august 14-15, 2003 crystal gateway marriott arlington, va software developers conference

40
August 14-15, 2003 Crystal Gateway Marriott Arlington, VA oftware Developers Conferenc

Upload: esmond-blake

Post on 18-Jan-2018

217 views

Category:

Documents


0 download

DESCRIPTION

FAFSA Changes Some formatting changes and improvements to instructions New, reworded, and reordered questions CPS Update

TRANSCRIPT

Page 1: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

August 14-15, 2003Crystal Gateway MarriottArlington, VA

Software Developers Conference

Page 2: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

FAFSA ChangesEDExpress ChangesCPS Processing ChangesISIR Record Layout ChangesISIR DatamartCPS Test System

CPS Processing Change for 2004-2005

Page 3: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

FAFSA Changes

Some formatting changes and improvements to instructionsNew, reworded, and reordered questions

CPS Update

Page 4: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

Step OneQuestion 13: Student’s e-mail address

Moved from Step Six to Step One40 characters long, with pre-printed @ symbolExplains how e-mail address will be used

Question 31: New number for the “drug question”

CPS Update

Page 5: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

CPS Update

Step TwoQuestions 43 – 45: Student’s asset net worth questions reordered

Cash, savings, and checkingReal estate/investment net worthBusiness/farm net worth

Page 6: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

Step FourAdded questions about students’ parents

Questions 59 and 63: Parent’s first name initialQuestions 60 and 64: Parent’s date of birthNo longer ask “Age of older parent” question

CPS Update

Page 7: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

CPS Update

Step SixEnrollment questions --

Moved from Step One One question for all termsSeparate response for “Not sure”

Page 8: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

Renewal FAFSAIncludes changes made to paper FAFSAWill roll forward 2003-04 FAFSA questions --

Will pre-print all school codes on transaction used to create the Renewal FAFSAWill pre-print housing plans for each school code listedEnrollment status questions will be converted

If any question = Full time, pre-print as full timeOtherwise, leave question blank

Parent’s Marital Status Date question

CPS Update

Page 9: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

Renewal FAFSAWill no longer pre-print income fields from previous year’s FAFSA for students who qualified for Automatic Zero EFCWill not roll forward parents’ SSN and last name information

CPS Update

Page 10: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

EDExpress ChangesIn 2004-05, EDExpress will interface directly with FAA Access to CPS Online through an embedded browser

Clicking on the FAFSA Tab in EDExpress will take you to FAA Access Application EntryAll application and correction entry will be done in FAA Access

CPS Update

Page 11: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

EDExpress ChangesAll Application Processing functionality still available in EDExpress

ISIR Import/ISIR printISIR Review tab List-Processed ISIRs NSLDS Print, File Format/External Export

CPS Update

Page 12: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

CPS Processing ChangesSSA Match

SSN match expanded to include dependent applicants’ parents

Will not send parent SSN if same as student’sWill use same match flag results as students

CPS Update

Page 13: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

SSA Match cont.Applicants whose parent has SSA Date of Death (Match Flag = 5) will receive a SAR comment instead of being rejectedParents allowed to change SSN, even if SSA gave clean match flag of ‘4’

CPS Update

Page 14: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

RejectsNew rejects for missing parent SSN, last name, first initial, and DOB

Reject 6Reject 6 - Father’s SSN not on SSA database (non-verifiable)

Reject 7Reject 7 - Mother’s SSN not on SSA database (non-verifiable)Reject SReject S - Father’s DOB not matched on SSA database (verifiable)Reject TReject T - Mother’s DOB not matched on SSA database (verifiable)

CPS Update

Page 15: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

Rejects cont.Added rejects for dependent students

Reject 12:Reject 12: If taxes paid amount is greater than or equal to AGI (non-verifiable reject)Reject G:Reject G: If taxes paid amount is less than AGI, but greater than 40% of AGI (verifiable reject)

CPS Update

Page 16: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

Warning EditsNew warning comment code for paper filers who reported parent’s marital status as single, but provided two parent SSNsCPS re-engineered to be a Multi-Year Applicant Database (MYAD) so it can perform cross-year edits to detect possible inconsistencies across application years

CPS Update

Page 17: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

CPS Update

EFC Formula

Only change is inflation updates to offsets

Page 18: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

ISIR Record ChangesDraft ISIR record layout available on IFAP (http://ifap.ed.gov)ISIR layout will follow order of paper FAFSA questions

CPS Update

Page 19: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

New Data Source/Data Type codes with alpha-numeric values

Data Source1 = Electronic2 = Student Web3 = FAA Access4 = Paper5 = CPS6 = FSAIC

CPS Update

Page 20: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

Data TypeA = Application J = Corr. ApplicationB = Spanish Application K = Corr. Appl.

