PRESUPUESTO DE OBRA CASA INTERES SOCIAL

CONCEPTO

1 CIMENTACION

2 OBRA NEGRA

3 INSTALACIONES

4 OBRA GRIS

5 ACABADOS

6 HERRERIA

7 CARPINTERIA

8 MUEBLES DE PLOMERIA Y ACCESORIOS

CASA UBICADA EN FRACC. SAN ISIDRO TERRENO 8 X 16 MTS (128 M2) SALA, COMEDOR COCINA, BAÑO, PATIO DE SERVICIO COCHERA DOS CARROS (63 M2 DE CONSTRUCCION)

Page 2: Avances de Obra 22

PRESUPUESTO DE OBRA CASA INTERES SOCIAL

TOTAL

$ 54,366.15

$ 158,430.61

$ 16,000.00

$ 35,224.85

$ 23,000.00

$ 9,600.00

$ 7,200.00

$ 5,562.00

SIN IVA $ 309,383.60

CON IVA $ 358,884.98

CASA UBICADA EN FRACC. SAN ISIDRO TERRENO 8 X 16 MTS (128 M2) SALA, COMEDOR COCINA, BAÑO, PATIO DE SERVICIO COCHERA DOS CARROS (63 M2 DE CONSTRUCCION)

Page 3: Avances de Obra 22

PRESUPUESTO

1 CIMENTACIONCONCEPTO UNIDAD CANTIDAD

1 BODEGA PROVISIONAL PZA 1

1.1 M3 13

1.2 ELABORACION DE 1M2 DE PLANTILA M2 45

1.3 M3 20

1.4 PZA 20

1.5 RELLENO M3 60

2 OBRA NEGRACONCEPTO UNIDAD CANTIDAD

2.1 ML 0

2.1.1 IMPERMEABILIZANTE DE DALA ML 44.95

2.2 M2 0.38

2.3 ML 0

2.4 ML 45

2.5 COMPACTACION Y NIVELACION M3 24

2.6 M2 63

2.7 M2 65

2.8 M2 20.00

3 INSTALACIONESCONCEPTO UNIDAD CANTIDAD

3.1 ELECTRICA LOTE 13.2 HIDRAULICA LOTE 13.3 SANITARIA LOTE 13.4 GAS LOTE 13.5 ESPECIALES LOTE 1

4 OBRA GRIS

CASA UBICADA EN FRACC SAN ISIDRO TERRENO 8 X 16 MTS (128 M2) SALA, COMEDOR COCINA, BAÑO, PATIO DE SERVICIO COCHERA DOS CARROS. 63 M2 DE

CONSTRUCCION

EXCAVACION Y AFINE DE CEPA DE CIMENTACION, POR MEDIO MANUAL EN TERRENO SEMI-DURO.

ELABORACION DE 1M3 DE CIMENTACION DE MAMPOSTERIA, SENTADA CON MORTERO-ARENA 1:5

ANCLAJE DE CASTILLOS ARMEX 15 X 15 X 4, CON CONCRETO F'C=150 HECHO EN OBRA.

DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5.

DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X15X4.

ELABORACION DE 1 M2 DE FIRME DE CONCRETO F'C=100KG/CM2 DE 8 CMS DE ESPESOR.

ELABORACION DE 1 M2 DE LOSA DE CONCRETO F'C=200 KG/CM2, T. M. A. 3/4", HECHO EN OBRA, ARMADA CON ACERO DE 3/8" @ 26 CMS EN AMBOS SENTIDOS, EL ESPESOR ES DE 12 CMS. INCLUYE CIMBRADO, ARMADO Y COLADO

MURO DE LADRILLO PARA PRETIL SENTADO CON MORTERO CEMENTO ARENA 1: 5.

Page 4: Avances de Obra 22

CONCEPTO UNIDAD CANTIDAD4.1 IMPERBEABILIZANTE O MACETEADO M2 654.2 BASE PARA TINACO PZA 1

4.3 M2 160

4.4 M2 160

4.5 M3 65

5 ACABADOSCONCEPTO UNIDAD CANTIDAD

5.1 M2 63

5.2 ELABORACION DE 1 ML DE ZOCLO DE VITROPISO. ML

5.3 M2 16

5.4 M2 225

6 HERRERIACONCEPTO UNIDAD CANTIDAD

6.1 PZA 1

6.2 PZA 1

6.3 PZA 3

6.4 PZA 1

6.5 PZA 1

7 CARPINTERIACONCEPTO UNIDAD CANTIDAD

7.1 PZA 2

7.2 PZA 1

REPELLADO DE MORTERO 1:5 , REGLEADO, Y PLOMEADO DE 2 CM DE ESPESOR.INCLUYE AMBOS LADOS DE LA BARDA Y BOQUILLA

ELABORACION DE 1 M2 DE APLANADO HECHO CON CEMENTO-CAL-ARCILLA PROP. 1:2:6 , DE 2 CMA. DE

ESPESOR, PLOMEADO Y NIVELADO

ELABORACION DE 1 M2 DE APLANADO HECHO CON PASTA DE YESO DE 2 CM DE ESPESOR, PLOMEADO Y NIVELADO

ELABORACION DE 1 M2 DE PISO CERAMICO 30 X 30 CMS O CEMENTO PULIDO POR DEFINIR

ELABORACION DE 1 M2 DE VITROMURO O CEMENTO PULIDO AUN POR DEFINIR

ELABORACION DE 1 M2 DE PINTURA DIVERSOS ACABADOS

PUERTA PRINCIPAL METALICA DE 2 TABLEROS Y MARCO RIGIDO; MEDIDAS 1.10 DE ANCHO POR 2.10 DE ALTO. INLCUYE CHAPA Y PINTURA

PUERTA TRASERA METALICA DE 1 TABLERO METALICO Y UN TABLERO DE CRISTAL MARCO RIGIDO; MEDIDAS 1 M DE ANCHO POR 2.10 M DE ALTO. INLCUYE CHAPA Y PINTURA

VENTANA TIPO 1: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS 1.20M X 1.20 M INCLUYE MOSQUITERO,PINTURA Y PROTECCION

VENTANA TIPO 2: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS 1.35 M DE ANCHO X 1.20 M DE ALTO INCLUYE MOSQUITERO,PINTURA Y PROTECCION

VENTANA TIPO 3: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS .60 M DE ANCHO X .50 M DE ALTO INCLUYE MOSQUITERO,PINTURA Y PROTECCION

PUERTA TIPO 1 PARA RECAMARAS. DE TAMBOR MADERA DE PINO; MEDIDAS 1.00 DE ANCHO POR 2.10 DE ALTO. INLCUYE MARCO, CHAPA, PINTURA E INSTALACION

PUERTA TIPO 2 PARA BAÑO. DE TAMBOR MADERA DE PINO; MEDIDAS .80 M DE ANCHO POR 2.10 DE ALTO. INLCUYE MARCO, CHAPA, PINTURA E INSTALACION

Page 5: Avances de Obra 22

8 MUEBLES DE PLOMERIA Y ACCESORIOSCONCEPTO UNIDAD CANTIDAD

8.1 PZA 1

8.2 KIT DE INSTALACION PARA FREGADERO PZA 18.3 LAVADERO

8.4 BOYLER PZA 18.5 KIT DE LAVABO Y TASA INCLUYE ACCESORIOS PZA 1

FREGADERO DE ACERO INOXIDABLE MARCA EB ESCURRIDOR DERECHO DE 52 X 80

Page 6: Avances de Obra 22

PRESUPUESTO

PRESU REAL PRESU 1 CEMENTO $ 28,356.85 $23,125.00 $15,639.00 TRAZO Y BODEGA

P.U. TOTAL $ 4,000.00 $ 4,000.00 $ 4,000.00

$ 92.94 $ 1,208.24 $ 525.00 1.5 HORAS

$ 70.50 $ 3,172.61 $ 1,500.00

$ 752.84 $ 15,056.86 $13,000.00

$ 95.96 $ 1,919.15 $ 2,000.00

$ 100.00 $ 3,000.00 $ 2,100.00

$ 41,414.29 P.U. TOTAL

$130.68 $ -

$8.00 $ 359.60

$ 117.60 $ 44.90

$130.68 $ -

$130.68 $ 5,880.66

$31.77 $ 762.50

$107.58 $ 6,777.55

$388.26 $ 25,237.03

$ 117.60 $ 2,352.06

$ 16,000.00 P.U. TOTAL

$3,000.00 $ 3,000.00 $3,000.00 $ 3,000.00 $3,000.00 $ 3,000.00 $3,000.00 $ 3,000.00 $3,000.00 $ 3,000.00

$ 28,365.09

CASA UBICADA EN FRACC SAN ISIDRO TERRENO 8 X 16 MTS (128 M2) SALA, COMEDOR COCINA, BAÑO, PATIO DE SERVICIO COCHERA DOS CARROS. 63 M2 DE

Page 7: Avances de Obra 22

P.U. TOTAL $ 100.00 $ 6,500.00 $ 1,500.00 $ 1,500.00

$ 53.65 $ 8,584.80

$ 52.03 $ 8,324.79

$ 53.16 $ 3,455.51

$ 16,005.00 P.U. TOTAL

$120.00 $ 7,560.00

$50.00

$120.00 $ 1,920.00

$29.00 $ 6,525.00

$ 9,600.00 P.U. TOTAL

$1,500.00 $ 1,500.00

$1,300.00 $ 1,300.00

$1,500.00 $ 4,500.00

$1,700.00 $ 1,700.00

$600.00 $ 600.00

$ 3,800.00 P.U. TOTAL

$1,300.00 $ 2,600.00

$1,200.00 $ 1,200.00

Page 8: Avances de Obra 22

$ 5,562.00 P.U. TOTAL

$769.00 $ 769.00

$393.00 $ 393.00 $ -

$1,400.00 $ 1,400.00 $3,000.00 $ 3,000.00

SIN IVA $149,103.24 CON IVA $172,959.76

Page 9: Avances de Obra 22

MORTERO ARENA GRAVA PIEDRA

13 4130

Page 10: Avances de Obra 22

PRESUPUESTO

CASA BURGOS AGUILAR

1 CIMENTACIONCONCEPTO UNIDAD CANTIDAD

1 BODEGA PROVISIONAL PZA 1TRAZO Y IVELACION M2 135

1.1 M3 37.48

1.2 ELABORACION DE 1M2 DE PLANTILA M2

1.3 M3 33

ELABORACION DE ZAPATA PZA 14

1.4 PZA 20

1.5 RELLENO Y COMPACTACION M3 56

2 OBRA NEGRACONCEPTO UNIDAD CANTIDAD

2.1 ML 100

2.2 M2 280.00

2.3 ML 100

2.4 ML 50

2.5 COMPACTACION Y NIVELACION M3 108

2.6 M2 108

2.7 M2 108

2.8 M2

3 INSTALACIONESCONCEPTO UNIDAD CANTIDAD

3.1 ELECTRICA LOTE 13.2 HIDRAULICA LOTE 13.3 SANITARIA LOTE 13.4 GAS LOTE 13.5 ESPECIALES LOTE 1

EXCAVACION Y AFINE DE CEPA DE CIMENTACION, POR MEDIO MANUAL EN TERRENO SEMI-DURO.

ELABORACION DE 1M3 DE CIMENTACION DE MAMPOSTERIA, SENTADA CON MORTERO-ARENA 1:5

ANCLAJE DE CASTILLOS ARMEX 15 X 15 X 4, CON CONCRETO F'C=150 HECHO EN OBRA.

DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5.

DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X15X4.

ELABORACION DE 1 M2 DE FIRME DE CONCRETO F'C=100KG/CM2 DE 8 CMS DE ESPESOR.

ELABORACION DE 1 M2 DE LOSA DE CONCRETO F'C=200 KG/CM2, T. M. A. 3/4", HECHO EN OBRA, ARMADA CON ACERO DE 3/8" @ 26 CMS EN AMBOS SENTIDOS, EL ESPESOR ES DE 12 CMS. INCLUYE CIMBRADO, ARMADO Y COLADO

MURO DE LADRILLO PARA PRETIL SENTADO CON MORTERO CEMENTO ARENA 1: 5.

Page 11: Avances de Obra 22

4 OBRA GRISCONCEPTO UNIDAD CANTIDAD

4.1 IMPERBEABILIZANTE O MACETEADO M24.2 BASE PARA TINACO PZA

4.3 M2 280

4.4 M2

4.5 M3 380

5 ACABADOSCONCEPTO UNIDAD CANTIDAD

5.1 M2 108

5.2 ELABORACION DE 1 ML DE ZOCLO DE VITROPISO. ML

5.3 M2 16

5.4 M2 280

6 HERRERIACONCEPTO UNIDAD CANTIDAD

6.1 PZA 1

6.2 PZA 1

6.3 PZA 3

6.4 PZA 1

6.5 PZA 1

7 CARPINTERIACONCEPTO UNIDAD CANTIDAD

7.1 PZA 4

REPELLADO DE MORTERO 1:5 , REGLEADO, Y PLOMEADO DE 2 CM DE ESPESOR.INCLUYE AMBOS LADOS DE LA BARDA Y BOQUILLA

ELABORACION DE 1 M2 DE APLANADO HECHO CON CEMENTO-CAL-ARCILLA PROP. 1:2:6 , DE 2 CMA. DE

ESPESOR, PLOMEADO Y NIVELADO

ELABORACION DE 1 M2 DE APLANADO HECHO CON PASTA DE YESO DE 2 CM DE ESPESOR, PLOMEADO Y NIVELADO

ELABORACION DE 1 M2 DE PISO CERAMICO 30 X 30 CMS O CEMENTO PULIDO POR DEFINIR

ELABORACION DE 1 M2 DE VITROMURO O CEMENTO PULIDO AUN POR DEFINIR

ELABORACION DE 1 M2 DE PINTURA DIVERSOS ACABADOS

PUERTA PRINCIPAL METALICA DE 2 TABLEROS Y MARCO RIGIDO; MEDIDAS 1.10 DE ANCHO POR 2.10 DE ALTO. INLCUYE CHAPA Y PINTURA

PUERTA TRASERA METALICA DE 1 TABLERO METALICO Y UN TABLERO DE CRISTAL MARCO RIGIDO; MEDIDAS 1 M DE ANCHO POR 2.10 M DE ALTO. INLCUYE CHAPA Y PINTURA

VENTANA TIPO 1: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS 1.20M X 1.20 M INCLUYE MOSQUITERO,PINTURA Y PROTECCION

VENTANA TIPO 2: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS 1.35 M DE ANCHO X 1.20 M DE ALTO INCLUYE MOSQUITERO,PINTURA Y PROTECCION

VENTANA TIPO 3: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS .60 M DE ANCHO X .50 M DE ALTO INCLUYE MOSQUITERO,PINTURA Y PROTECCION

PUERTA TIPO 1 PARA RECAMARAS. DE TAMBOR MADERA DE PINO; MEDIDAS 1.00 DE ANCHO POR 2.10 DE ALTO. INLCUYE MARCO, CHAPA, PINTURA E INSTALACION

Page 12: Avances de Obra 22

8 MUEBLES DE PLOMERIA Y ACCESORIOSCONCEPTO UNIDAD CANTIDAD

8.1 PZA 1

8.2 KIT DE INSTALACION PARA FREGADERO PZA 18.3 LAVADERO

8.4 BOYLER PZA 18.5 KIT DE LAVABO Y TASA INCLUYE ACCESORIOS PZA 1

FREGADERO DE ACERO INOXIDABLE MARCA EB ESCURRIDOR DERECHO DE 52 X 80

Page 13: Avances de Obra 22

PRESUPUESTO

CASA BURGOS AGUILAR

$ 54,366.15 P.U. TOTAL

$ 2,202.00 $ 2,202.00 $ 8.20 $ 1,107.00

$ 123.00 $ 4,610.04

$ 70.50 $ -

$ 543.00 $ 17,919.00

$ 1,410.00 $ 19,740.00

$ 95.96 $ 1,919.15

$ 122.66 $ 6,868.96

$158,430.61 P.U. TOTAL

$130.68 $ 13,068.12

$ 117.60 $ 32,928.80

$130.68 $ 13,068.12

$130.68 $ 6,534.06

$31.77 $ 3,431.24

$107.58 $ 11,618.66

$720.20 $ 77,781.60

$ 117.60 $ -

$ 16,000.00 P.U. TOTAL

$3,000.00 $ 3,000.00 $3,000.00 $ 3,000.00 $3,000.00 $ 3,000.00 $3,000.00 $ 3,000.00 $3,000.00 $ 3,000.00

Page 14: Avances de Obra 22

$ 35,224.85 P.U. TOTAL

$ 100.00 $ - $ 1,500.00 $ -

$ 53.65 $ 15,023.39

$ 52.03 $ -

$ 53.16 $ 20,201.45

$ 23,000.00 P.U. TOTAL

$120.00 $ 12,960.00

$50.00

$120.00 $ 1,920.00

$29.00 $ 8,120.00

$ 9,600.00 P.U. TOTAL

$1,500.00 $ 1,500.00

$1,300.00 $ 1,300.00

$1,500.00 $ 4,500.00

$1,700.00 $ 1,700.00

$600.00 $ 600.00

$ 7,200.00 P.U. TOTAL

$1,800.00 $ 7,200.00

Page 15: Avances de Obra 22

$ 5,562.00 P.U. TOTAL

$769.00 $ 769.00

$393.00 $ 393.00 $ -

$1,400.00 $ 1,400.00 $3,000.00 $ 3,000.00

SIN IVA $309,383.60 CON IVA $358,884.98

Page 16: Avances de Obra 22

INSUMO PROVEEDOR

FERRETERO FERRETERA RODO

MATERIALES PEDRO CALDERAHERRERIA PANCHO HERRERIACARPINTERIA CESAR GAMBOAINSTALACIONES CRISO

Page 17: Avances de Obra 22

DIRECCION

1305350

6188390895SAN CARLOS 6181279931

TELEFONOZACATECAS 312 , MORGA , C.P

34010 , DURANGO , DGO

Page 18: Avances de Obra 22

1 CIMENTACION

CONCEPTO UNIDAD CANTIDAD

1.1 M3 37.48

1.2 ELABORACION DE 1M2 DE PLANTILA M2 128.41

1.3 M3 12.04

1.4 PZA 32

$ 25,869.50

2 OBRA NEGRA

CONCEPTO UNIDAD CANTIDAD

2.1 ML 89.17

2.2 M2 156.38

2.3 ML 89.17

2.4 ML 98

2.5 COMPACTACION Y NIVELACION M3 24

2.6 M2 102.29

2.7 M2 154.73

2.8 M2 20.00

EXCAVACION Y AFINE DE CEPA DE CIMENTACION, POR MEDIO MANUAL EN TERRENO SEMI-DURO.

