audi, sytner v4
DESCRIPTION
Audi, Sytner V4TRANSCRIPT
Audi, Sytner Group LtdBradford, UK
the complete construc tion company
“A new car dealership, with service and repair workshop”
“A new car dealership, with service and repair workshop”
The design and construction of a New
Car Dealership with service and repair
workshop and valet cleaning.
The site was previously part of Bradford
Gas Works, its part remediation was
carried out in 2004. The three plotted
site required the full remediation for
the construction of the dealership and
the connecting Estate Road.
The plot is divided by the Bradford
Beck, the culvert cover formed the
basis of the building design, with
showroom and workshop constructed
on opposting sides of the Beck bridging
with the covered drive through.
Audi, Sytner Group Ltd.
“Two storey office, and welfare accommodation”
Start Date | September 2007
Duration | 36 Weeks
Completion Date | July 2008
Project Value | £7m
Client Details | Sytner Group HQ
2.4 Hectares of development
363m2 showroom display area
732m2 workship, 16 working bays & one MOT station
258m2 drive through drop off area
242m2 valet facilities
Two Storey office and welfare accommodation
Key Features
Statistics
the complete construc tion company
Anglo Holt Construction Ltd.
0121 525 6717
www.angloholt.co.uk