Austin Bergstrom International Airport

Safety Risk Management

Overview and Training Exercises,

“Train the Trainer”

Presented by: Jacobs Carter Burgess SMS Project Team

September 16, 2008

Page 2: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 2

What is a Safety Management System?

SafetyRisk

Management

Page 3: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 3

What is Safety Risk Management?

Safety Risk Management means being both reactive from a historical perspective and proactive from a speculative or anticipatory analysis.

By reviewing past occurrences and considering changes in progress, a probability and severity assessment can be utilized to mitigate hazards and potential hazards to an acceptable level.

Page 4: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 4

Safety Risk Management, continued

The SRM process is utilized when changes in a system (i.e. the airports’ configuration, operation, procedures, new equipment, expanded or personnel responsibilities, etc.) are either planned or occur.

Any changes to an existing system or systems can introduce adverse hazards which may result in incidents or accidents.

Page 5: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Reason Swiss Cheese Multi-Layer Safety Model

SAFETY LA

YER 3

SAFETY LA

YER 4

SAFETY LA

YER 2

SAFETY LA

YER 1

HAZARD

HAZARD

HAZARD

HAZARD

JACOBS ENGINEERING

Richard Compton

Accident?

Incident?

HAZARDHAZARD

Page 6: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 6

Safety Risk Management, continued

Risk is the assessment of the likelihood of occurrence and the predictable severity of each identified hazard.

SRM provides the process for evaluation of the various risks and the systematic analysis, mitigation and corrective course of action to:

Either eliminate the risk(s), or

Reduce the probability and severity of the risk(s) to an acceptable level.

Page 7: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 7

Safety Risk Management Examples

Examples when SRM would be required are:Configuration changes at the airport, whether temporary or permanent;

The design of new systems, procedures, and/or organizations;

Any proposed changes to an existing operation, procedures, equipment, personnel and/or environment; or

Hazards identified during operations or safety assurance functions, such as audits or safety reports.

Page 8: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 8

Safety Risk Management Process

Once hazards have been identified, they are assessed and analyzed for their potential impact on safety.

Mitigation of the potential hazard is developed to minimize the risk to an acceptable level.

The mitigation of the risks, development of revisions, modifications, contingency arrangements and the implementation of mitigation strategies, requires conscious management decisions to approve, fund, schedule, and implement one or more risk strategies.

Page 9: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 9

Safety Risk Management Process

The Safety Risk Management Process consists of five functional phases:

1. Describe the System, Procedure, or Organization

2. Hazard Identification

3. Analyze the Risk

4. Assess the Risk

5. Treat the Risk & Monitor for Effectiveness

Page 10: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 10

Safety Risk Management – Phase 1

Describe the System, Procedure, or Organization;Project, procedure, activity, equipment, and/or organization

In describing the system (current & proposed):Define, the configuration, use, intended operation, function and/or task descriptions

Define what changes are proposed

Define, the scope, objectives and implementation interactions

Page 11: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 11

Safety Risk Management – Phase 2

Hazard Identification

All potential hazards will be listed,

Hazard identification comes from;

Planning meetings,

Reports, safety concerns,

Data collection & assessment,

Locally developed “Check-Lists”, or

“Lessons Learned” and previous experiences

Page 12: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 12

Hazard Identification Table

Each hazard that is identified will be added to the list, without pre-judgment.

1 Construction haul route crosses active taxiway No Flagman

2 Construction equipment height at the work area

Contractor could use wrong height equipment

3 Temporary FAA maintenance personnel route will crosses an active taxiway

Assume FAA understands the rules

4

5

Page 13: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 13

Safety Risk Management – Phase 3

Analyze the risk for each hazardGroup hazards for commonality

Re-write for consolidation

Ask the open-ended questions What if….?, Why did….?

Determine the trigger mechanisms and their various outcomes

Identify existing controls

Page 14: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 14

Hazard Identification Table

1 Vehicles Unrestricted crossing active

access

Taxiway “A”between “A1” and “A2”

1 Construction haul route crosses active taxiway No Flagman

2 Construction vehicle height at the work area Contractor could use wrong height equipment

3Temporary FAA maintenance personnel route will crosses an active taxiway

Assume FAA understands the rules

Consolidate common hazards!

Page 15: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 15

Safety Risk Management – Phase 4

Assess the hazardAssess the severity and likelihood of occurrence by use of Risk MatrixPrioritize the risk and results from the Risk Matrix

1 Vehicles Unrestricted crossing active

access

Taxiway “A”between “A1” and “A2”

Page 16: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 16

Safety Risk Management - Matrix

Mitigating Risk to an acceptable level

11R

Page 17: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 17

Safety Risk Management – Phase 5

Mitigate/Treat the RiskIdentify risk mitigation options

Hazard reduction or elimination

Select best-suited option & implementation strategyAs Low As Reasonably Possible (ALARP)

Identify monitoring strategies for effectiveness of mitigation

Identify management level(s) for risk mitigation decisions

Page 18: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 18

Safety Risk Management – Phase 5 (cont.)

