automated demand response "pg&e" refers to pacific gas and electric company, a...
TRANSCRIPT
![Page 1: Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company](https://reader034.vdocuments.mx/reader034/viewer/2022052215/56649d1a5503460f949ef7b0/html5/thumbnails/1.jpg)
Automated Demand Response
"PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company. All rights reserved. These offerings are funded by California utility customers and administered by PG&E under the auspices of the California Public Utilities Commission.
![Page 2: Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company](https://reader034.vdocuments.mx/reader034/viewer/2022052215/56649d1a5503460f949ef7b0/html5/thumbnails/2.jpg)
2
Auto-DR at PG&E
Makes it easy for customers to automatically participate in DR events.
DR Program Participation
• Customers receive revenue from automated load shed in DR events
• Business Programs• Aggregator
Programs
Auto-DR Technology Incentive
• Customers receive incentives to help pay for controls and software that enable Auto-DR
• Require OpenADR certified client
![Page 3: Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company](https://reader034.vdocuments.mx/reader034/viewer/2022052215/56649d1a5503460f949ef7b0/html5/thumbnails/3.jpg)
3
• Improved DR performance• More DR incentive
• Facilitates enhanced automation• Less operating cost to do DR
• Improved electricity grid stability• Improved reliability
Benefits of Auto-DR
![Page 4: Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company](https://reader034.vdocuments.mx/reader034/viewer/2022052215/56649d1a5503460f949ef7b0/html5/thumbnails/4.jpg)
DRAS
Internet
Building Automation System (BAS/EMCS)
Electric Load
Fully Automated DR
Customer
Auto DR
![Page 5: Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company](https://reader034.vdocuments.mx/reader034/viewer/2022052215/56649d1a5503460f949ef7b0/html5/thumbnails/5.jpg)
5
ADR Program
Incentive $ per kW of load shed
Technical Services
On-site audit
Peak load reduction calculation assistance
Customer Application Assistance
One program representative assists customer during entire application process
![Page 6: Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company](https://reader034.vdocuments.mx/reader034/viewer/2022052215/56649d1a5503460f949ef7b0/html5/thumbnails/6.jpg)
6
Metering Distributed generation Permanent load shifting technologies Cameras Software licenses Ongoing maintenance
ADR Eligibility Requirements
Measures that are NOT covered by ADR incentives
Solar
Thermal energy storage
![Page 7: Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company](https://reader034.vdocuments.mx/reader034/viewer/2022052215/56649d1a5503460f949ef7b0/html5/thumbnails/7.jpg)
1st Payment: 60% provided once equipment is installed and verified
Performance based incentive structure
3
2nd Payment: up to 40% based on customer meeting performance goal
2nd Payment
1st Payment
![Page 8: Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company](https://reader034.vdocuments.mx/reader034/viewer/2022052215/56649d1a5503460f949ef7b0/html5/thumbnails/8.jpg)
Incentive Budget
Incentive Caps by Demand Response Program
4
DR Program Incentive Budget
Peak Day Pricing (PDP) $4.8 million
Aggregator Managed Portfolio (AMP)
$3 million
Demand Bidding Program (DBP)
$2 million
Capacity Bidding Program (CBP)
$1.5 million
IDSM Projects: Can enroll in PDP, DBP or CBP
$4.1 million
Customer must enroll in an eligible DR Program for three years
![Page 9: Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company](https://reader034.vdocuments.mx/reader034/viewer/2022052215/56649d1a5503460f949ef7b0/html5/thumbnails/9.jpg)
9
Incentive Rates
Technology CategoryIncentive Rate
($/dispatchable kW)
Semi – Automated Demand Response $125
Automated Demand Response $200
Advanced Technology HVAC $350
Advanced Technology Lighting $400
![Page 10: Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company](https://reader034.vdocuments.mx/reader034/viewer/2022052215/56649d1a5503460f949ef7b0/html5/thumbnails/10.jpg)
Project Milestones
Screening and
Enrollment
Project Approval
Installation
Load Shed
Verification
First Incentive Payment
DR Season
Performance
Second Incentive Payment
Continued
Customer Service
49
![Page 11: Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company](https://reader034.vdocuments.mx/reader034/viewer/2022052215/56649d1a5503460f949ef7b0/html5/thumbnails/11.jpg)
11
ADR Program Website
For up-to-date program information visit:www.pge-adr.com