August 25, 2014 ADDENDUM #1 BL077-14 Installation, Replacement and/or Relocation of Stormwater Culverts, Pipes and Appurtenances on an Annual Contract C1. CHANGE the bonding requirements to read: All suppliers must submit with bid, a bid bond, certified check or cashier's check in the amount of five percent (5%) of $1,000,000.00. Failure to submit a bid bond with the proper rating will result in the bid being deemed non-responsive. Successful supplier will be required to meet insurance requirements and submit a Performance Bond and Payment Bond, each in the sum of $1,000,000.00. Insurance and Bonding Company should be licensed to do business by the Georgia Secretary of State, authorized to do business in Georgia by The Georgia Insurance Department, listed in the Department of Treasury's Publication of Companies holding Certificates of Authority as Acceptable Surety on Federal Bonds and as acceptable reinsuring companies. The bid bond, payment bond, and performance bond must have an A.M. Best rating of A-5 or higher. All bonds should be submitted on forms provided by Gwinnett County and agencies providing bonds and insurance should provide proof that they meet the criteria outlined in the bid and contract documents. C2. NOTE THE FOLLOWING REVISED AND/OR ADDED DOCUMENTS ARE ATTACHED. PLEASE REPLACE THE APPROPRIATE PAGES IN YOUR BID DOCUMENT WITH THE ATTACHED REVISED AND/OR ADDED DOCUMENTS: Bid Schedule Table of Contents Page 2 Measurement and Payment (01 22 15.11) Storm Drainage Piping (33 41 13) Page 3 Appendix A – Attachments A-D Q1. The bid announcement calls for pipe and culvert replacement. Will the county consider the larger diameter pipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract only. This addendum should be signed in the space provided below and returned with your bid. Failure to do so may result in your bid being deemed non-responsive. Company Name ___________________________________________________________ Authorized Representative ___________________________________________________ Thank you. Holly Cafferata, CPPB Purchasing Associate III

Upload: others

Post on 27-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

August 25, 2014

ADDENDUM #1

BL077-14 Installation, Replacement and/or Relocation of Stormwater Culverts, Pipes and Appurtenances

on an Annual Contract C1. CHANGE the bonding requirements to read: All suppliers must submit with bid, a bid bond, certified check or cashier's check in the amount of five

percent (5%) of $1,000,000.00. Failure to submit a bid bond with the proper rating will result in the bid being deemed non-responsive. Successful supplier will be required to meet insurance requirements and submit a Performance Bond and Payment Bond, each in the sum of $1,000,000.00. Insurance and Bonding Company should be licensed to do business by the Georgia Secretary of State, authorized to do business in Georgia by The Georgia Insurance Department, listed in the Department of Treasury's Publication of Companies holding Certificates of Authority as Acceptable Surety on Federal Bonds and as acceptable reinsuring companies. The bid bond, payment bond, and performance bond must have an A.M. Best rating of A-5 or higher.

All bonds should be submitted on forms provided by Gwinnett County and agencies providing bonds and insurance should provide proof that they meet the criteria outlined in the bid and contract documents.

C2. NOTE THE FOLLOWING REVISED AND/OR ADDED DOCUMENTS ARE ATTACHED. PLEASE

REPLACE THE APPROPRIATE PAGES IN YOUR BID DOCUMENT WITH THE ATTACHED REVISED AND/OR ADDED DOCUMENTS:

Bid Schedule

Table of Contents Page 2

Measurement and Payment (01 22 15.11)

Storm Drainage Piping (33 41 13) Page 3

Appendix A – Attachments A-D   

Q1. The bid announcement calls for pipe and culvert replacement. Will the county consider the larger diameter pipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement?

A1. No, this is a replacement contract only. This addendum should be signed in the space provided below and returned with your bid. Failure to do so may result in your bid being deemed non-responsive. Company Name ___________________________________________________________ Authorized Representative ___________________________________________________ Thank you. Holly Cafferata, CPPB Purchasing Associate III

Page 2: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE: 4. Bidder submits the following lump sum/unit prices for the Installation, Replacement and/or Relocation of Stormwater Culverts, Pipes and Appurtenances on an Annual Contract Base Bid identified in the Bid Schedule as part of this Bid. Work included within each Bid Item in the Bid Schedule is described in Section 01 22 15.11 – Measurement and Payment.

REVSIED BID SCHEDULE

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

GENERAL ITEMS

1 01 22 15.11 FOREMAN HR 10 $ $

2 01 22 15.11 LABORER HR 50 $ $

EXPLORATION AND REMOVAL ITEMS

3 02 41 13.23 REMOVAL OF EXISTING NON-DRAINAGE STRUCTURES

EA 20 $ $

4 02 41 13.23

REMOVAL AND RELOCATION OF EXISTING STORAGE BUILDING

EA 10 $ $

5 02 41 13.23 REMOVAL OF EXISTING DRAINAGE STRUCTURES

EA 300 $ $

6 02 41 13.23 REMOVE EXISTING PIPE, ALL TYPES AND SIZES

LF 20000 $ $

7 02 42 11 DEBRIS REMOVAL LOAD 400 $ $

CAST IN PLACE CONCRETE

8 03 30 00

CONCRETE STRUCTURES, CAST IN PLACE, INCLUDING REINFORCING STEEL

8.A 03 30 00 Class AAA (5000 psi) CY 50 $ $

8.B 03 30 00 Class AA1(4500 psi) CY 50 $ $

8.C 03 30 00 Class A (3000 psi) CY 3000 $ $

8.D 03 30 00 Class B (2200 psi) CY 50 $ $

Page 3: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

9 03 30 00

CONCRETE STRUCTURES, CAST IN PLACE, WITHOUT REINFORCING STEEL

9.A 03 30 00 Class AAA (5000 psi) CY 50 $ $

9.B 03 30 00 Class AA1(4500 psi) CY 50 $ $

9.C 03 30 00 Class A (3000 psi) CY 100 $ $

9.D 03 30 00 Class B (2200 psi) CY 50 $ $

MASONRY ITEMS

10 04 21 13 BRICK MASONRY HEADWALL COMPLETE WITH FOOTING

10.A 04 21 13 For Pipe Size 18” EA 10 $ $

10.B 04 21 13 For Pipe Size 24” EA 10 $ $

10.C 04 21 13 For Pipe Size 30” EA 10 $ $

10.D 04 21 13 For Pipe Size 36” EA 20 $ $

10.E 04 21 13 For Pipe Size 42” EA 10 $ $

10.F 04 21 13 For Pipe Size 48” EA 5 $ $

10.G 04 21 13 For Pipe Size 54” EA 5 $ $

10.H 04 21 13 For Pipe Size 60” EA 5 $ $

10.I 04 21 13 For Pipe Size 66” EA 5 $ $

10.J 04 21 13 For Pipe Size 72” EA 5 $ $

10.K 04 21 13 For Pipe Size 78” EA 5 $ $

10.L 04 21 13 For Pipe Size 84” EA 5 $ $

10.M 04 21 13 For Pipe Size 96” EA 5 $ $

Page 4: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

11 04 43 13 RUBBLE MASONRY HEADWALL COMPLETE WITH FOOTING

11.A 04 43 13 For Pipe Size 18” EA 5 $ $

11.B 04 43 13 For Pipe Size 24” EA 5 $ $

11.C 04 43 13 For Pipe Size 30” EA 5 $ $

11.D 04 43 13 For Pipe Size 36” EA 5 $ $

11.E 04 43 13 For Pipe Size 42” EA 5 $ $

11.F 04 43 13 For Pipe Size 48” EA 5 $ $

11.G 04 43 13 For Pipe Size 54” EA 5 $ $

11.H 04 43 13 For Pipe Size 60” EA 5 $ $

11.I 04 43 13 For Pipe Size 66” EA 5 $ $

11.J 04 43 13 For Pipe Size 72” EA 5 $ $

11.K 04 43 13 For Pipe Size 78” EA 5 $ $

11.L 04 43 13 For Pipe Size 84” EA 5 $ $

11.M 04 43 13 For Pipe Size 96” EA 5 $ $

CLEARING AND EARTHWORK

12 31 11 00 TREE REMOVAL INCLUDING STUMP

12.A 31 11 00 6” to less than 12” EA 300 $ $

12.B 31 11 00 12” – 24” EA 100 $ $

12.C 31 11 00 Greater than 24” EA 50 $ $

13 31 11 00 TREE STUMP REMOVAL EA 5 $ $

Page 5: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

14 31 13 11 FENCE REMOVAL, STORAGE, AND RESETTING

LF 1000 $ $

15 31 13 11 FENCE REMOVAL AND REPLACEMENT, COMPLETE

LF 1000 $ $

16 31 13 11 TEMPORARY FENCING

LF 200 $ $

17 31 13 11 ORANGE BARRIER FENCE (NOT USED AS SAFETY FENCE)

LF 20000 $ $

18 31 23 00

PIPE INSTALLATION - ADDITIONAL EXCAVATION COST WHERE DEPTH TO TOP OF PIPE IS GREATER THAN 10’

18.A 31 23 00 10' – 15’ LF 1000 $ $

18.B 31 23 00 Greater than 15’ LF 500 $ $

19 31 23 00 CHANNEL EXCAVATION CY 200 $ $

20 31 23 00 BORROW EXCAVATION CY 1000 $ $

21 31 23 00 SHOULDER BUILDING/OTHER SOIL TO REMAIN ONSITE

CY 2000 $ $

22 31 23 00 HAUL OFF TO NON GCDWR SITE

LOAD 1000 $ $

23 31 23 00 HAUL-OFF TO GCDWR SITE

LOAD 1000 $ $

24 31 23 00 ROCK EXCAVATION, UP TO 100 CY

CY 300 $ $

25 31 23 00 ROCK EXCAVATION, GREATER THAN 100 CY

CY 200 $ $

26 31 23 00 CLASSIFIED STONE (#57, #5, #4, CRUSHER RUN, GAB, ETC.)