ELABORACION DE 1M3 DE CIMENTACION DE MAMPOSTERIA, SENTADA CON MORTERO-ARENA 1:5

ANCLAJE DE CASTILLOS ARMEX 15 X 15 X 4, CON CONCRETO F'C=150 HECHO EN OBRA.

DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X15X4.

MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5.

DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X15X4.

ELABORACION DE 1 M2 DE FIRME DE CONCRETO F'C=100KG/CM2 DE 8 CMS DE ESPESOR.

ELABORACION DE 1 M2 DE LOSA DE CONCRETO F'C=200 KG/CM2, T. M. A. 3/4", HECHO EN OBRA, ARMADA CON ACERO DE 3/8" @ 26 CMS EN AMBOS SENTIDOS, EL ESPESOR ES DE 12 CMS. INCLUYE CIMBRADO, ARMADO Y COLADO

MURO DE LADRILLO PARA PRETIL SENTADO CON MORTERO CEMENTO ARENA 1: 5.

Page 19: Avances de Obra 22

3 INSTALACIONESCONCEPTO UNIDAD CANTIDAD

3.1 ELECTRICA LOTE 13.2 HIDRAULICA LOTE 13.3 SANITARIA LOTE 13.4 GAS LOTE 13.5 ESPECIALES LOTE 1

4 OBRA GRISCONCEPTO UNIDAD CANTIDAD

4.1 IMPERBEABILIZANTE O MACETEADO M2 154.734.2 BASE PARA TINACO PZA 1

4.3 M2 99.042

4.4 M2 160

4.5 M3 7.2

5 ACABADOSCONCEPTO UNIDAD CANTIDAD

5.1 M2 63

5.2 ELABORACION DE 1 ML DE ZOCLO DE VITROPISO. ML

5.3 M2 16

5.4 M2 225

6 HERRERIACONCEPTO UNIDAD CANTIDAD

6.1 PZA 1

6.2 PZA 1

6.3 PZA 3

6.4 PZA 1

6.5 PZA 1

ELABORACION DE 1 M2 DE APLANADO HECHO CON MORTERO CEMENTO-ARENA A 2 CM DE ESPESOR

ELABORACION DE 1 M2 DE APLANADO HECHO CON CEMENTO-CAL-ARCILLA PROP. 1:2:6 , DE 2 CMA. DE

ESPESOR, PLOMEADO Y NIVELADO

ELABORACION DE 1 M2 DE APLANADO HECHO CON PASTA DE YESO DE 2 CM DE ESPESOR, PLOMEADO Y NIVELADO

ELABORACION DE 1 M2 DE PISO CERAMICO 30 X 30 CMS O CEMENTO PULIDO POR DEFINIR

ELABORACION DE 1 M2 DE VITROMURO O CEMENTO PULIDO AUN POR DEFINIR

ELABORACION DE 1 M2 DE PINTURA DIVERSOS ACABADOS

PUERTA PRINCIPAL METALICA DE 2 TABLEROS Y MARCO RIGIDO; MEDIDAS 1.10 DE ANCHO POR 2.10 DE ALTO. INLCUYE CHAPA Y PINTURA

PUERTA TRASERA METALICA DE 1 TABLERO METALICO Y UN TABLERO DE CRISTAL MARCO RIGIDO; MEDIDAS 1 M DE ANCHO POR 2.10 M DE ALTO. INLCUYE CHAPA Y PINTURA

VENTANA TIPO 1: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS 1.20M X 1.20 M INCLUYE MOSQUITERO,PINTURA Y PROTECCION

VENTANA TIPO 2: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS 1.35 M DE ANCHO X 1.20 M DE ALTO INCLUYE MOSQUITERO,PINTURA Y PROTECCION

VENTANA TIPO 3: PERFILES METALICOS PANEL CORREDIZO, MEDIDAS .60 M DE ANCHO X .50 M DE ALTO INCLUYE MOSQUITERO,PINTURA Y PROTECCION

Page 20: Avances de Obra 22

7 CARPINTERIACONCEPTO UNIDAD CANTIDAD

7.1 PZA 2

7.2 PZA 1

8 MUEBLES DE PLOMERIA Y ACCESORIOSCONCEPTO UNIDAD CANTIDAD

8.1 PZA 1

8.2 KIT DE INSTALACION PARA FREGADERO PZA 18.3 LAVADERO

8.4 BOYLER PZA 18.5 KIT DE LAVABO Y TASA INCLUYE ACCESORIOS PZA 1

PUERTA TIPO 1 PARA RECAMARAS. DE TAMBOR MADERA DE PINO; MEDIDAS 1.00 DE ANCHO POR 2.10 DE ALTO. INLCUYE MARCO, CHAPA, PINTURA E INSTALACION

PUERTA TIPO 2 PARA BAÑO. DE TAMBOR MADERA DE PINO; MEDIDAS .80 M DE ANCHO POR 2.10 DE ALTO. INLCUYE MARCO, CHAPA, PINTURA E INSTALACION

FREGADERO DE ACERO INOXIDABLE MARCA EB ESCURRIDOR DERECHO DE 52 X 80

Page 21: Avances de Obra 22

$ 10,779.37

P.U. TOTAL MANO DE OBRA PIE

DR

A

AR

EN

A

GR

AV

A

CE

ME

NT

O

PU TOTAL

$92.94 $3,482.64

$ 32.99 $ 4,236.25 $ 37.52 $ 4,817.36 3.08 4.19 1.60

$ 402.16 $ 4,842.01 $ 350.70 $ 4,222.43 16.01 4.49

$ 53.16 $ 1,701.12 $ 42.79 $ 1,369.37 2.30 3.22 1.55

16.01 9.87 7.41 3.15 $ 619.58 $13,891.81 $ 1,937.60 $ 1,095.79 $ 822.21 $ 5,707.94

$ 67,031.43

P.U. TOTAL MANO DE OBRA PIE

DR

A

AR

EN

A

GR

AV

A

CE

ME

NT

O

$80.51 $ 7,179.08 $ 50.17 $ 4,474.03 1.28 1.79 0.86

$65.00 $ 10,164.70 $ 52.60 $ 8,225.86 11.46

$80.51 $ 7,179.08 $ 52.60 $ 4,690.34 1.28 1.79 0.86

$80.51 $ 7,889.98 $ 50.17 $ 4,917.07 1.28 1.79 0.86

$31.77 $ 762.50 $ 31.77 $ 762.50

$54.98 $ 5,623.90 $ 52.60 $ 5,380.63 4.09 5.56 2.13

$167.26 $ 25,880.14 $ 221.00 $34,195.82 8.73 12.07 6.59

$117.60 $ 2,352.06 $ 52.60 $ 1,052.03 1.47

29.60 23.01 11.31

Page 22: Avances de Obra 22

$63,698.29 $ 3,285.08 $ 2,554.16 ###

P.U TOTAL MANO DE OBRA

$16.02 $1,586.65 $35.57 $3,522.92 $2.46

Page 23: Avances de Obra 22

MO

RT

ER

O T

ON

AR

ME

X M

L1

5 1

5

AG

UA

1.12

53.121.12 53.12

$ 1,635.68 $ 778.48 $11,977.69

MO

RT

ER

O T

ON

AR

ME

X M

L1

5 1

5

LA

DR

ILL

O (

MIL

AR

)

VA

RIL

LA

3/8

" K

G

AL

AM

BR

E

CL

AV

O

AG

UA

0.20

2.85 6.09882

0.20

0.20

959.326 30.946 15.473

0.36 0.78

3.22 0.61 6.87882 959.326 30.946 15.473

Page 24: Avances de Obra 22

$ 4,712.49 $ 8.88 $ 7,635.49 $ 7,443.05 $ 453.52 $ 206.75 $38,673.46

$0.06

Page 25: Avances de Obra 22

Numeros Generadoresconcepto: plantilla de cimentacion Fecha Unidad: M3

Largo Ancho Altura subtotal Total

13.13 9.78 0.1 12.84114 12.84114

FIRME DE CONCRETO DE 8 CM

13.13 9.78 0.08 10.27

Concepto: ANCLAJE DE CASTIL Fecha Unidad: M2

Eje Entre Ejes Largo Ancho Altura subtotal hueco Totalventana puerta

1 A-K 2.95 5 14.752 H-I 2.95 2 5.93 A-B 3.25 2 6.54 E-K 2.95 5 14.755 C-D 3.25 2 6.55¨ G 3.25 1 3.255¨¨ I 2.95 1 2.956 A 3.25 1 3.256¨ I-K 2.95 3 8.85

Page 26: Avances de Obra 22

7 C 3.25 1 3.257¨ F 3.35 1 3.357¨¨ I 2.95 1 2.95

8 A-C 3.25 2 6.5

8¨ I-K 2.95 2 5.9

COLUMNAS CILINDRICAS 3 2 63.35 1 3.35

ANCLAJES 32 ML CASTILLO 98

CONCRETO

M3 0.3818

0 0.3818

Concepto: MUROS Fecha Unidad: M2

Eje Entre Ejes Largo Ancho Altura subtotal hueco Totalventana puerta

1 A-B 3.07 2.25 6.9075 1.05 0 5.8575B-E 2.53 2.25 5.6925 2.1 0 3.5925E-H 2.74 2.25 6.165 1.155 0 5.01H-K 4.41 2.25 9.9225 1.68 0 8.2425

2 H-I 0.85 2.25 1.9125 0 0 1.91253 A-B 2.96 2.55 7.548 0 0 7.5484 E-H 2.74 2.25 6.165 0 1.572 4.593

Page 27: Avances de Obra 22

H-I 0.85 2.4 2.04 0 1.73 0.31I-K 2.43 2.25 5.4675 0 1.73 4.047

5 C-D 1.66 2.54 3.9757 0 0 3.9757D-G 2.4 2.9 6.96 0 6 0.96G-I 1.27 2.48 3 0 0 3

6 I-K 2.43 2.25 5.4675 0 1.73 4.0477 C-F 2.72 2.88 7.8336 2.07 4.8116

F-I 2.76 2.88 7.9488 0.345 1.85 4.668 I-K 3.42 2.25 7.695 1.365 0 6.33A 1,3 3.54 2.25 7.965 0 0 7.965

3,6 2.86 2.55 7.293 0 1.665 5.6286,8 3.1 2.55 7.9 0 0 7.9

C 5,7 3.85 2.55 9.81 0 0 9.817,8 1.27 2.55 3.238 0 0 3.238

E 1,4 3.4 2.25 7.65 0 0 7.65H 1,4 3.26 2.25 7.32 0 0 7.32I 2,4 1.03 2.25 2.31 0 0 2.31

5,6 1.37 2.25 3.08 0 0 3.086,7 1.69 2.25 3.8 0 0 3.87,8 1.27 2.25 2.85 0 0 2.85

J 4,6 3 2.25 6.75 0 1.57 5.17

K 1,4 3.4 2.25 7.65 0 0 7.654,6 3 2.25 6.75 0.6 0 6.15

6,8 3.1 2.25 6.97 0 0 6.97

m2 de ladrillo 156.3883

1 m2 = 40 ladrillos de .13*.07*.26 sentados a 2 cm de mortero cemento-arenamenos .85 % de desperdicio

cantidad de ladrillos millar 6.26

Page 28: Avances de Obra 22

Numeros GeneradoresConcepto: EXCAVACION Unidad: M3

Eje Entre Ejes Largo Ancho Profundidad Sub total1 A-K 14 0.95 0.4 5.322 H-I 1.3 0.95 0.4 0.4943 A-B 4 0.95 0.4 1.524 H-I 1.3 0.95 0.4 0.494

E-H 3.75 0.95 0.4 1.425I-K 4 0.95 0.4 1.52

5 C-I 6.3 0.95 0.4 2.3946 I-K 4 0.95 0.4 1.527 C-I 6.3 0.95 0.4 2.3948 A-K 14 0.95 0.4 5.32A 1,8 10.4 0.95 0.4 3.952C 5,7 5.8 0.95 0.4 2.204E 1,4 4 0.95 0.4 1.52H 1,4 4 0.95 0.4 1.52I 2,4 1.5 0.95 0.4 0.57J 4,6 3.6 0.95 0.4 1.368K 1,8 10.4 0.95 0.4 3.952

Page 29: Avances de Obra 22

m3 37.487

Eje Entre Ejes Largo Ancho Altura total

1 A-B 3.07 0.35 0.4 0.4298B-E 2.53 0.35 0.4 0.3542E-H 2.74 0.35 0.4 0.3836H-K 4.41 0.35 0.4 0.6174

2 H-I 0.85 0.35 0.4 0.1193 A-B 3.05 0.35 0.4 0.4274 E-H 2.74 0.35 0.4 0.3836

H-I 0.85 0.35 0.4 0.119I-J 2.43 0.35 0.4 0.3402J-K 0.85 0.35 0.4 0.119

5 C-D 1.66 0.35 0.4 0.2324D-G 2.4 0.35 0.4 0.336G-I 1.27 0.35 0.4 0.1778

6 I-J 2.43 0.35 0.4 0.3402J-K 0.85 0.35 0.4 0.119

7 C-F 2.72 0.35 0.4 0.3808F-I 2.76 0.35 0.4 0.3864

8 I-K 3.42 0.35 0.4 0.4788C-F 2.44 0.35 0.4 0.3416F-I 2.43 0.35 0.4 0.3402

A 1,3 3.54 0.35 0.4 0.49563,6 2.86 0.35 0.4 0.40046,8 3.1 0.35 0.4 0.434

C 5,7 3.85 0.35 0.4 0.5397,8 1.27 0.35 0.4 0.1778

CONCEPTO:CIMENTACION DE MAMPOSTERÍA DE PIEDRA, ANCHO .35, ALTURA .40, SENTADA CON MORTERO CEM-ARENA 1:5

Page 30: Avances de Obra 22

E 1,4 3.4 0.35 0.4 0.476H 1,2 3.26 0.35 0.4 0.4564

2,4 1.03 0.35 0.4 0.1442I 2,4 1.03 0.35 0.4 0.1442

5,6 1.37 0.35 0.4 0.19186,7 1.69 0.35 0.4 0.23667,8 1.27 0.35 0.4 0.1778

J 4,6 3 0.35 0.4 0.42K 1,4 3.4 0.35 0.4 0.476

4,6 3 0.35 0.4 0.42

6,8 3.1 0.35 0.4 0.434

M3 DE PIEDRA 12.0409

dala de cimentacion de .15 * .15

Eje Entre Ejes Largo total1 A-B 3.17 3.17

B-E 2.63 2.63E-H 2.74 2.74H-K 4.51 4.51

2 H-I 0.95 0.953 A-B 3.15 3.154 E-H 2.84 2.84

H-I 0.95 0.95I-J 2.53 2.53J-K 0.95 0.95

5 C-D 1.76 1.76D-G 2.5 2.5G-I 1.37 1.37

6 I-J 2.53 2.53J-K 0.95 0.95

7 C-F 2.82 2.82

Page 31: Avances de Obra 22

F-I 2.76 2.768 I-K 3.42 3.42

C-F 2.44 2.44F-I 2.53 2.53

A 1,3 3.64 3.643,6 2.96 2.966,8 3.2 3.2

C 5,7 3.85 3.857,8 1.37 1.37

E 1,4 3.5 3.5H 1,2 3.36 3.36

2,4 1.13 1.13I 2,4 1.13 1.13

5,6 1.47 1.476,7 1.79 1.797,8 1.37 1.37

J 4,6 3.1 3.1K 1,4 3.5 3.5

4,6 3.1 3.1

6,8 3.2 3.2

armex de 15*20 ml de dala de cimentacion 89.17

armex de 15*15 ml de dala de cerramiento 89.17

ml de varilla de 3/8 713.13

unidad: m2loza de concreto + marquesina de 40 cm. 12 cm de espesor total

154,73

m3 de concreto mas varilla de 3 / 8 18.5676

Page 32: Avances de Obra 22

aplanado de mortero cemento-arena de espesor de 2 cm en muros exterioresUNIDAD M2

eje entre eje subtotal total1 A-K 26.199 26.199A 1,8 24.393 24.3937 C-I 10.627 10.6278 I-K 7.515 7.515K 1,8 23.54 23.54I 7,8 3.384 3.384C 7,8 3.384 3.384

