B1 1t Align 1i Room name 101 SEE x/ax.x 6.01 30 GRID LINES DOOR SYMBOL WINDOW SYMBOL ALIGN PROPERTY LINE Name Elevation LEVEL PARTITION SYMBOL ROOM IDENTIFICATION CENTERLINE KEYNOTE SYMBOL FLOOR TRANSITION STC SYMBOL A101 1 SIM 1 1 SIM DETAIL TARGET REVISION SECTION A 1 127 NUMERICAL DOOR REFERENCE WINDOW TYPE AS DISPLAYED ON SCHEDULE SEE PARTITION SCHEDULE FOR TYPE ROOM NAME ROOM NUMBER ENLARGE ROOM PLAN REFERENCE BY CSI DESIGNATION STC RATING C L C L DETAIL NUMBER SHEET WHERE DETAIL IS DRAWN ELEVATION NUMBER SHEET WHERE ELEVATION IS DRAWN CLOUD AROUND REVISION INTERIOR ELEVATION ELEVATION NUMBER SHEET WHERE ELEVATION IS DRAWN A7.1 7A 7C 7D 7B A4.1 ELEVATION ELEVATION NUMBER SHEET WHERE ELEVATION IS DRAWN A3.1 7 VICINITY MAP PROJECT INFORMATION GENERAL NOTES LEGEND PROJECT INFORMATION A L L O W A B L E HEIGHT / BUILDING A R E A - TABLE 5-B BUILDING INFORMATION: U N I T / P A R K I N G T A B U L A T I O N : 2711 SHATTUCK AVENUE BERKELEY, CALIFORNIA APN:054-1719-038 LOT 19 LOT AREA: 5,674 SF / 0.13 ACRES DUA: 169 UNIT TYPES: 22-"SOLO" Studio Residential Hotel Units THE CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS OF BUILDING AND SITE AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES BEFORE PROCEEDING WITH CONSTRUCTION. THE GENERAL CONTRACTOR SHALL VERIFY AND ASSUME RESPONSIBILITY FOR ALL DIMENSIONS AND SITE CONDITIONS. THE GENERAL CONTRACTOR SHALL INSPECT THE EXISTING PREMISES AND TAKE NOTE OF EXISTING CONDITIONS PRIOR TO SUBMITTING PRICES. NO CLAIM SHALL BE ALLOWED FOR DIFFICULTIES ENCOUNTERED WHICH COULD HAVE REASONABLY BEEN INFERRED FROM SUCH AN EXAMINATION. FEDERAL FAIR HOUSING ACT - PART VI ACCESSIBILITY GUIDELINES 1991 AMERICAN WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES. 3) IN OPENINGS AROUND VENTS, PIPES, DUCTS, CHIMNEYS, FIREPLACES AND SIMILAR OPENINGS WHICH AFFORD A PASSAGE FOR FIRE AT CEILING AND FLOOR LEVELS, WITH NONCOMBUSTIBLE MATERIALS. 2) IN CONCEALED SPACES BETWEEN STAIR STRINGERS AT THE TOP AND BOTTOM OF THE RUN AND BETWEEN STUDS ALONG AND IN LINE WITH THE RUN OF STAIRS IF THE WALLS UNDER THE STAIRS ARE UNFINISHED. 1) IN CONCEALED SPACES OF STUD WALLS AND PARTITIONS, INCLUDING FURRED SPACES, AT THE CEILING AND FLOOR LEVELS AND AT 10-FOOT INTERVALS BOTH VERTICAL AND HORIZONTAL. ANY ERRORS, OMISSIONS, OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE PROCEEDING WITH THE WORK. ALL CLEAR DIMENSIONS ARE NOT TO BE ADJUSTED WITHOUT APPROVAL OF THE ARCHITECT. WHEN SHOWN IN PLAN, ALL DIMENSIONS ARE TO FACE OF STUD, CONCRETE, CENTERLINE OF COLUMNS, OR CENTERLINE OF WALL ASSEMBLIES, UNLESS OTHERWISE NOTED. WHEN SHOWN IN SECTION OR ELEVATION, ALL DIMENSIONS ARE TO TOP OF PLATE OR TOP OF CONCRETE UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR APPLYING AND OBTAINING ALL REQUIRED PROVIDE AND INSTALL 2x FLAT WOOD BLOCKING FOR ALL BATH ACCESSORIES, HANDRAILS, CABINETS, TOWEL BARS, WALL MOUNTED FIXTURES AND ANY OTHER ITEMS ATTACHED TO WALLS. ALL CHANGES IN FLOOR MATERIALS OCCUR AT CENTERLINE OF DOOR OR FRAMED OPENINGS INSTALL ALL FIXTURES, EQUIPMENT, AND MATERIALS PER MANUFACTURER'S RECOMMENDATIONS AND THE REQUIREMENTS OF THE CODES. ALL APPLIANCES, FIXTURES, AND EQUIPMENT ASSOCIATED WITH PLUMBING, ELECTRICAL, AND MECHANICAL SYSTEMS SHALL BE LISTED BY A NATIONALLY RECOGNIZED AND APPROVED AGENCY. VERIFY CLEARANCES FOR FLUES, VENTS, CHASES, SOFFITS, FIXTURES, FIREPLACES, ETC., BEFORE ANY CONSTRUCTION, ORDERING OF, OR INSTALLATION OF ANY ITEM OF WORK. PROVIDE FIRE-BLOCKING & DRAFTSTOPPING @ ALL CONCEALED DRAFT OPENINGS (VERTICAL & HORIZONTAL). AS PER 1994 UBC 708, FIREBLOCKING & DRAFTSTOPS SHALL BE PROVIDED IN THE FOLLOWING LOCATIONS: WINDOW SIZES ON DRAWINGS ARE NOMINAL DIMENSIONS. REFER TO MANUFACTURER FOR ACTUAL MECHANICAL, PLUMBING, ELECTRICAL, AND OTHER PENETRATIONS OF FLOORS, WALLS, AND CEILINGS SHALL BE SEALED AIRTIGHT WITH ACOUSTICAL SEALANT AND FIRESAFING AS REQUIRED. ALL EXTERIOR DOORS AND WINDOWS ARE TO BE WEATHERSTRIPPED PER TITLE 24 REQUIREMENTS. ALL WALL, FLOOR, ROOF, AND SHAFT CONSTRUCTION TO BE RATED MIN. ONE HOUR, U.O.N. 19. 18. 20. ROUGH OPENING SIZES. 17. 16. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. DETAILS SHOWN ARE TYPICAL, SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS. INSPECTIONS TO CONFORM WITH LOCAL BUILDING AND FIRE CODES. UNLESS OTHERWISE INDICATED ON THE DRAWINGS. 10. 14. 15. 11. 13. 12. 7. 9. 8. 5. 6. ALL CONSTRUCTION AND INSTALLATION SHALL CONFORM TO THE FOLLOWING CODES: 2009 INTERNATIONAL BUILDING CODE (IBC) 2001 UNIFORM MECHANICAL CODE (UMC) 2001 UNIFORM PLUMBING CODE (UPC) 2001 NATIONAL ELECTRIC CODE (NEC) TITLE 19 CALIFORNIA ADMINISTRATIVE CODE TITLE 24 CALIFORNIA ADMINISTRATIVE CODE AND ANY OTHER GOVERNING CODES AND ORDINANCES. IN THE EVENT OF CONFLICT, THE MOST STRINGENT REQUIREMENTS SHALL APPLY. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION BETWEEN ARCHITECTURAL, STRUCTURAL, LANDSCAPE, CIVIL, MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE PROTECTION. THIS INCLUDES REVIEWING REQUIREMENTS OF INDIVIDUAL SYSTEMS BEFORE ORDERING AND INSTALLATION OF ANY WORK. VERIFY ALL ARCHITECTURAL DETAILS AND ALL FINISH CONDITIONS (WHETHER DEPICTED IN DRAWINGS OR NOT) WITH SAME DISCIPLINES. 2001 STATE BUILDING CODE AMENDMENTS 4. 2. 3. 