)
10:35
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 40: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/40.jpg)
10:39
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 41: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/41.jpg)
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 42: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/42.jpg)
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 43: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/43.jpg)
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 44: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/44.jpg)
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 45: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/45.jpg)
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 46: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/46.jpg)
Windenergy Offshore: Foundation: AXZION Uppending Tool 04
© SpanSet Group 2013
![Page 47: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/47.jpg)
04 Windenergy Offshore: Foundation: AXZION Uppending Tool:Loadtest
Proofload app. 1.470 ton © SpanSet Group 2013
![Page 48: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/48.jpg)
Windenergy Offshore: Foundation: AXZION Uppending Tool 04 04
Windenergy Offshore: Foundation: AXZION Uppending Tool: Loadtest
© SpanSet Group 2013
![Page 49: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/49.jpg)
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 50: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/50.jpg)
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 51: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/51.jpg)
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 52: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/52.jpg)
Windenergy Offshore: Foundation: AXZION Uppending Tool 04
© SpanSet Group 2013
![Page 53: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/53.jpg)
04 Windenergy Offshore: Foundation: AXZION Uppending Tool
© SpanSet Group 2013
![Page 54: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/54.jpg)
Pile Handling: Upending Tool + Hinge
–RWE Energy, Aarslef, Bilfinger
–WLL 200 ton / 1.000 ton
–Handling of Piles
© SpanSet-secutex GmbH
04
![Page 55: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/55.jpg)
04 Windenergy Offshore: Foundation: Jackets
© SpanSet Group 2013
![Page 56: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/56.jpg)
04 Windenergy Offshore: Foundation: Jackets
© SpanSet Group 2013
![Page 57: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/57.jpg)
04 Windenergy Offshore: Foundation: Jackets
© SpanSet Group 2013
![Page 58: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/58.jpg)
04 Windenergy Offshore: Foundation: Tripods
© SpanSet Group 2013
![Page 59: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/59.jpg)
04 Windenergy Offshore: Construction
© SpanSet Group 2013
![Page 60: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/60.jpg)
04 Windenergy Offshore: Tower
© SpanSet Group 2013
![Page 61: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/61.jpg)
04 Windenergy Offshore: Tower
© SpanSet Group 2013
![Page 62: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/62.jpg)
04 Windenergy Offshore: Nacelle
![Page 63: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/63.jpg)
04 Windenergy Offshore: Nacelle
© SpanSet Group 2013
![Page 64: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/64.jpg)
04 Windenergy Offshore: Nacelle
© SpanSet Group 2013
![Page 65: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/65.jpg)
Spreader Beam: Nacelle
–Bard, Fred Olsen, Repower, Areva
–Production Year 2011
–WLL 300 + 450 ton
–Handling of Nacelle
–Suspension adjustable, hydraulical driven
© SpanSet-secutex GmbH
04
![Page 66: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/66.jpg)
04 Windenergy Offshore: Construction: Rotor
![Page 67: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/67.jpg)
04 Windenergy Offshore: Construction: Rotor
![Page 68: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/68.jpg)
04 Windenergy Offshore: Construction: Rotor
![Page 69: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/69.jpg)
04 Windenergy Offshore: Construction: Rotor
© SpanSet Group 2013
![Page 70: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/70.jpg)
04 Windenergy Offshore: Construction: Rotor
© SpanSet Group 2013
![Page 71: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/71.jpg)
04 Windenergy Offshore: Construction: Rotor
© SpanSet Group 2013
![Page 72: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/72.jpg)
Onshore 04
![Page 73: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/73.jpg)
Onshore
– AXZION TAP
– AXZION VarioTAP
– Repowering-Set
– AXZION J-Hook
– Others
04