TON 10000 $ $

Page 6: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

27 31 23 23.33 FLOWABLE FILL CY 500 $ $

EROSION AND SEDIMENT CONTROL

28 31 25 00 CONSTRUCTION EXIT EA 50 $ $

29 31 25 00 MULCH COMPLETE SY 3000 $ $

30 31 25 00 PINE STRAW BALE, COMPLETE

EA 2000 $ $

31 31 25 00 SILT FENCE, COMPLETE

31.A 31 25 00 Type A LF 3000 $ $

31.B 31 25 00 Type C LF 15000 $ $

32 31 25 00 HAY BALES, COMPLETE EA 100 $ $

33 31 25 00 INLET SEDIMENT TRAP EA 100 $ $

34 31 25 00

PERMANENT SOIL REINFORCING MAT INSTALLED (GADOT SECT 710)

SY 500 $ $

35 31 25 00 ORGANIC MATERIAL FIBER BLANKET (GADOT SECT 713)

SY 3000 $ $

STABILIZATION ITEMS

36 31 32 23 PRESSURE GROUTING SOIL STABILIZATION

CY 50 $ $

37 31 36 00 GABION STRUCTURES CY 50 $ $

38 31 37 00 PLASTIC FILTER FABRIC INSTALLED

SY 10000 $ $

39 31 37 00 STONE RIP RAP TYPE I, COMPLETE IN PLACE

TON 2000 $ $

40 31 37 00 STONE RIP RAP TYPE III, COMPLETE IN PLACE

TON 7500 $ $

Page 7: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

SITE RESTORATION AND LANDSCAPING ITEMS

41 32 12 16 ASPHALT PAVING RESURFACING (INCLUDING MILLING)

SY 4000 $ $

42 32 16 13 SIDEWALK RESTORATION

SY 1000 $ $

43 32 16 13 CURB AND GUTTER

43.A 32 16 13 6" X 24" X 12" HIGH BACK LF 2000 $ $

43.B 32 16 13 6" X 24" X 10" ROLL BACK LF 1500 $ $

43.C 32 16 13 6" X 30" X 12" HIGH BACK LF 500 $ $

44 32 32 29 TIMBER STRUCTURES CY 100 $ $

45 32 92 00 PERMANENT SEEDING COMPLETE

SY 55000 $ $

46 32 92 00 TEMPORARY SEEDING COMPLETE

SY 200 $ $

47 32 92 00 SODDING COMPLETE SY 25000 $ $

48 32 92 00 TOPSOIL COMPLETE CY 200 $ $

49 32 92 00 MOWING/BUSH HOGGING

Acre 50 $ $

50 32 93 43 TREE REPLACEMENT: HARDWOODS, 2”

50.A 32 93 43 HARDWOODS, 2” EA 30 $ $

50.B 32 93 43 EVERGREEN, 2” EA 10 $ $

51 32 93 43 SHRUB REPLACEMENT

51.A 32 93 43 1 GALLON EA 10 $ $

Page 8: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

51.B 32 93 43 3 GALLON EA 200 $ $

51.C 32 93 43 5 GALLON EA 100 $ $

51.D 32 93 43 7 GALLON EA 10 $ $

52 32 93 43 BEDDING FLOWERS: PER FLAT OF 18

EA 50 $ $

STORM LINE TELEVISION INSPECTION (For pipe investigation only)

