auburn station open house materials from october 2018 open

11
Fall 2018 Welcome! Sound Transit is improving access to Auburn Station for drivers, pedestrians, bicyclists and bus riders, including construction of a new garage. This open house provides an early look at: Garage layout and access Potential pedestrian, bicycle and transit improvements Auburn Station, which opened in 2000, has become a transit hub for local residents and workers. 13 roundtrip Sounder trains stop here each weekday, plus special event service; over 1,700 people board Sounder trains from Auburn Station each weekday 9 bus routes stop here The current garage has 520 parking spaces, and fills to capacity each weekday morning o Carpool parking permits are available now o Solo parking permits are expected to be available in 2019

Upload: others

Post on 30-May-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Auburn Station open house materials from October 2018 open

Fall 2018

Welcome!Sound Transit is improving access to Auburn Station for drivers, pedestrians, bicyclists and bus riders, including construction of a new garage.

This open house provides an early look at:

Garage layout and access

Potential pedestrian, bicycle and transit improvements

Auburn Station, which opened in 2000, has become a transit hub for local residents and workers.

13 roundtrip Sounder trains stop here each weekday, plus special event service; over 1,700 people board Sounder trains from Auburn Station each weekday

9 bus routes stop here

The current garage has 520 parking spaces, and fills to capacity each weekday morningo Carpool parking permits are available nowo Solo parking permits are expected to be available in 2019

Page 2: Auburn Station open house materials from October 2018 open

Fall 2018

We plan, build and operate regional transit systems and services to improve mobility in urban areas of King, Pierce and Snohomish counties.

WHO IS SOUND TRANSIT?

Sounder commuter rail

Our Sounder trains travel between Lakewood and Seattle (making stops in South Tacoma, Tacoma, Puyallup, Sumner, Auburn, Kent and Tukwila) and between Everett and Seattle (making stops in Mukilteo and Edmonds). Sounder regularly runs weekday mornings and afternoons with weekend service for special events.

ST Express bus

ST Express bus routes serve urban centers in Pierce, King and Snohomish counties with fast service between major cities and job centers. ST Express service offers easy transfers to train service and local buses, and operates seven days a week for many routes.

Sound Transit Board

Sound Transit is governed by an 18-member board made up of local elected officials and the Secretary of the Washington State Department of Transportation. The board establishes policies and gives direction and oversight.

FundingThe system plan is paid for with a combination of voter-approved local taxes, federal grants, farebox revenues, borrowed funds and interest revenues.

Tacoma Link

The existing 1.6-mile light rail line currently serves six stations between the Theater District and the Tacoma Dome. Trains run every 12 minutes and provide nearly a million rides per year. Sound Transit is extending this route north to the Hilltop District, adding six stations. This extension is targeted to open for service in 2022. Tacoma Link will further extend to Tacoma Community College in 2039.

Link light rail

Currently, Link light rail runs from Angle Lake and Sea-Tac Airport through downtown Seattle and to the University of Washington. Construction is underway to extend service to Northgate in 2021, to Bellevue and east King County in 2023. By 2024, service will futher extend to Federal Way, Lynnwood and downtown Redmond. Link light rail runs seven days a week with trains running every 6, 10 or 15 minutes depending on the time of day.

Page 3: Auburn Station open house materials from October 2018 open

Fall 2018

SYSTEM EXPANSION

Sound Transit is: Building a 116-mile network extending regional light rail from Tacoma to Everett

and from densely developed Seattle neighborhoods to Redmond and Issaquah Extending Tacoma Link Establishing Bus Rapid Transit to the north, east and south of Lake Washington. Expanding Sounder south line capacity and service, adding two new stations. Improving access and expanding parking at Sounder stations.

