1FOR OFFICIAL USE ONLY // REL TO USA, GBR MOD, ITA MOD, NLD MOD, TUR MND, CAN DND, AUS DOD, DNK MOD, and NOR MODDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Systems Engineering Challenges Air Force Systems Engineering Conference
17 August 2011
C. Douglas EbersoleDirector of Engineering, F-35 Lightning II
Program
2DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Problem Statement
Identify systems engineering challenges to the execution of the F-35 program.
Identify means to mitigate negative impacts through effective systems engineering policy, practices and
people.
3DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Outline
• Overview of F-35 Program• Systems Engineering Challenges/Mitigations• Workforce Management and Support• Final Thoughts
4DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
• Key Attributes:– Stealth– Integrated Avionics– A/G Munitions– Intraflight DL– Adv A/C Survivability
• General Features:– Single seat– Speed: 700 kts or 1.6M (630/1.6M STOVL)– Ceiling: 50,000 ft+– Engine: PW F135
• Sensors– Fully integrated open architecture system– A/G – A/A radar/SAR– Electro Optical A/G Targeting system– A/A IRST– Electronic Support Measures (ESM)– Short range EO spherical coverage
F-35 Characteristics
Three Variants: Max Commonality And Interoperability
Length: 51.4 ftWing Area: 460 ft2
Weight (Empty): 29,400 lbInternal Fuel: 18,200 lbRange: 600 + nm
Length: 51.1 ftWing Area: 460 ft2
Weight (Empty): 32,600 lbInternal Fuel: 13,500 lbRange: 450 + nm
Length: 51.4 ftWing Area: 668 ft2
Weight (Empty): 34,900 lbInternal Fuel: 19,700 lbRange: 600 + nm
CTOL(AF)
STOVL(BF)
CV(CF)
5DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Derivatives and EnhancementsJSF SDD
1990 20351995 2000 2005 2010 2015 2020 2025 2030ASTOVL
MRF
AX
JAST JSFCDP
LRIP
Full Rate Production
Performance Based Global Sustainment
ATA
NATF
System Development and Demonstration
Low Rate Initial Production
F-35 Program At Nexus of Planned Concurrency
F-35 PRECURSOR PROGRAMS:
Advanced Short Takeoff Vertical LandingMulti-Role FighterAdvanced Tactical Aircraft Naval Advanced Tactical FighterAdvanced AttackJoint Advanced Strike Technology / Concept Demonstration Phase
Eglin AFB ITC Operations
FMS
6DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Systems Engineering “V” Pre-Milestone C
Trades
Trades
VerificationLinkage
ValidationLinkage
VerificationLinkage
VerificationLinkage
Integrated DT&E, LFT&E & EOAs Verify Performance
Compliance to Specs
Individual CIVerification
DT&E
Evolve CI FunctionalSpecs into Product
(Build to) Documentation& Verification Plan
System DT&E, OT&E, LFT&E
& OAs Verify System Functionality & Constraints
Compliance to Specs
Fabricate, Assemble,
CodeUpdate Constraints, &
Cost/Risk Drivers
Combined DT&E/OT&E/LFT&E
Demonstrate System toSpecified User Needs andEnvironmental Constraints
Develop System Functional Specs & Verification Plan toEvolve System Functional
Baseline
Evolve FunctionalPerformance Specs into
System Allocated Baseline
Interpret User Needs,
Refine SystemPerformance Specs &
Environmental Constraints
7DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Systems Engineering “V” Pre-Milestone C
Trades
Trades
VerificationLinkage
ValidationLinkage
VerificationLinkage
VerificationLinkage
Integrated DT&E, LFT&E & EOAs Verify Performance
Compliance to Specs
Individual CIVerification
DT&E
Evolve CI FunctionalSpecs into Product
(Build to) Documentation& Verification Plan
System DT&E, OT&E, LFT&E
& OAs Verify System Functionality & Constraints
Compliance to Specs
Fabricate, Assemble,
CodeUpdate Constraints, &
Cost/Risk Drivers
Combined DT&E/OT&E/LFT&E
Demonstrate System toSpecified User Needs andEnvironmental Constraints
Develop System Functional Specs & Verification Plan toEvolve System Functional
Baseline
Evolve FunctionalPerformance Specs into
System Allocated Baseline
Interpret User Needs,
Refine SystemPerformance Specs &
Environmental Constraints
Challenge: Maintaining common air system level requirements across broad stakeholder base.Mitigation:JSF Executive Steering Board control of system level requirements.
8DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Systems Engineering “V” Pre-Milestone C
Trades
Trades
VerificationLinkage
ValidationLinkage
VerificationLinkage
VerificationLinkage
Integrated DT&E, LFT&E & EOAs Verify Performance
Compliance to Specs
Individual CIVerification
DT&E
Evolve CI FunctionalSpecs into Product
(Build to) Documentation& Verification Plan
System DT&E, OT&E, LFT&E
& OAs Verify System Functionality & Constraints
Compliance to Specs
Fabricate, Assemble,
CodeUpdate Constraints, &
Cost/Risk Drivers
Combined DT&E/OT&E/LFT&E
Demonstrate System toSpecified User Needs andEnvironmental Constraints
Develop System Functional Specs & Verification Plan toEvolve System Functional
Baseline
Evolve FunctionalPerformance Specs into
System Allocated Baseline
Interpret User Needs,
Refine SystemPerformance Specs &
Environmental Constraints
Develop System Functional Specs & Verification Plan toEvolve System Functional
Baseline
Interpret User Needs, Refine System
Performance Specs &Environmental Constraints
Challenge: Performance Based Acquisition broad definition of system level requirements.Mitigation:Definition of required functional attributes necessary via mission de-comp, use cases, active user engagement, other.
453 Shall Statements
9DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Systems Engineering “V” Pre-Milestone C
Trades
Trades
VerificationLinkage
ValidationLinkage
VerificationLinkage
VerificationLinkage
Integrated DT&E, LFT&E & EOAs Verify Performance
Compliance to Specs
Individual CIVerification
DT&E
Evolve CI FunctionalSpecs into Product
(Build to) Documentation& Verification Plan
System DT&E, OT&E, LFT&E
& OAs Verify System Functionality & Constraints
Compliance to Specs
Fabricate, Assemble,
CodeUpdate Constraints, &
Cost/Risk Drivers
Combined DT&E/OT&E/LFT&E
Demonstrate System toSpecified User Needs andEnvironmental Constraints
Develop System Functional Specs & Verification Plan toEvolve System Functional
Baseline
Evolve FunctionalPerformance Specs into
System Allocated Baseline
Interpret User Needs, Refine System
Performance Specs &Environmental Constraints
Evolve CI FunctionalSpecs into Product
(Build to) Documentation& Verification Plan
Evolve FunctionalPerformance Specs into
System Allocated Baseline
Challenge:Government oversight of requirements of allocated baseline.Mitigation:Manage to risk. Taking active steps to recover control for identified risk areas.
