aviation information systems

18
ISD we make IT happen Aviation Information Systems 24 September 2002

Upload: satya

Post on 06-Jan-2016

32 views

Category:

Documents


1 download

DESCRIPTION

Aviation Information Systems. 24 September 2002. ISD’s Core Products. ALMIS AMMIS (Aviation Maintenance Management Information System) ACMS (Aircraft Computerized Management System) EAL (Electronic Aircraft Logbook) Decision Support System (DSS) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Aviation Information Systems

ISDwe make IT happen

Aviation Information Systems

24 September 2002

Page 2: Aviation Information Systems

ISDwe make IT happen

ISD’s Core Products

ALMIS– AMMIS (Aviation Maintenance Management

Information System)– ACMS (Aircraft Computerized Management System)– EAL (Electronic Aircraft Logbook)– Decision Support System (DSS)

ATIMS (Aviation Technical Information Management System)

ARSC Website General Information Technology Support

Page 3: Aviation Information Systems

ISDwe make IT happen

ALMIS AC&I Project

Four ALMIS Project goals– Provide source data entry– Integrate legacy systems– Improve decision support– Improve external system integration

Page 4: Aviation Information Systems

ISDwe make IT happen

ALMIS AC&I Project – EAL

Phase 1 – Flight Schedule, Event Status, Aircraft Status

Phase 2 – Blue Sheet Phase 3 – Yellow and Pink Sheet Phase 4 – MPC / Supply integration Phase 5 –MPC signoff online Phase 6 – ACMS interface replacement

Page 5: Aviation Information Systems

ISDwe make IT happen

ALMIS AC&I Project – DSS

Phase 1 – Aviation Inventory Control Point Phase 2 – Reliability Centered Maintenance Phase 3 – Flight Operations Phase 4 – Finance and Procurement Phase 5 – Unit Maintenance Phase 6 – Depot Supply Phase 7 – Depot Maintenance

Page 6: Aviation Information Systems

ISDwe make IT happen

ALMIS Status

ALMISDatabase

ACMS Application

WSIIIprinters

EALApplication

Limitedprinters

ACMS GUIApplication

AMMIS Application

DSSApplication

Non-Std WS

ALMIS PortalWSIII WSIII

Page 7: Aviation Information Systems

ISDwe make IT happen

EAL Beta Sites

Electronic Aircraft Logbook • Flight Schedule, Event & Aircraft Status• Blue Sheet Implemented Jan 2002• Yellow/Pink Sheet Implemented by Jan 2003

Page 8: Aviation Information Systems

ISDwe make IT happen

ALMIS Evolution

ALMISDatabase

WSIIIprinters

EALBusiness Logic

DSSApplication

Non-Std WS

ALMIS Presentation Logic WSIII

ACMS GUIBusiness Logic

AMMISBusiness Logic

ACMS Business Logic

WSIIIprinters

Page 9: Aviation Information Systems

ISDwe make IT happen

ALMIS Portal

Page 10: Aviation Information Systems

ISDwe make IT happen

EAL

Page 11: Aviation Information Systems

ISDwe make IT happen

DSS

Page 12: Aviation Information Systems

ISDwe make IT happen

ALLDATA

Page 13: Aviation Information Systems

ISDwe make IT happen

ATIMS

Definitive-Synchronized

Delivery Mechanism

Centralized Content

Management

Decentralized Content Creation

Data Repository

Oracle

Arbortext

ProEngineer

ME10

Tech Illustrator

Corel Draw

Interleaf

Arbortextwith Extensions

Print

CDROM

Web

Page 14: Aviation Information Systems

ISDwe make IT happen

ARSC Website

Manage ARSC administrative information Educate personnel on aviation program /

processes Host ATTC training materials Manage static legacy information

Page 15: Aviation Information Systems

ISDwe make IT happen

Information Technology Focus

Complete security certifications Upgrade information technology hardware Complete deployment of Electronic Aircraft

Logbook Complete Decision Support System Complete MPC content management upgrade Implement systems into processes and

pipelines

Page 16: Aviation Information Systems

ISDwe make IT happen

How can you help?

Recognize that these are your information systems

Make sure someone in Engineering becomes local expert

Learn how system can help you serve your people better

Give us your feedback / suggestions for improvement

Consider ROI for recommended changes Smart folks like you will make a difference

Page 17: Aviation Information Systems

PVCS Tracker

HEAT Status Sequence

(1) Open (4) Reopened(2) WIP(3) Closed

HEAT Status Sequence

(1) Open (4) Reopened(2) WIP(3) Closed

PVCS Status Sequence

(1) Unassigned

(2) Analysis(3) CCB (10) On-Hold(4) Assigned(5) WIP (11) Return(6) Review (7) In QA (8) In Stage (9) Closed

Checklists

(a) Requirement(b) Development Worksheet(c) Peer Review (d) Functional Test(e) Integration Test(f) Staging

PVCS Status Sequence

(1) Unassigned

(2) Analysis(3) CCB (10) On-Hold(4) Assigned(5) WIP (11) Return(6) Review (7) In QA (8) In Stage (9) Closed

Checklists

(a) Requirement(b) Development Worksheet(c) Peer Review (d) Functional Test(e) Integration Test(f) Staging

A (3)

A

User Requirement

Support

Initial Entry (1) (a)

Initial Analysis

(2)CCB Action

(3) (10)

Work Plan Assignment

(4)

Development (5) (b) (11)

Peer Review (6) (c)

CMCheck-In

(c)

Build VDD

Functional Test

(7) (d)

Integration Test(e)

Production Ready

Acceptance Test(8) (f)

Close Out(9) (f)Production

Initial Entry (1) (4)

Analysis(2)

Support Process

Work Execution(2)

Close Out(3)

Development

QA

Staging

Production

Yes

Figure 1

Key Business Processes Service and Support

HEAT

Service

Page 18: Aviation Information Systems

ISDwe make IT happen

Demonstration?

Questions?