Kingsgate/Totem Lake

South Everett

Downtown Everett

NE 85th

Brickyard

Canyon Park

Woodinville

Bonney LakeSouth Hill

LakewoodTowne Center

NE 44th

South Renton

IssaquahHighlands

SouthSammamish

NorthSammamish

Burien

WestwoodVillage

Kirkland

EvergreenPoint

LakeForest

Park

KenmoreBothell

Edmonds

Mukilteo

Tukwila

Puyallup

Sumner

Kent

Auburn

Tillicum

DuPont

South Tacoma

Lakewood

& King StreetInternational District/Chinatown

SeaTac/Airport

Angle Lake

University ofWashington

Capitol Hill

MountBaker

Columbia City

Rainier Beach

Othello

Tukwila/International

Blvd

BeaconHill

Westlake

Pioneer SquareUniversity Street

Stadium

SODO

Convention CenterTheater District

Union StationS 25th

Roosevelt

Shoreline North/185th

Shoreline South/145th

NE 130th

Northgate

U District

Bellevue Downtown

Midtown

MountlakeTerrace

SE Redmond

Downtown Redmond

Spring District/120th

Overlake Village

S Graham St

S Boeing Access Rd

Lakemont

Redmond Technology

S 4thOld City Hall

S 272nd

Kent/DesMoines

Federal Way

SouthFederal Way

Stadium District

6th AveHilltop District

St Jos

eph

Tacoma General

TacomaDome

EastTacoma

Sprag

ue

Ainswort

h

Steve

nsUnio

n

Ballard

Interbay

Smith CoveSeattle CenterSouth Lake Union

TacomaCommunity

College

Mariner

SW EverettIndustrial Center

SR 99/Airport Rd

West Alderwood

LynnwoodCity Center

MercerIsland

JudkinsPark

AlaskaJunction

Avalon

Delridg

e

Denny

East Main

Wilburton

SouthBellevue

Bel-Red/130th

Eastgate

Richards Rd

SR 526/Evergreen

SouthKirkland

Ash Way

FifePearl

Issaquah

EverettEverett

BellevueSeattle

Tacoma

2021

2036

2024

2024

2023

2035

2031

2036

2031

2024

2041

2030

2041

2024

2024

2031

2039

2036

2024

2030

2021

2022

2021

2024

2023

2023

Page 4: Auburn Station open house materials from October 2018 open

Fall 2018

PROJECT OVERVIEW

Sound Transit is planning a new garage and other improvements so more people can conveniently access the Sounder train and local bus service.

In November 2017, the Sound Transit Board identified the site at First Street Northwest and A Street Northwest as the preferred site for a new parking garage with approximately 535 new spaces

Walking, bicycling, and bus transit are important ways for Sounder and bus riders to get to the Auburn Station, and we are evaluating a range of potential improvements, including improved pedestrian crossings, better bus shelters and new bicycle lockers

City Hall

Auburn Medical Center

S Di

visi

on S

t

1st St NW

W Main St

1st St SW

2nd St SW

3rd St SW

A St

SW

N D

ivis

ion

St

A St

NW

B St

NW

C St

NW

C St

SW

Pedestrian Sky Bridge

ExistingParkingGarage

ExistingSurfaceParking

Site for proposedparkinggarage

Auburn Station

BusLoop

Page 5: Auburn Station open house materials from October 2018 open

Fall 2018

PUBLIC INVOLVEMENT TO DATE

In 2017 Sound Transit worked closely with the City of Auburn and collected community feedback to help identify a site for a new parking garage and other improvements.

Two open houses were held, with over 120 participants

The City of Auburn Transportation Advisory Board met four times and provided input

The Auburn City Council recommended the garage site at First Street Northwest and A Street Northwest, with conditions

Criteria to identify a garage site included: improving access to transit, promoting a sustainable environment, feasibility, and supporting regional and community goals.