1. CONSTRUCTION TYPE: TYPE V - ONE HOUR - FULLY SPRINKLERED ADJUSTED ALLOWABLE S.F. x 2 PER MULTI-STORY (SECT. 504.2) x 2 PER AUTOMATIC SPRINKLER (SECT. 505.3) BASE ALLOWABLE S.F. 12,000 / Floor OCCUPANCY TYPE R-2, TYPE V, 1 HR FULLY SPRINKLERED PARKING: None FUNDING: Private 1ST LEVEL 1834 SF 2ND LEVEL 2325 SF 3RD LEVEL 2325 SF 4TH LEVEL 2325 SF 8810 SF R-1:RESIDENTIAL OCCUPANCY GROUPS: TABLE 10-A DRAWING INDEX Level Gross SF SQUARE FOOTAGE: PROJECT SITE IS BOUND: NORTH BY LOT 18, 2701 SHATTUCK - APN:054-1719-009, WITH AN EXISTING ONE STORY BUILDING SOUTH BY LOT 20 AND LOT 21, APN:054-1719-037, WITH TWO EXISTING BUILIDINGS: BUILDING ONE: AREA 7319 SQ.FT. HEIGHT 61.5' BUILDING TWO AREA 5377 SQ.FT. HEIGHT 19.9' WEST BY SHATTUCK AVENUE, 65' PUBLIC RIGHT OF WAY EAST BY LOT 22, APN:054-1719-036 WITH AN EXISITING BUILDING 2711 SHATTUCK AVE. BERKELEY, CA 94705 NO. DATE ISSUES AND REVISIONS BY 1. DATE: DRAWN BY: TT PROJECT NUMBER SHEET TITLE SHEET NUMBER ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT OF THE ARCHITECT TRUE NORTH 09.16.2009 Use Permit TT PROJECT NAME CONSULTANTS NOT FOR CONSTRUCTION 02.20.2010 847 Folsom Street, ste.201 San Francisco, CA 94107 t.415.753.1810 f.415.564.6911 PROJECT NORTH THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO ZETA COMMUNITIES AND IS FURNISHED FOR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT PRIOR WRITTEN CONSENT. ZETA Communities 1. 02.20.2010 Use Permit TT 2/19/2010 10:38:22 AMC:\Users\taco\Documents\72_MAIN_2009\72_ZETA\72_Z_PROJECTS\Z_0109-SSP\0109-SSP-CAD\0109-SSP-3D\0109_SSP_V2\0109-SSP_022010_ZAB.rvt 1 0109-SSP Title Sheet NO ADJUSTMENT REQUIRED ADJUSTED ALLOWABLE HEIGHT / STORIES BASE ALLOWABLE HEIGHT / STORIES 50 FT. 50 FT. - NO ADJUSTMENT REQUIRED +1 STORY PER AUTOMATIC SPRINKLER (SECT. 505.3) = FOUR STORY THREE STORIES 18 INCHES OF A WALKING SURFACE. GLAZING IN DOORS AND WINDOWS ADJACENT TO DOORS IN PROVIDE SAFETY GLAZING AT ALL HAZARDOUS LOCATIONS, INCLUDING, BUT NOT LIMITED TO GLAZING WITHIN PROVIDE I.C.B.O. EVALUATION SERVICES INC. REPORT ON TEST DATA FOR ALL SKYLIGHTS. DISCREPANCIES: WHERE A CONFLICT IN REQUIREMENTS OCCURS BETWEEN THE SPECIFICATIONS AND DRAWINGS, OR ON THE DRAWINGS, AND A RESOLUTION IS NOT OBTAINED FROM THE ARCHITECT BEFORE THE BIDDING DATE, THE MORE STRINGENT ALTERNATE WILL BECOME THE CONTRACTUAL REQUIREMENTS. CONTRACTOR SHALL NOTIFY GEOTECHNICAL ENGINEER FOR INSPECTION OF COMPRESSION GROUTING, BUILDING PAD, FOUNDATION EXCAVATION, DEPTH, BACK FILL MATERIALS, AND DRAINAGE AS APPLICABLE. CONTRACTOR SHALL INSURE THAT GUIDELINES SET FORTH ON SHT. NO.6 ARE MAINTAINED DURING CONSTRUCTION, INSTALLATION, AND FINISHING OF ALL ASPECTS OF THIS PROJECT. ALL TEMPERED GLASS SHALL BE AFFIXED WITH A PERMANENT LABEL PER UBC 2406.2 ACCORDANCE WITH SECTION 2406.4. 24. 25. 26. 22. 23. 21. PROVIDE EXIT SIGNS, FLOOR-LEVEL EXIT SIGNS, CONNECTED TO A SOURCE OF EMERGENCY BACKUP POWER, OPENINGS IN 1, 2, OR 3-HOUR RATED ASSEMBLIES SHOULD BE PROTECTED WITH ONE(1), TWO(2) OR THREE(3) AT THE EXIT STAIRWAYS AS PER SECTION 1013. HOUR RATED ASSEMBLIES RESPECTIVELY. ALL SMOKE DETECTORS TO BE HARD WIRED. 27. 29. 28. 30. PER UBC SEC.804, THE MAXIMUM FLAME-SPREAD CLASS OF FINISH MATERIALS USED ON INTERIOR WALLS AND CEILINGS SHALL NOT EXCEED THAT IN TABLE 8-B (1994 UBC). SHOWN ON DRAWINGS. ALL BLOCKOUTS IN SLABS, WALLS, FOOTINGS & P.T. SLABS SHALL BE PROVIDED, EVEN IF NOT SPECIFICALLY 31. ARCHITECTURAL 1 COVER SHEET 2 GROSS BUILDING AREA PLANS A 1.0 SITE PLAN A 2.0 FLOOR PLAN A 2.1 FLOOR PLAN A 2.2 FLOOR PLAN A 2.3 FLOOR PLAN A 2.4 FLOOR PLAN A 2.5 ROOF PLAN A 3.1 BUILDING ELEVATIONS A 3.2 BUILDING ELEVATIONS A 4.1 BUILDING SECTIONS A 4.2 BUILDING SECTIONS A 4.3 WALL SECTIONS A 4.4 WALL SECTIONS Room Schedule Level Number Name Area 3RD LEVEL 308 LOBBY 313 SF 4TH LEVEL 401 SOLO 256 SF 4TH LEVEL 402 SOLO 267 SF 4TH LEVEL 403 SOLO 267 SF 4TH LEVEL 404 SOLO 259 SF 4TH LEVEL 405 SOLO 268 SF 4TH LEVEL 406 SOLO 257 SF 4TH LEVEL 407 STAIR 2 174 SF 4TH LEVEL 408 LOBBY 313 SF Grand total: 30 7690 SF Room Schedule Level Number Name Area 1ST LEVEL 102 SOLO 267 SF 1ST LEVEL 103 SOLO 267 SF 1ST LEVEL 105 SOLO 268 SF 1ST LEVEL 106 SOLO 257 SF 1ST LEVEL 107 STAIR 2 175 SF 1ST LEVEL 108 LOBBY 251 SF 2ND LEVEL 201 SOLO 260 SF 2ND LEVEL 202 SOLO 272 SF 2ND LEVEL 203 SOLO 272 SF 2ND LEVEL 204 SOLO 260 SF 2ND LEVEL 205 SOLO 272 SF 2ND LEVEL 206 SOLO 260 SF 2ND LEVEL 207 STAIR 2 174 SF 2ND LEVEL 208 LOBBY 313 SF 3RD LEVEL 301 SOLO 256 SF 3RD LEVEL 302 SOLO 267 SF 3RD LEVEL 303 SOLO 267 SF 3RD LEVEL 304 SOLO 259 SF 3RD LEVEL 305 SOLO 268 SF 3RD LEVEL 306 SOLO 257 SF 3RD LEVEL 307 STAIR 2 174 SF PROJECT DIRECTORY DEVELOPER: Panoramic Interests 2116 Allston Way, Ste.1 Berkeley, CA 94704 Patrick Kennedy (510) 883-1000 x300 PROJECT MANAGER Panoramic Interests 2116 Allston Way, Ste.1 Berkeley, CA 94704 Cara Houser (510) 883-1000 x302 PROJECT MANAGER/ ARCHITECT: ZETA Communities 848 Folsom St, Suite 201 San Francisco, CA 94107 Taeko Takagi (415) 215-4395 ARCHITECT: Lowney Architecture 360 17th Street, Suite100 Oakland, CA 94612 Ken Lowney (510) 836-5400 STRUCTURAL ENGINEER: Tipping Mar and Associates 1906 Shattuck Avenue Berkeley, CA 94704 David Mar (510) 549-1906 MEP ENGINEER: Rumsey Engineers 99 Linden Street Oakland, CA 94607 Peter Rumsey (510) 663-2070 CIVIL ENGINEER: CSA, Inc. Civil Engineering 1090 Adams Street, Suite A Benicia, CA 94510 Rod Sherry (707) 745-3219 GEOTECHNICAL ENGINEER: Alan Kropp and Assoc.Inc. 848 Folsom St, Suite 201 San Francisco, CA 94107 Wayne Magnusen (510) 841-5095 BUILDER / FABRICATION: ZETA Communities 848 Folsom St, Suite 201 San Francisco, CA 94107 Naomi Porat (415) 753-1810 ATTACHMENT 4 DRC 10-16-14 Page 1 of 12