M2 DE APLANADO 99.042

aplanado de pasta de yeso de 2 cm de espesor para muros interiores

Concepto: MUROS Fecha Unidad: M2total

Eje Entre Ejes Largo muros Altura subtotal huecoventana puerta

1 A-B 3.07 1 2.4 7.368 1.05 0 6.318B-E 2.63 1 2.4 6.312 2.1 0 4.212E-H 2.74 1 2.4 6.576 1.155 0 5.421H-K 4.41 1 2.4 10.584 1.68 0 8.904

2 H-I 0.99 2 2.4 4.752 0 0 4.7523 A-B 3.17 2 2.7 17.118 0 0 17.1184 E-H 3.02 2 2.4 14.496 0 3.144 11.352

H-I 0.99 2 2.4 4.752 0 3.46 1.292I-K 3.42 1 2.4 8.208 0 3.46 4.748

5 C-I 5.62 2 2.9 32.596 0 13.6 18.9966 I-K 3.42 1 2.4 8.208 0 3.46 4.7487 C-I 5.62 1 2.9 16.298 2.41 1.85 12.038

Page 33: Avances de Obra 22

8 I-K 3.7 1 2.4 8.88 1.365 0 7.515A 1,3 3.54 1 2.4 8.496 0 0 8.496

3,6 3 1 2.7 8.1 0 1.665 6.4356,8 3.24 1 2.7 8.748 0 0 8.748

C 5,8 6.44 2 2.7 34.776 0 3.33 27.642E 1,4 3.4 2 2.4 16.32 0 0 16.32H 1,4 3.4 2 2.4 16.32 0 0 16.32I 2,4 1.03 2 2.4 4.944 0 0 4.944

5,8 4.57 2 2.4 21.936 0 0 18.55J 4,6 3 1 2.4 7.2 0 1.57 5.63K 1,4 3.4 1 2.4 8.16 0 0 8.16

4,6 3 1 2.4 7.2 0.6 0 6.6

6,8 3.1 1 2.4 7.44 0 0 7.44

APLANADO DE YESO EN LOZA 116.92

M2 DE APLANADO DE YESO 360

PINTURA VINILICA M2 317.9

PISO CERAMICO M2 95

AZULEJO M2 31.3

Page 34: Avances de Obra 22

A B C D E 300

CONCEPTO UNIDAD P.U. DESGLOSADO UNIDAD P.U DESGLOSADO CANTIDAD COSTO NETO MARCA OBSERVACION4 CEMENTO GRIS CPC 30R CEMEX TONELADA $2,100.00 $1,810.34 SACO $105.00 $90.52 14.4642587 $26,185.30 $30,374.94 MTY EL MOCTEZUMA ES MAS BARA5 MORTERO CEMEX TONELADA $1,700.00 $1,465.52 SACO $85.00 $73.28 4.33 $ 6,348.17 $ 7,363.88 6 YESO POLAR TONELADA $1,275.00 $1,099.14 SACO $63.75 $54.96 $ - $ - COTIZACION 30 DE MARZO7 ARENA M3 $128.76 $111.00 M3 $128.76 $111.00 39.47 $ 4,380.86 $ 5,081.80 8 GRAVA M3 $128.76 $111.00 M3 $128.76 $111.00 30.42 $ 3,376.37 $ 3,916.59 9 PIEDRA M3 $140.36 $121.00 M3 $140.36 $121.00 16.01 $ 1,937.60 $ 2,247.61

10 LADRILLO MILLAR $1,287.60 $1,110.00 PZA $1.29 $1.11 6.87882 $ 7,635.49 $ 8,857.17 11 HULE PARA SILO M2 $10.00 $8.62 $95.00 $81.90 $ - $ - 12 KG $9.00 $7.76 TRAMO $96.50 $83.19 $ - $ - 13 ALAMBRE RECOCIDO KG $17.00 $14.66 KG $17.00 $14.66 30.946 $ 453.52 $ 526.08 14 ALAMBRON KG $16.00 $13.79 KG $16.00 $13.79 $ - $ - 15 MALLA ALECT. 6-6 10-10 M2 $38.00 $32.76 ML $95.00 $81.90 $ - $ - 16 ARMEX 15X20X4 ML $17.00 $14.66 TRAMO $100.00 $86.21 53.73 $ 787.36 $ 913.34

ARMEX 15X15X4 ML $17.00 $14.66 TRAMO $98.00 $84.4817 ARMEX 15X30X4 ML $23.00 $19.83 $102.00 $87.9318 TELA DE GALLINERO M2 $25.00 $21.55 $103.00 $88.7919 REVOLVEDORA JNAL $200.00 $172.41 $104.00 $89.6620 VIBRADOR JNAL $200.00 $172.41 $105.00 $90.5221 ANDAMIOS JNAL $8.00 $6.90 $106.00 $91.3822 AGUA M3 $6.00 $5.17 $107.00 $92.2423 RENTA DE CIMBRA M2 $45.00 $38.79 $108.00 $93.1024 CLAVO DE 2 1/2" KG $15.50 $13.36 $109.00 $93.9725 ESTAMPADO DE CONCRETO M2 $115.00 $99.14 $110.00 $94.8326 CIMBRA APARENTE M2 $45.00 $38.79 $111.00 $95.6927 RENTA DE GRUA DE 10 TON HR y #VALUE! $112.00 $96.5528 EQUIPO NEUMATICO JORNAL $500.00 $431.03 $113.00 $97.41

CONCEPTO UNIDAD P.U. DESGLOSADO $59,281.41 31 CANAL METALICO PIEZA $26.00 $22.6132 POSTE METALICO PIEZA $26.00 $22.6133 PANEL DE YESO STD. PIEZA $65.00 $56.5234 PANEL DE YESO WR. PIEZA $130.00 $113.0435 PANEL DE YESO FR. PIEZA $120.75 $105.0036 PANEL DE YESO EXT. PIEZA $117.92 $102.5437 PANEL TEC-3000 MURO PIEZA $225.00 $195.6538 PANEL TEC-3000 LOSA PIEZA $230.00 $200.0039 TABLERO CEMPANEL LOSA PIEZA $345.00 $300.0040 TABLERO CEMPANEL MURO PIEZA $345.00 $300.0041 COMPUESTO PARA JUNTEO MC MILLAN KG $7.00 $6.0942 COMPUESTO PARA JUNTEO EUREKA KG $4.60 $4.0043 COMPUESTO PARA JUNTEO KG. $205.00 $178.2644 CINTA DE PAPEL ML $0.29 $0.2545 TORNILLO PARA PAPEL PIEZA $0.30 $0.2646 TORNILLO FRAMER PIEZA $10.00 $8.7047 TORNILLO CON TAQUETE PIEZA $0.40 $0.35

CONCEPTO UNIDAD P.U. DESGLOSADO40 BLOCK CONTEC DE 12.5 X 40X60 M3 $1,749.00 $1,520.8741 DINTEL ARMADO M3 $2,673.75 $2,325.0042 PANEL PARA LOSA CONTEC M3 $2,932.65 $2,550.1343 ADHESIVO CONTEC KG $5.30 $4.614445 CONCEPTO UNIDAD P.U. DESGLOSADO46 BETOSTYRENE M3 $1,150.00 $1,000.0047 PANEL MONOLITE 10.8 CMS. M2 $158.47 $137.8048 PANEL MONOLITE VOBEDILLA M2 $197.80 $172.0049 FIBRA DE POLIPROPILENO KG $92.00 $80.00

MALLA UNION PIEZA $10.92 $9.50MALLA ESCUADRA PIEZA $13.17 $11.45GRAPA STANLEY PIEZA $1.40 $1.22

5051 CONCEPTO UNIDAD P.U. DESGLOSADO52 MULTYMURO 3" M2 $633.00 $550.4353 MULTYTECHO 3" M2 $606.05 $527.0054 CONEXIONES 10% PANEL MURO $63.30 $55.0455 CONEXIONES 10% PANEL LOSA $60.61 $52.705657 CONCEPTO UNIDAD P.U. DESGLOSADO58 BLOCK FOAMBLOCK PIEZA $27.30 $23.7459 VIGUETA Y BOVEDILLA m2 $54.00 $46.9660 VIGUETA PRE-COLADA ML $143.75 $125.00

foamblock torreonBLOCK FOAMBLOCK PIEZA $31.05 $27.00VIGUETA Y BOVEDILLA m2 $57.50 $50.00VIGUETA PRE-COLADA ML $52.39 $45.56

FOLKLORICOS

CONCEPTO UNIDAD P.U. DESGLOSADOCAL TONELADA $1,700.00 $1,478.26 BULTO 40 $34.48ARCILLA M3 $110.00 $95.65

ALAMBRE RECOCIDO KG $0.00ALAMBRON KG $0.00MALLA ALECT. 6-6 10-10 M2 $0.00ARMEX 15X20X4 ML $0.00ARMEX 15X15X4 ML $0.00TELA DE GALLINERO M2 $10.00REVOLVEDORA JNAL $0.00VIBRADOR JNAL $0.00ANDAMIOS JNAL $0.00AGUA M3 $0.00RENTA DE CIMBRA M2 $0.00CLAVO DE 2 1/2" KG $0.00ESTAMPADO DE CONCRETO M2 $0.00CIMBRA APARENTE M2 $0.00RENTA DE GRUA DE 10 TON HR $0.00EQUIPO NEUMATICO JORNAL $0.00

MATERIALES TRADICIONALES

VARILLA CUALQUIER DIAMETRO

MATERIALES ALTERNOS TABLAROCA Y FIBROCEMENTO

MATERIALES ALTERNOS CONCRETO CELULAR

MATERIALES ALTERNOS BETOSTYRENE Y PANEL MONOLITE

MATERIALES ALTERNOS MULTYPANEL

MATERIALES ALTERNOS FOAMBLOCK, culiacan

Page 35: Avances de Obra 22

A B C D E F

3 analisis de costo de mano de obra4 concepto p.u. f.s.r. s.r.5 peon $145.45 1.28 $186.186 ayudante $137.16 1.28 $175.567 of. Albañil $218.50 1.28 $279.688 of. Fierrero $262.20 1.28 $335.629 of. Carpintero, plomero, electricista $262.20 1.28 $335.62

10 mando intermedio $274.32 1.28 $351.1311

14 analisis de cuadrillas para mano de obra15 cuadrilla peones oficial mando intermedio total16 cuadrilla # 1 (1peon + 0.10 de m.i.) $186.18 0 $35.11 $221.29 117 cuadrilla # 2 (1peon + 1ofic. De albañil + 0.10 de m.i.) $186.18 $279.68 $35.11 $500.97 218 cuadrilla # 3 (4peones + 0.15 de m.i.) $744.70 $0.00 $52.67 $797.37 319 cuadrilla # 4 (2ayudantes +1ofi. Fierr + 0.10 de m.i) $351.13 $335.62 $52.67 $739.42 420 cuadrilla # 5 (2ayudantes +1ofi. Carpint. + 0.10 de m.i) $351.13 $335.62 $52.67 $739.42 521 cuadrilla # 6 (2ayudantes +1ofi. plomero + 0.10 de m.i) $351.13 $351.13 $52.67 $754.93 722 cuadrilla # 7 (2ayudantes +1ofi. yesero + 0.10 de m.i) $351.13 $351.13 $52.67 $754.93 823

1023.968 799.975 3199.9 4100 1025600 IMSS

Page 36: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CEMENTO CPC 30-R TON 0.26 $1,810.34 $470.69

ARENA M3 0.5 $111.00 $55.50

GRAVA DE 3/4" M3 0.68 $111.00 $75.48

AGUA M3 0.195 $5.17 $1.01

TOTAL $602.68

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA No 3 JORNAL 1/15 $797.37 $53.16

$0.00

$0.00

$0.00

TOTAL $53.16

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

5% DE MANO DE OBRA % 0.05 $53.16 $2.66

REVOLVEDORA JNAL 0.17 $172.41 $28.74

TOTAL $31.39

SUB-TOTAL $687.23

I.VA

TOTAL

CONCEPTO: LABORACION DE 1 M3 DE CONCRETO F´C = 100 KG / CM2 T. M. A. 3/4", HECHO EN OBRA CON REVOLVEDORA.CONCEPTO: LABORACION DE 1 M3 DE CONCRETO F´C = 100 KG / CM2 T. M. A. 3/4", HECHO EN OBRA CON REVOLVEDORA.

Page 37: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 2 de 45

FECHA Feb-08

UNIDAD M3

OBRA BARDA

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CEMENTO CPC 30-R TON 0.323 $1,810.34 $584.74

ARENA M3 0.48 $111.00 $53.28

GRAVA DE 3/4" M3 0.67 $111.00 $74.37

AGUA M3 0.21 $5.17 $1.09

$0.00

$0.00

$0.00

$0.00

TOTAL $713.48

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA III JORNAL 1/5 $797.37 $159.47

$0.00

$0.00

$0.00

TOTAL $159.47

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

5% DE MANO DE OBRA % 0.05 $23.80 $1.19

REVOLVEDORA JNAL 0.17 $172.41 $28.74

TOTAL $29.93

SUB-TOTAL $902.88

I.VA

TOTAL

CONCEPTO: ELABORACION DE 1 M3 DE CONCRETO F´C = 150 KG / CM2 T. M. A. 3/4", HECHO EN OBRA CON REVOLVEDORA.

CONCEPTO: ELABORACION DE 1 M3 DE CONCRETO F´C = 150 KG / CM2 T. M. A. 3/4", HECHO EN OBRA CON REVOLVEDORA.

Page 38: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 3 de 45

FECHA Feb-08

UNIDAD M3

OBRA BARDA

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CEMENTO CPC 30-R TON 0.355 $1,810.34 $642.67

ARENA M3 0.47 $111.00 $52.17

GRAVA DE 3/4" M3 0.65 $111.00 $72.15

AGUA M3 0.195 $5.17 $1.01

$0.00

$0.00

$0.00

$0.00

TOTAL $768.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA III JORNAL 1/5 $797.37 $159.47

$0.00

$0.00

$0.00

TOTAL $159.47

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

5% DE MANO DE OBRA % 0.05 $23.80 $1.19

REVOLVEDORA JNAL 0.17 $172.41 $28.74

TOTAL $29.93

SUB-TOTAL $957.40

I.VA

TOTAL

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M3 DE CONCRETO F´C = 200 KG / CM2 T. M. A. 3/4", HECHO EN OBRA CON REVOLVEDORA.

CONCEPTO: ELABORACION DE 1 M3 DE CONCRETO F´C = 200 KG / CM2 T. M. A. 3/4", HECHO EN OBRA CON REVOLVEDORA.

Page 39: Avances de Obra 22

HOJA No. 4 de 45

FECHA Feb-08

UNIDAD M3

OBRA BARDA

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

MORTERO CEMEX TON 0.309 $1,465.52 $452.84

ARENA M3 1.242 $128.76 $159.92

AGUA M3 0.377 $5.17 $1.95

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $614.71

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA III JORNAL 1/5 $797.37 $159.47

$0.00

$0.00

$0.00

TOTAL $159.47

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

5% DE MANO DE OBRA % 0.05 $23.80 $1.19

REVOLVEDORA JNAL 0.17 $172.41 $28.74

TOTAL $29.93

SUB-TOTAL $804.12

I.VA

TOTAL

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M3 DE MORTERO-ARENA 1:4 PARA RECUBRIMIENTO, JUNTEO DE LADRILLO Y DE PIEDRA DE CIMENTACION.

CONCEPTO: ELABORACION DE 1 M3 DE MORTERO-ARENA 1:4 PARA RECUBRIMIENTO, JUNTEO DE LADRILLO Y DE PIEDRA DE CIMENTACION.

Page 40: Avances de Obra 22

HOJA No. 5 de 45

FECHA Mar-04

UNIDAD M3

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CEMENTO CPC 30-R TON 0.26 $1,810.34 $470.69

ARENA M3 0.5 $111.00 $55.50

AGUA M3 0.195 $5.17 $1.01

FIBRA DE POLIPROPILENO KG 0.6 $80.00 $15.60

$0.00

$0.00

$0.00

$0.00

TOTAL $542.80

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA III JORNAL 2/15 $797.37 $106.32

$0.00

$0.00

$0.00

TOTAL $106.32

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

5% DE MANO DE OBRA % 0.05 $23.80 $1.19

REVOLVEDORA JNAL 0.17 $172.41 $28.74

TOTAL $29.93

SUB-TOTAL $679.04

I.VA

TOTAL

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M3 DE MEZCLA CEMENTO-ARENA 1:4, CON FIBRA DE POLIPROPILENO PARA RECUBRIMIENTO DE PANEL ESTRUCTURAL MONOLITE.

