australian paper - gas fired boiler #9

Upload: kangbahar

Post on 18-Oct-2015

11 views

Category:

Documents


0 download

TRANSCRIPT

  • 5/28/2018 Australian Paper - Gas Fired Boiler #9

    1/3

    Australian Paper, Maryvale, Vic

    APA Group, Euroa, Vic

    Victorian Desalination Project, Wonthaggi, Vic

    Patricia Baleen, Newmerella, Vic

    Gippsland Water, Morwell, Vic

    Woodside Petroleum/Otway Gas Plant, Port

    Campbell, Vic

    Esso, Hastings, Vic

    Lang Lang processing gas plant, Vic

    Toyota Mechanical Division, Altona Vic

    Thompson Dam, Vic

    Hazelwood Power, Hazelwood, Vic

    Telstra Dome/Etihad, Docklands, Vic

    Australian Paper

    Gas Fired Boiler #9

    In June 2012, Primaweld was awarded the contract to supply labour and resources to repair the economiser

    and bifurcation sections of #9 gas fired boiled at Australian Paper Maryvale Mill. The duration of this shut

    lasted a total of 4 weeks and was finished early July 2012

    3rd Effect Head Replacement

    Fabrication of a 4.2 metre diameter, 16mm thick stainless steel vessel. This 9 tonne top section of the vessel

    was fitted on site and welded in place during the 10 day May 2012 shut.

    E4 Evaporator Upgrade (SITE)

    During 2011, Primaweld undertook this project consisting of the removal of an existing vessel, refurbish of the

    existing structure and install new vessel with new piping and ducting system

    Raw Water Upgrade

    Supply and Fabrication of 300-500nb stainless steel pipe line including site installation, NDT & hydro testing.

    M1, M2 Gantry Crane Replacement

    Replacement of existing gantry cranes with brand new equivalents including removal and reinstallation of

    existing roof structures

    M5 Steam Upgrade

    Fabrication and Installation of new steam lines including NDT testing

    Burke Street Pipe Bridge (Pulp Mill Project)

    Supply, fabrication & partial assembly of several secti ons of the "burke Street" pipe bridge and access towers.

    Home

    About UsNews

    Services

    Safety and Quality

    Projects

    Contact Us

    ISO 9001

    Australian Paper - Gas Fired Boiler #9 http://primaweld.com.au/index.php/projects/australian-paper/

    1 of 3 26/03/2014 16:34

  • 5/28/2018 Australian Paper - Gas Fired Boiler #9

    2/3

    M1 High consistency refiner upgrade

    Blow Tank

    As part of the Batch mill upgrade, Primaweld was awarded the supply, fabrication, testing and i nstallation of

    the blow tank. Material used was 2205 Stainless Steel and had a circumference of approx. 7.5m, was 36

    metres long and weight 80 tonnes.

    M5 Paper Machine (SITE)

    Australian Paper installed a new paper machine and some major upgrades took place in order to service their

    latest demands. At a cost of $ 830,000 the contract was awarded to Primaweld in February 1997 with

    completion in June 1997. Primaweld's responsibility under this contract was to supply materials (structural

    steel and piping), shop fabrication and installation on site.

    Australian Paper - Gas Fired Boiler #9 http://primaweld.com.au/index.php/projects/australian-paper/

    2 of 3 26/03/2014 16:34

  • 5/28/2018 Australian Paper - Gas Fired Boiler #9

    3/3

    Sign In to Edit this Site

    2014 Primaweld Group.

    Built with concrete5 - an open source CMS

    Australian Paper - Gas Fired Boiler #9 http://primaweld.com.au/index.php/projects/australian-paper/

    3 of 3 26/03/2014 16:34