Upload: others

Post on 09-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATTACHMENT DRC 10161 Pe 1 12 - Berkeley, California€¦ · 16/10/2014  · architectural 1 cover sheet 2 gross building area plans a 1.0 site plan a 2.0 floor plan a 2.1 floor plan

0

0

B1

1t

Align

1i

Roomname101

SEE x/ax.x

6.01

30

GRIDLINES

DOORSYMBOL

WINDOWSYMBOL

ALIGN

PROPERTYLINE

NameElevationLEVEL

PARTITIONSYMBOL

ROOMIDENTIFICATION

CENTERLINE

KEYNOTESYMBOL

FLOORTRANSITION

STC SYMBOL

A1011

SIM

1

1A101

SIM

DETAILTARGET

REVISION

SECTION

A1

127

NUMERICALDOORREFERENCE

WINDOW TYPEAS DISPLAYEDON SCHEDULE

SEE PARTITIONSCHEDULEFOR TYPE

ROOM NAME

ROOM NUMBER

ENLARGEROOM PLAN

REFERENCEBY CSIDESIGNATION

STC RATING

CL

CL

DETAILNUMBER

SHEET WHEREDETAIL ISDRAWNELEVATIONNUMBER

SHEET WHEREELEVATION ISDRAWN

CLOUDAROUNDREVISION

INTERIORELEVATION

ELEVATIONNUMBER

SHEET WHEREELEVATION ISDRAWN

A7.1

7A

7C

7D7B

A4.1

ELEVATIONELEVATIONNUMBER

SHEET WHEREELEVATION ISDRAWN

A3.1 7

VICINITY MAP

PROJECT INFORMATION

GENERAL NOTES

LEGEND

PROJECT INFORMATION

A L L O W A B L E HEIGHT / BUILDING A R E A - TABLE 5-B

BUILDING INFORMATION:

U N I T / P A R K I N G T A B U L A T I O N :

2711 SHATTUCK AVENUEBERKELEY, CALIFORNIA

APN:054-1719-038LOT 19LOT AREA: 5,674 SF / 0.13 ACRESDUA: 169

UNIT TYPES:

22-"SOLO" Studio Residential Hotel Units

THE CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS OF BUILDING AND SITE AND NOTIFYTHE ARCHITECT OF ANY DISCREPANCIES BEFORE PROCEEDING WITH CONSTRUCTION.

THE GENERAL CONTRACTOR SHALL VERIFY AND ASSUME RESPONSIBILITY FOR ALL DIMENSIONS ANDSITE CONDITIONS. THE GENERAL CONTRACTOR SHALL INSPECT THE EXISTING PREMISES AND TAKENOTE OF EXISTING CONDITIONS PRIOR TO SUBMITTING PRICES. NO CLAIM SHALL BE ALLOWED FORDIFFICULTIES ENCOUNTERED WHICH COULD HAVE REASONABLY BEEN INFERRED FROM SUCH ANEXAMINATION.

FEDERAL FAIR HOUSING ACT - PART VI ACCESSIBILITY GUIDELINES

1991 AMERICAN WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES.

3) IN OPENINGS AROUND VENTS, PIPES, DUCTS, CHIMNEYS, FIREPLACES AND SIMILAR OPENINGSWHICH AFFORD A PASSAGE FOR FIRE AT CEILING AND FLOOR LEVELS, WITH NONCOMBUSTIBLEMATERIALS.

2) IN CONCEALED SPACES BETWEEN STAIR STRINGERS AT THE TOP AND BOTTOM OF THERUN AND BETWEEN STUDS ALONG AND IN LINE WITH THE RUN OF STAIRS IF THE WALLS UNDERTHE STAIRS ARE UNFINISHED.

1) IN CONCEALED SPACES OF STUD WALLS AND PARTITIONS, INCLUDING FURRED SPACES, AT THECEILING AND FLOOR LEVELS AND AT 10-FOOT INTERVALS BOTH VERTICAL AND HORIZONTAL.

ANY ERRORS, OMISSIONS, OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTIONDOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFOREPROCEEDING WITH THE WORK.

ALL CLEAR DIMENSIONS ARE NOT TO BE ADJUSTED WITHOUT APPROVAL OF THE ARCHITECT.

WHEN SHOWN IN PLAN, ALL DIMENSIONS ARE TO FACE OF STUD, CONCRETE, CENTERLINE OFCOLUMNS, OR CENTERLINE OF WALL ASSEMBLIES, UNLESS OTHERWISE NOTED.

WHEN SHOWN IN SECTION OR ELEVATION, ALL DIMENSIONS ARE TO TOP OF PLATE OR TOP OFCONCRETE UNLESS OTHERWISE NOTED.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR APPLYING AND OBTAINING ALL REQUIRED

PROVIDE AND INSTALL 2x FLAT WOOD BLOCKING FOR ALL BATH ACCESSORIES, HANDRAILS,

CABINETS, TOWEL BARS, WALL MOUNTED FIXTURES AND ANY OTHER ITEMS ATTACHED TO WALLS.

ALL CHANGES IN FLOOR MATERIALS OCCUR AT CENTERLINE OF DOOR OR FRAMED OPENINGS

INSTALL ALL FIXTURES, EQUIPMENT, AND MATERIALS PER MANUFACTURER'S RECOMMENDATIONSAND THE REQUIREMENTS OF THE CODES. ALL APPLIANCES, FIXTURES, AND EQUIPMENT ASSOCIATEDWITH PLUMBING, ELECTRICAL, AND MECHANICAL SYSTEMS SHALL BE LISTED BY A NATIONALLYRECOGNIZED AND APPROVED AGENCY.