CONCEPTO: ELABORACION DE 1 M3 DE MEZCLA CEMENTO-ARENA 1:4, CON FIBRA DE POLIPROPILENO PARA RECUBRIMIENTO DE PANEL ESTRUCTURAL MONOLITE.

CONCEPTO: ELARACION DE 1M3 DE YESO PARA APLANADO CONCEPTO: ELARACION DE 1M3 DE YESO PARA APLANADO

Page 41: Avances de Obra 22

HOJA No. 6 de 45

FECHA Mar-04

UNIDAD M3

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

YESO TONELADA 0.8345 $1,099.14 $917.23

AGUA M3 1.17 $5.17 $6.05

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $923.28

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA I JORNAL 67/100 $221.29 $148.26

$0.00

$0.00

$0.00

TOTAL $148.26

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

5% DE MANO DE OBRA % 0.05 $23.80 $1.19

TOTAL $1.19

SUB-TOTAL $1,072.74

I.VA

TOTAL

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 7 DE 45

CONCEPTO: ELARACION DE 1M3 DE YESO PARA APLANADO CONCEPTO: ELARACION DE 1M3 DE YESO PARA APLANADO

CONCEPTO: EXCAVACION Y AFINE DE CEPA DE CIMENTACION, POR MEDIO MANUAL EN TERRENO SEMI-DURO.CONCEPTO: EXCAVACION Y AFINE DE CEPA DE CIMENTACION, POR MEDIO MANUAL EN TERRENO SEMI-DURO.

Page 42: Avances de Obra 22

FECHA Feb-08

UNIDAD M3

OBRA BARDA

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA I JORNAL 2/5 $221.29 $88.52

$0.00

$0.00

$0.00

TOTAL $88.52

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HTA. MENOR % 0.05 $88.52 $4.43

TOTAL $4.43

SUB-TOTAL $92.94

I.VA $13.94

TOTAL $106.88

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 8 DE 45

FECHA Mar-04

CONCEPTO: EXCAVACION Y AFINE DE CEPA DE CIMENTACION, POR MEDIO MANUAL EN TERRENO SEMI-DURO.CONCEPTO: EXCAVACION Y AFINE DE CEPA DE CIMENTACION, POR MEDIO MANUAL EN TERRENO SEMI-DURO.

CONCEPTO: ELABORACION 1M2 DE PLANTILLA DE CIMENTACION DE CONCRETO F'C=100 HECHO EN OBRA DE 10 CMS DE ESPESOR .

CONCEPTO: ELABORACION 1M2 DE PLANTILLA DE CIMENTACION DE CONCRETO F'C=100 HECHO EN OBRA DE 10 CMS DE ESPESOR .

Page 43: Avances de Obra 22

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO F'C = 100 KG/CM2 M3 0.048 $687.23 $32.99

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $32.99

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/14 $500.97 $35.78

$0.00

$0.00

$0.00

TOTAL $35.78

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HTA. MENOR % 0.05 $35.78 $1.73

TOTAL $1.73

SUB-TOTAL $70.50

I.VA $10.58

TOTAL $81.08

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 9 DE 45

FECHA Feb-08

UNIDAD M3

CONCEPTO: ELABORACION 1M2 DE PLANTILLA DE CIMENTACION DE CONCRETO F'C=100 HECHO EN OBRA DE 10 CMS DE ESPESOR .

CONCEPTO: ELABORACION 1M2 DE PLANTILLA DE CIMENTACION DE CONCRETO F'C=100 HECHO EN OBRA DE 10 CMS DE ESPESOR .

CONCEPTO:ELABORACION DE 1M3 DE CIMENTACION DE MAMPOSTERIA, SENTADA CON MORTERO-ARENA 1:5.CONCEPTO:ELABORACION DE 1M3 DE CIMENTACION DE MAMPOSTERIA, SENTADA CON MORTERO-ARENA 1:5.

Page 44: Avances de Obra 22

OBRA BARDA

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

MORTERO CEM-ARENA 1:5 M3 0.3 $804.12 $241.23

PIEDRA M3 1.33 $121.00 $160.93

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $402.16

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 2/3 $500.97 $333.98

$0.00

$0.00

$0.00

TOTAL $333.98

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HTA. MENOR % 0.05 $333.98 $16.70

$0.00

TOTAL $16.70

SUB-TOTAL $752.84

I.VA $112.93

TOTAL $865.77

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 10 DE 45

FECHA Feb-08

UNIDAD PIEZA

OBRA BARDA

CONCEPTO:ELABORACION DE 1M3 DE CIMENTACION DE MAMPOSTERIA, SENTADA CON MORTERO-ARENA 1:5.CONCEPTO:ELABORACION DE 1M3 DE CIMENTACION DE MAMPOSTERIA, SENTADA CON MORTERO-ARENA 1:5.

CONCEPTO: ANCLAJE DE CASTILLOS ARMEX 15 X 15 X 4, CON CONCRETO F'C=150 HECHO EN OBRA. CONCEPTO: ANCLAJE DE CASTILLOS ARMEX 15 X 15 X 4, CON CONCRETO F'C=150 HECHO EN OBRA.

Page 45: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO F?C=150 KG/CM2 M3 0.011 $902.88 $9.93

ARMEX 15X15X4 ML 2.95 $14.66 $43.23

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $53.16

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA III JORNAL 1/50 $500.97 $10.02

CUADRILLA IV JORNAL 1/50 $797.37 $15.95

CUADRILLA IV JORNAL 1/50 $739.42 $14.79

$0.00

TOTAL $40.76

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HTA. MENOR % 0.05 $40.76 $2.04

$0.00

TOTAL $2.04

SUB-TOTAL $95.96

I.VA $14.39

TOTAL $110.35

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 11 DE 45

FECHA Feb-08

UNIDAD M3

OBRA BARDA

CONCEPTO: ANCLAJE DE CASTILLOS ARMEX 15 X 15 X 4, CON CONCRETO F'C=150 HECHO EN OBRA. CONCEPTO: ANCLAJE DE CASTILLOS ARMEX 15 X 15 X 4, CON CONCRETO F'C=150 HECHO EN OBRA.

CONCEPTO: RELLENO Y COMPACTACION CON MATERIAL PRODUCTO DE LA EXCAVACION, ENCAPAS DE 12 CMS.CONCEPTO: RELLENO Y COMPACTACION CON MATERIAL PRODUCTO DE LA EXCAVACION, ENCAPAS DE 12 CMS.

Page 46: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA I JORNAL 1/7 $221.29 $31.61

$0.00

$0.00

$0.00

TOTAL $31.61

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.005 $31.61 $0.16

TOTAL $0.16

SUB-TOTAL $31.77

I.VA $4.77

TOTAL $36.54

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 12 DE 45

FECHA Feb-08

UNIDAD ML

OBRA BARDA

CONCEPTO: ELABORACION DE 1 ML DE DALA DE DESPLANTE Y CERRAMINENTOO DE CONCRETO F'C=150 KG7CM2, HECHO EN OBRA

CONCEPTO: ELABORACION DE 1 ML DE DALA DE DESPLANTE Y CERRAMINENTOO DE CONCRETO F'C=150 KG7CM2, HECHO EN OBRA

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO ESTANDAR SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO ESTANDAR SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

Page 47: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO F´C= 150 KG/CM2 M3 0.03 $902.88 $27.09

ACERO #3 TN 0.002264 $13,463.30 $30.48

ALAMBRON DE 1/4 " KG 0.5208 $16.00 $8.33

CIMBRA M2 0.3 $38.79 $11.64

DIESEL LT 0.15 $10.50 $1.58

CLAVO DE 2 1/2 " KG 0.09 $15.50 $1.40

$0.00

$0.00

TOTAL $80.51

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/60 $500.97 $8.35

CUADRILLA V JORNAL 1/50 $739.42 $14.79

CUADRILLA IV JORNAL 1/30 $739.42 $24.65

$0.00

TOTAL $47.78

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $47.78 $2.39

TOTAL $2.39

SUB-TOTAL $130.68

I.VA $19.60

TOTAL $150.28

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 13 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO:ELABORACION DE 1 M2 DE FIRME DE CONCRETO F'C=100KG/CM2 DE 8 CMS DE ESPESOR.CONCEPTO:ELABORACION DE 1 M2 DE FIRME DE CONCRETO F'C=100KG/CM2 DE 8 CMS DE ESPESOR.

Page 48: Avances de Obra 22

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO F'C=100 KG/CM2 M3 0.08 $687.23 $54.98

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $54.98

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/10 $500.97 $50.10

$0.00

$0.00

$0.00

TOTAL $50.10

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $50.10 $2.50

TOTAL $2.50

SUB-TOTAL $107.58

I.VA $16.14

TOTAL $123.72

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 14 DE 45

FECHA Feb-08

UNIDAD M2

OBRA BARDA

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

CONCEPTO: ELABORACION DE 1 M2 DE MURO DE LADRILLO DE DIMENSIONES REGULARES, JUNTEADO CON MORTERO-ARENA 1:5.

CONCEPTO: ELABORACION DE 1 M2 DE MURO DE LADRILLO DE DIMENSIONES REGULARES, JUNTEADO CON MORTERO-ARENA 1:5.

Page 49: Avances de Obra 22

UNITARIO

MORTERO CEM ARENA 1:5 M3 0.027 $804.12 $21.71

LADRILLO DE LA REGION MILLAR 0.039 $1,110.00 $43.29

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $65.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/10 $500.97 $50.10

$0.00

$0.00

$0.00

TOTAL $50.10

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $50.10 $2.50

$0.00

TOTAL $2.50

SUB-TOTAL $117.60

I.VA $17.64

TOTAL $135.24

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 15 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCEPTO: ELABORACION DE 1 M2 DE LOSA DE CONCRETO F'C=200 KG/CM2, T. M. A. 3/4", HECHO EN OBRA, ARMADA CON ACERO DE 3/8" @ 26 CMS EN AMBOS SENTIDOS, EL ESPESOR ES DE 12 CMS. INCLUYE CIMBRADO, ARMADO Y COLADO.

CONCEPTO: ELABORACION DE 1 M2 DE LOSA DE CONCRETO F'C=200 KG/CM2, T. M. A. 3/4", HECHO EN OBRA, ARMADA CON ACERO DE 3/8" @ 26 CMS EN AMBOS SENTIDOS, EL ESPESOR ES DE 12 CMS. INCLUYE CIMBRADO, ARMADO Y COLADO.

Page 50: Avances de Obra 22

CONCRETO 200 KG/CM2 M3 0.12 $957.40 $114.89

ACERO DE 3/8" KG 6.2 $7.76 $48.10

ALAMBRE RECOCIDO KG 0.2 $14.66 $2.93

CALVO DE 21/2" KG 0.1 $13.36 $1.34

$0.00

$0.00

$0.00

$0.00

TOTAL $167.26

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/8 $500.97 $62.62

CUADRILLA IV JORNAL 1/20 $739.42 $36.97

CUADRILLA V JORNAL 1/10 $739.42 $73.94

$0.00

TOTAL $173.53

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HTA. MENOR % 0.05 $173.53 $8.68

RENTA DE CIMBRA M2 1 $38.79 $38.79

TOTAL $47.47

SUB-TOTAL $388.26

I.VA $58.24

TOTAL $446.50

Page 51: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 16 DE 45

FECHA Feb-08

UNIDAD M2

OBRA BARDA

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

MEZCLA M3 0.02 $804.12 $16.08

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $16.08

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/14 $500.97 $35.78

$0.00

$0.00

$0.00

TOTAL $35.78

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $35.78 $1.79

$0.00

TOTAL $1.79

SUB-TOTAL $53.65

I.VA $8.05

TOTAL $61.70

CONCEPTO: ELABORCION DE 1 M2 DE APLANADO HECHO CON MORTERO-ARENA PROP. 1:5, DE 2 CMA. DE ESPESOR, PLOMEADO Y NIVELADO

CONCEPTO: ELABORCION DE 1 M2 DE APLANADO HECHO CON MORTERO-ARENA PROP. 1:5, DE 2 CMA. DE ESPESOR, PLOMEADO Y NIVELADO

Page 52: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

Page 53: Avances de Obra 22

HOJA No. 17 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

PASTA DE YESO M3 0.02 $1,072.74 $21.45

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $21.45

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA VIIi JORNAL 1/25 $754.93 $30.20

$0.00

$0.00

$0.00

TOTAL $30.20

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $30.20 $1.51

$0.00

TOTAL $1.51

SUB-TOTAL $53.16

I.VA $7.97

TOTAL $61.14

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE APLANADO HECHO CON PASTA DE YESO DE 2 CM DE ESPESOR, PLOMEADO Y NIVELADO

CONCEPTO: ELABORACION DE 1 M2 DE APLANADO HECHO CON PASTA DE YESO DE 2 CM DE ESPESOR, PLOMEADO Y NIVELADO

Page 54: Avances de Obra 22

HOJA No. 18 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO F'C=200 M3 3/50 $957.40 $57.44

ARMEX 20 X 15 X 4 ML 1 $14.66 $14.66

HULE NEGRO M2 0.8 $8.62 $6.90

VR DE 3/8" KG 0.5 $7.76 $3.88

ALAMBRE RECOCIDO KG 0.025 $14.66 $0.37

$0.00

$0.00

$0.00

TOTAL $83.24

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA IV JORNAL 1/60 $739.42 $12.32

CUADRILLA V JORNAL 1/50 $739.42 $14.79

CUADRILLA II JORNAL 1/30 $500.97 $16.70

$0.00

TOTAL $43.81

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $43.81 $2.19

TOTAL $2.19

SUB-TOTAL $129.24

I.VA $19.39

TOTAL $148.63

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 ML DE TRABE DE 30 X 20 CMS. DE CONCRETO F'C=200KG/CM2, ARMADO CON ARMEX 15X20X4, INCLUYE HULE CONTRA TRANSMINACION.

CONCEPTO: ELABORACION DE 1 ML DE TRABE DE 30 X 20 CMS. DE CONCRETO F'C=200KG/CM2, ARMADO CON ARMEX 15X20X4, INCLUYE HULE CONTRA TRANSMINACION.

CONCEPTO: ELABORACION DE 1 ML DE TRABE DE 30 X 20 CMS. DE CONCRETO F'C=200KG/CM2, ARMADO CON ARMEX 15X20X4, INCLUYE HULE CONTRA TRANSMINACION Y ESTRIBOS DE VR DE 3/8" @ 30 MCS. PARA MUROS DE MONOLITE.

CONCEPTO: ELABORACION DE 1 ML DE TRABE DE 30 X 20 CMS. DE CONCRETO F'C=200KG/CM2, ARMADO CON ARMEX 15X20X4, INCLUYE HULE CONTRA TRANSMINACION Y ESTRIBOS DE VR DE 3/8" @ 30 MCS. PARA MUROS DE MONOLITE.

Page 55: Avances de Obra 22

HOJA No. 18 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO F'C=200 M3 3/50 $543.13 $32.59

ARMEX 20 X 15 X 4 ML 1 $0.00

HULE PARA SILO M2 0.8 $0.00

VR DE 3/8" KG 1.74 $0.00

ALAMBRE RECOCIDO KG 0.025 $0.00

$0.00

$0.00

$0.00

TOTAL $32.59

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/60 $500.97 $8.35

CUADRILLA V JORNAL 1/50 $739.42 $14.79

CUADRILLA IV JORNAL 1/30 $739.42 $24.65

$0.00

TOTAL $47.78

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERREMIENTA MENOR % 0.05 $47.78 $2.39

TOTAL $2.39

SUB-TOTAL $82.76

I.VA $12.41

TOTAL $95.18

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 20 DE 45

CONCEPTO: ELABORACION DE 1 ML DE TRABE DE 30 X 20 CMS. DE CONCRETO F'C=200KG/CM2, ARMADO CON ARMEX 15X20X4, INCLUYE HULE CONTRA TRANSMINACION Y ESTRIBOS DE VR DE 3/8" @ 30 MCS. PARA MUROS DE MONOLITE.

CONCEPTO: ELABORACION DE 1 ML DE TRABE DE 30 X 20 CMS. DE CONCRETO F'C=200KG/CM2, ARMADO CON ARMEX 15X20X4, INCLUYE HULE CONTRA TRANSMINACION Y ESTRIBOS DE VR DE 3/8" @ 30 MCS. PARA MUROS DE MONOLITE.

CONCEPTO: ELABORACION DE 1 M2 DE LOSA DE CIMENTACION DE CONCRETO F'C=200KG/CM2, ARMADO CON MALLA ELECTORSOLDADA Y ACABADO ESTAMPADO. INCLUYE HULE CONTRA TRANSMINACION.

CONCEPTO: ELABORACION DE 1 M2 DE LOSA DE CIMENTACION DE CONCRETO F'C=200KG/CM2, ARMADO CON MALLA ELECTORSOLDADA Y ACABADO ESTAMPADO. INCLUYE HULE CONTRA TRANSMINACION.