Example: Helmet Mounted Display System3.2.1.1.1.3.7. The JSF Air System shall provide … and night vision target techniques, including visibility through aircraft structures to execute missions …
Gen II Helmet EODAS sensors HTS DMC-H Required specificity: Visual acuity as function of light conditions End to end system latency
10DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Systems Engineering “V” Pre-Milestone C
Trades
Trades
VerificationLinkage
ValidationLinkage
VerificationLinkage
VerificationLinkage
Integrated DT&E, LFT&E & EOAs Verify Performance
Compliance to Specs
Individual CIVerification
DT&E
Evolve CI FunctionalSpecs into Product
(Build to) Documentation& Verification Plan
System DT&E, OT&E, LFT&E
& OAs Verify System Functionality & Constraints
Compliance to Specs
Fabricate, Assemble,
CodeUpdate Constraints, &
Cost/Risk Drivers
Combined DT&E/OT&E/LFT&E
Demonstrate System toSpecified User Needs andEnvironmental Constraints
Develop System Functional Specs & Verification Plan toEvolve System Functional
Baseline
Evolve FunctionalPerformance Specs into
System Allocated Baseline
Interpret User Needs,
Refine SystemPerformance Specs &
Environmental Constraints
Fabricate, Assemble,
CodeUpdate Constraints, &
Cost/Risk Drivers
Individual CIVerification
DT&E
Challenge:Active management of program risk at lowest configuration item level.Mitigation:Access to program data artifacts, active TPM and risk management
11DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Systems Engineering “V” Pre-Milestone C
Trades
Trades
VerificationLinkage
ValidationLinkage
VerificationLinkage
VerificationLinkage
Integrated DT&E, LFT&E & EOAs Verify Performance
Compliance to Specs
Individual CIVerification
DT&E
Evolve CI FunctionalSpecs into Product
(Build to) Documentation& Verification Plan
System DT&E, OT&E, LFT&E
& OAs Verify System Functionality & Constraints
Compliance to Specs
Fabricate, Assemble,
CodeUpdate Constraints, &
Cost/Risk Drivers
Combined DT&E/OT&E/LFT&E
Demonstrate System toSpecified User Needs andEnvironmental Constraints
Develop System Functional Specs & Verification Plan toEvolve System Functional
Baseline
Evolve FunctionalPerformance Specs into
System Allocated Baseline
Interpret User Needs,
Refine SystemPerformance Specs &
Environmental Constraints
Integrated DT&E, LFT&E & EOAs Verify Performance
Compliance to Specs
System DT&E, OT&E, LFT&E
& OAs Verify System Functionality & Constraints
Compliance to Specs
Challenge:Concurrent development of multiple air system software builds. Drives close coordination across major system components (flight sciences, mission systems, ALIS, PHM, training systems). Stresses program resources. Mitigation:Broad investment in component and system level test and laboratory infrastructure. Tools to have program level sight picture of all components. Disciplined burndown of SDD success criteria.Example: F-35 Software Build Status
Success Criteria Burndown
12DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
F-35 Software Build-Up Status
As of 26 July 2011
REQSIT
SC
DEV
REQ
DEV
SIT
SC
On-board SW
Off-board SW
RequirementsREQ
System Integration & Test/ ReworkSITDevelopment Code &Unit TestDEV
Delivery (DD250/Production Readiness)DELSecurity Cert/Govt. AcceptanceSC
Complete
>=95% of Plan
90-95% of Plan
<90% of Plan
SW Phase for each
LRIP fleet release
Fill Level Denotes % CompleteColor Denotes Status to Plan
Software Phase Status against plan
REQ
SIT
SC
REQ
DEV
SIT
SC
REQSIT
SC
Legend Notes• On-board SW includes IPT: MS, VS, PHM Prime SW, Suppliers• Off-board SW includes IPT: OMS, ALIS, AIHM• Color codes based on IPT with lowest status against plan• Relative weighted across requirements, development, SI&T and
SW based on effort
REQ
DEV
SIT
Block 1A(Eglin Ready for Training)
Block 1B(Multi-Level Security,Full Block 1 Avionics)
Block 2A
Block 2B(SW Retrofit)
Block 3 Initial(Tech Refresh 2)
Block 3 Final(Full SDD war-fighting capability, SW Retrofit)
Supplier Dev: 89% Act vs. 92% PlanPrime Dev: 15% Act vs. 36% Plan