VERIFY CLEARANCES FOR FLUES, VENTS, CHASES, SOFFITS, FIXTURES, FIREPLACES, ETC., BEFOREANY CONSTRUCTION, ORDERING OF, OR INSTALLATION OF ANY ITEM OF WORK.

PROVIDE FIRE-BLOCKING & DRAFTSTOPPING @ ALL CONCEALED DRAFT OPENINGS (VERTICAL &HORIZONTAL). AS PER 1994 UBC 708, FIREBLOCKING & DRAFTSTOPS SHALL BE PROVIDED IN THEFOLLOWING LOCATIONS:

WINDOW SIZES ON DRAWINGS ARE NOMINAL DIMENSIONS. REFER TO MANUFACTURER FOR ACTUAL

MECHANICAL, PLUMBING, ELECTRICAL, AND OTHER PENETRATIONS OF FLOORS, WALLS, AND CEILINGSSHALL BE SEALED AIRTIGHT WITH ACOUSTICAL SEALANT AND FIRESAFING AS REQUIRED.

ALL EXTERIOR DOORS AND WINDOWS ARE TO BE WEATHERSTRIPPED PER TITLE 24 REQUIREMENTS.

ALL WALL, FLOOR, ROOF, AND SHAFT CONSTRUCTION TO BE RATED MIN. ONE HOUR, U.O.N.

19.

18.

20.

ROUGH OPENING SIZES.

17.

16.

DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.

DETAILS SHOWN ARE TYPICAL, SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS.

INSPECTIONS TO CONFORM WITH LOCAL BUILDING AND FIRE CODES.

UNLESS OTHERWISE INDICATED ON THE DRAWINGS.

10.

14.

15.

11.

13.

12.

7.

9.

8.

5.

6.

ALL CONSTRUCTION AND INSTALLATION SHALL CONFORM TO THE FOLLOWING CODES:

2009 INTERNATIONAL BUILDING CODE (IBC)

2001 UNIFORM MECHANICAL CODE (UMC)

2001 UNIFORM PLUMBING CODE (UPC)

2001 NATIONAL ELECTRIC CODE (NEC)

TITLE 19 CALIFORNIA ADMINISTRATIVE CODE

TITLE 24 CALIFORNIA ADMINISTRATIVE CODE

AND ANY OTHER GOVERNING CODES AND ORDINANCES.IN THE EVENT OF CONFLICT, THE MOST STRINGENT REQUIREMENTS SHALL APPLY.

CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION BETWEEN ARCHITECTURAL,STRUCTURAL, LANDSCAPE, CIVIL, MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE PROTECTION.THIS INCLUDES REVIEWING REQUIREMENTS OF INDIVIDUAL SYSTEMS BEFORE ORDERING ANDINSTALLATION OF ANY WORK. VERIFY ALL ARCHITECTURAL DETAILS AND ALL FINISHCONDITIONS (WHETHER DEPICTED IN DRAWINGS OR NOT) WITH SAME DISCIPLINES.

2001 STATE BUILDING CODE AMENDMENTS

4.

2.

3.

1.

CONSTRUCTION TYPE: TYPE V - ONE HOUR - FULLY SPRINKLERED

ADJUSTED ALLOWABLE S.F.

x 2 PER MULTI-STORY (SECT. 504.2)x 2 PER AUTOMATIC SPRINKLER (SECT. 505.3)

BASE ALLOWABLE S.F.

12,000 / Floor

OCCUPANCY TYPE

R-2, TYPE V, 1 HRFULLY SPRINKLERED

PARKING: None

FUNDING: Private

1ST LEVEL 1834 SF2ND LEVEL 2325 SF3RD LEVEL 2325 SF4TH LEVEL 2325 SF

8810 SF

R-1:RESIDENTIALOCCUPANCY GROUPS:TABLE 10-A

DRAWING INDEX

Level Gross SF

SQUARE FOOTAGE:

PROJECT SITE IS BOUND:NORTH BY LOT 18, 2701 SHATTUCK - APN:054-1719-009, WITH AN EXISTINGONE STORY BUILDING

SOUTH BY LOT 20 AND LOT 21, APN:054-1719-037, WITH TWO EXISTINGBUILIDINGS:BUILDING ONE: AREA 7319 SQ.FT. HEIGHT 61.5'BUILDING TWO AREA 5377 SQ.FT. HEIGHT 19.9'

WEST BY SHATTUCK AVENUE, 65' PUBLIC RIGHT OF WAY

EAST BY LOT 22, APN:054-1719-036 WITH AN EXISITING BUILDING

2711 SHATTUCK AVE.BERKELEY, CA 94705

NO. DATE ISSUES AND REVISIONS BY

1.

DATE:

DRAWN BY: TT

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

ALL DRAWINGS AND WRITTEN MATERIAL APPEARINGHEREIN CONSTITUTE ORIGINAL AND UNPUBLISHEDWORK OF THE ARCHITECT AND MAY NOT BEDUPLICATED, USED OR DISCLOSED WITHOUTWRITTEN CONSENT OF THE ARCHITECT

TRUENORTH

09.16.2009 Use Permit TT

PROJECT NAME

CONSULTANTS

NOT FOR CONSTRUCTION

02.20.2010

847 Folsom Street, ste.201San Francisco, CA 94107

t.415.753.1810f.415.564.6911

PROJECTNORTH

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO ZETA COMMUNITIES AND IS FURNISHED FOR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT PRIOR WRITTEN CONSENT.

ZETA Communities

1. 02.20.2010 Use Permit TT

2/19

/201

0 10

:38:

22 A

MC:\U

sers

\taco

\Doc

umen

ts\7

2_M

AIN

_200

9\72

_ZE

TA\7

2_Z_

PR

OJE

CTS

\Z_0

109-

SSP

\010

9-SS

P-C

AD\0

109-

SSP

-3D

\010

9_S

SP_V

2\01

09-S

SP

_022

010_

ZAB

.rvt

1

0109-SSP

Title Sheet

NO ADJUSTMENT REQUIRED

ADJUSTED ALLOWABLE HEIGHT / STORIESBASE ALLOWABLE HEIGHT / STORIES

50 FT. 50 FT. - NO ADJUSTMENT REQUIRED+1 STORY PER AUTOMATIC SPRINKLER(SECT. 505.3)= FOUR STORY

THREE STORIES

18 INCHES OF A WALKING SURFACE. GLAZING IN DOORS AND WINDOWS ADJACENT TO DOORS INPROVIDE SAFETY GLAZING AT ALL HAZARDOUS LOCATIONS, INCLUDING, BUT NOT LIMITED TO GLAZING WITHIN

PROVIDE I.C.B.O. EVALUATION SERVICES INC. REPORT ON TEST DATA FOR ALL SKYLIGHTS.

DISCREPANCIES: WHERE A CONFLICT IN REQUIREMENTS OCCURS BETWEEN THE SPECIFICATIONS ANDDRAWINGS, OR ON THE DRAWINGS, AND A RESOLUTION IS NOT OBTAINED FROM THE ARCHITECT BEFORETHE BIDDING DATE, THE MORE STRINGENT ALTERNATE WILL BECOME THE CONTRACTUAL REQUIREMENTS.

CONTRACTOR SHALL NOTIFY GEOTECHNICAL ENGINEER FOR INSPECTION OF COMPRESSION GROUTING,

BUILDING PAD, FOUNDATION EXCAVATION, DEPTH, BACK FILL MATERIALS, AND DRAINAGE AS APPLICABLE.