53 33 01 30.16 Storm Line TV Inspection LF 500 $ $

STORM LINE CLEANING

54 33 01 30.51 STORM LINE CLEANING – Light

LF 500 $ $

55 33 01 30.51 STORM LINE CLEANING – Heavy

LF 500 $ $

STRUCTURE REHABILITATION

56 33 01 30.71

MORTAR GROUTING OF CRACKS/JOINTS, COMPLETE PER STRUCTURE

EA 50 $ $

UTILITY RELOCATION ITEMS

57 33 05 23.16 UTILITY PIPE JACKING

57.A 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 6” DIP Water Main

LF 50 $ $

57.B 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 8” DIP Water Main

LF 50 $ $

57.C 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 10” DIP Water Main

LF 50 $ $

Page 9: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

57.D 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 12” DIP Water Main

LF 50 $ $

57.E 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 16” DIP Water Main

LF 50 $ $

57.F 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 8” DIP Gravity Sewer

LF 50 $ $

57.G 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 10” DIP Gravity Sewer

LF 50 $ $

57.H 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 12” DIP Gravity Sewer

LF 50 $ $

57.I 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 16” DIP Gravity Sewer

LF 50 $ $

57.J 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 24” Storm Drain

LF 50 $ $

57.K 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 30” Storm Drain

LF 50 $ $

57.L 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 36” Storm Drain

LF 50 $ $

57.M 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 42” Storm Drain

LF 50 $ $

57.N 33 05 23.16 Jack and Bore Casing

Installation, Includes Carrier Pipe, 48” Storm Drain

LF 50 $ $

58 33 11 13.05 WATER MAIN, DUCTILE IRON PIPE

58.A 33 11 13.05 6” Diameter LF 200 $ $

58.B 33 11 13.05 8” Diameter LF 200 $ $

58.C 33 11 13.05 10” Diameter LF 100 $ $

58.D 33 11 13.05 12” Diameter LF 100 $ $

Page 10: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

58.E 33 11 13.05 16” Diameter LF 100 $ $

59 33 11 13.05

33 31 00 SANITARY SEWER PIPE, DUCTILE IRON

59.A 33 11 13.05

33 31 00 6” Diameter LF 100 $ $

59.B 33 11 13.05

33 31 00 8” Diameter LF 200 $ $

59.C 33 11 13.05

33 31 00 10” Diameter LF 100 $ $

59.D 33 11 13.05

33 31 00 12” Diameter LF 100 $ $

59.E 33 11 13.05

33 31 00 16” Diameter LF 100 $ $

60 33 31 00 SANITARY SEWER PIPE,

PVC

60.A 33 31 00 4” Diameter LF 100 $ $

60.B 33 31 00 6” Diameter LF 100 $ $

60.C 33 31 00 8” Diameter LF 200 $ $

60.D 33 31 00 10” Diameter LF 100 $ $

60.E 33 31 00 12” Diameter LF 100 $ $

61 33 12 16 WATER UTILITY DISTRIBUTION VALVES

61.A 33 12 16 Gate Valve, 6” Diameter EA 5 $ $

61.B 33 12 16 Gate Valve, 8” Diameter EA 5 $ $

61.C 33 12 16 Gate Valve, 10” Diameter EA 2 $ $

61.D 33 12 16 Gate Valve/Buffterfly Valve,

12” DiameterEA 2 $ $

61.E 33 12 16 Butterfly Valve,

16” DiameterEA 2 $ $

Page 11: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

61.F 33 12 16 Tapping Sleeve and Valve,

6”x6” EA 5 $ $

61.G 33 12 16 Tapping Sleeve and Valve,

8”x6”EA 5 $ $

61.H 33 12 16 Tapping Sleeve and Valve,

10”x6”EA 2 $ $

61.I 33 12 16 Tapping Sleeve and Valve,

12”x6” EA 2 $ $

61.J 33 12 16 Tapping Sleeve and Valve,

16”x6” EA 2 $ $

61.K 33 12 16 Tapping Sleeve and Valve,

8”x8” EA 2 $ $

61.L 33 12 16 Tapping Sleeve and Valve,

10”x10” EA 2 $ $

61.M 33 12 16 Tapping Sleeve and Valve,

12”x12” EA 2 $ $

61.N 33 12 16 Tapping Sleeve and Valve,

16”x16”EA 1 $ $

62 33 12 13 WATER SERVICE LINES, INCLUDING TAPPING SADDLES

62.A 33 12 13 PVC Service Lines, Sizes less

than ¾”LF 100 $ $

62.B 33 12 13 ¾” Type K Copper LF 100 $ $

62.C 33 12 13 1” Type K Copper LF 100 $ $

62.D 33 12 13 1 1/2” Type K Copper LF 100 $ $

62.E 33 12 13 2” Type K Copper LF 100 $ $

63 33 31 00

SANITARY SEWER LATERALS, INCLUDING TAP/WYE AND CLEAN OUTS

63.A 33 31 00 4” PVC LATERAL LF 100 $ $

63.B 33 31 00 6” PVC LATERAL LF 100 $ $

Page 12: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

64 33 12 19.81 RELOCATE OR RECONNECT FIRE HYDRANTS

EA 5 $ $

65 33 12 19.81

RELOCATE EXISTING WATER METER, RESIDENTIAL, INCLUDING BOX

EA 5 $ $

REPLACEMENT PIPE

66 33 41 13 ALUMINUM COATED (TYPE 2) CORRUGATED METAL PIPE

66.A 33 41 13 15” Diameter LF 50 $ $

66.B 33 41 13 18” Diameter LF 50 $ $

66.C 33 41 13 24” Diameter LF 50 $ $

66.D 33 41 13 30” Diameter LF 50 $ $

66.E 33 41 13 36” Diameter LF 50 $ $

66.F 33 41 13 42” Diameter LF 50 $ $

66.G 33 41 13 48” Diameter LF 50 $ $

66.H 33 41 13 54” Diameter LF 50 $ $

66.I 33 41 13 60” Diameter LF 50 $ $

66.J 33 41 13 66” Diameter LF 50 $ $

66.K 33 41 13 72” Diameter LF 50 $ $

66.L 33 41 13 78” Diameter LF 50 $ $

66.M 33 41 13 84” Diameter LF 50 $ $

66.N 33 41 13 96” Diameter LF 50 $ $

67 33 41 13 CORRUGATED POLYMER PRECOAT STEEL PIPE

67.A 33 41 13 15” Diameter LF 50 $ $

Page 13: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

67.B 33 41 13 18” Diameter LF 50 $ $

67.C 33 41 13 24” Diameter LF 50 $ $

67.D 33 41 13 30” Diameter LF 50 $ $

67.E 33 41 13 36” Diameter LF 50 $ $

67.F 33 41 13 42” Diameter LF 50 $ $

67.G 33 41 13 48” Diameter LF 50 $ $

67.H 33 41 13 54” Diameter LF 50 $ $

67.I 33 41 13 60” Diameter LF 50 $ $

67.J 33 41 13 66” Diameter LF 50 $ $

67.K 33 41 13 72” Diameter LF 50 $ $

67.L 33 41 13 78” Diameter LF 50 $ $

67.M 33 41 13 84” Diameter LF 50 $ $

67.N 33 41 13 96” Diameter LF 50 $ $

68 33 41 13 CORRUGATED ALUMINUM ALLOY PIPE

68.A 33 41 13 15” Diameter LF 50 $ $

68.B 33 41 13 18” Diameter LF 50 $ $

68.C 33 41 13 24” Diameter LF 50 $ $

68.D 33 41 13 30” Diameter LF 50 $ $

68.E 33 41 13 36” Diameter LF 50 $ $

68.F 33 41 13 42” Diameter LF 50 $ $

68.G 33 41 13 48” Diameter LF 50 $ $

68.H 33 41 13 54” Diameter LF 50 $ $

68.I 33 41 13 60” Diameter LF 50 $ $

Page 14: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

68.J 33 41 13 66” Diameter LF 50 $ $

68.K 33 41 13 72” Diameter LF 50 $ $

68.L 33 41 13 78” Diameter LF 50 $ $

68.M 33 41 13 84” Diameter LF 50 $ $

68.N 33 41 13 96” Diameter LF 50 $ $

69 33 41 13

SMOOTH LINED CORRUGATED HIGH DENSITY POLYETHYLENE (HDPE) PIPE

69.A 33 41 13 15” Diameter LF 50 $ $

69.B 33 41 13 18” Diameter LF 200 $ $

69.C 33 41 13 24” Diameter LF 500 $ $

69.D 33 41 13 30” Diameter LF 500 $ $

69.E 33 41 13 36” Diameter LF 500 $ $

69.F 33 41 13 42” Diameter LF 100 $ $

69.G 33 41 13 48” Diameter LF 50 $ $

69.H 33 41 13 54” Diameter LF 50 $ $

69.I 33 41 13 60” Diameter LF 50 $ $

70 33 41 13 REINFORCED CONCRETE PIPE – ANY CONFIGURATION

70.A 33 41 13 15” Diameter LF 50 $ $

70.B 33 41 13 18” Diameter LF 5000 $ $

70.C 33 41 13 24” Diameter LF 5000 $ $

70.D 33 41 13 30” Diameter LF 2000 $ $

70.E 33 41 13 36” Diameter LF 2000 $ $

Page 15: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

70.F 33 41 13 42” Diameter LF 1000 $ $

70.G 33 41 13 48” Diameter LF 1000 $ $

70.H 33 41 13 54” Diameter LF 1000 $ $

70.I 33 41 13 60” Diameter LF 1000 $ $

70.J 33 41 13 66” Diameter LF 500 $ $

70.K 33 41 13 72” Diameter LF 500 $ $

70.L 33 41 13 78” Diameter LF 200 $ $

70.M 33 41 13 84” Diameter LF 200 $ $

70.N 33 41 13 96” Diameter LF 200 $ $

71 33 41 13 REINFORCED CONCRETE ARCH PIPE

71.A 33 41 13 13.5” x 22” LF 50 $ $

71.B 33 41 13 18” x 28.5” LF 200 $ $

71.C 33 41 13 22.5” x 36.5” LF 1000 $ $

71.D 33 41 13 26.5” x 43.5” LF 1000 $ $

71.E 33 41 13 31.5” x 51.5” LF 200 $ $

71.F 33 41 13 36” x 58.5” LF 200 $ $

71.G 33 41 13 40” x 65” LF 50 $ $

71.H 33 41 13 45” x 73” LF 50 $ $

71.I 33 41 13 54” x 88” LF 50 $ $

72 33 41 13 CONCRETE FLARED END SECTIONS

72.A 33 41 13 18” Diameter EA 50 $ $

72.B 33 41 13 24” Diameter EA 50 $ $

72.C 33 41 13 30” Diameter EA 50 $ $

Page 16: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

72.D 33 41 13 36” Diameter EA 50 $ $

72.E 33 41 13 42” Diameter EA 50 $ $

72.F 33 41 13 48” Diameter EA 50 $ $

73 33 41 13 CONCRETE SAFETY FLARED END SECTIONS

73.A 33 41 13 18” Diameter EA 50 $ $

73.B 33 41 13 24” Diameter EA 50 $ $

73.C 33 41 13 30” Diameter EA 50 $ $

73.D 33 41 13 36” Diameter EA 50 $ $

73.E 33 41 13 42” Diameter EA 10 $ $

73.F 33 41 13 48” Diameter EA 10 $ $

74 33 41 13 PAVE PIPE INVERT

74.A 33 41 13 48” Diameter LF 50 $ $

74.B 33 41 13 54” Diameter LF 50 $ $

74.C 33 41 13 60” Diameter LF 50 $ $

74.D 33 41 13 66” Diameter LF 50 $ $

74.E 33 41 13 72” Diameter LF 50 $ $

74.F 33 41 13 78” Diameter LF 50 $ $

74.G 33 41 13 84” Diameter LF 50 $ $

74.H 33 41 13 96” Diameter LF 50 $ $

DRAINAGE STRUCTURES

75 33 41 16.13

PRE-CAST REINFORCED CONCRETE BOX CULVERT

Page 17: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

75.A 33 41 16.13

6’ x 3’ LF 100 $ $

75.B 33 41 16.13 6’ x 4’ LF 100 $ $

75.C 33 41 16.13 6’ x 6’ LF 100 $ $

75.D 33 41 16.13 7’ x 4’ LF 100 $ $

75.E 33 41 16.13 7’ x 5’ LF 100 $ $

75.F 33 41 16.13 7’ x 7’ LF 100 $ $

75.G 33 41 16.13 8’ x 5’ LF 100 $ $

75.H 33 41 16.13 8’ x 6’ LF 100 $ $

75.I 33 41 16.13 8’ x7’ LF 100 $ $

75.J 33 41 16.13 8’ x 8’ LF 100 $ $

75.K 33 41 16.13 9’ x 6’ LF 100 $ $

75.L 33 41 16.13 9’ x 9’ LF 100 $ $

75.M 33 41 16.13 10’ x 4’ LF 100 $ $

75.N 33 41 16.13 10’ x 5’ LF 100 $ $

75.O 33 41 16.13 10’ x 6’ LF 100 $ $

75.P 33 41 16.13 10’ x 7’ LF 100 $ $

Page 18: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

75.Q 33 41 16.13 10’ x 8’ LF 100 $ $

75.R 33 41 16.13 10’ x 9’ LF 100 $ $

75.S 33 41 16.13 10’ x 10’ LF 100 $ $

76 33 41 16.13 PRECAST REINFORCED CONCRETE BOX CULVERT

CY 250 $ $

77 33 46 13 FRENCH DRAIN LF 100 $ $

78 33 46 13 CORRUGATED PLASTIC TUBING

78.A 33 46 13 4” Diameter LF 500 $ $

78.B 33 46 13 6” Diameter LF 100 $ $

78.C 33 46 13 8” Diameter LF 50 $ $

78.D 33 46 13 12” Diameter LF 50 $ $

79 33 49 13 COMPLETE BRICK CATCH BASIN, GROUP 1 (GDOT 1033 / 1034)

VF 500 $ $

80 33 49 13 COMPLETE BRICK CATCH BASIN, GROUP 2 (GDOT 1033 / 1034)

VF 250 $ $

81 33 49 13 COMPLETE PRECAST CATCH BASIN, GROUP 1 (GDOT 1033 / 1034)

VF 100 $ $

82 33 49 13 COMPLETE PRECAST CATCH BASIN, GROUP 2 (GDOT 1033 / 1034)

VF 150 $ $

83 33 49 13 REPLACEMENT TOP FOR 1033/1034, COMPLETE

EA 50 $ $

84 33 49 13 REPLACE CATCH BASIN THROAT ONLY SINGLE WING

EA 30 $ $

85 33 49 13 REPLACE CATCH BASIN THROAT ONLY DOUBLE WING

EA 30 $ $

Page 19: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

86 33 49 13 COMPLETE BRICK MANHOLE, TYPE 1 (GDOT 1011A)

VF 300 $ $

87 33 49 13 COMPLETE BRICK MANHOLE, TYPE 2 (GDOT 1011A)

VF 100 $ $

88 33 49 13 COMPLETE PRECAST MANHOLE, TYPE 1 (GDOT 1011A)

VF 100 $ $

89 33 49 13 COMPLETE PRECAST MANHOLE, TYPE 2 (GDOT 1011A)

VF 100 $ $

90 33 49 13

COMPLETE BRICK DROP INLET, GROUP 1 (GDOT 1019A, GDOT 9031S, GC P&D 609, or GC P&D 610)

VF 50 $ $

91 33 49 13

COMPLETE BRICK DROP INLET, GROUP 2 (GDOT 1019A, GDOT 9031S, GC P&D 609, or GC P&D 610)

VF 50 $ $

92 33 49 13

COMPLETE PRECAST DROP INLET, GROUP 1 (GDOT 1019A, GDOT 9031S, GC P&D 609, or GC P&D 610)

VF 50 $ $

93 33 49 13

COMPLETE PRECAST DROP INLET, GROUP 2 (GDOT 1019A, GDOT 9031S, GC P&D 609, or GC P&D 610)

VF 50 $ $

94 33 49 13 REPLACEMENT TOP FOR GC P&D 609, W\RING & COVER, COMPLETE

EA 30 $ $

95 33 49 13 REPLACEMENT TOP FOR GC P&D 610, W\RING & COVER, COMPLETE

EA 30 $ $

96 33 49 13 REPLACEMENT TOP FOR GDOT 1019A, W\FRAME & GRATE, COMPLETE

EA 30 $ $

97 33 49 13 REPLACEMENT TOP FOR GDOT 9031S, W\ STEEL PLATE, COMPLETE

EA 30 $ $

98 33 49 13 TIE INTO EXISTING STRUCTURES

EA 100 $ $

Page 20: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

99 33 49 13 PRECAST CONCRETE BOX CULVERT HEADWALL-PARAPET

99.A 33 49 13 1’ High LF 100 $ $

99.B 33 49 13 2’ High LF 100 $ $

99.C 33 49 13 3’ High LF 50 $ $

100 33 49 13

PRECAST CONCRETE BOX CULVERT HEADWALL-WINGWALL,

CY 500 $ $

101 33 49 13

PRECAST CONCRETE BOX CULVERT HEADWALL- APRONS AND BAFFLES

CY 500 $ $

102 33 49 13 DITCHES - PAVING SY 200 $ $

103 33 49 13 PRECAST CONCRETE PIPE HEADWALL

103.A 33 49 13 For Pipe Size 18” EA 20 $ $

103.B 33 49 13 For Pipe Size 24” EA 20 $ $

103.C 33 49 13 For Pipe Size 30” EA 20 $ $

103.D 33 49 13 For Pie Size 36” EA 20 $ $

103.E 33 49 13 For Pie Size 42” EA 20 $ $

103.F 33 49 13 For Pie Size 48” EA 20 $ $

103.G 33 49 13 For Pie Size 54” EA 10 $ $

103.H 33 49 13 For Pie Size 60” EA 5 $ $

103.I 33 49 13 For Pie Size 66” EA 5 $ $

103.J 33 49 13 For Pie Size 72” EA 5 $ $

Page 21: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

TRAFFIC CONTROL

104 34 41 16.10 TRAFFIC CONTROL

104.A 34 41 16.10 TRAFFIC CONTROL MAJOR – TOTAL PROJECT

EA 100 $ $

104.B 34 41 16.10 TRAFFIC CONTROL MINOR - TOTAL PER PROJECT

EA 100 $ $

ROADWAY RESTORATION

105 34 71 10 STREET CUT

105.A 34 71 10 Detail ‘A’ SY 2000 $ $

105.B 34 71 10 Detail ‘B’ SY 50 $ $

105.C 34 71 10 Detail ‘C’ SY 8000 $ $

105.D 34 71 10 Detail ‘D’ SY 1000 $ $

106 34 71 10 GUARDRAIL

106.A 34 71 10 Type W Beam LF 200 $ $

106.B 34 71 10 Type T Beam LF 200 $ $

107 34 71 10 GUARDRAIL ANCHORS

107.A 34 71 10 Type 1 EA 5 $ $

107.B 34 71 10 Type 12 EA 5 $ $

108 34 71 10 TRAFFIC STRIPING, GENERAL

LF 500 $ $

109 34 71 10 TRAFFIC STRIPING, GORE AREA

SY 20 $ $

110 34 71 10 RAISED TRAFFIC MARKERS

EA 20 $ $

Page 22: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

REVISED BID FORM BID NUMBER: BL077-14 BID DATE: September 09, 2014 COMPANY NAME: BIDDER’S SIGNATURE:

Bid Item Specification

Section

Description Units Quantity Unit Price

Total Price

111 34 71 10 DRIVEWAY RESTORATION

111.A 34 71 10 6" Concrete SY 2000 $ $

111.B 34 71 10 8" Concrete SY 100 $ $

Total Base Bid (Bid Items 1 – 111): (use words) Dollars $

Page 23: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

Section Number Title

312323.33 FLOWABLE FILL 312500 EROSION AND SEDIMENTATION CONTROLS 313223 PRESSURE GROUTING SOIL STABILIZATION 313600 GABION STRUCTURES 313700 RIPRAP 315200 COFFERDAMS

DIVISION 32 – EXTERIOR IMPROVEMENTS 321216 ASPHALT PAVING 321613 SIDEWALKS, CURBS, AND GUTTERS 323229 327300

TIMBER RETAINING WALLS WETLANDS PROTECTION

329200 TURF AND GRASSES 329343 TREES, SHRUBS, AND PLANTS

DIVISION 33 - UTILITIES 330130.16 TV INSPECTION OF STORM DRAINAGE PIPELINES 330130.51 CLEANING OF STORM DRAINAGE SYSTEMS 330130.74 BYPASS PUMPING 330523.16 UTILITY PIPE JACKING 331113.05 DUCTILE IRON PIPE 331213 WATER SERVICE CONNECTIONS 331216 WATER UTILITY DISTRIBUTION VALVES 331219 WATER UTILITY DISTRIBUTION FIRE HYDRANTS 331219.81 RELOCATE AND RECONNECT HYDRANTS, VALVES, AND METERS 333100 SANITARY UTIILTY SEWERAGE PIPING 334113 STORM DRAINAGE PIPING 334216.13 PRECAST CONCRETE CULVERTS 334216.16 CAST-IN-PLACE CONCRETE CULVERTS 334613 FOUNDATION DRAINAGE 334913 STORM DRAINAGE STRUCTURES

DIVISION 34 - TRANSPORTATION 344116.10 TRAFFIC CONTROL 347100 ROADWAY CONSTRUCTION

APPENDIX “A” - ATTACHMENTS

ATTACHMENT A – RCP PIPE BEDDING AND BACKFILL ATTACHMENT B – HDPE PIPE BEDDING AND BACKFILL ATTACHMENT C – METAL PIPE BEDDING AND BACKFILL ATTACHMENT D – GWINNETT COUNTY DOT UTILITY CUT DETAILS

Page 24: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-1

SECTION 01 22 15.11

MEASUREMENT AND PAYMENT

PART 1 – GENERAL

1.1 SUMMARY

A. This section defines the Pay Items of Work listed on the Bid Form and how payment shall be determined. Payment shall be made for each Pay Item based on the description in this section.