Page 56: Avances de Obra 22

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO F'C=200 M3 3/25 $957.40 $114.89

MALLA ELECT. 6-6-10-10 M2 1 $32.76 $32.76

HULE PARA SILO M2 1 $8.62 $8.62

ALAMBRE RECOCIDO KG 0.025 $14.66 $0.37

$0.00

$0.00

$0.00

$0.00

TOTAL $156.63

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/20 $500.97 $25.05

CUADRILLA V JORNAL 1/20 $221.29 $11.06

CUADRILLA IV JORNAL 1/40 $739.42 $18.49

$0.00

TOTAL $54.60

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $54.60 $2.73

ESTAMPADO M2 1 99.137931034 $99.14

TOTAL $101.87

SUB-TOTAL $313.10

I.VA $46.96

TOTAL $360.06

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 21 DE 45

FECHA Mar-04

CONCEPTO: ELABORACION DE 1 M2 DE LOSA DE CIMENTACION DE CONCRETO F'C=200KG/CM2, ARMADO CON MALLA ELECTORSOLDADA Y ACABADO ESTAMPADO. INCLUYE HULE CONTRA TRANSMINACION.

CONCEPTO: ELABORACION DE 1 M2 DE LOSA DE CIMENTACION DE CONCRETO F'C=200KG/CM2, ARMADO CON MALLA ELECTORSOLDADA Y ACABADO ESTAMPADO. INCLUYE HULE CONTRA TRANSMINACION.

CONCEPTO: ELABORACION DE 1M3 DE CONCRETO LIGERO F'C=175 KG/CM2 HECHO CON BETOSTYRENE, HECHO EN OBRA.CONCEPTO: ELABORACION DE 1M3 DE CONCRETO LIGERO F'C=175 KG/CM2 HECHO CON BETOSTYRENE, HECHO EN OBRA.

Page 57: Avances de Obra 22

UNIDAD M3

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CEMENTO CPC 30-R TON 0.6 $1,810.34 $1,086.21

ARENA M3 0.56 $111.00 $62.16

BETOSTYRENE M3 0.4 $1,000.00 $400.00

AGUA M3 0.3 $5.17 $1.55

$0.00

$0.00

$0.00

$0.00

TOTAL $1,549.92

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA III JORNAL 1/16 $797.37 $49.84

$0.00

$0.00

$0.00

TOTAL $49.84

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR. % 0.05 $49.84 $2.49

RENTA REVOLVEDORA JORNAL 1/6 $172.41 $28.74

TOTAL $31.23

SUB-TOTAL $1,630.98

I.VA

TOTAL

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 22 DE 45

FECHA Mar-04

UNIDAD M2

CONCEPTO: ELABORACION DE 1M3 DE CONCRETO LIGERO F'C=175 KG/CM2 HECHO CON BETOSTYRENE, HECHO EN OBRA.CONCEPTO: ELABORACION DE 1M3 DE CONCRETO LIGERO F'C=175 KG/CM2 HECHO CON BETOSTYRENE, HECHO EN OBRA.

CONCEPTO: ELABORCION DE 1 M2 DE MURO DE CONCRETO LIGERO F'C=175 KG/CM2 DE 12 CMS. DE ESPESOR CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

CONCEPTO: ELABORCION DE 1 M2 DE MURO DE CONCRETO LIGERO F'C=175 KG/CM2 DE 12 CMS. DE ESPESOR CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

Page 58: Avances de Obra 22

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO LIGERO F'c=175 M3 0.12 $1,630.98 $195.72

MALLA ELECTROSOLDADA M2 2 $32.76 $65.52

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $261.24

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/30 $500.97 $16.70

CUADRILLA IV JORNAL 1/50 $739.42 $14.79

CUADRILLA V JORNAL 1/60 $739.42 $12.32

$0.00

TOTAL $43.81

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $43.81 $2.19

CIMBRA APARENTE M2 2 $38.79 $77.59

TOTAL $79.78

SUB-TOTAL $384.82

I.VA $57.72

TOTAL $442.55

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 23 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

CONCEPTO: ELABORCION DE 1 M2 DE MURO DE CONCRETO LIGERO F'C=175 KG/CM2 DE 12 CMS. DE ESPESOR CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

CONCEPTO: ELABORCION DE 1 M2 DE MURO DE CONCRETO LIGERO F'C=175 KG/CM2 DE 12 CMS. DE ESPESOR CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

CONCEPTO: ELABORCION DE 1 M2 DE LOSA DE CONCRETO LIGERO F'C=175 KG/CM2 CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

CONCEPTO: ELABORCION DE 1 M2 DE LOSA DE CONCRETO LIGERO F'C=175 KG/CM2 CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

Page 59: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO LIGERO F'c=175 M3 0.12 $1,630.98 $195.72

MALLA ELECTROSOLDADA M2 1 $32.76 $32.76

ALAMBRE RECOCIDO KG 0.12 $14.66 $1.76

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $230.24

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/20 $500.97 $25.05

CUADRILLA IV JORNAL 1/20 $739.42 $36.97

CUADRILLA V JORNAL 1/20 $739.42 $36.97

$0.00

TOTAL $98.99

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $98.99 $4.95

CIMBRA M2 1 $38.79 $38.79

TOTAL $43.74

SUB-TOTAL $372.97

I.VA $55.95

TOTAL $428.91

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 24 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

CONCEPTO: ELABORCION DE 1 M2 DE LOSA DE CONCRETO LIGERO F'C=175 KG/CM2 CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

CONCEPTO: ELABORCION DE 1 M2 DE LOSA DE CONCRETO LIGERO F'C=175 KG/CM2 CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

CONCEPTO: ELABORACION DE 1 M2 DE MURO HECHO CON BLOCK CONTEC, DE 12 CMS, DE ESPESOR SENTADO CON ADHESIVO DE LA MISMA MARCA.

CONCEPTO: ELABORACION DE 1 M2 DE MURO HECHO CON BLOCK CONTEC, DE 12 CMS, DE ESPESOR SENTADO CON ADHESIVO DE LA MISMA MARCA.

Page 60: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

BLOCK CONTEC 12.5X40X60 M3 0.15 $1,520.87 $228.13

ADHESIVO CONTEC KG 3.3 $4.61 $15.21

AGUA M3 0.001 $5.17 $0.01

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $243.34

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/18 $500.97 $27.83

$0.00

$0.00

$0.00

TOTAL $27.83

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR 5 0.05 $27.83 $1.39

TOTAL $1.39

SUB-TOTAL $272.57

I.VA $40.89

TOTAL $313.45

ELABORACION DE ARMEX PARA DALA DE DESPLANTE

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

VARILLA DE 3/8 KG

ALAMBRE RECOCIDO KG

ALAMBRON DE 1/4 KG

Page 61: Avances de Obra 22

CONCEPTO: ELABORACION DE 1 ML DE CASTILLO DE CONCRETO

DE F´C= 150 KG/CM2 DE 10 *10*4

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO F´C= 150 KG/CM2 M3 0.03 $902.88 $27.09

CASTILLO DE 10*10*4 ML 1 $45.00 $45.00

CIMBRA M2 0.26 $38.79 $10.09

DIESEL LT 0.13 $10.50 $1.37

CLAVO DE 2 1/2 " KG 0.07 $15.50 $1.09

$0.00

$0.00

TOTAL $84.62

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/60 $500.97 $8.35

CUADRILLA IV JORNAL 1/30 $739.42 $24.65

$0.00

TOTAL $33.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $33.00 $1.65

TOTAL $1.65

SUB-TOTAL $119.27

I.VA $17.89

TOTAL $137.16

Page 62: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 25 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

DINTEL ARMADO M3 0.0225 $2,325.00 $52.31

ADHESIVO CONTEC KG 0.1 $4.61 $0.46

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $52.77

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/18 $500.97 $27.83

$0.00

$0.00

$0.00

TOTAL $27.83

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $27.83 $1.39

TOTAL $1.39

SUB-TOTAL $82.00

I.VA $12.30

TOTAL $94.30

CONCEPTO: ELABORACION DE 1 ML DE DINTEL CONTEC DE 12.5X12.5 CMS. SENTADO CON MADHESIVO DE LA MISMA MARCA.CONCEPTO: ELABORACION DE 1 ML DE DINTEL CONTEC DE 12.5X12.5 CMS. SENTADO CON MADHESIVO DE LA MISMA MARCA.

Page 63: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 26 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

PANEL PARA LOSA CONTEC M3 0.125 $2,550.13 $318.77

CONCRETO F'C=200 M3 0.015 $957.40 $14.36

VARILLA DE 3/8" KG 1.5 $21.55 $32.33

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $365.45

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/20 $500.97 $25.05

CUADRILLA IV JORNAL 1/20 $739.42 $36.97

CUADRILLA V JORNAL 1/20 $739.42 $36.97

$0.00

TOTAL $98.99

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $98.99 $4.95

RENTA DE GRUA HR 0.1 #VALUE! #VALUE!

TOTAL #VALUE!

SUB-TOTAL #VALUE!

I.VA #VALUE!

TOTAL #VALUE!

CONCEPTO: ELABORACION DE 1 M2 DE PANEL LOSA CONTEC DE 15 CMS. DE ESPESOR. CONCEPTO: ELABORACION DE 1 M2 DE PANEL LOSA CONTEC DE 15 CMS. DE ESPESOR.

Page 64: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 27 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO F´C=200 M3 0.03 $1,072.74 $32.18

ARMEX 15X20X4 ML 1 $14.66 $14.66

VARILLA DE 3/8" KG 1.5 $7.76 $11.64

ALAMBRE RECOCIDO KG 1 $14.66 $14.66

$0.00

$0.00

$0.00

$0.00

TOTAL $73.13

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/45 $500.97 $11.13

CUADRILLA IV JORNAL 1/45 $739.42 $16.43

CUADRILLA V JORNAL 1/45 $739.42 $16.43

$0.00

TOTAL $44.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

5% DE MANO DE OBRA % 0.05 $44.00 $2.20

CIMBRA m2 0.40 $38.79 $15.52

TOTAL $17.72

SUB-TOTAL $134.84

I.VA $20.23

TOTAL $155.07

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M DE DALA DE DESPLANTE HECHO CON CONCRETO F'C=200 HECHO EN OBRA, ARMADA CON ARMEX 15X20X4,INCLUYE,VR 3/8 PARA FIJACION, CIMBRADO , COLADO Y CURADO.

CONCEPTO: ELABORACION DE 1 M DE DALA DE DESPLANTE HECHO CON CONCRETO F'C=200 HECHO EN OBRA, ARMADA CON ARMEX 15X20X4,INCLUYE,VR 3/8 PARA FIJACION, CIMBRADO , COLADO Y CURADO.

Page 65: Avances de Obra 22

HOJA No. 28 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

PANEL ESTRUCTURAL MONOLITE DE M2 1 $137.80 $137.80

MORTERO CEM-ARENA 1:5 M3 0.17 $679.04 $115.44

ACCESORIOS % 0.3 $137.80 $41.34

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $294.58

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/20 $500.97 $25.05

CUADRILLA IV JORNAL 1/20 $739.42 $36.97

$0.00

$0.00

TOTAL $62.02

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

5% DE MANO DE OBRA % 0.05 $62.02 $3.10

EQUIPO NEUMATICO JNAL 0.02 $431.03 $8.62

TOTAL $11.72

SUB-TOTAL $368.32

I.VA $55.25

TOTAL $423.57

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE MURO DE PANEL ESTRUCTURAL MONOLITE DE 4" CMS. DE ESPESOR, CON ACABADO APLANADO A BASE DE MORTERO CEM-ARENA 1:5 DE 2 CMS. DE ESPESOR, APLICADO CON EQUIPO NEUMATICO.

CONCEPTO: ELABORACION DE 1 M2 DE MURO DE PANEL ESTRUCTURAL MONOLITE DE 4" CMS. DE ESPESOR, CON ACABADO APLANADO A BASE DE MORTERO CEM-ARENA 1:5 DE 2 CMS. DE ESPESOR, APLICADO CON EQUIPO NEUMATICO.

Page 66: Avances de Obra 22

HOJA No. 29 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

PANEL ESTRUCTURAL MONOLITE DE M2 1 $137.80 $137.80

MORTERO CEM-ARENA 1:5 M3 0.17 $679.04 $115.44

ACCESORIOS % 0.3 $137.80 $41.34

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $294.58

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/10 $500.97 $50.10

CUADRILLA IV JORNAL 1/10 $739.42 $73.94

$0.00

$0.00

TOTAL $124.04

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

5% DE MANO DE OBRA % 0.05 $124.04 $6.20

TOTAL $6.20

SUB-TOTAL $424.82

I.VA $63.72

TOTAL $488.54

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE MURO DE PANEL ESTRUCTURAL MONOLITE DE 4" CMS. DE ESPESOR, CON ACABADO APLANADO A BASE DE MORTERO CEM-ARENA 1:5 DE 2 CMS. DE ESPESOR, APLICADO A MANO.

CONCEPTO: ELABORACION DE 1 M2 DE MURO DE PANEL ESTRUCTURAL MONOLITE DE 4" CMS. DE ESPESOR, CON ACABADO APLANADO A BASE DE MORTERO CEM-ARENA 1:5 DE 2 CMS. DE ESPESOR, APLICADO A MANO.

CONCEPTO: ELABORACION DE 1 M2 DE LOSA HECHA CON PANEL ESTRUCTURAL MONOLITE BOVEDILLA DE 10CMS. DE ESPESOR CON CONCRETO F´C = 200 KG / CM2 T. M. A. 3/4", DE 5 CMS DE ESPESOR, HECHO EN OBRA CON REVOLVEDORA. Y ACABADO INTERIOR DE APLANADO DE MORTERO CEM-ARENA 1:5 DE 2 CMS DE ESPESOR.

CONCEPTO: ELABORACION DE 1 M2 DE LOSA HECHA CON PANEL ESTRUCTURAL MONOLITE BOVEDILLA DE 10CMS. DE ESPESOR CON CONCRETO F´C = 200 KG / CM2 T. M. A. 3/4", DE 5 CMS DE ESPESOR, HECHO EN OBRA CON REVOLVEDORA. Y ACABADO INTERIOR DE APLANADO DE MORTERO CEM-ARENA 1:5 DE 2 CMS DE ESPESOR.

Page 67: Avances de Obra 22

HOJA No. 30 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

P E M BOVEDILLA M2 1 $172.00 $172.00

CONCRETO F´C=200 M3 0.09 $957.40 $86.17

MORTERO CEM-ARENA 1:5 M3 0.06 $29.93 $1.80

VARILLA DE 3/8" KG 2.5 $7.76 $19.40

ALAMBRE RECOCIDO KG 0.15 $14.66 $2.20

EQUIPO NEUMATICO JNAL 0.09 $431.03 $36.64

$0.00

$0.00

TOTAL $318.19

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/20 $500.97 $25.05

CUADRILLA IV JORNAL 1/20 $739.42 $36.97

CUADRILLA V JORNAL 1/20 $739.42 $36.97

$0.00

TOTAL $98.99

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $98.99 $4.95

CIMBRA M2 1 38.79 38.79

TOTAL $43.74

SUB-TOTAL $460.93

I.VA $69.14

TOTAL $530.07

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 31 DE 45

CONCEPTO: ELABORACION DE 1 M2 DE LOSA HECHA CON PANEL ESTRUCTURAL MONOLITE BOVEDILLA DE 10CMS. DE ESPESOR CON CONCRETO F´C = 200 KG / CM2 T. M. A. 3/4", DE 5 CMS DE ESPESOR, HECHO EN OBRA CON REVOLVEDORA. Y ACABADO INTERIOR DE APLANADO DE MORTERO CEM-ARENA 1:5 DE 2 CMS DE ESPESOR.

CONCEPTO: ELABORACION DE 1 M2 DE LOSA HECHA CON PANEL ESTRUCTURAL MONOLITE BOVEDILLA DE 10CMS. DE ESPESOR CON CONCRETO F´C = 200 KG / CM2 T. M. A. 3/4", DE 5 CMS DE ESPESOR, HECHO EN OBRA CON REVOLVEDORA. Y ACABADO INTERIOR DE APLANADO DE MORTERO CEM-ARENA 1:5 DE 2 CMS DE ESPESOR.

CONCEPTO: MURO DIVISORIO DE TABLERO TEC-3000 ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE FIBROCEMENTO, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLERO TEC-3000 ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE FIBROCEMENTO, INCLUYE MATERIAL Y MANO DE OBRA.

Page 68: Avances de Obra 22

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CANAL AMARRE PIEZA 0.3 $22.61 $6.78

POSTE METALICO PIEZA 0.77 $22.61 $17.41

PANEL TEC-3000 PIEZA 0.71 $195.65 $138.91

TORNILLO PARA PAPEL PIEZA 22.16 $0.26 $5.78

COMPUESTO PARA JUNTEO KG. 1.53 $6.09 $9.31

CINTA DE PAPEL ML 2.45 $0.25 $0.62

TORNILLO FRAMER PIEZA 9 $8.70 $78.26

TORNILLO CON TAQUETE PIEZA 4.5 $0.35 $1.57

TOTAL $258.64

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA VI JORNAL 1/10 #REF! #REF!

$0.00

$0.00

TOTAL #REF!

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 #REF! #REF!

TOTAL #REF!