SpanishC = Correction M = DHS Sec. Conf.E = EZ FAFSA N = NSLDS PostscreeningF = EZ FAFSA Spanish R = Renewal ApplicationG = EZ FAFSA Renewal V = Verification Corr.H = EZ FAFSA Correction

CPS Update

Page 21: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

ISIR Record cont.Will include parent SSN match flag resultsNew flag indicates whether transaction is result of address or e-mail address change onlyReject G override added

CPS Update

Page 22: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

ISIR Record cont.Verification Tracking Flag

Expanded to 4 characters Higher numbers continue to have higher priority

CPS Update

Page 23: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

ISIR Record cont.New values for Multi School Code Flags

Still used to determine which schools get ISIR Will also indicate the type of ISIR for each school

CPS Update

Page 24: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

ISIR DatamartISIR Datamart will be implemented on Jan. 2, 2004Will store 2004-05 ISIR data for retrieval and distribution to authorized usersNew feature in FAA Access to CPS Online allows users to request ISIRs from Datamart

CPS Update

Page 25: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

Options for receiving ISIRs --DailyBy request

Sign up through Participation Management System

Default is daily receipt (like current system)May change option at any timeUsers who select daily receipt can also use Datamart to request ISIRs

CPS Update

Page 26: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

CPS Update

Query Options for SSN/Name IDDate range for receipt date or processed dateTransaction number: first, last, all, specific, or greater than XInstitution codeGrade level

Retrieving ISIRsDependency statusEligibility statusState of legal residence or state of collegeEFC rangeVerification statusVeteran statusCombination of these fields

Page 27: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

DPA has authority to run queries Queries can be set up to run on demand or for a future dateQuery must be completed before next query can be submittedLast query entered is displayed when user returns to FAA AccessNo limit on requesting same ISIR multiple times

CPS Update

Page 28: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

As queries run against Datamart, files of requested ISIRs generatedFiles loaded to SAIG under separate message classFiles of requested ISIRs must be retrieved within 14 calendar days

CPS Update

Page 29: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

Certain ISIRs automatically “pushed” regardless of option selected by institution

EFC changesSAR C Code changesSystem-generated transactions –

NSLDS post-screeningDHS automated secondary confirmationReprocessing

CPS Update

Page 30: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

Schools must look at all “pushed” ISIRsSchool must request ISIRs for all enrolled studentsDatamart will be used for YTD and FDR requests

CPS Update

Page 31: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

Message ClassesCurrent ISIR message classes will be replaced with three new message classes

ISDF05OP – Daily regular ISIRsISRF05OP – Requested ISIRsISGF05OP – CPS Pushed ISIRs

CPS Update

Page 32: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

Types of Message Classes a destination point will receive:

Daily automatic optionRegularCPS pushed ISIRs

ISIRs requested through DatamartRequestedCPS pushed ISIRs

CPS Update

Page 33: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

SpecificationsSoftware Developer Specifications (NAS Specifications) – draft will be posted to IFAP by the end of AugustUpdates will be made as needed – most likely in October or November

CPS Update

Page 34: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

CPS Test SystemIs a mechanism for you to ensure your system meets the specifications for interfacing with the CPS and for calculating correct resultsAllows you to

test applications and correctionsreceive ISIR data

CPS Update

Page 35: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

CPS Test SystemAvailable November 24, 2003 through end of processing cycleUser Guide will be posted to IFAP in early NovemberMessage will be issued when test system goes live for your testing

CPS Update

Page 36: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

CPS Test SystemTest files will be available in early NovemberSeparate input and output files will be posted for testing specifications

CPS Update

Page 37: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

CPS Test SystemRemember - CPS is still in test until SFA accepts system and production starts on January 2, 2004

CPS Update

Page 38: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

CPS Update

We appreciate your feedback and comments.

Phone: 1-800-330-5947Email: [email protected]

Page 39: August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference

August 14-15, 2003Crystal Gateway MarriottArlington, VA

Software Developers Conference