B. Bid Prices included on the Bid Form shall be full compensation for all materials, labor, equipment, tools, construction equipment and machinery, heat, utilities, mobilization, demobilization, transportation, taxes, overhead, markup, incidentals and services necessary for the execution and completion of the Work in the Contract Documents to be performed under this Contract. For the Work described, the allowance and unit price, actual used and installed quantities of each Pay Item shall be measured in the field and certified by the Engineer and/or GCDWR upon completion of construction in the manner set forth for each item in this and other sections of the Specifications. Payment for all items listed on the Bid Form will constitute full compensation for all Work shown and specified to be performed.

C. The Contractor shall assist and fully cooperate with GCDWR to determine proper measurement and payment for each item providing complete and reasonable backup documentation as requested by GCDWR to substantiate payment due.

D. Any item of work shown on the Drawings or called for in the Specifications but not specifically enumerated for separate measurement and payment in the various project bid items shall considered incidental to the project. All incidental work shall be included in the various contract bid items as determined by the Contractor.

E. Any and all work required to complete the Work called for in the Contract Documents shall be included in the various Pay Items whether or not such work is specifically called for. The individual Pay Item descriptions are not exhaustive and do not detail each specific item need to complete the Work of that Pay Item. Any necessary labor, materials, equipment, tools, appurtenances or other items not mentioned but required to complete the Work shall be considered incidental to Contract, and as such, shall be included in the appropriate Pay Item prices.

1.2 BID ITEMS

The following Bid Items 1 through 110, together with any supplemental Bid Items that may also be included, comprise the Bid Total as listed on the Bid Form.

A. ITEM 1, SPECIFICATION NO. 012215.11, UNIT PRICE FOR FOREMAN: MEASUREMENT: The number of units paid shall be measured by the actual number

of hours worked as verified by the GCDWR Project Inspector. This item is to only be used to limits established in writing by GCDWR upon directing such work and is not to

Page 25: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-2

be used by the Contractor as a method of payment for any work that is part of the work of another item. The Contractor shall provide payroll records and description of work accomplished for all labor hours paid for under this item. PAYMENT: The Unit Prices Bid under this item shall include all necessary labor, equipment, tools, and materials required for work under this item.

B. ITEM 2, SPECIFICATION NO. 012215.11, UNIT PRICE FOR LABORER: MEASUREMENT: The number of units paid shall be measured by the actual number

of hours worked as verified by the GCDWR Project Inspector. This item is to only be used to limits established in writing by GCDWR upon directing such work and is not to be used by the Contractor as a method of payment for any work that is part of the work of another item. The Contractor shall provide payroll records and description of work accomplished for all labor hours paid for under this item. PAYMENT: The Unit Prices Bid under this item shall include all necessary labor, equipment, tools, and materials required for work under this item.

C. ITEM 3, SPECIFICATION SECTION NO. 024113.23, UNIT PRICE FOR REMOVAL OF EXISTING NON-DRAINAGE STRUCTURES:

MEASUREMENT: The removal of existing non-drainage structures paid for under this item shall be the existing non-drainage structures authorized by GCDWR not incidental to other work to be removed. There will be no additional payment for excavating and backfilling of existing non-drainage structures that are removed.

PAYMENT: The Unit Prices Bid for each existing non-drainage structure removed shall include all necessary tools, equipment, labor and materials to remove, load, handle, haul away, and dispose to complete the Work.

D. ITEM 4, SPECIFICATION SECTION NO. 024113.23, UNIT PRICE FOR REMOVAL OF AND RELOCATION OF EXISTING STORAGE BUILDING:

MEASUREMENT: The removal and relocation of existing storage buildings shall be measured and paid for per each storage building authorized by GCDWR to be removed and relocated. There will be no additional payment for excavating, backfilling, storage building foundations, utility work, etc. under this item.

PAYMENT: The Unit Prices Bid for each existing storage building removed and relocated shall include all necessary tools, equipment, labor, and materials to remove, load, handle, relocate, restore utility services, and other incidentals required to complete the Work.

E. ITEM 5, SPECIFICATION SECTION NO. 024113.23, UNIT PRICE FOR REMOVAL OF EXISTING DRAINAGE STRUCTURES:

MEASUREMENT: The removal of existing drainage structures paid for under this item shall be the existing drainage structures authorized by GCDWR to be removed. There will be no additional payment for excavating and backfilling of existing drainage structures that are removed.

PAYMENT: The Unit Prices Bid for each existing drainage structure removed shall include all necessary tools, equipment, labor and materials to remove, load, handle, haul away, and dispose to complete the Work.

F. ITEM 6, SPECIFICATION SECTION NO. 024113.23, UNIT PRICE FOR REMOVAL OF EXISTING PIPE, ALL TYPES AND SIZES:

Page 26: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-3

MEASUREMENT: The removal of existing pipe, all types and sizes paid for under this item shall be the existing pipe, all types and sizes authorized by GCDWR to be removed. There will be no additional payment for excavating and backfilling of existing pipe, all types and sizes that are removed.

PAYMENT: The Unit Prices Bid for each existing pipe, all types and sizes removed shall include all necessary tools, equipment, labor and materials to remove, load, handle, haul away, and dispose to complete the Work.

G. ITEM 7, SPECIFICATION SECTION NO. 024211, UNIT PRICE FOR DEBRIS REMOVAL:

MEASUREMENT: Debris Removal paid for under this item shall be measured per load of debris removed authorized by GCDWR not incidental to other work to be removed. Each Load is defined as 15 CY of material.

PAYMENT: The Unit Prices Bid for debris removal shall include removal, loading, haul away, and disposal of trash, debris, detritus, dumped waste materials, automobiles, and all other tools, equipment, labor, materials, and incidentals required to complete the Work.

H. ITEMS 8.A-8.D, 9.A-9.D SPECIFICATION SECTION NO. 03 33 00, CONCRETE STRUCTURES, CAST-IN-PLACE, INCLUDING/WITHOUT REINFORCING STEEL: MEASUREMENT: Concrete structures, cast-in-place shall be measured and paid for per cubic yard of each separate class of concrete installed, complete-in-place.

1. Structures with and without steel reinforcing shall be measured and paid for under the appropriate Pay Item as noted on the Bid Form.

2. Cast-in-place reinforced concrete box culvert barrels, parapets, wingwalls, aprons, baffles, and any other cast-in-place structures associated with cast-in-place culvert construction shall be measured and paid for under Items 8 and 9 as appropriate.

3. GCDWR may also use Items 8 and 9 for the construction of other miscellaneous cast-in-place concrete work that is not measured and paid for under other Item in this Contract.

PAYMENT: The Price Bid for Concrete structures, , cast-in-place shall include excavation, backfill, concrete, reinforcing steel as applicable, materials testing, and all other labor, materials, equipment and other incidentals required to complete the Work.

I. ITEMS 10.A-10.M, SPECIFICATION SECTION NO. 04 21 13, BRICK MASONRY: MEASUREMENT: Brick Masonry shall be measured and paid for per each size classification shown on the bid form installed, complete in place. PAYMENT: The Price Bid for Brick Masonry shall include excavation, bedding, and backfill not included in other items, brick masonry, reinforcing as applicable, materials testing, and all other labor, materials, equipment and other incidentals required to complete the Work.

J. ITEMS 11.A-11.M, SPECIFICATION SECTION NO. 04 43 13, RUBBLE MASONRY: MEASUREMENT: Rubble Masonry shall be measured and paid for per each size classification shown on the bid form installed, complete in place. PAYMENT: The Price Bid for Rubble Masonry shall include excavation, bedding, and

Page 27: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-4

backfill not included in other items, rubble masonry, reinforcing as applicable, materials testing, and all other labor, materials, equipment and other incidentals required to complete the Work.

K. ITEMS 12.A-12.C, SPECIFICATION SECTION NO. 31 11 00, TREE REMOVAL INCLUDING STUMP: MEASUREMENT: Tree removal including stump shall be measured per the number of trees actually removed per each size classification shown on the Bid Form. PAYMENT: The Price Bid for each tree removed shall include all necessary tools, labor, equipment, and materials required to remove the tree, stump, and root wad, removal from the site and disposal of the tree and stump, and all other incidentals required to complete the Work.

L. ITEM 13, SPECIFICATION SECTION NO. 31 11 00, TREE STUMP REMOVAL: MEASUREMENT: Tree stump removal shall be measured per the number of tree stumps actually removed per each size classification shown on the Bid Form. This item shall not be utilized for tree stumps removed as part of Items 12.A-12.C. PAYMENT: The Price Bid for each tree removed shall include all necessary tools, labor, equipment, and materials required to remove the stump, and root wad, removal from the site and disposal of the stump, and all other incidentals required to complete the Work.

M. ITEMS 14-16, SPECIFICATION SECTION 31 13 11, UNIT PRICE FOR FENCING REMOVAL, STORAGE, AND RESETTING, FENCING, REMOVAL AND REPLACEMENT, COMPLETE, AND TEMPORARY FENCING MEASUREMENT: Fencing shall be measured and paid for per linear foot of fence to the limits established in writing or as otherwise directed by GCDWR. PAYMENT: Bid Prices shall include furnishing and installing poles, fence fabric, cross beams, gates, slates, maintenance during construction, disposal of fencing removed, and all other labor, materials, equipment, and incidentals required to complete the Work. Removal, handling, hauling, and disposal of existing fences will be considered incidental to this Pay Item and no additional compensation will be made.

N. ITEM 17, SPECIFICATION SECTION NO. 31 13 11, ORANGE BARRIER FENCE (NOT USED AS SAFETY FENCE): MEASUREMENT: Orange barrier fence shall be measured per linear foot installed, complete in place. This item shall not be utilized for orange barrier fencing used as safety fence, which shall be considered incidental to the Work. PAYMENT: The unit price shall include all labor, equipment, and materials necessary for furnishing, placing, maintenance, removal, inspection, monitoring, and reporting on the erosion and sedimentation controls. No additional payment shall be made for maintenance or replacement of Orange Barrier Fence.

O. ITEMS 18.A-18.B, SPECIFICATION SECTION NO. 31 23 00, PIPE INSTALLATION - ADDITIONAL EXCAVATION COST WHERE DEPTH TO TOP OF PIPE IS GREATER THAN 10’ (10’-15’)/(GREATER THAN 15’): MEASUREMENT: Additional Excavation Cost Where Depth to top of pipe exceeds the value as specified per Item and shall be measured per linear foot as measured along the centerline of the pipe.

