avida tower bgc 34th as of mar 19, 2013
TRANSCRIPT
Happy to be Home!
34th Street cor 11th Avenue and Lane T, North Bonifacio Global City, Taguig
Vicinity MapVicinity Map
Building PerspectiveBuilding Perspective
34th STREET
Lane - T
11T
H A
VE
NU
E
PE
DE
ST
RIA
N A
LL
EY
PARKPARK
Site Development PlanSite Development Plan
Tower 230 Residential
Levels
Tower 230 Residential
Levels
Tower 130 Residential
Levels
Tower 130 Residential
Levels
Ground LevelGround Level
4 Podium Levels
4 Podium Levels
Ground Level•15 Retail Units•16 Retail Parking Units•Residential Parking Units
Ground Level•15 Retail Units•16 Retail Parking Units•Residential Parking Units
4 Podium Levels•Residential Parking Units•15 Drive-Up Units (Tower2)•Amenity Area on Podium Level (6th Floor)
4 Podium Levels•Residential Parking Units•15 Drive-Up Units (Tower2)•Amenity Area on Podium Level (6th Floor)
Residential Levels•Tower 1 – 652 Units•Tower 2 – 682 Units
Residential Levels•Tower 1 – 652 Units•Tower 2 – 682 Units
The MasterplanThe Masterplan
ClubhouseAdult Swimming PoolKiddie PoolLapping PoolOpen LawnPlay AreaOutdoor Gym EquipmentIndoor GardenReflection Pond
Community and Building AmenitiesCommunity and Building Amenities
Main LobbyMailbox for each unit3 elevator Units per TowerAdequate Emergency PowerFire Protection/Alarm SystemTelephone and Cable ProvisionsInternet (Wi-Fi) Ready (within the amenity area)
Community and Building AmenitiesCommunity and Building Amenities
TYPE UNITS/FLOOR
1BR 18
2BR 5
Total 23
1 Bedroom1 Bedroom
36.75 to 40.68 sqm.36.75 to 40.68 sqm.
2 Bedroom2 Bedroom
60.69 to 62.61 sqm.60.69 to 62.61 sqm.
1BR Parkview Units1BR Parkview Units1BR Parkview Units1BR Parkview Units
53.89 sqm53.89 sqm
2BR Parkview Units2BR Parkview Units2BR Parkview Units2BR Parkview Units
93.18 sqm93.18 sqm
Penthouse Floor Plan (Loft Units)Penthouse Floor Plan (Loft Units)TYPE Area Range
UNITS/ FLOOR
2BR Loft 77.97 – 78.35 sqm 10
3BR Loft 108.23 – 117.46 sqm 3
2BR Loft Lay-out2BR Loft Lay-out
Disclaimer: The particulars, details & visuals shown herein are intended to give a general idea of the project & as such are not to be relied upon as statements of fact. While such particulars & details on present plans have been prepared w/ utmost care & given in good faith, buyers are invited to verify their factual correctness & subsequent changes, if any. The contents herein are subject to change w/o prior notice & do not constitute part of an offer or contract.Training use only (KS 11-1-09
Completion Date Turn Over
Tower 1 October 2015 Q1 2016
Tower 2 September 2016 Q4 2016