australia to india project movement

15
AUSTRALIA to INDIA AUSTRALIA to INDIA Dismantling and Dismantling and Dismantling and Dismantling and Transportation Project Transportation Project Movement Movement By

Upload: nitesh-desai

Post on 29-Jun-2015

277 views

Category:

Documents


0 download

DESCRIPTION

Recently completed Project from australia to india for Door to Door Basis covering Total Scope of Dismantling , Packing , Transportation and Shipping and delivering the Same to Customer Door step in india .

TRANSCRIPT

Page 1: Australia To India Project Movement

AUSTRALIA to INDIA AUSTRALIA to INDIA Dismantling and Dismantling and Dismantling and Dismantling and

Transportation Project Transportation Project p jp jMovementMovement

By

Page 2: Australia To India Project Movement

Scope of Work At Origin Scope of Work At Origin Scope of Work At Origin Scope of Work At Origin 1) Dismantling of 8 Trimming Press Machines2) Packing & Transportation

4) Handling & Clearance At Melbourne -custom documents & Ground rent,

dl d l d

3) Port & warfrage etc

5)O F i h i l d

-Handling , Loading & unloading -sea Cargo worthiness , Internal transportation up to Hook Point-This does not include THC & ODC surcharge for 20” OT and 40” OT

5)Ocean Freight -: includes - Stev Doring , - Marin surrey , - lashing & Choking,lashing & Choking,- Dunn age's with Materials to be used for Packing ,- Plus The 20” OT and 40”OT freight as already Given by Your

Agent

Page 3: Australia To India Project Movement

The Movement of Dismantled Parts of

1)MAIN PRESS-Siempel kamp & Massy trim press (1987 Year Bilt)

2) Trim Press Massy (1976 year built).

3) Main Press-EUMUCO (1978 BUILT)

4) TRIM PRESS-WILKINS (1970 BUILTYEAR).

5) MAIN PRESS -MAXI (1969 YEAR BUILT).5) MAIN PRESS MAXI (1969 YEAR BUILT).

6) Trim press -wilkins (1966 year built).

7) ADDITIONAL TRIM PRESS7) ADDITIONAL TRIM PRESS.

8) ADDITIONAL CADDY 80 (CHOPPER PRESS).

Page 4: Australia To India Project Movement
Page 5: Australia To India Project Movement

Scope of Work at DestinationScope of Work at Destination1) U l di t B b P t f V l1) Unloading at Bombay Port from Vessel .

2) Handling & Clearance at Bombay Port .

3) Transportation to Customer Door Step .

4) Arrangements of Crain's of heavy duty at Customer Area .

Page 6: Australia To India Project Movement

Tentative Schedule of Project Tentative Schedule of Project 1) J l 23 J l 26 R i i f d i d di tli l1) July 23 - July 26 : Revision of drawings and dismantling plan

2) July 27 : Delivery of tools and kit

3) July 30 : Commence dismantling.

4) August 25 Completion of dismantling and loading of containers

5) August 26 start delivery of cargo to port.

Containers will; be delivered to site once we have enough cargo to pack

Page 7: Australia To India Project Movement

Site before start of Dismantling of Site before start of Dismantling of Press’sPress’s

Page 8: Australia To India Project Movement
Page 9: Australia To India Project Movement
Page 10: Australia To India Project Movement
Page 11: Australia To India Project Movement

Dismantling of Trim Press’sDismantling of Trim Press’sDismantling of Trim Press sDismantling of Trim Press s

Page 12: Australia To India Project Movement

Dismantling of Trim Press’sDismantling of Trim Press’sDismantling of Trim Press sDismantling of Trim Press s

Page 13: Australia To India Project Movement
Page 14: Australia To India Project Movement
Page 15: Australia To India Project Movement

Site after Completion of Site after Completion of Dismantling of Press’sDismantling of Press’s