Page 28: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-5

PAYMENT: The Price Bid for this item shall include excavating, handling, rehandling, backfilling, compacting and disposal of materials at the specified extra depth of cover as measured to the pipe invert, including all shoring and protective measures. Extra depth must be approved if not indicated on the plan as being required.

P. ITEMS 19-20, SPECIFICATION SECTION NO. 31 23 00, CHANNEL/BORROW EXCAVATION: MEASUREMENT: Channel/Borrow Excavation shall be measured and paid for per cubic yard to the limits established in writing by GCDWR upon directing such work. PAYMENT: Prices Bid shall include excavation, backfill with approved materials, hauling, handling, placement, and compaction, and all other labor, materials, equipment, and incidentals required to complete the Work.

Q. ITEM 21, SPECIFICATION SECTION NO. 31 23 00, SHOULDER BUILDING/OTHER SOIL TO REMAIN ONSITE: MEASUREMENT: Shoulder building/other soil to remain onsite shall be measured and paid for per cubic yard of material that is disturbed, not replaced in excavation areas, and used for other purposes on site. PAYMENT: Prices Bid shall include handling, rehandling, hauling, and all other labor, materials, equipment, and incidentals required to complete the Work.

R. ITEM 22, SPECIFICATION SECTION NO. 31 23 00, HAUL OFF TO NON-GCDWR SITE: MEASUREMENT: Spoil Removal shall be measured and paid for per load of material removed from the site and hauled to a non-GCDWR owned site. Each Load is defined as 15 cubic yards of material. PAYMENT: Prices Bid shall include handling, rehandling, hauling, disposal, disposal fees, and all other labor, materials, equipment, and incidentals required to complete the Work.

S. ITEM 23, SPECIFICATION SECTION NO. 31 23 00, HAUL OFF TO GCDWR SITE: MEASUREMENT: Haul off to GCDWR Site shall be measured and paid for per load of material removed from the site and hauled to a GCDWR site where disposal fees do not have to be paid. Each Load is defined as 15 cubic yards of material. PAYMENT: Prices Bid shall include handling, rehandling, hauling, placement at the destination site, and all other labor, materials, equipment, and incidentals required to complete the Work.

T. ITEMS 24-25, SPECIFICATION SECTION NO. 31 23 00, ROCK EXCAVATION (UP TO 100 CY)/(GREATER THAN 100 CY): MEASUREMENT: Rock Excavation shall be measured and paid for per cubic yard of rock material removed. PAYMENT: Prices Bid shall include, excavation, blasting, hoe ramming, ripping, and all other manner of rock excavation methods, backfill not included in other items, and all other labor, materials, equipment, and incidentals required to complete the Work.

U. ITEM 26, SPECIFICATION SECTION NO. 31 23 00, CLASSIFIED STONE (#57, #5, #4, CRUSHER RUN, GAB, ETC.): MEASUREMENT: Classified Stone shall be measured and paid for per the actual

Page 29: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-6

number of tons of material placed as directed in writing by GCDWR. PAYMENT: The Unit Prices Bid per ton of Classified Stone include any additional permit fees, maintenance charges and inspection fees required by all road departments and the furnishing of all materials, labor, tools, and appliances necessary to complete the Work as herein specified, shown or ordered. Included shall be the costs of additional excavation beyond trench width to provide firm foundation and any costs of furnishing necessary work beyond the limits of measurement as defined under these specifications. Payment will not be made when Classified Stone is used by the Contractor for the Contractor’s convenience or when used by the Contractor to simplify compaction.

V. ITEM 27, SPECIFICATION SECTION NO. 31 23 23.33, FLOWABLE FILL: MEASUREMENT: Flowable fill shall be measured and paid for per cubic yard of material placed as directed by GCDWR. PAYMENT: The Price Bid shall include furnishing and placing flowable fill and all other labor, materials, equipment, and incidentals required to complete the Work.

W. ITEM 28, SPECIFICATION SECTION NO. 31 25 00, CONSTRUCTION EXIT: MEASUREMENT: Construction Exits shall be measured per each installed, complete in place. PAYMENT: The unit price shall include all labor, equipment, and materials necessary for furnishing, placing, maintenance, removal, inspection, monitoring, and reporting on the erosion and sedimentation controls. No additional payment shall be made for re-application or maintenance of construction exits.

X. ITEM 29, SPECIFICATION SECTION NO. 31 25 00, MULCH COMPLETE: MEASUREMENT: Mulch shall be measured per square yard installed at the coverage rate specified, complete in place. PAYMENT: The unit price shall include all labor, equipment, and materials necessary for furnishing, placing, maintenance, removal, inspection, monitoring, and reporting on the erosion and sedimentation controls. No additional payment shall be made for re-application or maintenance of mulch.

Y. ITEM 30, SPECIFICATION SECTION NO. 31 25 00, PINE STRAW BALE COMPLETE: MEASUREMENT: Pine straw bales shall be measured and paid for per each bale used, complete. PAYMENT: The unit price shall include all labor, equipment, and materials necessary for furnishing, placing, maintenance, removal, inspection, monitoring, and reporting on the erosion and sedimentation controls. No additional payment shall be made for re-application or maintenance of pine straw.

Z. ITEMS 31.A-31.B, SPECIFICATION SECTION NO. 31 25 00, SILT FENCE, COMPLETE: MEASUREMENT: Silt Fence shall be measured per linear foot of each type installed, complete in place. PAYMENT: The unit price shall include all labor, equipment, and materials necessary for furnishing, placing, maintenance, removal, inspection, monitoring, and reporting on the erosion and sedimentation controls. No additional payment shall be made for

Page 30: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-7

maintenance or replacement of Silt Fence.

AA. ITEM 32, SPECIFICATION SECTION NO. 31 25 00, HAY BALES: MEASUREMENT: Hay bales shall be measured per each installed, complete in place. PAYMENT: The unit price shall include all labor, equipment, and materials necessary for furnishing, placing, maintenance, removal, inspection, monitoring, and reporting on the erosion and sedimentation controls. No additional payment shall be made for maintenance or replacement of hay bales.

BB. ITEM 33, SPECIFICATION SECTION NO. 31 25 00, INLET SEDIMENT TRAP: MEASUREMENT: Inlet sediment traps shall be measured per each installed, complete in place. PAYMENT: The unit price shall include all labor, equipment, and materials necessary for furnishing, placing, maintenance, removal, inspection, monitoring, and reporting on the erosion and sedimentation controls. No additional payment shall be made for maintenance or replacement of inlet sediment traps.

CC. ITEM 34, SPECIFICATION SECTION NO. 31 25 00, PERMANENT SOIL REINFORCING MAT INSTALLED (GADOT SECTION 710): MEASUREMENT: Permanent soil reinforcing mat shall be measured per square yard, complete in place. PAYMENT: The unit price shall include all labor, equipment, and materials necessary for furnishing, placing, maintenance, removal, inspection, monitoring, and reporting on the erosion and sedimentation controls. No additional payment shall be made for maintenance or replacement of permanent soil reinforcing mat.

DD. ITEM 35, SPECIFICATION SECTION NO. 31 25 00, ORGANIC MATERIAL FIBER BLANKET (GADOT SECTION 713): MEASUREMENT: Organic Material Fiber Blanket shall be measured per square yard, complete in place. PAYMENT: The unit price shall include all labor, equipment, and materials necessary for furnishing, placing, maintenance, removal, inspection, monitoring, and reporting on the erosion and sedimentation controls. No additional payment shall be made for maintenance or replacement of Organic Material Fiber Blanket.

EE. ITEM 36, SPECIFICATION SECTION NO. 31 32 23, PRESSURE GROUTING SOIL STABILIZATION: MEASUREMENT: Pressure grouting soil stabilization shall be measured and paid for per cubic yard of material placed as directed by GCDWR. PAYMENT: The Price bid shall include furnishing and placing pressure grouting soil stabilization and all other labor, materials, equipment, and incidentals required to complete the Work.

FF. ITEM 37, SPECIFICATION SECTION NO. 31 36 00, GABION STRUCTURES: MEASUREMENT: Gabion Structures shall be measured and paid for per cubic yard of material placed as directed by GCDWR. PAYMENT: The Price bid shall include furnishing and placing gabion structures and all other labor, materials, equipment, and incidentals required to complete the Work.

Page 31: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-8

GG. ITEM 38, SPECIFICATION SECTION NO. 31 37 00, PLASTIC FILTER FABRIC INSTALLED: MEASUREMENT: Plastic filter fabric shall be measured per square yard installed. PAYMENT: The unit price shall include all labor, equipment, and materials necessary for furnishing, placing, maintenance, removal, inspection, monitoring, and reporting on the erosion and sedimentation controls. No additional payment shall be made for or maintenance or replacement of plastic filter fabric.

HH. ITEMS 39-40, SPECIFICATION SECTION NO. 31 37 00, STONE RIP RAP TYPE I/III COMPLETE IN PLACE: MEASUREMENT: Stone Rip Rap shall be measured and paid for per ton of material placed to the limits as ordered in writing or as otherwise directed by GCDWR. PAYMENT: The Price Bid shall include excavation and preparation of ground surface to the correct lines and grades, furnishing and placing rip rap to the specified depth and all other labor, materials, equipment, and incidentals required to complete the Work.

II. ITEM 41, SPECIFICATION SECTION NO. 32 12 16, UNIT PRICE FOR ASPHALT PAVING RESURFACING (INCLUDING MILLING):

MEASUREMENT: The quantity to be paid for under this item shall be the actual number of square yards of roadway or parking area pavement restored as shown on the Drawings or as directed by GCDWR.

PAYMENT: The Price Bids per ton for roadway pavements and parking areas shall include permit fees, maintenance charges and inspection fees required by all road departments and the furnishing of all materials, including tack coat, labor, tools, and appliances necessary to complete the Work as herein specified, shown or ordered. Included shall be the costs of additional excavation beyond trench width to provide firm foundation, milling and any costs of furnishing necessary work beyond the limits of measurement as defined under these specifications.

JJ. ITEM 42, SPECIFICATION SECTION NO. 32 16 13, UNIT PRICE FOR SIDEWALK RESTORATION: MEASUREMENT: The quantity to be paid for under this item shall be the actual number of square yards of sidewalk restored in accordance with the Drawings, or as directed by GCDWR. PAYMENT: The Unit Prices Bid per lineal feet of sidewalks shall include any additional permit fees, maintenance charges and inspection fees required by all road departments and the furnishing of all materials, labor, tools, and appliances necessary to complete the Work as herein specified, shown or ordered. Included shall be the costs of additional excavation beyond trench width to provide firm foundation and any costs of furnishing necessary work beyond the limits of measurement as defined under these specifications. Removal, handling, hauling, and disposal of existing sidewalk material will be considered incidental to this Pay Item and no additional compensation will be made.

KK. ITEMS 43.A-43.C, SPECIFICATION SECTION NO. 32 16 13, UNIT PRICE FOR CURB AND GUTTER, HIGH BACK OR ROLL BACK MEASUREMENT: The quantity to be paid for under these items shall be the actual number of lineal feet of curb and combination curb and gutter restored in accordance

Page 32: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-9

with these specifications, within the limits of specified trench excavation, or as directed by GCDWR. PAYMENT: The Price Bids per unit of length for curbs/curbs and gutter shall include permit fees, maintenance charges and inspection fees required by all road departments and the furnishing of all materials, labor, tools, and appliances necessary to complete the Work as herein specified, shown or ordered. Included shall be the costs of additional excavation beyond trench width to provide firm foundation and any costs of furnishing necessary work beyond the limits of measurement as defined under these specifications. Removal, handling, hauling, and disposal of existing curb and gutter material will be considered incidental to this Pay Item and no additional compensation will be made.

