Page 1: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION

ERNST ÜBERREITER

Page 2: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

WFD, Annex VII B.2The first update of the river basin management plan and all subsequent updates shall also include an assessment of the progress made towards the achievement of the environmental objectives […]

EEA HomepageThe European Environment Agency (EEA) is an agency of the European Union. Our task is to provide sound, independent information on the environment. We are a major information source for those involved in developing, adopting, implementing and evaluating environmental policy, and also the general public.

--- 2 ---

WHY TALKING ABOUTSHOWING PROGRESS ON EU LEVEL?

Copenhagen, 28. 4. 2014

Page 3: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

--- Justification for high investment costs in WFD implementation measures- public- politics

e.g. estimated costs for hydromorphological measures in AT: 3 Billion Euro

- Restoration of river continuity (~1000) in larger catchments: 500 Mio. Euro

- Morphological measures in larger catchments : 1 Billion Euro

--- Decision basis for subsequent management cycle

--- Support EC compliance check with WFD requirements

--- 3 ---

WHY IS IT IMPORTANT FOR AUSTRIATO SHOW PROGRESS?

Copenhagen, 28. 4. 2014

Page 4: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

Percentage of surface water bodies

--- 4 ---

HOW PROGRESS USUALLY IS SHOWN

AT EXAMPLE EC EXAMPLE

Copenhagen, 28. 4. 2014

Improvement of % river lengthin good status or better

+ 3%

Source: Austrian RBMP 2009

QUESTIONS THAT STILL ARISE:

WHERE HAS ALL THE INVESTED MONEY GONE?

LOW AMBITION?

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

EE SK RO SE MT IE PT LV LT ES BG AT FR CY DK EL UK FI IT CZ DE HU LU PL NL BE

Perc

enta

ge o

f sur

face

wat

er b

odie

s

Source: EC presentation 2012, Impl. Report

█ Good Ecological Status█ Unknown Ecological Status

▌ Exemptions

4%

Page 5: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

--- 5 ---

TAKEN EFFORTS HAVE TO BE MADE

TRANSPARENTCopenhagen, 28. 4. 2014

Bregenzerach, Abbr. Sohlschwelle Mellau

Source: Alpenrhein/Bodensee, WFD Status Report 2013

FAH-Schlitzpass KW Braz

Bolabach, Renaturierung

Lutz, Renaturierung

Spirsbach, Renaturierung Mündung Dorfbach Hard

Page 6: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

--- Changes in reference conditions:Example: significant changes in number of river waterbodies between 1. RBMP and 2.

RBMP mainly due to splitting of existing waterbodies (+ 7%, main intention to protect high status areas),

while length of river network almost constant (ca. 31,600 km) Water bodies of 1. RBMP and 2. RBMP are not fully comparable

--- Changes of valuation standards:Example: new EQS Directive 2008/105/EC tightens standards for existing substances and enshrines quite high new standards for ubiquitous substances virtual deterioration of all WB status when considering the one-out-all-out-principle

--- Multiple pressures in water bodies:Example: cost intensive restoration of river continuity is pre-condition for further measures; but reduction of only one pressure (dam or barrier) without further measures may not lead to direct improvement in status; no improvement in status is visible when considering the one-out-all-out-principle

--- 6 ---

CHALLENGES FOR SHOWING PROGRESS Copenhagen, 28. 4. 2014

Page 7: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

--- Slow reaction of ecosystems:Example: atrazine still detectable in some groundwaterbodies although it is banned since

many years (decades). no improvement visible although all measures taken

--- Apparent „increase“ of pressures due to better data:Example: awareness of disruptions of continuity increased from 28,000 (2009) to 33,000

(2013), while about 1,000 major ones where in fact removed; pretended increase of pressure on paper hiding of achievements

--- 7 ---

CHALLENGES FOR SHOWING PROGRESS Copenhagen, 28. 4. 2014

Page 8: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

--- 8 ---

SHOWING PROGRESS BYDIFFERENTIATED RISK/STATUS INFORMATION

Copenhagen, 28. 4. 2014

Source: Austrian WFD Status analysis 2013 Nat

ional

chem

ical s

ubst.