CONTRACTOR SHALL INSURE THAT GUIDELINES SET FORTH ON SHT. NO.6 ARE MAINTAINED DURINGCONSTRUCTION, INSTALLATION, AND FINISHING OF ALL ASPECTS OF THIS PROJECT.

ALL TEMPERED GLASS SHALL BE AFFIXED WITH A PERMANENT LABEL PER UBC 2406.2

ACCORDANCE WITH SECTION 2406.4.

24.

25.

26.

22.

23.

21.

PROVIDE EXIT SIGNS, FLOOR-LEVEL EXIT SIGNS, CONNECTED TO A SOURCE OF EMERGENCY BACKUP POWER,

OPENINGS IN 1, 2, OR 3-HOUR RATED ASSEMBLIES SHOULD BE PROTECTED WITH ONE(1), TWO(2) OR THREE(3)

AT THE EXIT STAIRWAYS AS PER SECTION 1013.

HOUR RATED ASSEMBLIES RESPECTIVELY.

ALL SMOKE DETECTORS TO BE HARD WIRED.27.

29.

28.

30. PER UBC SEC.804, THE MAXIMUM FLAME-SPREAD CLASS OF FINISH MATERIALS USED ON INTERIOR WALLSAND CEILINGS SHALL NOT EXCEED THAT IN TABLE 8-B (1994 UBC).

SHOWN ON DRAWINGS.ALL BLOCKOUTS IN SLABS, WALLS, FOOTINGS & P.T. SLABS SHALL BE PROVIDED, EVEN IF NOT SPECIFICALLY31.

ARCHITECTURAL

1 COVER SHEET2 GROSS BUILDING AREA PLANS

A 1.0 SITE PLANA 2.0 FLOOR PLANA 2.1 FLOOR PLANA 2.2 FLOOR PLANA 2.3 FLOOR PLANA 2.4 FLOOR PLANA 2.5 ROOF PLAN

A 3.1 BUILDING ELEVATIONSA 3.2 BUILDING ELEVATIONS

A 4.1 BUILDING SECTIONSA 4.2 BUILDING SECTIONSA 4.3 WALL SECTIONSA 4.4 WALL SECTIONS

Room ScheduleLevel Number Name Area

3RD LEVEL 308 LOBBY 313 SF4TH LEVEL 401 SOLO 256 SF4TH LEVEL 402 SOLO 267 SF4TH LEVEL 403 SOLO 267 SF4TH LEVEL 404 SOLO 259 SF4TH LEVEL 405 SOLO 268 SF4TH LEVEL 406 SOLO 257 SF4TH LEVEL 407 STAIR 2 174 SF4TH LEVEL 408 LOBBY 313 SFGrand total: 30 7690 SF

Room ScheduleLevel Number Name Area

1ST LEVEL 102 SOLO 267 SF1ST LEVEL 103 SOLO 267 SF1ST LEVEL 105 SOLO 268 SF1ST LEVEL 106 SOLO 257 SF1ST LEVEL 107 STAIR 2 175 SF1ST LEVEL 108 LOBBY 251 SF2ND LEVEL 201 SOLO 260 SF2ND LEVEL 202 SOLO 272 SF2ND LEVEL 203 SOLO 272 SF2ND LEVEL 204 SOLO 260 SF2ND LEVEL 205 SOLO 272 SF2ND LEVEL 206 SOLO 260 SF2ND LEVEL 207 STAIR 2 174 SF2ND LEVEL 208 LOBBY 313 SF3RD LEVEL 301 SOLO 256 SF3RD LEVEL 302 SOLO 267 SF3RD LEVEL 303 SOLO 267 SF3RD LEVEL 304 SOLO 259 SF3RD LEVEL 305 SOLO 268 SF3RD LEVEL 306 SOLO 257 SF3RD LEVEL 307 STAIR 2 174 SF

PROJECT DIRECTORYDEVELOPER:Panoramic Interests2116 Allston Way, Ste.1Berkeley, CA 94704Patrick Kennedy(510) 883-1000 x300

PROJECT MANAGERPanoramic Interests2116 Allston Way, Ste.1Berkeley, CA 94704Cara Houser(510) 883-1000 x302

PROJECT MANAGER/ARCHITECT:ZETA Communities848 Folsom St, Suite 201San Francisco, CA 94107Taeko Takagi(415) 215-4395

ARCHITECT:Lowney Architecture360 17th Street, Suite100Oakland, CA 94612Ken Lowney(510) 836-5400

STRUCTURAL ENGINEER:Tipping Mar and Associates1906 Shattuck AvenueBerkeley, CA 94704David Mar(510) 549-1906

MEP ENGINEER:Rumsey Engineers99 Linden StreetOakland, CA 94607Peter Rumsey(510) 663-2070

CIVIL ENGINEER:CSA, Inc. Civil Engineering1090 Adams Street, Suite ABenicia, CA 94510Rod Sherry(707) 745-3219

GEOTECHNICAL ENGINEER:Alan Kropp and Assoc.Inc.848 Folsom St, Suite 201San Francisco, CA 94107Wayne Magnusen(510) 841-5095

BUILDER / FABRICATION:ZETA Communities848 Folsom St, Suite 201San Francisco, CA 94107Naomi Porat(415) 753-1810

ATTACHMENT 4 DRC 10-16-14

Page 1 of 12

mjacob
Steve Sig
Page 2: ATTACHMENT DRC 10161 Pe 1 12 - Berkeley, California€¦ · 16/10/2014  · architectural 1 cover sheet 2 gross building area plans a 1.0 site plan a 2.0 floor plan a 2.1 floor plan

UP

DN

DN UP

UP

DN

UP

DN

UP

DN

DN

UP

DN

DN

1834 SFArea

Building Area Legend

Gross Building Area

2325 SFArea2325 SF

Area

2325 SFArea

2711 SHATTUCK AVE.BERKELEY, CA 94705

NO. DATE ISSUES AND REVISIONS BY

1.

DATE:

DRAWN BY: TT

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

ALL DRAWINGS AND WRITTEN MATERIAL APPEARINGHEREIN CONSTITUTE ORIGINAL AND UNPUBLISHEDWORK OF THE ARCHITECT AND MAY NOT BEDUPLICATED, USED OR DISCLOSED WITHOUTWRITTEN CONSENT OF THE ARCHITECT

TRUENORTH

09.16.2009 Use Permit TT

PROJECT NAME

CONSULTANTS

NOT FOR CONSTRUCTION

02.20.2010

847 Folsom Street, ste.201San Francisco, CA 94107

t.415.753.1810f.415.564.6911

PROJECTNORTH

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO ZETA COMMUNITIES AND IS FURNISHED FOR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT PRIOR WRITTEN CONSENT.

ZETA Communities

1. 02.20.2010 Use Permit TT

2/19

/201

0 8:

30:2

8 AM

G:\0

109_

SSP_

V2\0

109-

SSP_

0220

10_Z

AB.rv

t

2

0109-SSP

Gross Building Area

1/8" = 1'-0"

11ST LEVEL

1/8" = 1'-0"

22ND LEVEL

1/8" = 1'-0"

33RD LEVEL

1/8" = 1'-0"

44TH LEVEL

1ST LEVEL 1834 SF2ND LEVEL 2325 SF3RD LEVEL 2325 SF4TH LEVEL 2325 SF

8810 SF

ATTACHMENT 4 DRC 10-16-14

Page 2 of 12

mjacob
Steve Sig
mjacob
Steve Sig
Page 3: ATTACHMENT DRC 10161 Pe 1 12 - Berkeley, California€¦ · 16/10/2014  · architectural 1 cover sheet 2 gross building area plans a 1.0 site plan a 2.0 floor plan a 2.1 floor plan

DN

(E) ONE STORYCOMMERCIAL BUILDINGHT. = +19'-11"

(E) FOUR STORY COMMERCIALBUILDINGHT. = +61'-6"

(E) COMMERCIAL BUILDING+~20'-0"

PROPOSED FOURSTORY BUILDINGHT. = +~50'-0"

(E) PARKING LOT

(E) RESIDENTIAL (E) RESIDENTIAL (E) RESIDENTIAL

(E) RESIDENTIALAPARTMENT

BLDG.