SUB-TOTAL #REF!

I.VA #REF!

TOTAL #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 32 DE 45

FECHA Mar-04

CONCEPTO: MURO DIVISORIO DE TABLERO TEC-3000 ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE FIBROCEMENTO, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLERO TEC-3000 ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE FIBROCEMENTO, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: CUBIERTA DE TABLERO TEC-3000, ELABORADA CON PERFILES DE ACERO GALVANIZADO Y PANELES DE FIBROCEMENTO SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: CUBIERTA DE TABLERO TEC-3000, ELABORADA CON PERFILES DE ACERO GALVANIZADO Y PANELES DE FIBROCEMENTO SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

Page 69: Avances de Obra 22

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CANAL AMARRE PIEZA 0.15 $22.61 $3.39

POSTE METALICO PIEZA 0.385 $22.61 $8.70

PANEL DE FIBROCEMENTO PIEZA 0.355 $200.00 $71.00

TORNILLO PARA PAPEL PIEZA 11.08 $0.26 $2.89

COMPUESTO PARA JUNTEO KG. 0.75 $6.09 $4.57

CINTA DE PAPEL ML 1.25 $0.25 $0.32

TORNILLO FRAMER PIEZA 4.5 $8.70 $39.13

TORNILLO CON TAQUETE PIEZA 2.2 $0.35 $0.77

TOTAL $130.76

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA VI JORNAL 1/10 #REF! #REF!

$0.00

$0.00

$0.00

TOTAL #REF!

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR $ 0.05 #REF! #REF!

RENTA DE GRUA HR 0.1 $850.00 $85.00

TOTAL #REF!

SUB-TOTAL #REF!

I.VA #REF!

TOTAL #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 33 DE 45

FECHA Mar-04

UNIDAD M2

CONCEPTO: CUBIERTA DE TABLERO TEC-3000, ELABORADA CON PERFILES DE ACERO GALVANIZADO Y PANELES DE FIBROCEMENTO SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: CUBIERTA DE TABLERO TEC-3000, ELABORADA CON PERFILES DE ACERO GALVANIZADO Y PANELES DE FIBROCEMENTO SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO ESTANDAR EN AMBAS CARAS, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO ESTANDAR EN AMBAS CARAS, INCLUYE MATERIAL Y MANO DE OBRA.

Page 70: Avances de Obra 22

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CANAL AMARRE PIEZA 0.3 $22.61 $6.78

POSTE METALICO PIEZA 0.77 $22.61 $17.41

PANEL DE YESO PIEZA 0.71 $56.52 $40.13

TORNILLO PARA PAPEL PIEZA 22.16 $0.26 $5.78

COMPUESTO PARA JUNTEO KG. 1.53 $4.00 $6.12

CINTA DE PAPEL ML 2.45 $0.25 $0.62

TORNILLO FRAMER PIEZA 8 $8.70 $69.57

TORNILLO CON TAQUETE PIEZA 3.3 $0.35 $1.15

TOTAL $147.55

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA VI JORNAL 1/15 #REF! #REF!

$0.00

$0.00

$0.00

TOTAL #REF!

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 #REF! #REF!

TOTAL #REF!

SUB-TOTAL #REF!

I.VA #REF!

TOTAL #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 34 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO ESTANDAR EN AMBAS CARAS, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO ESTANDAR EN AMBAS CARAS, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DETABLA ROCA RW EN AMBAS CARAS, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DETABLA ROCA RW EN AMBAS CARAS, INCLUYE MATERIAL Y MANO DE OBRA.

Page 71: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CANAL AMARRE PIEZA 0.3 $22.61 $6.78

POSTE METALICO PIEZA 0.77 $22.61 $17.41

PANEL DE TABLAROCA RW PIEZA 0.71 $172.00 $122.12

TORNILLO PARA PAPEL PIEZA 22.16 $0.26 $5.78

COMPUESTO PARA JUNTEO KG. 1.53 $4.00 $6.12

CINTA DE PAPEL ML 2.45 $0.25 $0.62

TORNILLO FRAMER PIEZA 8 $8.70 $69.57

TORNILLO CON TAQUETE PIEZA 3.3 $0.35 $1.15

TOTAL $229.54

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA VI JORNAL 1/15 #REF! #REF!

$0.00

$0.00

$0.00

TOTAL #REF!

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 #REF! #REF!

TOTAL #REF!

SUB-TOTAL #REF!

I.VA #REF!

TOTAL #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 35 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DETABLA ROCA RW EN AMBAS CARAS, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DETABLA ROCA RW EN AMBAS CARAS, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO RW SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO RW SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

Page 72: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CANAL AMARRE PIEZA 0.15 $22.61 $3.39

POSTE METALICO PIEZA 0.385 $22.61 $8.70

PANEL DE TABLAROCA PIEZA 0.355 $113.04 $40.13

TORNILLO PARA PAPEL PIEZA 11.08 $0.26 $2.89

COMPUESTO PARA JUNTEO KG. 0.75 $4.00 $3.00

CINTA DE PAPEL ML 1.25 $0.25 $0.32

TORNILLO FRAMER PIEZA 4 $8.70 $34.78

TORNILLO CON TAQUETE PIEZA 1.65 $0.35 $0.57

TOTAL $93.79

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA VI JORNAL 1/25 #REF! #REF!

$0.00

$0.00

$0.00

TOTAL #REF!

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

HERRAMIENTA MENOR % 0.05 #REF! #REF!

TOTAL #REF!

SUB-TOTAL #REF!

I.VA #REF!

TOTAL #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 36 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO ESTANDAR SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO ESTANDAR SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

Page 73: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CANAL AMARRE PIEZA 0.15 $22.61 $3.39

POSTE METALICO PIEZA 0.385 $22.61 $8.70

PANEL DE YESO PIEZA 0.355 $56.52 $20.07

TORNILLO PARA PAPEL PIEZA 11.08 $0.26 $2.89

COMPUESTO PARA JUNTEO KG. 0.75 $4.00 $3.00

CINTA DE PAPEL ML 1.25 $0.25 $0.32

TORNILLO FRAMER PIEZA 4 $8.70 $34.78

TORNILLO CON TAQUETE PIEZA 1.65 $0.35 $0.57

TOTAL $73.72

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA VI JORNAL 1/25 #REF! #REF!

$0.00

$0.00

$0.00

TOTAL #REF!

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 #REF! #REF!

TOTAL #REF!

SUB-TOTAL #REF!

I.VA #REF!

TOTAL #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 37 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO RF. SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO RF. SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

Page 74: Avances de Obra 22

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CANAL AMARRE PIEZA 0.15 $22.61 $3.39

POSTE METALICO PIEZA 0.385 $22.61 $8.70

PANEL DE TABLAROCA RF PIEZA 0.355 $105.00 $37.28

TORNILLO PARA PAPEL PIEZA 11.08 $0.26 $2.89

COMPUESTO PARA JUNTEO KG. 0.75 $4.00 $3.00

CINTA DE PAPEL ML 1.25 $0.25 $0.32

TORNILLO FRAMER PIEZA 4 $8.70 $34.78

TORNILLO CON TAQUETE PIEZA 1.65 $0.35 $0.57

TOTAL $90.93

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA TABLAROCA JORNAL 1/15 $738.46 $49.23

$0.00

$0.00

$0.00

TOTAL $49.23

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

5% DE MANO DE OBRA % 0.05 $49.23 $2.46

TOTAL $2.46

SUB-TOTAL $142.63

I.VA $21.39

TOTAL $164.02

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 38 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO EXT. SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: MURO DIVISORIO DE TABLAROCA ELABORADO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO EXT. SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

Page 75: Avances de Obra 22

UNITARIO

CANAL AMARRE PIEZA 0.15 $22.61 $3.39

POSTE METALICO PIEZA 0.385 $22.61 $8.70

PANEL DE TABLAROCA PIEZA 0.355 $102.54 $36.40

TORNILLO PARA PAPEL PIEZA 11.08 $0.26 $2.89

COMPUESTO PARA JUNTEO KG. 0.75 $4.00 $3.00

CINTA DE PAPEL ML 1.25 $0.25 $0.32

TORNILLO FRAMER PIEZA 4 $0.26 $1.04

TORNILLO CON TAQUETE PIEZA 1.65 $8.70 $14.35

TOTAL $70.10

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA VI JORNAL 1/25 #REF! #REF!

$0.00

$0.00

$0.00

TOTAL #REF!

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

5% DE MANO DE OBRA % 0.05 #REF! #REF!

TOTAL #REF!

SUB-TOTAL #REF!

I.VA #REF!

TOTAL #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 39 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCEPTO: ELABORACION DE 1 M2 DE MURO HECHO CON BLOCK FOAMBLOCK, DE 12.5X25X112 CMS, SENTADO CON MORTERO CEMENTO ARENA 1:5 Y RELLENO DE CONCRETO F´C=200KG/CM2 Y ARMADO CON VR 3/8@ 35CMS.

CONCEPTO: ELABORACION DE 1 M2 DE MURO HECHO CON BLOCK FOAMBLOCK, DE 12.5X25X112 CMS, SENTADO CON MORTERO CEMENTO ARENA 1:5 Y RELLENO DE CONCRETO F´C=200KG/CM2 Y ARMADO CON VR 3/8@ 35CMS.

Page 76: Avances de Obra 22

BLOC FOAMBLOCK PIEZA 3.47 $23.74 $82.37

CONCRETO F´C=200 M3 0.135 $957.40 $129.25

MORTERO CEM-ARENA 1:5 M3 0.02 $804.12 $16.08

VR DE 3/8" KG 1.5 $7.76 $11.64

TELA DE GALLINERO M2 2 $21.55 $43.10

APLANADO DE YESO M3 0.02 $1,072.74 $21.45

$0.00

$0.00

TOTAL $303.90

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/15 $500.97 $33.40

CUADRILLA II JORNAL 1/40 $754.93 $18.87

$0.00

$0.00

TOTAL $52.27

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HTA. MENOR % 0.05 $52.27 $2.61

$0.00

TOTAL $2.61

SUB-TOTAL $358.79

I.VA $53.82

TOTAL $412.61

Page 77: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 40 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

BOVEDILLA M2 1 $46.96 $46.96

CONCRETO F´C=200KG M3 0.065 $957.40 $62.23

MALLA ELECTROSOLDAD M2 1 $32.76 $32.76

ALAMBRE RECOCIDO KG 0.025 $14.66 $0.37

VIGUETA PRE-COLADA ML 1.6 $125.00 $200.00

$0.00

$0.00

$0.00

TOTAL $342.31

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/40 $500.97 $12.52

CUADRILLA I V JORNAL 1/25 $739.42 $29.58

CUADRILLA V JORNAL 1/20 $739.42 $36.97

$0.00

TOTAL $79.07

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $79.07 $3.95

CIMBRA M2 1 38.79 $38.79

TOTAL $42.75

SUB-TOTAL $464.13

I.VA $69.62

TOTAL $533.75

CONCEPTO: ELABORACION DE 1 M2 DE LOSA HECHA CON VIGUETA Y BOVEDILLA MARCA FANOSA, DE 12 CMS DE ESPESOR, CON CONCRETO F'C=200 KG/CM2.

CONCEPTO: ELABORACION DE 1 M2 DE LOSA HECHA CON VIGUETA Y BOVEDILLA MARCA FANOSA, DE 12 CMS DE ESPESOR, CON CONCRETO F'C=200 KG/CM2.

Page 78: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

Page 79: Avances de Obra 22

HOJA No. 41 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CANAL AMARRE PIEZA 0.22 $22.61 $4.97

POSTE METALICO PIEZA 0.44 $22.61 $9.95

PANEL DE YESO PIEZA 1 $56.52 $56.52

TORNILLO PARA PAPEL 1 1/8 PIEZA 11 $0.26 $2.87

COMPUESTO PARA JUNTEO KG. 0.76 $4.00 $3.04

CINTA DE PAPEL ML 1.25 $0.25 $0.32

$0.00

$0.00

TOTAL $77.67

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA VI JORNAL 1/25 #REF! #REF!

$0.00

$0.00

$0.00

TOTAL #REF!

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 #REF! #REF!

REVOLVEDORA JNAL 0.17 $172.41 $29.31

TOTAL #REF!

SUB-TOTAL #REF!

I.VA #REF!

TOTAL #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M2 DE PLAFON ACUSTOM, HECHO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO STANDAR SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

CONCEPTO: ELABORACION DE 1 M2 DE PLAFON ACUSTOM, HECHO CON PERFILES DE ACERO GALVANIZADO Y PANELES DE YESO STANDAR SENCILLO, INCLUYE MATERIAL Y MANO DE OBRA.

Page 80: Avances de Obra 22

HOJA No. 42 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO LIGERO F'c=175 M3 0.15 #REF! #REF!

MALLA ELECTROSOLDADA M2 2 $32.76 $65.52

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL #REF!

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/30 $500.97 $16.70

CUADRILLA IV JORNAL 1/20 $739.42 $36.97

CUADRILLA V JORNAL 1/40 $739.42 $18.49

$0.00

TOTAL $72.16

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $72.16 $3.61

CIMBRA APARENTE M2 2 38.79 $77.59

TOTAL $81.19

SUB-TOTAL #REF!

I.VA #REF!

TOTAL #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORCION DE 1 M2 DE MURO DE CONCRETO LIGERO F'C=175 KG/CM2 CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

CONCEPTO: ELABORCION DE 1 M2 DE MURO DE CONCRETO LIGERO F'C=175 KG/CM2 CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

CONCEPTO: ELABORCION DE 1 M2 DE LOSA DE CONCRETO LIGERO F'C=175 KG/CM2 CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

CONCEPTO: ELABORCION DE 1 M2 DE LOSA DE CONCRETO LIGERO F'C=175 KG/CM2 CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

Page 81: Avances de Obra 22

HOJA No. 43 DE 45

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO LIGERO F'c=175 M3 0.12 #REF! #REF!

MALLA ELECTROSOLDADA M2 2 $32.76 $65.52

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL #REF!

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/30 $500.97 $16.70

CUADRILLA IV JORNAL 1/20 $739.42 $36.97

CUADRILLA V JORNAL 1/40 $739.42 $18.49

$0.00

TOTAL $72.16

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $72.16 $3.61

CIMBRA APARENTE M2 1 $38.79 $38.79

TOTAL $42.40

SUB-TOTAL #REF!

I.VA #REF!

TOTAL #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 44 DE 45

CONCEPTO: ELABORCION DE 1 M2 DE LOSA DE CONCRETO LIGERO F'C=175 KG/CM2 CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

CONCEPTO: ELABORCION DE 1 M2 DE LOSA DE CONCRETO LIGERO F'C=175 KG/CM2 CON AGREGADO DE BETOSTYRENE, ARMADO CON MALLA ELECTROSOLDADA 6X6 10-10

CONCEPTO: ELABORACION DE 1 M2 DE MURO HECHO CON MULTY-MURO, MARCA MULTYPANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

CONCEPTO: ELABORACION DE 1 M2 DE MURO HECHO CON MULTY-MURO, MARCA MULTYPANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

Page 82: Avances de Obra 22

FECHA Mar-04

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

MULTYMURO M2 1 $550.43 $550.43

CONEXIONES % 0.1 $550.43 $55.04

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $605.48

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA VI JORNAL 1/15 #REF! #REF!

$0.00

$0.00

$0.00

TOTAL #REF!

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 #REF! #REF!

TOTAL #REF!

SUB-TOTAL #REF!

I.VA #REF!

TOTAL #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 45 DE 45

FECHA Mar-04

CONCEPTO: ELABORACION DE 1 M2 DE MURO HECHO CON MULTY-MURO, MARCA MULTYPANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

CONCEPTO: ELABORACION DE 1 M2 DE MURO HECHO CON MULTY-MURO, MARCA MULTYPANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

CONCEPTO: ELABORACION DE 1 M2 DE LOSA HECHA CON MULTY-LOSA, MARCA MULTYPANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

CONCEPTO: ELABORACION DE 1 M2 DE LOSA HECHA CON MULTY-LOSA, MARCA MULTYPANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

Page 83: Avances de Obra 22

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

MULTYTECHO M2 1 $527.00 $527.00

CONEXIONES % 0.1 $527.00 $52.70

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $579.70

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA VI JORNAL 1/15 #REF! #REF!

$0.00

$0.00

$0.00

TOTAL #REF!

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 #REF! #REF!

TOTAL #REF!

SUB-TOTAL #REF!

I.VA #REF!

TOTAL #REF!

