Page 1: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Inc. June 6, 2011 | Slide 1

AWEA Windpower 2011

MV Wind Converter ProductsTop 10 Reasons

Page 2: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Inc. June 6, 2011 | Slide 2

Speaker name: Arnd BeckerSpeaker title: Business Development ManagerCompany name: ABB Inc.

In booth theater presentationsMV Wind Converter Products – Top 10 Reasons

Page 3: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Inc. June 6, 2011 | Slide 3

MV Wind Converter Products

Page 4: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Group June 6, 2011 | Slide 4

Top Reasons for MV Wind- Maximum Energy to the Grid

Typical efficiency for whole electrical drive train (DD with PMSG)

~98% converter efficiency incl. all auxiliaries & filters partial load efficiency >95% already at 10% of rated power

Best MTTR by remote access and special repair concept

Page 5: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Group June 6, 2011 | Slide 5

Top Reasons for MV Wind- Maximum Generator Control

Generator operation at optimum active and reactive power

Rotor positioning mode (on-site needed for service)

Generator test run (hall test needed for pre-heating, over-speed)

Total over-speed voltage suppression (field weakening)

Active drive train damping leads to lean design of mechanicaldrive train components

Page 6: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Group June 6, 2011 | Slide 6

Top Reasons for MV Wind- Easy cabling and lowest losses

Easy and quick cabling by the Pfisterer© P3 MV PLUG System

I2R losses significantly lower (>factor 20) compared to 690V system maximum system efficiency

Page 7: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Group June 6, 2011 | Slide 7

Top Reasons for MV Wind- Full Drive Train Decoupling

Full decoupling of mechanical turbine from the electrical grid

Power dissipation resistors for smooth FRT

Active drive train damping lean design of mechanical components

Page 8: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Group June 6, 2011 | Slide 8

Top Reasons for MV Wind- Full Grid Code Compliance

Integrated Statcom functionality

Three-level switching topology

Control algorithm harmonic elimination

Start & stop at zero breaker current

Immediate restart after grid failures

Page 9: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Group June 6, 2011 | Slide 9

Door interlock system connected to DC-link voltage

Remote operated generator breaker incl. manually operated grounding switch

Fuseless design for minimized replacement even after severe component failures firing through concept

Controlled short circuit current distribution incl. transformer design

Top Reasons for MV Wind- Advanced Safety and Repair Concept

Page 10: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Group June 6, 2011 | Slide 10

Top Reasons for MV Wind- AC 800PEC High End Controller

3-level control strategy

Integrated monitoring & diagnostic tools event-recorder

Operational flexibility by implemented thermal model of main components

Full remote access (to go on-site only once!)

Immediate restart after grid failureblack start capability

Very Fast Applications

(VHDL)

Fast Applications

(MATLAB/Simulink)

Slow Appllications

(ABB Control Builder)

CycleTime

1 ms

100us

25ns

TASK LEVEL

Very Fast Applications

(VHDL)

Fast Applications

(MATLAB/Simulink)

Slow Appllications

(ABB Control Builder)

CycleTime

1 ms

100us

25ns

TASK LEVEL

Page 11: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Group June 6, 2011 | Slide 11

Power modules, Cooling Unit, all filters, brake chopper (incl. resistor),generator breaker

Various layouts available: face-2-face, back-2-back, I-shape, T-shape

Electrical section in tower less tower head weight / smallerfoundation

Top Reasons for MV Wind- Modular Design - All on one Level

Page 12: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Group June 6, 2011 | Slide 12

Top Reasons for MV Wind- System Know-how and Global Footprint of ABB

Advanced protection concept includes transformer, switch gear and whole drive train concept

Inclusion of further components into scope of supply

Maximum customer support due to world-wide presence

Page 13: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Group June 6, 2011 | Slide 13

Top Reasons for MV Wind- Strong Service Organization

ABB Commissioner©: Remote access tool with advanced monitoring and component lifetime calculation assures that your service people know what happens on-site, at all times

Maximum serviceability by customer training concept, lifecycle management, and installed base management

Page 14: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System

© ABB Group June 6, 2011 | Slide 14

PCS 6000 – Maximum Energy to the Grid

grid filter

PM Gen

dv/dt filter Generator-side converter Grid-side converter

DC link with voltage limiting

unitBreaker

Pre-charging UnitAux. Equipment

(heaters, fans, …) Cooling Unit

M

M

Converter Controller

Turbine Braking Resistor

AC 800 PEC S800 I/OVery Fast I/O

Wind

Par

k Grid

Industrial PC

PCS 6000 MV Full-Power ConverterPrinciple single line diagram

Water Cooling Unit

dv/dt-Filter

Gen.-SideConverter

DC-Link,Chopper

Grid-SideConverter

Grid Filter

Main components:

Optional components:

Generator-breaker

Soft-start unit, anti-condens.

function

Extended resistors for smooth FRT

Page 15: AWEA Windpower 2011 MV Wind Converter …...June 6, 2011 | Slide 6 Top Reasons for MV Wind - Easy cabling and lowest losses Easy and quick cabling by the Pfisterer© P3 MV PLUG System