(E) RESIDENTIAL

(E) RESIDENTIAL

(E) RESIDENTIAL (E) RESIDENTIAL (E) RESIDENTIAL

(E) ONE STORYCOMMERCIAL BLDG.

REAR YARD

WARD ST.

SHAT

TUCK

AVE

.

SHAT

TUCK

AVE

.

DERBY ST.

WA

LKER

ST.

(E) ONE STORYCOMMERCIAL

BUILDING

(E) ONE STORY COMMERCIALBUILDING

(E) ONE STORY COMMERCIALBUILDING

116' - 5"

48' -

3"

(E) C

ON

CR

ETE

DR

IVEW

AY

APPROVED XX'-0"MIXED-USEPROJECT

21' - 11 1/2"

14' - 9"

SHATTUCK AVENUE - 65'PUBLIC RIGHT OF WAY

49' - 3"

49' - 1 1/2" 36' - 0" 49' - 3"

134' - 5"

64' - 2 1/2"

29' - 2 1/2"

44' -

10"

2' - 8"

1" = 20'-0"1 SITE PLAN

2711 SHATTUCK AVE.BERKELEY, CA 94705

NO. DATE ISSUES AND REVISIONS BY

1.

DATE:

DRAWN BY: TT

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

ALL DRAWINGS AND WRITTEN MATERIAL APPEARINGHEREIN CONSTITUTE ORIGINAL AND UNPUBLISHEDWORK OF THE ARCHITECT AND MAY NOT BEDUPLICATED, USED OR DISCLOSED WITHOUTWRITTEN CONSENT OF THE ARCHITECT

TRUENORTH

11.10.2009 Use Permit TT

PROJECT NAME

CONSULTANTS

NOT FOR CONSTRUCTION

11.10.2009

847 Folsom Street, ste.201San Francisco, CA 94107

t.415.753.1810f.415.564.6911

PROJECTNORTH

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO ZETA COMMUNITIES AND IS FURNISHED FOR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT PRIOR WRITTEN CONSENT.

ZETA Communities

2. 02.20.2010 Use Permit TT

2/19

/201

0 8:

21:3

7 AM

C:\U

sers

\taco

\Doc

umen

ts\7

2_M

AIN

_200

9\72

_ZET

A\72

_Z_P

RO

JEC

TS\Z

_010

9-SS

P\01

09-S

SP-C

AD\0

109-

SSP-

3D\0

109_

SSP_

V2\0

109-

SSP_

V2_S

ITEP

LAN

.rvt

A2.0

P0901-SSP

SITE PLAN

ATTACHMENT 4 DRC 10-16-14

Page 3 of 12

mjacob
Steve Sig
mjacob
Steve Sig
Page 4: ATTACHMENT DRC 10161 Pe 1 12 - Berkeley, California€¦ · 16/10/2014  · architectural 1 cover sheet 2 gross building area plans a 1.0 site plan a 2.0 floor plan a 2.1 floor plan

UP

DN

DN UP

A3.21

Eas

t

A3.2

A3.1

A3.1

3North

1

Wes

t

2South

1

5

6

7

C A

1A4.1

2A4.2

4

2A4.1

267 SF

SOLO102

268 SF

SOLO105

257 SF

SOLO106

STAIR 1

Exit Discharge toPublic Right of Way

BREAZEWAY

REARYARD

F3656

D

251 SF

LOBBY108

oo

-

3B-

3D

B

267 SF

SOLO103

MailCenter

2

3

ENTRY

175 SF

STAIR 2107

F501Fo

1A4.2

43' -

5"

29' - 3" 6' - 0" 29' - 3"

9' -

10 1

/2"

9' -

10"

9' -

5 1/

2"

6"10

' - 4

"10

' - 1

0"10

' - 1

0"10

' - 4

"7"

64' - 6"

o

28' - 6" 36' - 0"

6' - 0"

SEE A2.0FOR SITE +

LANDSCAPEPLAN

A6.21

A6.11

2711 SHATTUCK AVE.BERKELEY, CA 94705

NO. DATE ISSUES AND REVISIONS BY

1.

DATE:

DRAWN BY: TT

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

ALL DRAWINGS AND WRITTEN MATERIAL APPEARINGHEREIN CONSTITUTE ORIGINAL AND UNPUBLISHEDWORK OF THE ARCHITECT AND MAY NOT BEDUPLICATED, USED OR DISCLOSED WITHOUTWRITTEN CONSENT OF THE ARCHITECT

TRUENORTH

09.16.2009 Use Permit TT

PROJECT NAME

CONSULTANTS

NOT FOR CONSTRUCTION

02.20.2010

847 Folsom Street, ste.201San Francisco, CA 94107

t.415.753.1810f.415.564.6911

PROJECTNORTH

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO ZETA COMMUNITIES AND IS FURNISHED FOR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT PRIOR WRITTEN CONSENT.

ZETA Communities

1. 02.20.2010 Use Permit TT

2/19

/201

0 8:

30:3

7 AM

G:\0

109_

SSP_

V2\0

109-

SSP_

0220

10_Z

AB.rv

t

A2.1

0109-SSP

GROUND FLOOR PLAN

1/8" = 1'-0"1 1ST - Level

ATTACHMENT 4 DRC 10-16-14

Page 4 of 12

mjacob
Steve Sig
Page 5: ATTACHMENT DRC 10161 Pe 1 12 - Berkeley, California€¦ · 16/10/2014  · architectural 1 cover sheet 2 gross building area plans a 1.0 site plan a 2.0 floor plan a 2.1 floor plan

UP

DN

UP

DN

A3.21

Eas

t

A3.2

A3.1

A3.1

3North

1

Wes

t

2South

1

5

6

7

C A

1A4.1

2A4.2

4

2A4.1

43' -

5"

260 SF

SOLO201

272 SF

SOLO202

260 SF

SOLO204

272 SF

SOLO205

260 SF

SOLO206

D

-

3B-

3D

272 SF

SOLO203

B

29' - 3" 6' - 0" 29' - 3"

27' - 7"

174 SF

STAIR 2207

2

3

9' -

10 1

/2"

9' -

10 1

/2"

9' -

5 1/

2"

6"10

' - 4

"10

' - 1

0"10

' - 1

0"10

' - 4

"7"

64' - 6"

STAIR 1

1A4.2

313 SF

LOBBY208

A

A

A

A

F457C

F461C

F465C

F489C

F490C

F491C

F492C

F541C

F542C

F544F

77

77

77

77

77

84

85

77

A6.22

A6.12

2711 SHATTUCK AVE.BERKELEY, CA 94705

NO. DATE ISSUES AND REVISIONS BY

1.

DATE:

DRAWN BY: TT

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

ALL DRAWINGS AND WRITTEN MATERIAL APPEARINGHEREIN CONSTITUTE ORIGINAL AND UNPUBLISHEDWORK OF THE ARCHITECT AND MAY NOT BEDUPLICATED, USED OR DISCLOSED WITHOUTWRITTEN CONSENT OF THE ARCHITECT

TRUENORTH

09.16.2009 Use Permit TT

PROJECT NAME

CONSULTANTS

NOT FOR CONSTRUCTION

02.20.2010

847 Folsom Street, ste.201San Francisco, CA 94107

t.415.753.1810f.415.564.6911

PROJECTNORTH

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO ZETA COMMUNITIES AND IS FURNISHED FOR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT PRIOR WRITTEN CONSENT.