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

CONCEPTO: ELABORACION DE 1 M2 DE LOSA HECHA CON MULTY-LOSA, MARCA MULTYPANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

CONCEPTO: ELABORACION DE 1 M2 DE LOSA HECHA CON MULTY-LOSA, MARCA MULTYPANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

CONCEPTO: CONCEPTO:

Page 84: Avances de Obra 22

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00 $0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 85: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00 $0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 86: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00 $0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

Page 87: Avances de Obra 22
Page 88: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 12 DE 45

FECHA Feb-08

UNIDAD ML

OBRA BARDA

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO F´C= 150 KG/CM2 M3 0.045 $902.88 $40.63

ARMEX 15 X 30 X 4 ML 1 $14.66 $14.66

VARILLA DE 3/8" ML 1 $10.50 $10.50

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $65.78

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/60 $500.97 $8.35

CUADRILLA V JORNAL 1/50 $739.42 $14.79

CUADRILLA IV JORNAL 1/30 $739.42 $24.65

$0.00

TOTAL $47.78

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $47.78 $2.39

CIMBRA M2 0.3 $38.79 $11.64

TOTAL $14.03

SUB-TOTAL $127.60

I.VA $19.14

TOTAL $146.74

CONCEPTO: CONCEPTO: CONCEPTO: ELABORACION DE 1 ML DE CASTILLO, DE CONCRETO F'C=150 KG7CM2, HECHO EN OBRA ARMADO CON ARMEX 15 X 30 X 4, REFORZADO CON VARILLA DE 3/8" INCLUYE ARMADO, CIMBRADO Y COLADO.

CONCEPTO: ELABORACION DE 1 ML DE CASTILLO, DE CONCRETO F'C=150 KG7CM2, HECHO EN OBRA ARMADO CON ARMEX 15 X 30 X 4, REFORZADO CON VARILLA DE 3/8" INCLUYE ARMADO, CIMBRADO Y COLADO.

Page 89: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No. 12 DE 45

FECHA Feb-08

UNIDAD ML

OBRA BARDA

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCRETO F´C= 200 KG/CM2 M3 0.1 $957.40 $95.74

VARILLA DE 1/2" ML 4 $10.50 $42.00

ESTRIBOS VS 1/4" KG 2 $11.50 $23.00

$0.00

$0.00

$0.00

$0.00

TOTAL $160.74

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/60 $500.97 $8.35

CUADRILLA V JORNAL 1/50 $739.42 $14.79

CUADRILLA IV JORNAL 1/30 $739.42 $24.65

$0.00

TOTAL $47.78

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $47.78 $2.39

CIMBRA M2 1.2 $55.04 $66.05

TOTAL $68.44

SUB-TOTAL $276.97

I.VA $41.54

TOTAL $318.51

CONCEPTO: CONCEPTO: CONCEPTO: CONCEPTO: CONCEPTO: ELABORACION DE 1 ML DE COLUMNA F´C 200 KGS/CMS2 ARMADA CON VS DE 1/2 Y ESTRIBOS A CADA 25 CMS FY 4200 KG/CMS2

CONCEPTO: ELABORACION DE 1 ML DE COLUMNA F´C 200 KGS/CMS2 ARMADA CON VS DE 1/2 Y ESTRIBOS A CADA 25 CMS FY 4200 KG/CMS2

Page 90: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: CONCEPTO:

Page 91: Avances de Obra 22

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CEMENTO TON 0.15 $1,810.34 $271.55

CAL M3 0.15 $1,478.26 $221.74

ARCILLA M3 0.7 $95.65 $66.96

AGUA M3 0.377 $5.17 $1.95

$0.00

$0.00

$0.00

$0.00

TOTAL $562.20

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA III JORNAL 1/5 $797.37 $159.47

$0.00

$0.00

$0.00

TOTAL $159.47

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

5% DE MANO DE OBRA % 0.05 $23.80 $1.19

REVOLVEDORA JNAL 0.17 $0.00 $0.00

TOTAL $1.19

SUB-TOTAL $722.86

I.VA

TOTAL

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: ELABORACION DE 1 M3 DE CEMENTO-CAL-ARCILLA 1:2:6 PARA RECUBRIMIENTO, JUNTEO DE LADRILLO Y DE PIEDRA DE CIMENTACION.

CONCEPTO: ELABORACION DE 1 M3 DE CEMENTO-CAL-ARCILLA 1:2:6 PARA RECUBRIMIENTO, JUNTEO DE LADRILLO Y DE PIEDRA DE CIMENTACION.

Page 92: Avances de Obra 22

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 93: Avances de Obra 22

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 94: Avances de Obra 22

FECHA Sep-01

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 95: Avances de Obra 22

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 96: Avances de Obra 22

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 97: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 98: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

CONCEPTO: CONCEPTO:

Page 99: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO: CONCEPTO:

Page 100: Avances de Obra 22

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

CONCEPTO: CONCEPTO:

Page 101: Avances de Obra 22

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CONCEPTO: CONCEPTO:

Page 102: Avances de Obra 22

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

Page 103: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

MEZCLA M3 0.02 $722.86 $14.46

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $14.46

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

CUADRILLA II JORNAL 1/14 $500.97 $35.78

$0.00

$0.00

$0.00

TOTAL $35.78

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

HERRAMIENTA MENOR % 0.05 $35.78 $1.79

TOTAL $1.79

SUB-TOTAL $52.03

I.VA $7.80

TOTAL $59.83

CONCEPTO: ELABORACION DE 1 M2 DE APLANADO HECHO CON CEMENTO-CAL-ARCILLA PROP. 1:2:6 , DE 2 CMA. DE ESPESOR, PLOMEADO Y NIVELADO

CONCEPTO: ELABORACION DE 1 M2 DE APLANADO HECHO CON CEMENTO-CAL-ARCILLA PROP. 1:2:6 , DE 2 CMA. DE ESPESOR, PLOMEADO Y NIVELADO

Page 104: Avances de Obra 22

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

Page 105: Avances de Obra 22

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: CONCEPTO:

Page 106: Avances de Obra 22

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 107: Avances de Obra 22

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 108: Avances de Obra 22

FECHA Sep-01

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 109: Avances de Obra 22

UNIDAD M2

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 110: Avances de Obra 22

OBRA TESIS

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 111: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

TARJETA DE ANALISIS DE PRECIOS UNITARIOS

HOJA No.

FECHA Sep-01

UNIDAD M2

OBRA TESIS

CONCEPTO: CONCEPTO:

CONCEPTO: CONCEPTO:

Page 112: Avances de Obra 22

MATERIALES

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

MANO DE OBRA

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

$0.00

$0.00

$0.00

TOTAL $0.00

HTA. Y EQUIPO MENOR

CONCEPTO UNIDAD CANTIDAD PRECIO TOTAL

UNITARIO

$0.00

TOTAL $0.00

SUB-TOTAL $0.00

I.VA $0.00

TOTAL $0.00

Page 113: Avances de Obra 22

CONCEPTO UNIDAD CANTIDAD TOTAL

EXCAVACIÓN CON MAQUINARIA M3 63.00 $50.00 $3,150.00

M3 12.00 $106.88 $1,282.59

M3 51.00 $865.77 $44,154.23

PIEZA 24.00 $110.35 $2,648.42

M3 6.48 $31.77 $205.87

ML 96.00 $150.28 $14,427.21

M2 152.00 $135.24 $20,556.98

ML 36.00 $146.74 $5,282.51

ML 10.00 $124.30 $1,243.00

ML 96.00 $130.53 $12,530.88

ML 6.00 $318.51 $1,911.07

M2 432.00 $61.70 $26,655.79

PZA 1.00 $10,000.00 $10,000.00

TOTAL = $134,048.55

CONCEPTO UNIDAD CANTIDAD TOTAL

M2 115.00 $7.67 $882.05

EXCAVACIÓN CON MAQUINARIAM3 63.00 $50.00 $3,150.00

M3 12.00 $106.88 $1,282.59

M3 131.00 $865.77 $113,415.77

PIEZA 24.00 $110.35 $2,648.42

M3 6.48 $31.77 $205.87

ML 96.00 $150.28 $14,427.21

M2 152.00 $135.24 $20,556.98

ML 61.20 $146.74 $8,980.26

ML 14.00 $124.30 $1,740.20

ML 96.00 $130.53 $12,530.88

ML 6.00 $318.06 $1,908.36

PZA 1.00 $10,000.00 $10,000.00

TOTAL $178,938.19

CONCEPTO UNIDAD CANTIDAD TOTAL CONCEPTO UNIDAD TOTAL CONCEPTO UNIDAD TOTAL

M2 115.00 $7.67 $882.05 M2 $882.05 M2 $882.05

EXCAVACIÓN CON MAQUINARIAM3 63.00 $50.00 $3,150.00

EXCAVACIÓN CON MAQUINARIAM3 $3,150.00

EXCAVACIÓN CON MAQUINARIAM3 $3,150.00

M3 12.00 $106.88 $1,282.59 M3 $1,282.59 M3 $1,282.59

M3 131.00 $865.77 $113,415.77 M3 $113,415.77 M3 $113,415.77

PIEZA 24.00 $110.35 $2,648.42 PIEZA $2,648.42 PIEZA $2,648.42

M3 6.48 $31.77 $205.87 M3 $205.87 M3 $205.87

M3 849.00 $55.00 $46,695.00 M3 $46,695.00 $46,695.00

ML 96.00 $150.28 $14,427.21 ML $14,427.21 ML $14,427.21

M2 288.00 $135.24 $38,950.06 M2 $38,950.06 M2 $28,086.00

ML 61.20 $146.74 $8,980.26 ML $8,980.26 ML $8,980.26

ML 14.00 $124.30 $1,740.20 ML $1,740.20 ML $1,740.20

ML 96.00 $130.53 $12,530.88 ML $12,530.88 ML $12,530.88

ML 8.50 $318.06 $2,703.51 ML $2,703.51 ML $2,703.51

M2 590.00 $61.70 $36,404.90 M2 $36,404.90 M2 $22,077.00

PZA 1.00 $10,000.00 $10,000.00 PZA $10,000.00 PZA $10,000.00

SUBTOTAL $283,134.68 SUBTOTAL $283,134.68 SUBTOTAL $257,942.72

U. Y G.I. $56,626.94 U. Y G.I. $56,626.94 U. Y G.I. $51,588.54

TOTAL $339,761.62 TOTAL $339,761.62 TOTAL $309,531.26

CONCEPTO UNIDAD CANTIDAD TOTAL CONCEPTO UNIDAD TOTAL CONCEPTO UNIDAD TOTAL

M2 115.00 $7.67 $882.05 M2 $882.05 M2 $882.05

EXCAVACIÓN CON MAQUINARIAM3 63.00 $50.00 $3,150.00

EXCAVACIÓN CON MAQUINARIAM3 $3,150.00

EXCAVACIÓN CON MAQUINARIAM3 $3,150.00

M3 12.00 $106.88 $1,282.59 M3 $1,282.59 M3 $1,282.59

M3 131.00 $865.77 $113,415.77 M3 $113,415.77 M3 $113,415.77

PIEZA 24.00 $110.35 $2,648.42 PIEZA $2,648.42 PIEZA $2,648.42

M3 6.48 $31.77 $205.87 M3 $205.87 M3 $205.87

M3 849.00 $55.00 $46,695.00 $46,695.00 $46,695.00

ML 96.00 $150.28 $14,427.21 ML $14,427.21 ML $14,427.21

M2 288.00 $135.24 $38,950.06 M2 $38,950.06 M2 $28,086.00

ML 61.20 $163.34 $9,996.41 ML $9,996.41 ML $9,996.41

ML 96.00 $130.53 $12,530.88 ML $12,530.88 ML $12,530.88

ML 8.50 $318.06 $2,703.51 ML $2,703.51 ML $2,703.51

PZA 1.00 $10,000.00 $10,000.00 PZA $10,000.00 PZA $10,000.00

SUBTOTAL $252,170.28 $252,170.28 $241,306.22

U. Y G.I. $50,434.06 $50,434.06 $48,261.24

TOTAL $302,604.34 $302,604.34 $289,567.46

CONCEPTO UNIDAD CANTIDAD TOTAL

M2 56.27 $442.37 $24,892.04

M2 101.30 $423.57 $42,907.17

M2 57.00 $530.07 $30,213.76

TOTAL = $98,012.98

$1,719.53

CONCEPTO UNIDAD CANTIDAD TOTAL

M2 56.27 $50.00 $2,813.50

M2 101.30 $201.34 $20,395.74

M2 57.00 $121.60 $6,931.20M2 57.00 $78.34 $4,465.38

TOTAL = $34,605.82

$607.12

CONCEPTO UNIDAD CANTIDAD TOTAL

M2 56.27 $50.00 $2,813.50

M2 101.30 #REF! #REF!

M2 57.00 #REF! #REF!

M2 57.00 #REF! #REF!

TOTAL = #REF!

#REF!

CONCEPTO UNIDAD CANTIDAD TOTAL

M2 56.27 $50.00 $2,813.50

M2 75.77 #REF! #REF!

M2 27.31 #REF! #REF!

M2 70.05 #REF! #REF!

M2 8.00 $125.75 $1,006.00

M2 10.18 #REF! #REF!

PRESUPUESTO BARDA 2 MTS DE ALTURA CON REPELLADO

PRECIO UNITARIO

AFINE DE CEPAS POR MEDIO MANUAL EN TERRENO TIPO B

CIMENTACION DE MAMPOSTERÍA DE PIEDRA, BASE 80, C0R0NA 30, ALTURA 80, SENTADA CON MORTERO CEM-ARENA 1:5

ANCLAJE DE CASTILLOS ARMEX 15X30X4, INCLUYE CONCRETO F'C=150 KG/CM2

RELLENO PARA TAPAR CEPAS CON MATERIAL PRODUCTO DE LA EXCAVACIÓN.

DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5.

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X30X4 Y REFORZADO CON VARILLA DE 3/8".

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X15X4.

DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

COLUMNAS DE CONCRETO F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y ESTRIBOS DE 1/4" A CADA 25 CMS.

REPELLADO DE MORTERO 1:5 , REGLEADO, Y PLOMEADO DE 2 CM DE ESPESOR.INCLUYE AMBOS LADOS DE LA BARDA Y BOQUILLA

PORTON DE 2 HOJAS ABATIBLE C/ PUERTA DE SERVICIO 2.85 MTS DE ALTURA X 5 MTS DE LARGO MARCO DE TUBO DE 2" CON TABLERO DE LAMINA INCLUYE: PINTURA, CHAPAS Y COLOCACION.

PRESUPUESTO BARDA 2 MTS DE ALTURA SIN REPELLADO

PRECIO UNITARIO

TRAZO Y NIVELACION DEL TERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANTE DE ESTRUCTURAS, ESTABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE CONSTRUCCIÓN

AFINE DE CEPAS POR MEDIO MANUAL EN TERRENO TIPO B

CIMENTACION DE MAMPOSTERÍA DE PIEDRA, BASE 80, C0R0NA 30, ALTURA VARIABLE, SENTADA CON MORTERO CEM-ARENA 1:5ANCLAJE DE CASTILLOS ARMEX 15X30X4, INCLUYE CONCRETO F'C=150 KG/CM2

RELLENO PARA TAPAR CEPAS CON MATERIAL PRODUCTO DE LA EXCAVACIÓN.

DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5.

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X30X4 Y REFORZADO CON VARILLA DE 3/8".

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X15X4.

DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

COLUMNAS DE CONCRETO F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y ESTRIBOS DE 1/4" A CADA 25 CMS.

PORTON DE 2 HOJAS ABATIBLE C/ PUERTA DE SERVICIO 2.85 MTS DE ALTURA X 5 MTS DE LARGO MARCO DE TUBO DE 2" CON TABLERO DE LAMINA INCLUYE: PINTURA,

PRESUPUESTO BARDA 3.35 MTS DE ALTURA CON REPELLADO

PRESUPUESTO BARDA 2 MTS DE ALTURA CON REPELLADO

PRESUPUESTO BARDA 3.35 MTS DE ALTURA CON REPELLADO

PRECIO UNITARIO

TRAZO Y NIVELACION DEL TERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANTE DE ESTRUCTURAS, ESTABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE CONSTRUCCIÓN

TRAZO Y NIVELACION DEL TERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANTE DE ESTRUCTURAS, ESTABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE CONSTRUCCIÓN

TRAZO Y NIVELACION DEL TERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANTE DE ESTRUCTURAS, ESTABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE CONSTRUCCIÓN

AFINE DE CEPAS POR MEDIO MANUAL EN TERRENO TIPO B

AFINE DE CEPAS POR MEDIO MANUAL EN TERRENO TIPO B

AFINE DE CEPAS POR MEDIO MANUAL EN TERRENO TIPO B

CIMENTACION DE MAMPOSTERÍA DE PIEDRA, BASE 80, C0R0NA 30, ALTURA VARIABLE, SENTADA CON MORTERO CEM-ARENA 1:5

CIMENTACION DE MAMPOSTERÍA DE PIEDRA, BASE 80, C0R0NA 30, ALTURA VARIABLE, SENTADA CON MORTERO CEM-ARENA 1:5

CIMENTACION DE MAMPOSTERÍA DE PIEDRA, BASE 80, C0R0NA 30, ALTURA VARIABLE, SENTADA CON MORTERO CEM-ARENA 1:5

ANCLAJE DE CASTILLOS ARMEX 15X30X4, INCLUYE CONCRETO F'C=150 KG/CM2

ANCLAJE DE CASTILLOS ARMEX 15X30X4, INCLUYE CONCRETO F'C=150 KG/CM2

ANCLAJE DE CASTILLOS ARMEX 15X30X4, INCLUYE CONCRETO F'C=150 KG/CM2

RELLENO PARA TAPAR CEPAS CON MATERIAL PRODUCTO DE LA EXCAVACIÓN.