LL. ITEM 44, SPECIFICATION SECTION 32 32 29, UNIT PRICE FOR TIMBER STRUCTURES MEASUREMENT: Timber Structures shall be measured and paid for per cubic yard of timber material installed, complete-in-place, to the limits established in writing or as otherwise directed by GCDWR. The volume of any excavation and backfill required for timber structure construction shall not be considered in determining quantities measured for payment under this Item. PAYMENT: The Price Bid shall include timber, spikes, deadmen anchors, excavation, bedding, backfill, compaction, maintenance during construction, any woodworking or cutting and shaping, and all other labor, materials, equipment and incidentals required to complete the Work.

MM. ITEMS 45-47, SPECIFICATION SECTION 32 92 00, UNIT PRICE FOR SEEDING, PERMANENT AND TEMPORARY, SODDING : The quantity to be paid for under this item shall be the number of square yards of seeding, permanent matting, and sod removal\replacement as directed GCDWR. PAYMENT: The Unit Prices Bid per square yard includes the furnishing of all labor, materials, sanding, maintenance, and appliances necessary to complete the Work as specified. Topsoil removed from the immediate site and reused will not be considered for payment.

NN. ITEM 48, SPECIFICATION SECTION 32 92 00, UNIT PRICE FOR TOPSOIL MEASUREMENT: The quantity to be paid for under this item shall be the number of cubic yards of topsoil placed as directed GCDWR. PAYMENT: The Unit Prices Bid per cubic yard includes the furnishing of all labor, materials and appliances necessary to complete the Work as specified. Topsoil removed from the immediate site and reused will not be considered for payment.

OO. ITEM 49, SPECIFICATION SECTION 32 92 00, UNIT PRICE FOR MOWING/BUSH HOGGING MEASUREMENT: The quantity to be paid for mowing/bush hogging under this item shall be the number of acres mowed/bush hogged to the limits established in writing by GCDWR upon directing such work. PAYMENT: The Unit Prices Bid per acre includes the furnishing of all labor, materials, equipment, and appliances necessary to complete the Work as specified.

Page 33: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-10

PP. ITEMS 50.A-50.B, 51.A-51.D, AND 52, SPECIFICATION SECTION 32 93 43, UNIT PRICE FOR TREE, SHRUB, AND FLOWER REPLACEMENTS MEASUREMENT: The quantity to be paid under this item shall be the number of trees, shrubs, and bedding flowers (per flat of 18 flower plants) actually planted by type as shown on the Drawings or as directed by GCDWR. . PAYMENT: The Unit Prices Bid for each type planted shall include all necessary tools, equipment, labor and materials to complete the Work.

QQ. ITEMS 53, SPECIFICATION SECTION 33 01 30.16, UNIT PRICE FOR STORM LINE TV INSPECTION MEASUREMENT: Storm Line TV Inspection shall be measured by linear foot of pipe line from center of the upstream manhole/structure to center of the downstream manhole/structure.

1. No separate payment will be made for television inspection when that inspection is associated with the installation of rehabilitation systems; the work and materials being considered as incidental to and part of the rehabilitation system. Contractor will be required to submit both a Pre-Lining and Post-Lining inspection, and these inspections must comply with the same technical standards and specifications as all CCTV Condition Assessment surveys as outlined in Section 33 01 30.16.

PAYMENT: The Price Bid shall be full compensation for furnishing all labor, tools, NASSCO PACP/MACP training, preparing and furnishing condition assessment reports meeting NASSCO standards, and all other labor, materials, equipment, and incidentals required to complete the Work.

RR. ITEMS 54-55, SPECIFICATION SECTION 33 01 30.51, UNIT PRICE FOR STORM LINE CLEANING, LIGHT AND HEAVY MEASUREMENT: Storm Line Cleaning shall be measured by linear foot of pipe from center of the upstream manhole/structure to center of the downstream manhole/structure or to face of headwall.

1. Cleaning shall be defined as the removal of all foreign materials, debris, rocks, roots, silt, and sediment from the storm system to restore the pipe to a minimum of 95% + of the through flow channel and cross section for clear viewing of the interior surfaces of the pipes during television inspection, or as required pre-cleaning for other specified rehabilitation.

2. No separate payment will be made for cleaning when that cleaning is associated with the installation of the rehabilitation system, the work and materials being considered as incidental to and part of the rehabilitation system unit bid prices.

3. Storm System Cleaning, Light shall be defined as the removal of foreign materials as defined above when the existing materials to be removed make up less than 25% of the pipe cross section. Rocks should average less than 3” in diameter.

4. Storm System Cleaning, Heavy shall be defined as the removal of foreign materials as defined above when the existing materials to be removed make up more than 25% of the pipe cross section. Rocks should average more than 3” in diameter. This level of cleaning requires prior notice to GCDWR and prior approval from GCDWR.

PAYMENT: Payment will be full compensation for furnishing all labor, materials,

Page 34: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-11

tools, equipment, disposal of removed materials, and other incidentals required to complete the Work.

SS. ITEM 56, SPECIFICATION SECTION 33 01 30.71, UNIT PRICE FOR MORTAR GROUTING OF CRACKS/JOINTS, COMPLETE PER STRUCTURE MEASUREMENT: Mortar Grouting of cracks/joints, shall be measured and paid for per each structure where joints and/or cracks are sealed as directed by GCDWR. PAYMENT: The Price Bid shall include cleaning, patching, flow control, plugging/blocking, mortar and/or concrete, and all other labor, materials, equipment, and other incidentals required to complete the Work.

TT. ITEMS 57.A-57.N, SPECIFICATION SECTION 33 05 23.16, UTILITY PIPE JACKING MEASUREMENT: The quantity to be paid for uncased boring, jacked steel casing, or steel casing/open cut shall be the actual number of lineal feet placed under the respective item as shown on the Drawings or as directed by the Engineer. PAYMENT: The Unit Prices Bid per lineal feet of uncased boring, jacked steel casing, or steel casing/open cut shall be in full compensation for all excavation, rock excavation, dewatering, sheeting, shoring, jacking/auguring operations, receiving pits, concrete, grout, sand and screenings, brick masonry, steel casing pipe, welding, backfill and all other materials, labor, tools, equipment necessary for the proper completion of the Work as shown, specified, or directed. The unit price for each shall further include full compensation for maintaining traffic, furnishing barricades, warning signals, lights, and watchmen. The cost carrier pipe shall be included in the linear foot cost of these items.

UU. ITEMS 58.A-58.E, SPECIFICATION SECTION 33 11 13.05, DUCTILE IRON PIPE (WATER) MEASUREMENT: The quantity to be paid for ductile iron pipe shall be the actual number of lineal feet of pipe, by size, furnished and installed or lowered in place. PAYMENT: The Unit Prices Bid per lineal foot shall include ductile iron pipe and fittings, clearing and grubbing, erosion and sedimentation controls, traffic control, excavation, borrow, bedding material, rock excavation, furnishing and placing of pipe and fittings complete, including all thrust restraints, all concrete work, poly wrap; making all required connections to either active or inactive lines, including wet cut-ins and installation of new service lines where required, service connections; backfilling, testing, and sterilization, site restoration and clean up, seeding and sodding, asphalt trench patching; compiling and submitting all project record documents, including as-builts, and the furnishing of all labor, materials, tools, and appliances necessary for the proper completion of the Work as specified, indicated, or directed.

VV. ITEMS 59.A-59.E, SPECIFICATION SECTION 33 11 13.05/33 31 00, SANITARY SEWER PIPE, DUCTILE IRON MEASUREMENT: The quantity to be paid for ductile iron pipe shall be the actual number of lineal feet of pipe, by size, furnished and installed or lowered in place. PAYMENT: The Unit Prices Bid per lineal foot shall include ductile iron pipe and fittings, clearing and grubbing, erosion and sedimentation controls, traffic control, excavation, borrow, bedding material, rock excavation, furnishing and placing of pipe and fittings complete, including all thrust restraints, all concrete work, poly wrap;

Page 35: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-12

making all required connections to either active or inactive lines, including connections and installation of new service laterals where required, backfilling, testing, site restoration and clean up, seeding and sodding, asphalt trench patching; compiling and submitting all project record documents, including as-builts, and the furnishing of all labor, materials, tools, and appliances necessary for the proper completion of the Work as specified, indicated, or directed.

WW. ITEMS 60.A-60.E, SPECIFICATION SECTION 33 11 13.05/33 31 00, SANITARY SEWER PIPE, PVC MEASUREMENT: The quantity to be paid for Sanitary Sewer Pipe, PVC shall be the actual number of lineal feet of pipe, by size, furnished and installed or lowered in place. PAYMENT: The Unit Prices Bid per lineal foot shall include PVC pipe and fittings, clearing and grubbing, erosion and sedimentation controls, traffic control, excavation, borrow, bedding material, rock excavation, furnishing and placing of pipe and fittings complete, including all thrust restraints, all concrete work, poly wrap; making all required connections to either active or inactive lines, including connections and installation of new service laterals where required, backfilling, testing, site restoration and clean up, seeding and sodding, asphalt trench patching; compiling and submitting all project record documents, including as-builts, and the furnishing of all labor, materials, tools, and appliances necessary for the proper completion of the Work as specified, indicated, or directed.

XX. ITEMS 61.A-61.N, SPECIFICATION SECTION 33 12 16, WATER UTILITY DISTRIBUTION VALVES MEASUREMENT: Measurement shall be based on the actual number, size, and type of valves installed or relocated as shown on the Drawings or as directed by GCDWR. PAYMENT: The Unit Prices Bid per each valve under this item shall be in full compensation for the furnishings, testing, installing and painting of all valves, furnishing and installing valve markers, valve boxes with concrete collars, including pilot valves, sleeves, anchors, gauges, gearing, wrenches, lubricant, brackets, valve operating nut extensions, valve keys, tapping sleeves, the cutting and plugging of existing mains as required, and other accessories and appurtenances, and the furnishing of all detailed drawings, manuals, labor, superintendents, materials, tools and appliances necessary to complete the Work as specified. All necessary earth excavation required for the installation of valves shall be included in this Unit Prices Bid item. The valves specifically included under other items of the contract will be included in the payments made under those items. No additional payment will be made for a valve installation on an existing live main requiring a Wet Cut-In.

YY. ITEMS 62.A-62.E, SPECIFICATION SECTION 33 12 13, WATER SERVICE LINES, INCLUDING TAPPING SADDLES MEASUREMENT: Water Service Lines shall be measured and paid for under this item per the actual linear feet of water service line installed as verified by the GCDWR Inspector. PAYMENT: The Unit Prices Bid for water service lines shall include excavation, backfill, tapping saddles, corp stops, caps, and reconnections to existing water meters, testing, disinfection, and the furnishing of all other labor, materials, tools, incidentals, and appliances necessary to complete the Work as specified.