![Page 74: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/74.jpg)
04 Windenergy Onshore: Construction: Tower Attachement Point
© SpanSet Group 2013
![Page 75: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/75.jpg)
04 Windenergy Onshore: Construction: Tower Attachement Point
© SpanSet Group 2013
![Page 76: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/76.jpg)
TAP
– Pojects
Gamesa
Enercon
GE Wind
–Certification of the system together with
Lloyds Register
04
![Page 77: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/77.jpg)
Windenergy Onshore: Construction: Towerhandling 04
© SpanSet Group 2013
![Page 78: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/78.jpg)
Windenergy Onshore: Construction: AXZION VarioTAP 04
© SpanSet Group 2013
![Page 79: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/79.jpg)
NEW Vario-TAP
–WLL 25 ton / system 100 ton
–Flexible for all tower segments
–Repowering
–For construction teams
04
![Page 80: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/80.jpg)
Windenergy Onshore: Construction: Vario-TAP 04
© SpanSet Group 2013
![Page 81: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/81.jpg)
Windenergy Onshore: Construction: Vario-TAP 04
© SpanSet Group 2013
![Page 82: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/82.jpg)
04 Windenergy On- Offshore: Construction: Pulley
![Page 83: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/83.jpg)
Pulley with Rope or MagnumX Sling
–WLL 80 ton,120 ton, 200 ton
–Moveable tip
–Gamesa, Nordex, Areva
04
![Page 84: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/84.jpg)
Windenergy Onshore: Construction: Vario J-Hook 04
![Page 85: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/85.jpg)
NEW Vario-J-Hook (Patent bending)
–WLL 40 ton,60 ton, 70 ton, 120 ton
–Moveable tip
–No stress for the flanges
–Enercon, Vestas, Gamesa, Nordex, Areva
04
![Page 86: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/86.jpg)
04 Windenergy Onshore: Construction: VarioBeam
© SpanSet Group 2013
![Page 87: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/87.jpg)
Spreaderbeam for Single Blades
–WLL 12 ton, 20 ton, 35 ton
–Nordex, Repower, GE Wind, Samsung
04
![Page 88: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/88.jpg)
04 Windenergy On- Offshore: Transportation: Rotor Blades
![Page 89: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/89.jpg)
04 Windenergy On- Offshore: Transportation: Rotor Blades
© SpanSet Group 2013
![Page 90: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/90.jpg)
04 Windenergy On- Offshore: Transportation: Rotor Blades
© SpanSet Group 2013
![Page 91: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/91.jpg)
04 Windenergy On- Offshore: Transportation: Rotor Blades
© SpanSet Group 2013
![Page 92: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/92.jpg)
Windenergy On- Offshore: Transportation: Rotorblades
04
© SpanSet Group 2013
![Page 93: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/93.jpg)
© SpanSet-secutex GmbH
04 Windenergy On- Offshore: Transportation: Rotor Blades Windenergy On- Offshore: Transportation: Rotorblades
04
© SpanSet Group 2013
![Page 94: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/94.jpg)
Windenergy On- Offshore: Transportation: Rotor Blades Blades
–Repower, Nordex, Areva
–Tansportation of Rotorblades
04
![Page 95: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/95.jpg)
© SpanSet-secutex GmbH
Windenergy On- Offshore: Transportation: Rotor Blades
04
![Page 96: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/96.jpg)
04 Windenergy On- Offshore: Transportation: Rotor Blades
![Page 97: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/97.jpg)
04 Windenergy On- Offshore: Transportation: Rotor Blades
![Page 98: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/98.jpg)
Transport frame: Nacelle
–Repower
–Production Year 2010 - 2012
–WLL 350 ton
–Handling of Nacelle
04
![Page 99: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/99.jpg)
Windenergy High Safety
04
![Page 100: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/100.jpg)
Windenergy High Safety
04
© SpanSet Group 2013
![Page 101: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/101.jpg)
Windenergy High Safety
04
© SpanSet Group 2013
![Page 102: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/102.jpg)
Others 05
![Page 103: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/103.jpg)
Insurance Axzion-GKS
– Coverage Standard 15 Mio €
– Coverage Projects 25 Mio. €
05
![Page 104: Axzion GKS 2013 - 株式会社ルッドリフティングジャ … Beam Pile Handling –Bard, RWE, Fred Olsen –WLL 700 ton / 500 ton / 300 ton –Handling of Piles –Length 35](https://reader031.vdocuments.mx/reader031/viewer/2022012923/5ac0724f7f8b9aca388bed43/html5/thumbnails/104.jpg)
Thank you for watching!