ZETA Communities

1. 02.20.2010 Use Permit TT

2/19

/201

0 8:

30:4

3 AM

G:\0

109_

SSP_

V2\0

109-

SSP_

0220

10_Z

AB.rv

t

A2.2

0109-SSP

SECOND FLOOR PLANS

1/8" = 1'-0"1 2ND - Level

ATTACHMENT 4 DRC 10-16-14

Page 5 of 12

mjacob
Steve Sig
Page 6: ATTACHMENT DRC 10161 Pe 1 12 - Berkeley, California€¦ · 16/10/2014  · architectural 1 cover sheet 2 gross building area plans a 1.0 site plan a 2.0 floor plan a 2.1 floor plan

UP

DN

DN

UP

A3.21

Eas

t

A3.2

A3.1

A3.1

3North

1

Wes

t

2South

1

5

6

7

C A

1A4.1

2A4.2

4

2A4.1

256 SF

SOLO301

267 SF

SOLO302

267 SF

SOLO303

259 SF

SOLO304

268 SF

SOLO305

257 SF

SOLO306

D

-

3B-

3D

B

2

3

STAIR 1

1A4.2

174 SF

STAIR 2307

43' -

5"

29' - 3" 6' - 0" 29' - 3"

9' -

10 1

/2"

9' -

10 1

/2"

9' -

5 1/

2"

6"10

' - 4

"10

' - 1

0"10

' - 1

0"10

' - 4

"7"

64' - 6"

6' -

6"

313 SF

LOBBY308

A6.23

A6.13

2711 SHATTUCK AVE.BERKELEY, CA 94705

NO. DATE ISSUES AND REVISIONS BY

1.

DATE:

DRAWN BY: TT

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

ALL DRAWINGS AND WRITTEN MATERIAL APPEARINGHEREIN CONSTITUTE ORIGINAL AND UNPUBLISHEDWORK OF THE ARCHITECT AND MAY NOT BEDUPLICATED, USED OR DISCLOSED WITHOUTWRITTEN CONSENT OF THE ARCHITECT

TRUENORTH

09.16.2009 Use Permit TT

PROJECT NAME

CONSULTANTS

NOT FOR CONSTRUCTION

02.20.2010

847 Folsom Street, ste.201San Francisco, CA 94107

t.415.753.1810f.415.564.6911

PROJECTNORTH

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO ZETA COMMUNITIES AND IS FURNISHED FOR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT PRIOR WRITTEN CONSENT.

ZETA Communities

1. 02.20.2010 Use Permit TT

2/19

/201

0 8:

30:4

8 AM

G:\0

109_

SSP_

V2\0

109-

SSP_

0220

10_Z

AB.rv

t

A2.3

0109-SSP

THIRD FLOOR PLAN

1/8" = 1'-0"1 3RD - Level

ATTACHMENT 4 DRC 10-16-14

Page 6 of 12

mjacob
Steve Sig
Page 7: ATTACHMENT DRC 10161 Pe 1 12 - Berkeley, California€¦ · 16/10/2014  · architectural 1 cover sheet 2 gross building area plans a 1.0 site plan a 2.0 floor plan a 2.1 floor plan

DN

DNA3.21

Eas

t

A3.2

A3.1

A3.1

3North

1

Wes

t

2South

1

5

6

7

C A

1A4.1

2A4.2

4

2A4.1

256 SF

SOLO401

267 SF

SOLO402

267 SF

SOLO403

259 SF

SOLO404

268 SF

SOLO405

257 SF

SOLO406

D

-

3B-

3D

B

2

3

174 SF

STAIR 2407

STAIR 1

1A4.2

313 SF

LOBBY408 43

' - 5

"

29' - 3" 6' - 0" 29' - 3"

6"10

' - 4

"10

' - 1

0"10

' - 1

0"10

' - 4

"7"

64' - 6"

6' -

6"

27' - 7"

A6.24

A6.14

2711 SHATTUCK AVE.BERKELEY, CA 94705

NO. DATE ISSUES AND REVISIONS BY

1.

DATE:

DRAWN BY: TT

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

ALL DRAWINGS AND WRITTEN MATERIAL APPEARINGHEREIN CONSTITUTE ORIGINAL AND UNPUBLISHEDWORK OF THE ARCHITECT AND MAY NOT BEDUPLICATED, USED OR DISCLOSED WITHOUTWRITTEN CONSENT OF THE ARCHITECT

TRUENORTH

09.16.2009 Use Permit TT

PROJECT NAME

CONSULTANTS

NOT FOR CONSTRUCTION

02.20.2010

847 Folsom Street, ste.201San Francisco, CA 94107

t.415.753.1810f.415.564.6911

PROJECTNORTH

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO ZETA COMMUNITIES AND IS FURNISHED FOR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT PRIOR WRITTEN CONSENT.

ZETA Communities

1. 02.20.2010 Use Permit TT

2/19

/201

0 8:

31:0

1 AM

G:\0

109_

SSP_

V2\0

109-

SSP_

0220

10_Z

AB.rv

t

A2.4

0109-SSP

FOURTH FLOOR PLAN

1/8" = 1'-0"1 4TH - Level

ATTACHMENT 4 DRC 10-16-14

Page 7 of 12

mjacob
Steve Sig
Page 8: ATTACHMENT DRC 10161 Pe 1 12 - Berkeley, California€¦ · 16/10/2014  · architectural 1 cover sheet 2 gross building area plans a 1.0 site plan a 2.0 floor plan a 2.1 floor plan

A3.21

Eas

t

A3.2

A3.1

A3.1

3North

1

Wes

t

2South

1

5

6

7

C A

1A4.1

2A4.2

4

2A4.1

D

-

3B-

3D

B

2

3

1A4.2

43' -

5"

29' - 3" 6' - 0" 29' - 3"

6"10

' - 4

"10

' - 1

0"10

' - 1

0"10

' - 4

"7"

64' - 6"

36' - 0"28' - 6"

33' -

0 1

/2"

10' -

5 1

/2"

19' - 11 1/2"8' - 6 1/2"

2711 SHATTUCK AVE.BERKELEY, CA 94705

NO. DATE ISSUES AND REVISIONS BY

1.

DATE:

DRAWN BY: TT

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

ALL DRAWINGS AND WRITTEN MATERIAL APPEARINGHEREIN CONSTITUTE ORIGINAL AND UNPUBLISHEDWORK OF THE ARCHITECT AND MAY NOT BEDUPLICATED, USED OR DISCLOSED WITHOUTWRITTEN CONSENT OF THE ARCHITECT

TRUENORTH

09.16.2009 Use Permit TT

PROJECT NAME

CONSULTANTS

NOT FOR CONSTRUCTION

02.20.2010

847 Folsom Street, ste.201San Francisco, CA 94107

t.415.753.1810f.415.564.6911

PROJECTNORTH

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO ZETA COMMUNITIES AND IS FURNISHED FOR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT PRIOR WRITTEN CONSENT.