Page 6: Auburn Station open house materials from October 2018 open

Fall 2018

SCHEDULE

Nov 2017: Sound Transit Board identified preferred improvement package

2018/2019: Conceptual engineering and environmental review

Early 2019: Public comment

Spring 2019: Sound Transit Board selects project to build

Advance design

Obtain permits

Acquire property

Groundbreaking

Construction updates

WE ARE HERE

CONSTRUCTION 2021–2023

DESIGN2019–2021

PLANNING2017–2019

OPEN TOPUBLIC

2023

Page 7: Auburn Station open house materials from October 2018 open

Fall 2018

PROPOSED PARKING GARAGE

EXISTING SOUNDER PARKING GARAGE

EXISTING SOUNDERSURFACE PARKING LOCATION

AUBURN SOUNDER STATION

LEGEND

N

Auburn Sounder Station Access ImprovementsParking Garage

EXISTING TRACKWAY

BUS PICK-UP/DROP-OFF

DIVISION STREET S

A STREET SE

A STREET NW

2 ND STREET NW

1 ST STREET NW

W MAIN STREET

1 ST STREET NW

AUBURN STATION AND GARAGE AXONOMETRIC VIEW

B STREET NW

3 RD STREET NW

EARLY GARAGE CONCEPT

Two garage entrances: 1st St NW, A St NW (south and east of garage)

Estimated parking spaces: 535 new spaces

Existing parking garage

PROPOSED PARKING GARAGE

EXISTING SOUNDER PARKING GARAGE

EXISTING SOUNDERSURFACE PARKING LOCATION

AUBURN SOUNDER STATION

LEGEND

N

PROPOSED PARK

EXISTING SOUNDGARAGE

EXISTING SOUNDSURFACE PARKIN

AUBURN SOUNDE

LEGEND

NAuburn Sounder Station Access ImprovementsParking Garage

EXISTING TRACKWAY

BUS PICK-UP/DROP-OFF

DIVISION STREET S

A STREET SE

A STREET NW

2 ND STREET NW

1 ST STREET NW

W MAIN STREET

1 ST STREET NW

AUBURN STATION AND GARAGE AXONOMETRIC VIEW

B STREET NW

3 RD STREET NW

Proposed parking garage

Page 8: Auburn Station open house materials from October 2018 open

Fall 2018

City Hall

Auburn Medical Center

S Di

visi

on S

t

1st St NW

W Main St

1st St SW

2nd St SW

3rd St SW

A St

SW

N D

ivis

ion

St

A St

NW

B St

NW

C St

NW

C St

SW

Pedestrian Sky Bridge

ExistingParkingGarage

ExistingSurfaceParking

Site for proposedparkinggarage

Auburn Station

BusLoop

Pedestrian Path

Legend

Garage entrance

Garage exit

Pedestrian pathway

Elevator

Stairs

ACCESSING THE GARAGE

Representative concept, subject to change.

Page 9: Auburn Station open house materials from October 2018 open

Fall 2018

E Main StreetE Main Street

C Str

eet N

WC

Stree

t SW

W Main Street

W Main Street

2nd Street SW

1st Street SW

2nd Street SE 2nd Street SE

1st Street SE

A Stre

et SE

S Divi

sion S

treet

A Stre

et SW

B Stre

et SW

A Stre

et SE

S Divi

sion S

treet

A Stre

et SW

N Di

vision

Stree

t

A Stre

et NW

B Stre

et NW

Auburn Way N

Auburn Way S

D Str

eet N

WD

Stree

t SW

E Str

eet S

W

1st Street NE1st Street NW

Aubu

rn Av

e

1st Street SW1st Street SW

3rd Street SW 3rd Street SW 3rd Street SE

City Hall

AuburnMedicalCenter

West AuburnHigh School

ExistingGarage

2

5

1

1

7

4

3

9

10

8

11

6

12

13

2

3

4 5

Potential Garage Sites Considered - AuburnAuburn StationSite Chosen For Further Analysis Site Not Chosen For Further Analysis

Legend

100 Feet

Intersections AnalyzedKent and Auburn Station Access Improvements – April 17 , 2017