Hazard Reduction or EliminationDesign and/or modify the hazard for minimization or elimination

Reduce exposure and severity – physical guards or barriers

Warnings, advisories, and/or signals

Procedural and/or operational changes

Training for hazard avoidance

Upon completion, re-apply SRM process on the substituted or eliminated risks

Track changes to system, procedure, equipment, personnel and/or environment through data capture, monitoring, reporting, and debriefs

Page 19: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 19

Decision Reporting

Safety Risk Management – SRMDR

Page 20: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 20

Safety Risk Management – SRMDR

Safety Risk Management Decision Report (SRMDR) The development of a SRMDR, is the formal documentation of SRM decisions.

Each SRMDR must:

Describe the hazard and analysis process

Explain mitigating options and implementation strategy

Identify the responsible management organization for this task or activity

Identify stakeholders for implementation, communications, and training requirements

Identify monitoring strategies for effectiveness of mitigation

Page 21: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 21

Multiple Hazard Reports for a Project is Typical

SRMDR Forms

Page 22: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 22

SRMDR Forms

Page 23: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 23

SRMDR Forms

• Simplified, or• Expanded

Page 24: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 24

Safety Risk Management – SRMDR

Safety Risk Management Decision Reports should be completed by the SMS Coordinator Approvals of SRMDR’s should be at the division head level or above. Approval of the SRMDR certifies that:

It was developed properly.

Hazards were systematically identified.

Risks were appropriately assessed,mitigated and the risks are acceptable

Page 25: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 25

Safety Risk Management (SRM) Training

Page 26: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 26

Practical Training Exercises

2 Projects Planned for SRM Determinations#1 - Roadway within Runway Clear Areas

#2 - ABIA identified project

Page 27: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 27

Training Exercise #1

Roadway within

Runway Airport Operations Areas

Page 28: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 28

Training Exercise #1 – Project Area

Roadway within the Airport Operations Area

Page 29: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 29

Training Exercise #1 - Issues

OFZ

RSA

OFA

Roadway penetrates;

• OFZ

• RSA

• OFA

Page 30: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 30

Training Exercise #1 – Detailed Issues

OFZ

RSA

OFA

RU

NW

AY

Page 31: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 31

Training Exercise #1 – Project Access

Page 32: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 32

Training Exercise #1 – Project Plan

Staging Area

OFZ

/ C

onst

ruct

ion

Lim

its

Haul Routes

New Roadway

Page 33: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 33

Populating the Hazard List

1 Staging area location

2 Haul route

3

4

Construction equipment type

Runway Operations

5 Work within OFZ, RSA or OFA

6 Weather

7 Low visibility

8 Navaids

9 Pilot Distractions

10 Dust

Page 34: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 34

Construction & Maintenance Checklist

Page 35: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 35

Safety Risk Management - Matrix

Mitigating Risk to an acceptable level

HIGH RISK

MODERATE HIGH RISK

MEDIUM RISK

LOW RISK

Page 36: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 36

Hazard Identification Table

1

2

3

4

5

6

7

8

9

Page 37: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 37

Safety Risk Management - Matrix

Mapping the Risk

1 2

3

4

5

1R 2R

3R

4R

5R

Page 38: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 38

SRMDR Hazard Form

2

1

3

4

5

6

Page 39: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 39

SRMDR Report Form

Simplified, or Expanded.The SRMDR Report can be as brief or complex as need / risk demands.

Page 40: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 40

Training Exercise #1 - SRMDR

Hazard Identification

Analyze Each Risk

Assess the Risk

Staging Area

OFZ

/ C

onst

ruct

ion

Lim

its

Haul Routes

New Roadway

Page 41: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 41

Training Exercise #1

Treat the Risk

SRM Determination

Tracking Mitigation Effectiveness

Page 42: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 42

Training Exercise #2

_________________ Project

Page 43: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 43

Training Exercise #2

Project SelectionSelect a project within the area identified in RED, for SRM Approval

Not too simple

Challenge yourself!

Time limit – 90 minutes

Project Scope

Hazard List

Hazard Analysis Worksheets

Preliminary Hazard Analysis Worksheet

Risk Matrix Mapping

SRMDR

Page 44: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 44

Training Exercise #2 – ABIA Project

Construct Apron

Haul R

oute 1H

aul Route 2

Access TaxiwayKeep

DrainageDetention

Page 45: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 45

Training Exercise #2

Page 46: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 46

Training Exercise #2

Page 47: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 47

Training Exercise #2

Page 48: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 48

SRMDR Form – Hazard List

Page 49: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 49

SRMDR Form – Hazard Analysis Worksheet

Page 50: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 50

SRMDR Form – Hazard Identification Table

Page 51: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 51

Safety Risk Management - Matrix

Mitigating Risk to an acceptable level

Page 52: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 52

Safety Risk Management - Matrix

Mitigating Risk to an acceptable level

Page 53: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 53

SRMDR Form – SMRDR Report

Page 54: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 54

SRMDR Form – SMRDR Report

Page 55: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 55

SRMDR Form – SMRDR Report

Page 56: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Page 56

SRM Life Cycle / Style

Describe System

Identify Hazards

Analyze & AssessRisk

Implement Mitigate

Monitor

EvaluateEffectiveness

Communicate

Page 57: Austin Bergstrom International Airport Safety Risk ...€¦ · Safety Risk Management Overview and Training Exercises for Austin-Bergstrom International Airport (AUS), 16 September

Thank You!

YourJacobs Carter Burgess SMS Team