RELLENO PARA TAPAR CEPAS CON MATERIAL PRODUCTO DE LA EXCAVACIÓN.

RELLENO PARA TAPAR CEPAS CON MATERIAL PRODUCTO DE LA EXCAVACIÓN.

MATERIAL INHERTE PARA RELLENO A VOLTEO PARA NIVELACION DE TERRENO

MATERIAL INHERTE PARA RELLENO A VOLTEO PARA NIVELACION DE TERRENO

MATERIAL INHERTE PARA RELLENO A VOLTEO PARA NIVELACION DE TERRENO

DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5.

MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5.

MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5.

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X30X4 Y REFORZADO CON VARILLA DE 3/8".

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X30X4 Y REFORZADO CON VARILLA DE 3/8".

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X30X4 Y REFORZADO CON VARILLA DE 3/8".

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X15X4.

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X15X4.

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X15X4.

DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

COLUMNAS DE CONCRETO F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y ESTRIBOS DE 1/4" A CADA 25 CMS.

COLUMNAS DE CONCRETO F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y ESTRIBOS DE 1/4" A CADA 25 CMS.

COLUMNAS DE CONCRETO F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y ESTRIBOS DE 1/4" A CADA 25 CMS.

REPELLADO DE MORTERO 1:5 , REGLEADO, Y PLOMEADO DE 2 CM DE ESPESOR.INCLUYE AMBOS LADOS DE LA BARDA Y BOQUILLA

REPELLADO DE MORTERO 1:5 , REGLEADO, Y PLOMEADO DE 2 CM DE ESPESOR.INCLUYE AMBOS LADOS DE LA BARDA Y BOQUILLA

REPELLADO DE MORTERO 1:5 , REGLEADO, Y PLOMEADO DE 2 CM DE ESPESOR.INCLUYE AMBOS LADOS DE LA BARDA Y BOQUILLA

PORTON DE 2 HOJAS ABATIBLE C/ PUERTA DE SERVICIO 2.85 MTS DE ALTURA X 5 MTS DE LARGO MARCO DE TUBO DE 2" CON TABLERO DE LAMINA INCLUYE: PINTURA, CHAPAS Y COLOCACION.

PORTON DE 2 HOJAS ABATIBLE C/ PUERTA DE SERVICIO 2.85 MTS DE ALTURA X 5 MTS DE LARGO MARCO DE TUBO DE 2" CON TABLERO DE LAMINA INCLUYE: PINTURA, CHAPAS Y COLOCACION.

PORTON DE 2 HOJAS ABATIBLE C/ PUERTA DE SERVICIO 2.85 MTS DE ALTURA X 5 MTS DE LARGO MARCO DE TUBO DE 2" CON TABLERO DE LAMINA INCLUYE: PINTURA, CHAPAS Y COLOCACION.

PRESUPUESTO BARDA 3.35 MTS DE ALTURA SIN REPELLADO

PRESUPUESTO BARDA 2 MTS DE ALTURA SIN REPELLADO

PRESUPUESTO BARDA 3.35 MTS DE ALTURA SIN REPELLADO

PRECIO UNITARIO

TRAZO Y NIVELACION DEL TERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANTE DE ESTRUCTURAS, ESTABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE CONSTRUCCIÓN

TRAZO Y NIVELACION DEL TERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANTE DE ESTRUCTURAS, ESTABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE CONSTRUCCIÓN

TRAZO Y NIVELACION DEL TERRENO PLANO POR MEDIOS MANUALES, PARA DESPLANTE DE ESTRUCTURAS, ESTABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. EN AREA DE CONSTRUCCIÓN

AFINE DE CEPAS POR MEDIO MANUAL EN TERRENO TIPO B

AFINE DE CEPAS POR MEDIO MANUAL EN TERRENO TIPO B

AFINE DE CEPAS POR MEDIO MANUAL EN TERRENO TIPO B

CIMENTACION DE MAMPOSTERÍA DE PIEDRA, BASE 80, C0R0NA 30, ALTURA VARIABLE, SENTADA CON MORTERO CEM-ARENA 1:5

CIMENTACION DE MAMPOSTERÍA DE PIEDRA, BASE 80, C0R0NA 30, ALTURA VARIABLE, SENTADA CON MORTERO CEM-ARENA 1:5

CIMENTACION DE MAMPOSTERÍA DE PIEDRA, BASE 80, C0R0NA 30, ALTURA VARIABLE, SENTADA CON MORTERO CEM-ARENA 1:5

ANCLAJE DE CASTILLOS ARMEX 15X30X4, INCLUYE CONCRETO F'C=150 KG/CM2

ANCLAJE DE CASTILLOS ARMEX 15X30X4, INCLUYE CONCRETO F'C=150 KG/CM2

ANCLAJE DE CASTILLOS ARMEX 15X30X4, INCLUYE CONCRETO F'C=150 KG/CM2

RELLENO PARA TAPAR CEPAS CON MATERIAL PRODUCTO DE LA EXCAVACIÓN.

RELLENO PARA TAPAR CEPAS CON MATERIAL PRODUCTO DE LA EXCAVACIÓN.

RELLENO PARA TAPAR CEPAS CON MATERIAL PRODUCTO DE LA EXCAVACIÓN.

MATERIAL INHERTE PARA RELLENO A VOLTEO PARA NIVELACION DE TERRENO

MATERIAL INHERTE PARA RELLENO A VOLTEO PARA NIVELACION DE TERRENO

MATERIAL INHERTE PARA RELLENO A VOLTEO PARA NIVELACION DE TERRENO

DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

DALA DE DESPLANTE DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5.

MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5.

MURO DE LADRILLO SENTADO CON MORTERO CEMENTO ARENA 1: 5.

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X15X4.

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X15X4.

CASTILLOS DE CONCRETO F´C=150, ARMADOS CON ARMEX 15X15X4.

DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

DALA DE CERRAMIENTO DE CONCRETO F'C=150, DE 15X20 CMS., ARMADO CON ARMEX 15X20X4.

COLUMNAS DE CONCRETO F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y ESTRIBOS DE 1/4" A CADA 25 CMS.

COLUMNAS DE CONCRETO F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y ESTRIBOS DE 1/4" A CADA 25 CMS.

COLUMNAS DE CONCRETO F'C 200 KG/CMS2, ARMADAS CON VARILLA DE 1/2" Y ESTRIBOS DE 1/4" A CADA 25 CMS.

PORTON DE 2 HOJAS ABATIBLE C/ PUERTA DE SERVICIO 2.85 MTS DE ALTURA X 5 MTS DE LARGO MARCO DE TUBO DE 2" CON TABLERO DE LAMINA INCLUYE: PINTURA, CHAPAS Y COLOCACION.

PORTON DE 2 HOJAS ABATIBLE C/ PUERTA DE SERVICIO 2.85 MTS DE ALTURA X 5 MTS DE LARGO MARCO DE TUBO DE 2" CON TABLERO DE LAMINA INCLUYE: PINTURA, CHAPAS Y COLOCACION.

PORTON DE 2 HOJAS ABATIBLE C/ PUERTA DE SERVICIO 2.85 MTS DE ALTURA X 5 MTS DE LARGO MARCO DE TUBO DE 2" CON TABLERO DE LAMINA INCLUYE: PINTURA, CHAPAS Y COLOCACION.

CATALOGO DE PRECIOS UNITARIOS SISTEMA PANEL MONOLITE

PRECIO UNITARIO

ELABORACIÓN DE LOSA DE CIMENTACIÓN HECHA CON CONCRETO F'C=200, ARMADA CON MALLA ELECTRO SOLDADA 6X6 10X10, CON UN ESPESOR DE 12 CMS., INCLUYE MURO DE PANEL MONOLITE DE 12 CMS. DE ESPESOR, CUBIERTO CON MORTERO CEMENTO ARENA 1 : 5.

LOSA DE PANEL ESTRUCTURAL MONOLITE BOVEDILLA, CUBIERTO CON MORTERO CEMENTO 1: 5, Y COLADO CON CONCRETO F'C= 200 KG/CM2.

COSTO POR M2 DE CONSTRUCCION $

CATALOGO DE PRECIOS UNITARIOS SISTEMA CEM-PANEL (FIBROCEMENTO)

PRECIO UNITARIO

ELABORACIÓN DE LOSA DE CIMENTACIÓN HECHA CON CONCRETO F'C=200, ARMADA CON MALLA ELECTRO SOLDADA 6X6 10X10, CON UN ESPESOR DE 12 CMS., INCLUYE EXCAVACIÓN, Y TRABES DE CIMENTACIÓN DEL MISMO CONCRETO, ARMADAS CON MURO DE TABLERO DE FIBROCEMENTO MARCA CEM-PANEL INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA.

LOSA DE TABLERO DE FIBROCEMENTO MARCA CEM-PANEL, INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA.

FALSO PLAFOND DE TABLA ROCA, INCLUYE ACCESORIOS Y CONEXIONES ASÍ COMO ACABADO DE LA MISMA MARCA.

COSTO POR M2 DE CONSTRUCCION $

CATALOGO DE PRECIOS UNITARIOS SISTEMA TEC-3000 (FIBROCEMENTO)

PRECIO UNITARIO

ELABORACIÓN DE LOSA DE CIMENTACIÓN HECHA CON CONCRETO F'C=200, ARMADA CON MALLA ELECTRO SOLDADA 6X6 10X10, CON UN ESPESOR DE 12 CMS., INCLUYE EXCAVACIÓN, Y TRABES DE CIMENTACIÓN DEL MISMO CONCRETO, ARMADAS CON ARMEX 15 X 20 X 4, INCLUYE HULE NEGRO MURO DE TABLERO DE FIBROCEMENTO MARCA TEC-3000, INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA.

LOSA DE TABLERO DE FIBROCEMENTO MARCA TEC-3000, INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA.

FALSO PLAFOND DE TABLA ROCA, INCLUYE ACCESORIOS Y CONEXIONES ASÍ COMO ACABADO DE LA MISMA MARCA.

COSTO POR M2 DE CONSTRUCCION $

CATALOGO DE PRECIOS UNITARIOS SISTEMA TABLA-ROCA

PRECIO UNITARIO

ELABORACIÓN DE LOSA DE CIMENTACIÓN HECHA CON CONCRETO F'C=200, ARMADA CON MALLA ELECTRO SOLDADA 6X6 10X10, CON UN ESPESOR DE 12 CMS., INCLUYE EXCAVACIÓN, Y TRABES DE CIMENTACIÓN DEL MISMO CONCRETO, ARMADAS CON ARMEX 15 X 20 X 4, INCLUYE HULE NEGRO PARA EVITAR TRANSMINACION DE HUMEDAD Y ACABADO DE CONCRETO MURO DE TABLERO DE TABLA-ROCA ESTÁNDAR AMBAS CARAS MARCA PANEL-REY INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA.MURO DE TABLERO DE TABLA-ROCA ESTÁNDAR SENCILLO MARCA PANEL-REY INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA.MURO DE TABLERO DE TABLA-ROCA EXTERIOR SENCILLO MARCA PANEL-REY INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA.

MURO DE TABLERO DE TABLA-ROCA RESIT WATER MARCA PANEL-REY INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA.MURO DE TABLERO DE TABLA-ROCA DOBLE, RESISTENT WATER MARCA PANEL-REY INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA.

Page 114: Avances de Obra 22

M2 7.63 $112.69 $859.26

M2 57.00 #REF! #REF!

TOTAL = #REF!

#REF!

CONCEPTO UNIDAD CANTIDAD TOTAL

M2 56.27 $50.00 $2,813.50

M2 101.30 $412.61 $41,796.90

M2 57.00 $533.75 $30,423.78

TOTAL = $75,034.18

$1,316.39

CONCEPTO UNIDAD CANTIDAD TOTAL

M2 56.27 $50.00 $2,813.50

M2 101.30 $442.55 $44,829.92

M2 57.00 $428.91 $24,448.03

TOTAL = $72,091.44

$1,264.76

CONCEPTO UNIDAD CANTIDAD TOTAL

M2 56.27 $50.00 $2,813.50

M2 101.30 #REF! #REF!

M2 57.00 #REF! #REF!

TOTAL = #REF!

#REF!

CONCEPTO UNIDAD CANTIDAD TOTAL

M3 2.58 $106.88 $275.76

ML 43.00 $148.63 $6,391.06

M2 57.00 $360.06 $20,523.70

TOTAL = $27,190.52

$483.22

CONCEPTO UNIDAD CANTIDAD TOTAL

M3 2.58 $106.88 $275.76

ML 43.00 $95.18 $4,092.58

M2 57.00 $360.06 $20,523.70

TOTAL = $24,892.04

$442.37

MURO DE TABLERO DE TABLA-ROCA SENCILLO, RESISTENT FIRE MARCA PANEL-REY INCLUYE CONEXIONES Y ACABADO DE LA MISMA MARCA.

FALSO PLAFOND DE TABLA ROCA, INCLUYE ACCESORIOS Y CONEXIONES ASÍ COMO ACABADO DE LA MISMA MARCA.

COSTO POR M2 DE CONSTRUCCION $

CATALOGO DE PRECIOS UNITARIOS SISTEMA FORMAS AISLANTES (FOAMBLOCk)

PRECIO UNITARIO

ELABORACIÓN DE LOSA DE CIMENTACIÓN HECHA CON CONCRETO F'C=200, ARMADA CON MALLA ELECTRO SOLDADA 6X6 10X10, CON UN ESPESOR DE 12 CMS., INCLUYE ELABORACIÓN DE MURO HECHO CON FOAM-BLOCK DE 12.5X112X25 CMS. SENTADO CON MORTERO CEMENTO-ARENA 1:5 Y RELLENO DE CONCRETO ELABORACIÓN DE LOSA HECHA CON BOVEDILLA FANOSA DE 61.5X1.60X15 CMS. DE CONCRETO F'C=200 Y ARMADO CON MALLA ELECTRO SOLDADA 6-6-10-10

COSTO POR M2 DE CONSTRUCCION $

CATALOGO DE PRECIOS UNITARIOS SISTEMA CONCRETO LIGERO (BETOSTYRENE)

PRECIO UNITARIO

ELABORACIÓN DE LOSA DE CIMENTACIÓN HECHA CON CONCRETO F'C=200, ARMADA CON MALLA ELECTRO SOLDADA 6X6 10X10, CON UN ESPESOR DE 12 CMS., INCLUYE EXCAVACIÓN, Y TRABES DE CIMENTACIÓN DEL MISMO CONCRETO, ARMADAS CON ELABORACIÓN DE MURO HECHO CON CONCRETO LIGERO F'C=175, CON AGREGADO DE BETOSTYRENE, DE 15 CMS. DE ESPESOR, ARMADO CON MALLA ELECTROSOLDADA CALIBRE 6X6 10-10.

ELABORACIÓN DE LOSA HECHA CON CONCRETO LIGERO F'C=175, CON AGREGADO DE BETOSTYRENE, DE 12 CMS. DE ESPESOR, ARMADO CON MALLA

COSTO POR M2 DE CONSTRUCCION $

CATALOGO DE PRECIOS UNITARIOS SISTEMA MULTY-PANEL (INTEGRAL)

PRECIO UNITARIO

ELABORACIÓN DE LOSA DE CIMENTACIÓN HECHA CON CONCRETO F'C=200, ARMADA CON MALLA ELECTRO SOLDADA 6X6 10X10, CON UN ESPESOR DE 12 CMS., INCLUYE ELABORACIÓN DE 1 M2 DE MURO HECHO CON MULTY PANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

ELABORACIÓN DE 1 M2 DE LOSA HECHA CON MULTY PANEL DE 3" DE ESPESOR, INCLUYE CONEXIONES.

COSTO POR M2 DE CONSTRUCCION $

CATALOGO DE PRECIOS UNITARIOS LOSA DE CIMENTACION

PRECIO UNITARIO

EXCAVACION MANUAL SOBRE TERRENO COMPACTADO.

ELABORACION DE 1 ML DE TRABE DE 30 X 20 CMS. DE CONCRETO F'C=200KG/CM2, ARMADO CON ARMEX 15X20X4, INCLUYE HULE CONTRA TRANSMINACIONELABORACION DE 1 M2 DE LOSA DE CIMENTACION DE CONCRETO F'C=200KG/CM2, ARMADO CON MALLA ELECTORSOLDADA Y ACABADO

COSTO POR M2 DE CONSTRUCCION $

CATALOGO DE PRECIOS UNITARIOS LOSA DE CIMENTACION SISTEMA PANEL MONOLITE

PRECIO UNITARIO

EXCAVACION MANUAL SOBRE TERRENO COMPACTADO, CEPA DE 20 X 30 CMS.

ELABORACION DE 1 ML DE TRABE DE 30 X 20 CMS. DE CONCRETO F'C=200KG/CM2, ARMADO CON ARMEX 15X20X4, INCLUYE HULE CONTRA TRANSMINACIONELABORACION DE 1 M2 DE LOSA DE CIMENTACION DE CONCRETO F'C=200KG/CM2, ARMADO CON MALLA ELECTORSOLDADA Y ACABADO

COSTO POR M2 DE CONSTRUCCION $