Page 36: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-13

ZZ. ITEMS 63.A-63.B, SPECIFICATION SECTION 33 31 00, SANITARY SEWER LATERALS, INCLUDING TAP/WYE AND CLEAN OUTS MEASUREMENT: Sanitary Sewer Laterals shall be measured and paid for under this item per the actual linear feet of lateral installed as verified by the GCDWR Inspector. PAYMENT: The Unit Prices Bid for laterals shall include excavation, backfill, fittings, caps, reconnections to existing piping to re-establish service, testing, and the furnishing of all other labor, materials, tools, incidentals, and appliances necessary to complete the Work as specified.

AAA. PAY ITEM 64, SPECIFICATION NO. 331219.81, RELOCATE OR RECONNECT FIRE HYDRANTS MEASUREMENT: Measurement shall be based on the number of actual existing hydrants that have been relocated or reconnected as shown on the Drawings or as directed by GCDWR. PAYMENT: The Unit Prices Bid for relocating or reconnecting fire hydrants shall include excavation, disconnecting from and plugging and blocking or connecting up openings in existing mains, cleaning and reworking hydrants and valves removed from the existing water system, and relocating, setting, connecting all hydrants and gate valves to the new mains, and furnishing all labor, superintendence, equipment, materials, tools, and appliances necessary to complete the Work as specified, indicated, or required. Gate valves will be paid for under the bid item titled Gate Valves. Cast-in-place concrete, including cast-in-place concrete vaults, will be provided and paid for under the bid item titled Cast-in-Place Concrete. Additional ductile iron pipe and fittings will be provided and paid for under the items titled Ductile Iron Pipe.

BBB. PAY ITEM 65, SPECIFICATION NO. 331219.81, RELOCATE EXISTING WATER METER, RESIDENTIAL, INCLUDING BOX MEASUREMENT: Measurement shall be based on the number of actual existing water meters that have been relocated as shown on the Drawings or as directed by GCDWR. PAYMENT: The Unit Prices Bid for relocating water meters shall include excavation, backfill, service saddles, corp stops, Type K copper tubing, meter boxes, yokes, and all other labor, materials, equipment, tools, and other incidentals required to complete the Work.

CCC. ITEMS 66.A-66.N, 67.A-67.N, 68.A-68.N, 69.A-69.I, 70.A-70.N, 71.A-71.I, SPECIFICATION SECTION 33 41 13, UNIT PRICE FOR REPLACEMENT PIPE, VARIOUS SIZES AND MATERIALS MEASUREMENT: Replacement Pipe shall be measured and paid for per linear foot actually installed based on the pipe material and diameter, measured in the horizontal plane after the pipe has been connected. Measurements shall be from center/face of structure to center/face of structure. PAYMENT: The Prices Bid per lineal feet for the various sizes and materials of replacement pipe shall include excavating, bedding material, backfilling, furnishing and placing of pipe, jointing materials, mastic fillers, stoppers, concrete work, testing and inspections and the furnishing of all labor, materials, tools, and appliances necessary to complete the Work as specified, indicated, or directed on the Drawings.

Page 37: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-14

DDD. ITEMS 72.A-72.F, SPECIFICATION SECTION 33 41 13, UNIT PRICE FOR CONCRETE FLARED END SECTIONS MEASUREMENT: Concrete Flared End Sections shall be measured and paid for per each installed based on the size and type installed. PAYMENT: The Prices Bid shall include excavating, bedding material, backfilling, furnishing and placing of flared end sections, jointing materials, concrete work, testing and inspections and the furnishing of all labor, materials, tools, appliances, and other incidentals necessary to complete the Work as specified, indicated, or directed on the Drawings.

EEE. ITEMS 73.A-73.F, SPECIFICATION SECTION 33 41 13, UNIT PRICE FOR CONCRETE SAFETY FLARED END SECTIONS MEASUREMENT: Concrete Safety Flared End Sections shall be measured and paid for per each installed based on the size and type installed. PAYMENT: The Prices Bid shall include excavating, bedding material, backfilling, furnishing and placing of safety flared end sections, jointing materials, concrete work, testing and inspections and the furnishing of all labor, materials, tools, appliances, and other incidentals necessary to complete the Work as specified, indicated, or directed on the Drawings.

FFF. PAY ITEM 74.A-74.I, SPECIFICATION SECTION NO. 33 41 13, PAVE PIPE INVERT: MEASUREMENT: Pave Pipe Invert shall be measured and paid for per linear foot of pipeline invert paved per pipe size as measured along the centerline, complete in place. PAYMENT: The Price Bid for Pave Pipe Invert shall include concrete, finishing, materials testing, and all other labor, materials, equipment and other incidentals required to complete the Work.

GGG. ITEMS 75.A-75.S, SPECIFICATION SECTION NO. 33 41 16.13, PRECAST REINFORCED CONCRETE BOX CULVERT: MEASUREMENT: Precast Reinforced Concrete Box Culvert shall be measured and paid for per linear foot installed as measured along the centerline, complete in place. PAYMENT: The Price Bid for Reinforced Concrete Box Culvert shall include excavation, bedding, backfill, reinforcing, concrete, compaction, materials testing, and all other labor, materials, equipment and other incidentals required to complete the Work.

HHH. ITEM 76, SPECIFICATION SECTION NO. 33 41 16.13, PRECAST REINFORCED CONCRETE BOX CULVERT: MEASUREMENT: Precast Reinforced Concrete Box Culvert shall be measured and paid for per cubic yard installed, complete in place.

1. Only pre-cast reinforced concrete box culvert barrels shall be paid for under this item.

2. Pre-cast concrete parapets, wings, aprons & baffles shall be measured and paid for under the respective items for such work.

PAYMENT: The Price Bid for Reinforced Concrete Box Culvert shall include excavation, bedding, backfill, reinforcing, concrete, compaction, materials testing, and

Page 38: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-15

all other labor, materials, equipment and other incidentals required to complete the Work.

III. ITEM 77, SPECIFICATION SECTION 33 46 13, UNIT PRICE FOR FRENCH DRAINS MEASUREMENT: French Drains shall be measured and paid for per linear foot installed as measured along the centerline, complete in place. PAYMENT: The Price Bid for French Drains shall include excavation, aggregates, backfill, compaction, geotextiles as called for, materials testing, and all other labor, materials, equipment and other incidentals required to complete the Work.

JJJ. ITEM 78.A-78.D, SPECIFICATION 33 46 13, UNIT PRICE FOR CORRUGATED PLASTIC TUBING MEASUREMENT: Corrugated plastic tubing shall be measured and paid for per linear foot installed of each size as measured along the centerline, complete in place. PAYMENT: The Price Bid for Corrugated Plastic Tubing shall include excavation, backfill, bedding, corrugated plastic tubing, geotextiles as called for, compaction, materials testing, and all other labor, materials, equipment and other incidentals required to complete the Work.

KKK. PAY ITEMS 79-80, SPECIFICATION SECTION 33 49 13, UNIT PRICE FOR COMPLETE BRICK CATCH BASIN, GROUP 1 OR 2 (GDOT 1033/1034) MEASUREMENT: Complete Brick Catch Basins, Group 1 or 2, shall be measured and paid for per vertical linear foot installed as measured from invert to top elevation, per Group Type, complete in place. PAYMENT: The Prices Bid shall include excavation, backfill, bedding, removal and disposal of existing catch basin, frames and covers, brick masonry, top and bottom slabs, and all other labor, materials, equipment, and incidentals required to complete the Work.

LLL. ITEMS 81-82, SPECIFICATION SECTION 33 49 13, UNIT PRICE FOR COMPLETE PRECAST CATCH BASIN, GROUP 1 OR 2 (GDOT 1033/1034) MEASUREMENT: Complete Precast Catch Basins, Group 1 or 2, shall be measured and paid for per vertical linear foot installed as measured from invert to top elevation, per Group Type, complete in place. PAYMENT: The Prices Bid shall include excavation, backfill, bedding, removal and disposal of existing catch basin, frames and covers, precast concrete catch basins bases, wall sections, and top slabs, and all other labor, materials, equipment, and incidentals required to complete the Work.

MMM. ITEM 83, SPECIFICATION SECTION 33 49 13, UNIT PRICE FOR REPLACEMENT TOP FOR 1033/1034 CATCH BASIN, COMPLETE MEASUREMENT: Replacement Tops for 1033/1034 Catch Basins shall be measured and paid for per each installed per each catch basin type, complete in place. PAYMENT: The Prices Bid shall include excavation, backfill, bedding, removal and disposal of existing top, frames and covers, precast concrete top slabs, and all other labor, materials, equipment, and incidentals required to complete the Work.

Page 39: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-16

NNN. ITEMS 84-85, SPECIFICATION SECTION 33 49 13, UNIT PRICE FOR REPLACE CATCH BASIN THROAT, SINGLE OR DOUBLE WING MEASUREMENT: Replacement catch basin throats shall be measured and paid for per each installed, per each type single or double wing. PAYMENT: The Prices Bid shall include excavation, backfill, bedding, removal and disposal of existing throats, concrete work, and all other labor, materials, equipment, and incidentals required to complete the Work.

OOO. ITEMS 86-87, SPECIFICATION SECTION 33 49 13, UNIT PRICE FOR COMPLETE BRICK MANHOLE, TYPE 1 OR 2 (GDOT 1011A) MEASUREMENT: Complete Brick Manholes, Type 1 or 2, shall be measured and paid for per vertical linear foot installed as measured from invert to top elevation complete in place per manhole type. PAYMENT: The Prices Bid shall include excavation, backfill, removal and disposal of existing manhole, bedding, frames and covers, manhole bases, inverts, brick masonry, and top slabs, and all other labor, materials, equipment, and incidentals required to complete the Work.

PPP. ITEMS 88-89, SPECIFICATION SECTION 33 49 13, UNIT PRICE FOR COMPLETE PRECAST MANHOLE, TYPE 1 OR 2 (GDOT 1011A) MEASUREMENT: Complete Precast Manholes, Type 1 or 2, shall be measured and paid for per vertical linear foot installed as measured from invert to top elevation complete in place per manhole type. PAYMENT: The Prices Bid shall include excavation, backfill, bedding, removal and disposal of existing manhole, frames and covers, manhole bases, inverts, wall sections, and top slabs, and all other labor, materials, equipment, and incidentals required to complete the Work.

QQQ. ITEMS 90-91, SPECIFICATION SECTION 33 49 13, UNIT PRICE FOR COMPLETE BRICK DROP INLET, GROUP 1 OR 2 (GDOT 1019A/9031S, GC P&D 609/610) MEASUREMENT: Complete Brick Drop Inlets, Group 1 or 2, shall be measured and paid for per vertical linear foot installed as measured from the invert to the rim/throat elevation, complete in place. PAYMENT: The Prices Bid shall include excavation, backfill, bedding, removal and disposal of existing manhole, frames and castings, structure bases, inverts, brick masonry, and top slabs, and all other labor, materials, equipment, and incidentals required to complete the Work.

RRR. ITEMS 92-93, SPECIFICATION SECTION 33 49 13, UNIT PRICE FOR COMPLETE PRECAST DROP INLET, GROUP 1 OR 2 (GDOT 1019A/9031S, GC P&D 609/610) MEASUREMENT: Complete Precast Drop Inlets, Group 1 or 2, shall be measured and paid for per vertical linear foot installed as measured from the invert to the rim/throat elevation, complete in place. PAYMENT: The Prices Bid shall include excavation, backfill, bedding, removal and disposal of existing manhole, frames and castings, structure bases, inverts, wall sections, and top slabs, and all other labor, materials, equipment, and incidentals required to complete the Work.