DRAFT for Discussion Purposes Only

CST SW

E MAIN ST

AUBU

RN AV

E NE

2ND ST SE

DST

S W

DST SE

4TH ST SE

F ST S

E

1ST ST NE

A ST

SW

AUBURNW

AYS

B ST

SE

A ST

SE

B ST

SE

3RD ST SW

I ST N

E

A PL SE

C ST SW

6TH ST SE

DST

SE

TRAN

SIT RD SW

3RD ST NE

B ST

NW

B ST

SW

4TH ST NE

H ST

NE

1ST ST NW

1ST ST SW

W MAIN ST

A ST

NW

3RD ST NW

2ND ST NW

ESTN

E

D ST

NE

H ST

SE

3RD ST NE

1ST ST NE

3RD ST SW

B ST NE

2ND ST NW

1ST ST SW

3RD ST SE

2ND ST SW

1ST ST SW

AUBURN WAY N

1ST ST SE

3RD ST SW

A ST

SW

S DIV

ISIO

N ST

E ST S

W

2ND ST NE

4TH ST SW

F ST S

W

A ST

NE

N DI

VISI

ON ST

5TH ST SW

1ST ST NE

G ST

SW

CST

NW

AST

NW

A ST

NE

B ST

NE

DS T

NW

5TH ST SE

7TH ST SE

F ST N

W

G ST

NW

E ST S

E

G ST SE

H ST SE

IST

SE

H ST

NW

CROSS ST SE

6TH ST SE

4TH ST SW

C ST SW

C

ST SW

CLAY

ST N

W

18

5

1

3

2

Project Type

Bike

Ped

Bus

Half MileQuarter MileAuburn Station

I

0 0.25 0.5 Mi

Bus Access Improvements

4

DRAFT8/23/2017

City of AuburnPriority Non-Motorized Projects

N

1st St SW1st St SW

2nd St SW 2nd St SE

7th St SE

6th St SE

5th St SE

E Main St

1st St NE

2nd St NE

3rd St SW

4th St SW

3rd St SW

1st St NW

2nd St NW

3rd St NW 3rd St NE

2nd St NW

E Main St

W Main St

1st St SW S Di

visio

n St

A St

SW

A St

SE

A St

SE

E St

SE

B St

NE

A St

NW

C St

NW

D St

NW

H St

NW

A St

NE

F St

SE

G St

SE

H St

SE

C St

SW

C St

SW

D St

SW

F St

SW

G St

NW

G St

SW

F St

NW

B St

NW

Aubu

rn A

ve

City Hall

Auburn Medical Center

Proposed GarageFootprintWest Auburn

High School

ExistingParking Garage

Transit shelters and sidewalks at bus stops on connecting transit routes to the Sounder station

Clearly marked pedestrian zone

Bike improvements on E Main St connecting to station area

Bike rack and bike locker upgrades at the station

MAKING IT EASIER TO WALK, BICYCLE AND BUS TO THE STATION

Sound Transit, the City of Auburn and King County Metro are looking at several potential options for improving pedestrian, bicycle and bus access to Auburn Station. More information about these projects as they are refined will be available in spring 2019.

Page 10: Auburn Station open house materials from October 2018 open

Fall 2018

Stay engaged

Sign up to receive project emails: soundtransit.org/subscribe

Learn more about the project: soundtransit.org/auburn-access-improvements

Contact Community Outreach Specialist Melanie Mayock, 206-689-4877 or [email protected]

NEXT STEPS

Thank you for attending the open house! We will consider your input as we continue the garage and pedestrian, bicycle and transit improvements.

Sound Transit is currently evaluating potential environmental impacts and possible mitigation measures for this project. We will share the results of this evaluation for public review and comment in spring 2019 – stay tuned for another open house.