AIHM Dev: 39% vs. 47% PlanALIS Dev: 88% vs. 100% Plan
MS Integration: 83% Act vs. 95% Plan
DEV
REQ
DEV
SIT
DEL
REQ
DEV
SIT
DEL
REQ
DEV
SIT
DEL
REQ
DEV
SIT
DEL
REQ
DEV
SIT
DEL
REQ
DEV
SIT
DEL
REQ
DEV
SIT
DEL
DEV
MS Integration: 5% Act vs. 26% Plan
SC
GLOC CTE projecting Aug Start vs May Plan
13DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
1175 SCs to Be closed
In 2016 and Beyond
14DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Systems Engineering “V” Pre-Milestone C
Trades
Trades
VerificationLinkage
ValidationLinkage
VerificationLinkage
VerificationLinkage
Integrated DT&E, LFT&E & EOAs Verify Performance
Compliance to Specs
Individual CIVerification
DT&E
Evolve CI FunctionalSpecs into Product
(Build to) Documentation& Verification Plan
System DT&E, OT&E, LFT&E
& OAs Verify System Functionality & Constraints
Compliance to Specs
Fabricate, Assemble,
CodeUpdate Constraints, &
Cost/Risk Drivers
Combined DT&E/OT&E/LFT&E
Demonstrate System toSpecified User Needs andEnvironmental Constraints
Develop System Functional Specs & Verification Plan toEvolve System Functional
Baseline
Evolve FunctionalPerformance Specs into
System Allocated Baseline
Interpret User Needs,
Refine SystemPerformance Specs &
Environmental Constraints
Combined DT&E/OT&E/LFT&E
Demonstrate System toSpecified User Needs andEnvironmental ConstraintsChallenge:
LRIP production aircraft delivery concurrent to continued SDD execution. Mitigation:Clear definition of incremental system level performance to be delivered with each LRIP lot to execute user mission needs. Example: Block development plan.
15DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Block Plan: Capabilities / Transition Plan
Includes Proposed “Accelerated” Block 2B Weapons (AF & CF)
NOTE: Block 2B and 3C Fleet Release timing under development (SDD Replan)
LRIP 1 LRIP2 LRIP3 LRIP4 LRIP5 LRIP6 LRIP 7 LRIP 8 +
1B 3C (3F)
Mission Capabilities
Initial TrainingMulti-Level Security
Full Warfighting / Export
Multi-ship Fusion, ORD Compliant
Altitude 40k 50kAirspeed 550 / 450 / -- 700 / 630 / 700
Mach 0.9 / 0.9 / -- 1.6AOA 18 50
G 5.5 / 4.5 / -- 9 / 7 / 7.5 2 AIM-120-C5/7 (A/B/C)2 JDAM (GBU-31) (A/C)
2 JDAM GBU-32 (B)2 GBU-12 Internal (A/B)
* Carriage/Employment Envelope Limited
2B / 3IFleet Release
40K
1.6 / 1.2 / 1.250
7 / 5.5 / 7.5
0.9 / 0.9 / 0.918
Initial Warfighting Basic CAS/Interdiction,
Initial A/A
Ready for TrainingBasic
Nav/Comm/Sensors
40k
0.9 / .8 / --18
5.0 / 4.5 / --
450 / 400 / -- 550 / 450 / 450 700 / 550 / 550
Full SDD WeaponsNo WeaponsWeapons
Enhanced TrainingBasic Mission SystemsInitial MADL, Link 16
40k
1A 2A
5.5 / 4.5 / 4.5
No WeaponsNo Weapons
16DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
A Bit About Personnel
CSAF Vector: "Improved acquisition performance begins with experienced professionals, using the right analytic tools and processes, all supported by transparent decision-making".
JSF DoE Challenge: Transition Engineering Community of Practice from one that “Reviews and Reports” to one
that “Engages and Influences”
• Current F-35 Engineering Workforce– 765 Engineers across numerous work sites representing 83 specific competencies
• Feb-Jun 11 we completed 100% audit of all spaces/75% of faces– Resulted in need to re-align workforce competencies and re-assign personnel– Committed to stand up FTW JPO engineering presence– Identified the requisite data and artifacts required for staff to meet expectations
• Transition of workforce to be accomplished throughout FY12
17DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Closing Thoughts
• VADM Venlet’s commitment to program execution coming out of the N-M re-certification.– Realism in planning– Transparency in all we do– Program grounded in disciplined systems engineering
• It’s not hard … it’s not free … but it requires discipline and commitment
• For most—simply follow your SEP– Systems Engineering Technical Reviews critical
• Enables “gated” approach to program execution
18DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Effective Use of SETR as Program Gates