Page 40: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-17

SSS. ITEMS 94-97, SPECIFICATION SECTION 33 49 13, UNIT PRICE FOR REPLACEMENT TOP FOR DROP INLET, VARIOUS TYPES MEASUREMENT: Replacement Tops for Drop Inlets (GC P&D Type 609/610 and GDOT Type 1019A/9031S) shall be measured and paid for per each installed per each drop inlet type, complete in place. PAYMENT: The Prices Bid shall include excavation, backfill, bedding, removal and disposal of existing top, frames and castings, precast concrete top slabs, and all other labor, materials, equipment, and incidentals required to complete the Work.

TTT. ITEM 98, SPECIFICATION SECTION 33 49 13, UNIT PRICE FOR TIE INTO EXISTING STRUCTURES MEASUREMENT: Ties into Existing Structures shall be measured and paid for per each tie-in installed. Tie-in’s of all sizes and configurations shall be paid for at the same price. PAYMENT: The Price Bid includes excavation, bedding and backfill not included in other Pay Items, coring, drilling, jack hammering, grouting, and all other labor, materials, equipment, and incidentals required to complete the Work.

UUU. ITEMS 99.A-99.C, SPECIFICATION SECTION 33 49 13, UNIT PRICE FOR PRECAST CONCRETE BOX CULVERT HEADWALL-PARAPET, 1’-3’ HIGH MEASUREMENT: Precast Concrete Headwall Parapets shall be measured and paid for per linear foot installed, complete-in-place.

1. Only pre-cast concrete headwall parapets shall be paid for under this item. 2. Cast-in-place concrete, brick masonry, and rubble masonry headwalls shall be

measured and paid for under the respective items for such work. PAYMENT: The Price Bid shall include excavation, bedding, backfill, installation of the headwall, grouting, and all other labor, materials, equipment, and incidentals required to complete the Work.

VVV. ITEM 100, SPECIFICATION SECTION 33 49 13, UNIT PRICE FOR PRECAST CONCRETE BOX CULVERT HEADWALL-WINGWALL, MEASUREMENT: Precast Concrete Headwall Wingwalls shall be measured and paid for per cubic yard installed, complete-in-place.

1. Only pre-cast concrete headwall wingwalls shall be paid for under this item. 2. Cast-in-place concrete, brick masonry, and rubble masonry headwalls shall be

measured and paid for under the respective items for such work. PAYMENT: The Price Bid shall include excavation, bedding, backfill, installation of the headwall, grouting, and all other labor, materials, equipment, and incidentals required to complete the Work.

WWW. ITEM 101, SPECIFICATION SECTION 33 49 13, UNIT PRICE FOR PRECAST CONCRETE BOX CULVERT HEADWALL-APRONS AND BAFFLES MEASUREMENT: Precast Concrete Headwall Aprons and Baffles shall be measured and paid for per cubic yard of apron and baffle installed, complete-in-place.

1. Only pre-cast concrete headwall aprons and baffles shall be paid for under this item.

2. Cast-in-place concrete, brick masonry, and rubble masonry headwalls shall be measured and paid for under the respective items for such work.

PAYMENT: The Price Bid shall include excavation, bedding, backfill, installation of

Page 41: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-18

the headwall, grouting, and all other labor, materials, equipment, and incidentals required to complete the Work.

XXX. ITEM 102, SPECIFICATION 33 49 13, UNIT PRICE FOR DITCHES – PAVED MEASUREMENT: Ditches - Paved shall be measured and paid for square yard of ditch paved as measured in the horizontal plane, complete in place. PAYMENT: The Prices Bid shall include excavation, backfill, bedding, concrete, reinforcing, materials, testing, finishing, equipment, and incidentals required to complete the Work.

YYY. ITEM 103.A-103J, SPECIFICATION 33 49 13, UNIT PRICE FOR PRECAST CONCRETE PIPE HEADWALL MEASUREMENT: Precast concrete pipe headwall shall be measured and paid for per each size classification shown on the bid form installed, complete in place. PAYMENT: The Price Bid shall include excavation, bedding, and backfill not included in other items, reinforcing as applicable, materials testing, and all other labor, materials, equipment and other incidentals required to complete the Work.

ZZZ. ITEM 104A-104B, SPECIFICATION SECTION 34 41 16.10, UNIT PRICE FOR TRAFFIC CONTROL MEASUREMENT: Traffic Control shall be measured and paid for per each project task order issued to the contractor on a lump sum basis for the project, complete. PAYMENT: The Prices Bid shall include furnishing and maintaining traffic control measures to include, but are not limited to, barricades, warning signals, pilot vehicles, crash trucks, barrels, cones, steel plates, lights, flagmen, watchmen, temporary signs, message boards, maintenance, obtaining traffic permits, and all other labor, materials, equipment, and incidentals required to complete the Work.

AAAA. ITEMS 105.A-105.D, SPECIFICATION SECTION 34 71 10, UNIT PRICE FOR STREET CUT, DETAILS A-D MEASUREMENT: The quantities to be paid for under the appropriate items shall be measured per square yard of street cut surface area. Any damage or replacement beyond the specified limits of these items shall be the responsibility of the Contractor and shall not be measured for payment. No additional payment will be made for temporary pavement, and the cost thereof shall be considered as being incidental to the Work of this Contract. No additional payment will be made for resetting highway signs, and the cost thereof shall be considered as being incidental to the Work of this Contract. PAYMENT: The Price Bids per unit of area for Street Cuts shall include saw cuts, sub-base, base course, and surface course pavements, concrete, prime and tack coats, compaction, permit fees, maintenance charges and inspection fees required by all road departments and the furnishing of all materials, labor, tools, and appliances necessary to complete the Work as herein specified, shown or ordered. Included shall be the costs of additional excavation beyond trench width to provide firm foundation, graded aggregate base backfill, and any costs of furnishing necessary work beyond the limits of measurement as defined under these specifications. Removal, handling, hauling, and disposal of existing roadway material will be considered incidental to this Pay Item and no additional compensation will be made.

Page 42: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-19

BBBB. ITEMS 106.A-106.B, SPECIFICATION SECTION 34 71 10, UNIT PRICE FOR GUARDRAIL MEASUREMENT: Guardrail shall be measured and paid for per linear foot installed, complete in place. PAYMENT: The Prices Bid shall include guardrail, bolts, anchors, other needed hardware, and all other labor, materials, equipment, and incidentals required to complete the Work.

CCCC. ITEMS 107.A-107.B, SPECIFICATION SECTION 34 71 10, UNIT PRICE FOR GUARDRAIL ANCHORS MEASUREMENT: Guardrail anchors shall be measured and paid for per each installed per each type, complete in place. PAYMENT: The Prices Bid shall include guardrail anchors, bolts, anchors, other needed hardware, excavation, backfill, and all other labor, materials, equipment, and incidentals required to complete the Work.

DDDD. ITEM 108, SPECIFICATION SECTION 34 71 10, UNIT PRICE FOR TRAFFIC STRIPING, GENERAL MEASUREMENT: Traffic Striping, General shall be measured and paid for per linear foot installed, complete in place. PAYMENT: The Prices Bid shall include striping materials, and all other labor, materials, equipment, and incidentals required to complete the Work.

EEEE. ITEM 109, SPECIFICATION SECTION 34 71 10, UNIT PRICE FOR TRAFFIC STRIPING, GORE AREA MEASUREMENT: Traffic Striping, Gore Area shall be measured and paid for per square yard installed, complete in place. PAYMENT: The Prices Bid shall include striping materials, and all other labor, materials, equipment, and incidentals required to complete the Work.

FFFF. ITEM 110, SPECIFICATION SECTION 34 71 10, UNIT PRICE FOR RAISED TRAFFIC MARKERS MEASUREMENT: Raised Traffic Markers shall be measured and paid for per each installed, complete in place. PAYMENT: The Prices Bid shall include raised traffic markers, and all other labor, materials, equipment, and incidentals required to complete the Work.

GGGG. ITEMS 111.A-111.B, SPECIFICATION SECTION 34 71 10, UNIT PRICE FOR DRIVEWAY RESTORATION, VARIOUS THICKNESSES MEASUREMENT: The quantity to be paid for under these items shall be the actual number of square yards of driveway or parking area pavement restored within the length of trench crossing said driveways or parking areas. The width of pavement measured for payment shall be the allowable payment width of excavation as defined on the Detail Drawings; except in the instance where entire squares or slabs have been removed under direction of GCDWR. PAYMENT: The Price Bids per unit of area for driveways and parking areas shall include permit fees, maintenance charges and inspection fees required by all road departments and the furnishing of all materials, labor, tools, and appliances necessary to complete the Work as herein specified, shown or ordered. Included shall be the costs of

Page 43: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

01 22 15.11-20

additional excavation beyond trench width to provide firm foundation, crusher run backfill, and any costs of furnishing necessary work beyond the limits of measurement as defined under these specifications. Removal, handling, hauling, and disposal of existing driveway material will be considered incidental to this Pay Item and no additional compensation will be made.

END OF SECTION 01 22 15.11

Page 44: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract

STORMWATER INFRASTRUCTURE REPLACEMENT SPECIFICATIONS JULY 2014 GWINNETT COUNTY, GA

33 41 13-3

A. Smooth Lined Corrugated High Density Polyethylene Pipe shall meet the requirements of AASHTO M 294, Type S, and the Georgia Department of Transportation Standard Specifications for Road and Bridge Construction, Section 845 , latest edition.

2.6 REINFORCED CONCRETE PIPE (RCP)

A. RCP shall meet the requirements of ASTM C76/AASHTO M 170, and the Georgia Department of Transportation Standard Specifications for Road and Bridge Construction, Section 843, latest edition. RCP shall be minimum of Class III in accordance with GDOT Standard Detail 1030-D, Table No. 1, and shall be provided in lengths of not less than 8 feet each. All joints shall be bell and spigot or tongue and groove type with a rubber gasket conforming to ASTM C-443.

B. RCP Arch Pipe shall meet the requirements of ASTM C506 and AASHTO M 206.

2.7 FLARED END SECTIONS

A. Flared end sections shall be of the following types: 1. Concrete Flared End Sections shall conform to GDOT Standard Detail

1120. 2. Safety Flared End Sections shall conform to GDOT Standard Detail 1122. 3. Corrugated Metal Flared End Sections shall conform to GDOT Standard

Detail 1120.

PART 3 - EXECUTION

3.1 BEDDING

A. No pipe shall be brought into position until the preceding length has been thoroughly embedded and secured in place. The supporting of pipe on wood blocks, loose brick, etc., shall not be permitted. Defects due to settlement shall be made good by the Contractor at his/her own expense.

B. For laying pipe in rock, the trench shall be made to conform to the general dimensions required, and the sub grade shall be brought to the required elevation by use of bedding materials. Sides and bottom of pipes shall be supported by compacting these materials in place so as to ensure an even bearing for the pipe. Particular care shall be taken that pipes are not permitted to rest upon or against solid or projecting portions of rock.

C. Take care to avoid contact between the pipe and mechanical compaction equipment. Do not use compaction equipment directly over the pipe until sufficient backfill has been placed to assure that such equipment shall not damage or disturb the pipe.

D. Bedding shall conform to the attached details.

Page 45: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract
Page 46: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract
Page 47: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract
Page 48: August 25, 2014 ADDENDUM #1 BL077-14 on an Annual … Ad1.pdfpipes being rehabilitated with a spincast geopolymer concrete in lieu of replacement? A1. No, this is a replacement contract