Page 11: Auburn Station open house materials from October 2018 open

Fall 2018

OTHER SOUND TRANSIT PROJECTS IN THE AUBURN AREA

Federal Way Link ExtensionThe Federal Way Link Extension project will extend light rail from the Angle Lake Station in the City of SeaTac to the Federal Way Transit Center. The 7.8-mile alignment will include three stations near Auburn Des Moines Road, South 272nd Street and the Federal Way Transit Center. Service is scheduled to begin in 2024.

Tacoma Dome Link Extension and Operations and Maintenance FacilityThe Tacoma Dome Link Extension will extend light rail approximately 9.7 miles from the Federal Way Transit Center to the Tacoma Dome Station area. The project also includes an operations and maintenance facility in the south corridor (South King and Pierce counties). The extension includes four new light rail stations, two new parking garages, and is scheduled to open in 2030.

Sounder South Capacity ExpansionAs ridership on the Sounder South line continues to grow, Sound Transit is working to increase train and platform capacity from seven cars to 10, accommodating 40 percent more passengers. Sound Transit will also negotiate with Burlington Northern Santa Fe (BNSF) Railway, the railway owns the tracks used by Sounder, to run more daily trips. Planning for Sounder South Capacity Expansion will get under way in late 2018, with improvements completed by 2036.

Puget Sound

Angle Lake

Star Lake

Steel Lake

Veterans Dr

S 316th St

S Star

Lake Rd

36th

Ave

S

S 240th St

S 272nd St

Mili

tary

Rd

S

23rd

Ave

S

Pacif

ic Hw

y S

Mili

tary

Rd

S

S 320th St

Kent-Des Moines Rd S

Pacif

ic Hw

y S

S 200th St

Green River Natural Resources Area

Celebration Park

Riverbend Golf Course

Lake Fenwick Park

Saltwater State Park

Valley Floor Community Park

Des Moines Creek Park

Angle Lake

Kent/Des Moines

South 272ndStreet

Federal WayTransit Center

Link Light Rail

New station

Existing station

New parking

Existing parking

Angle Lake–Federal WaySurfaceElevated

Other serviceAngle Lake–Seattle (in service)Federal Way–Fife–Tacoma (2030)

N

2024

Summer 2018

P o v e r t yBay

S 320th St

54th Ave E

Port

land

Ave

E

161

18

Federal WayTransit Center

SouthFederal Way

Fife

EastTacoma

TacomaDome

Fife

City ofFederal Way

PuyallupTribe ofIndians

City ofMilton

City ofTacoma

City of

Kent

2030

CommencementBay

Tacoma DomeLink Extensionand OMF South*

Elevated

Surface

Link Light Rail

New station area

Parking

Transfer hub

Existing station

Tacoma Dome extension

Federal Way extension (2024)

Tacoma Link

Current/future service

Note: map not to scale

(Representative project per ST3 Plan)

Representative project showing transit mode, route and general station locations per ST3 Plan. Final project may reflect refinements.

*Operations and Maintenance Facility: South (OMF South) is also being located in the south corridor (South King and Pierce counties) to support the south corridor and the entire Link system expansion.

For projects in the voter-approved system expansion, Sound Transit produced “representative projects that formed the basis for the project’s scope, schedule and budget,” which include mode, station locations and related features, such as an operations and maintenance facility.

As assumed in that plan, Tacoma Dome Link Extension (TDLE) will extend regional light rail approximately 10 miles from the Federal Way Transit Center to the Tacoma Dome Station area. The project travels through the cities of Federal Way, Milton, Fife and Tacoma, and the reservation of the Puyallup Tribe of Indians.

BACKGROUND

Assumptions: representative project

Fast and frequent service to destinations South Federal Way to Tacoma Dome station in 20 minutes.

Fife to Tacoma Dome Station in 6 minutes.

Tacoma Dome Station to Sea-Tac Airport in 35 minutes.

Federal Way to CenturyLink Field in 45 minutes.