Chem

ical s

ubsta

nces

Hydro

mor

pholo

gy

Gener

al ch

em.-p

hys.

Tota

l risk

% r

iver

wat

er b

ody

leng

th

no risk possible risk risk

Hydromorphology

Impo

undm

ent

Flow flu

ctuat

ion

Disrup

tion

of

cont

inuity

Reduc

ed

flow

River r

egula

tion

Continuity

Morphology

Hydrology

Page 9: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

--- 9 ---

SHOWING PROGRESS BY IMPROVED LENGTH/AREA OF WATERBODIES

Copenhagen, 28. 4. 2014

Pressure

3

Pressure removed

2

2009 2015*

Pressure

1

3

PROGRESS: PROTECTION OF HIGH STATUS AREAS

PROGRESS: IMPROVEMENTS DUE TO REDUCED PRESSURES

Pressure2015

Pressure

All-out-one-out ubiquitous substances

*Remark: if ubiquitous substances are considered in total status visualisation, all status would be bad.

Pressure removed

Status of Water bodies 2009/2015 is not comparable due to re-delineation

Page 10: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

Example:

Disruption of continuity in rivers (1/km)

- Number of reduced pressures

2009-2013: ~1,000 main disruptions removed

Beware: efforts may be hidden by „new“ disruptions only on paper: 2009: ~28,000, 2013: ~33,000 +4,000 on paper

- Km river length improved by reduced pressure

2009-2013: 3,800 km (12%) improved due to removed disruptions

--- 10 ---

SHOWING PROGRESS BYREDUCED PRESSURES

Copenhagen, 28. 4. 2014

COMPARABLE RESULTS ALSO FOR

DIFFERENT WB SIZES ON EU LEVEL

Page 11: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

--- Wrong aggregation of provided data:Example: summing up areas of surface GWB (83,708km²) and deep GWB

(12,229km²); total area of groundwater bodies is larger than Austrian territory (ca.

84,000km²)

--- Wrong interpretation of focus on problems:Example: quite high number of monitoring stations in porous GW bodies with

problems due to agricultural pressure (~11% due to nitrates) and low number of monitoring stations in carstic GW bodies with almost no pressure;

disproportionate high number of „bad“ monitoring stations (~11% „bad“ monitoring stations due to nitrates representing ~5% of GWB area).

--- 11 ---

FURTHER ISSUES DETECTEDIN EC/EEA IMPLEMENTATION REPORTS

Copenhagen, 28. 4. 2014

Page 12: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

Grassland and forests

Arable land

Land cover and land use Nitrates Monitoring Stations

FURTHER ISSUES DETECTEDIN EC/EEA IMPLEMENTATION REPORTS

MONITORING FOCUS IN AREAS WITH PROBLEMS IS WELL REPRESENTED BY MONITORING STATIONS PER KM² GWB

Page 13: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

--- Showing progress is important (public, politics, management decisions) and required (WFD).

--- Differentiated approach (e.g. by reduced pressures) to make main water management issues and taken efforts transparent.

Difficulties to show progress considering one-out-all-out principle (e.g. ubiquitous substances).

--- Preferably show progress by improved length/area of water bodies, which delivers comparable results also for different WB sizes on EU level.

--- 13 ---

CONCLUSION Copenhagen, 28. 4. 2014

Page 14: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

THANK YOU FOR YOURKIND ATTENTION!

[email protected]

--- 14 ---

Copenhagen, 28. 4. 2014

Page 15: AUSTRIAN EXPERIENCES ON SHOWING PROGRESS OF WFD IMPLEMENTATION ERNST ÜBERREITER

2009: 31466 km, 7910 river WB

2013: 31600 km, 7910 river WB

--- 15 ---

AT SUGGESTION: SHOWING PROGRESSBY DIFFERENTIATED STATUS INFORMATION

Copenhagen, 28. 4. 2014

Source: Austrian WFD Status analysis 2013