ZETA Communities

1. 02.20.2010 Use Permit TT

2/19

/201

0 8:

31:0

7 AM

G:\0

109_

SSP_

V2\0

109-

SSP_

0220

10_Z

AB.rv

t

A2.5

0109-SSP

ROOF PLAN

1/8" = 1'-0"1 ROOF

ATTACHMENT 4 DRC 10-16-14

Page 8 of 12

mjacob
Steve Sig
Page 9: ATTACHMENT DRC 10161 Pe 1 12 - Berkeley, California€¦ · 16/10/2014  · architectural 1 cover sheet 2 gross building area plans a 1.0 site plan a 2.0 floor plan a 2.1 floor plan

GRADE0"

PARAPET49' - 11 1/2"

1ST LEVEL2' - 1 1/2"

2ND LEVEL13' - 0 1/2"

3RD LEVEL23' - 11"

4TH LEVEL34' - 9 1/2"

ROOF46' - 7 1/2"

49' -

11

1/2"

47' -

10"

2' -

1 1/

2"

3' -

4"11

' - 1

0 1/

2"10

' - 1

0 1/

2"10

' - 1

0 1/

2"10

' - 1

0 1/

2"

PARAPET49' - 11 1/2"

1ST LEVEL2' - 1 1/2"

2ND LEVEL13' - 0 1/2"

3RD LEVEL23' - 11"

4TH LEVEL34' - 9 1/2"

ROOF46' - 7 1/2"

10' -

10

1/2"

10' -

10

1/2"

10' -

10

1/2"

11' -

10

1/2"

3' -

4"

47' -

10"

1/8" = 1'-0"1 West 1/8" = 1'-0"3 North

2711 SHATTUCK AVE.BERKELEY, CA 94705

NO. DATE ISSUES AND REVISIONS BY

1.

DATE:

DRAWN BY: TT

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

ALL DRAWINGS AND WRITTEN MATERIAL APPEARINGHEREIN CONSTITUTE ORIGINAL AND UNPUBLISHEDWORK OF THE ARCHITECT AND MAY NOT BEDUPLICATED, USED OR DISCLOSED WITHOUTWRITTEN CONSENT OF THE ARCHITECT

TRUENORTH

09.16.2009 Use Permit TT

PROJECT NAME

CONSULTANTS

NOT FOR CONSTRUCTION

02.20.2010

847 Folsom Street, ste.201San Francisco, CA 94107

t.415.753.1810f.415.564.6911

PROJECTNORTH

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO ZETA COMMUNITIES AND IS FURNISHED FOR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT PRIOR WRITTEN CONSENT.

ZETA Communities

1. 02.20.2010 Use Permit TT

2/19

/201

0 8:

31:1

2 AM

G:\0

109_

SSP_

V2\0

109-

SSP_

0220

10_Z

AB.rv

t

A3.1

0109-SSP

BUILDING ELEVATIONS

ATTACHMENT 4 DRC 10-16-14

Page 9 of 12

mjacob
Steve Sig
Page 10: ATTACHMENT DRC 10161 Pe 1 12 - Berkeley, California€¦ · 16/10/2014  · architectural 1 cover sheet 2 gross building area plans a 1.0 site plan a 2.0 floor plan a 2.1 floor plan

GRADE0"

PARAPET49' - 11 1/2"

1ST LEVEL2' - 1 1/2"

2ND LEVEL13' - 0 1/2"

3RD LEVEL23' - 11"

4TH LEVEL34' - 9 1/2"

47' -

10"

2' -

1 1/

2"

5' -

4"9'

- 10

1/2

"10

' - 1

0 1/

2"10

' - 1

0 1/

2"10

' - 1

0 1/

2"

OPENTO

BEYOND

ROOF46' - 7 1/2"

GRADE0"

PARAPET49' - 11 1/2"

1ST LEVEL2' - 1 1/2"

2ND LEVEL13' - 0 1/2"

3RD LEVEL23' - 11"

4TH LEVEL34' - 9 1/2"

ADJACENTUC STORAGE BLDG.

BLIND PROPERTYLINE WALL

ROOF46' - 7 1/2"

10' -

10

1/2"

10' -

10

1/2"

10' -

10

1/2"

3' -

4"11

' - 1

0 1/

2"

47' -

10"

2' -

1 1/

2"

2711 SHATTUCK AVE.BERKELEY, CA 94705

NO. DATE ISSUES AND REVISIONS BY

1.

DATE:

DRAWN BY: TT

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

ALL DRAWINGS AND WRITTEN MATERIAL APPEARINGHEREIN CONSTITUTE ORIGINAL AND UNPUBLISHEDWORK OF THE ARCHITECT AND MAY NOT BEDUPLICATED, USED OR DISCLOSED WITHOUTWRITTEN CONSENT OF THE ARCHITECT

TRUENORTH

09.16.2009 Use Permit TT

PROJECT NAME

CONSULTANTS

NOT FOR CONSTRUCTION

02.20.2010

847 Folsom Street, ste.201San Francisco, CA 94107

t.415.753.1810f.415.564.6911

PROJECTNORTH

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO ZETA COMMUNITIES AND IS FURNISHED FOR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT PRIOR WRITTEN CONSENT.

ZETA Communities

1. 02.20.2010 Use Permit TT

2/19

/201

0 8:

31:1

9 AM

G:\0

109_

SSP_

V2\0

109-

SSP_

0220

10_Z

AB.rv

t

A3.2

0109-SSP

BUILDING ELEVATIONS

1/8" = 1'-0"

1East

1/8" = 1'-0"

2South

ATTACHMENT 4 DRC 10-16-14 Page 10 of 12

mjacob
Steve Sig
Page 11: ATTACHMENT DRC 10161 Pe 1 12 - Berkeley, California€¦ · 16/10/2014  · architectural 1 cover sheet 2 gross building area plans a 1.0 site plan a 2.0 floor plan a 2.1 floor plan

CA

SOLO209

SOLO309

SOLO409

SOLO201

SOLO301

SOLO401

GRADE0"

PARAPET49' - 11 1/2"

1ST LEVEL2' - 1 1/2"

2ND LEVEL13' - 0 1/2"

3RD LEVEL23' - 11"

4TH LEVEL34' - 9 1/2"

10' -

10

1/2"

10' -

10

1/2"

10' -

10

1/2"

ROOF LEVEL44' - 7 1/2"

9' -

10 1

/2"

ENTRYBREAZEWAY

REARYARD

SHATTUCKAVE

DB

1C11' - 1 1/2"

2C22' - 0"

3C32' - 11"

4C43' - 9 1/2"

9' -

0"9'

- 0"

9' -

0"

ROOF46' - 7 1/2"

3' -

4"

5' -

4"

49' -

11

1/2"

2' -

1 1/

2"

64' - 6"

P.L.

48' - 7" 18' - 10"

FRONTYARD

P.L.

CA

GRADE0"

PARAPET49' - 11 1/2"

1ST LEVEL2' - 1 1/2"

2ND LEVEL13' - 0 1/2"

3RD LEVEL23' - 11"

4TH LEVEL34' - 9 1/2"

SOLO206

SOLO306

SOLO406

SOLO202

SOLO302

SOLO402

SOLO106

SOLO102

ROOF LEVEL44' - 7 1/2"

D

HALL 2209

HALL 3309

HALL 4409

HALL 1109

B

1C11' - 1 1/2"

2C22' - 0"

3C32' - 11"

4C43' - 9 1/2"

ROOF46' - 7 1/2"

P.L. P.L.

10' -

10

1/2"

10' -

10

1/2"

10' -

10

1/2"

9' -

10 1

/2"

REARYARD

SHATTUCKAVE

9' -

0"9'

- 0"

9' -

0"3'

- 4"

5' -

4"

49' -

11

1/2"

2' -

1 1/

2"

64' - 6"49' - 3"

FRONTYARD

9' -

0"

2' -

7"

1/8" = 1'-0"

1Section 3

2711 SHATTUCK AVE.BERKELEY, CA 94705

NO. DATE ISSUES AND REVISIONS BY

1.

DATE:

DRAWN BY: TT

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

ALL DRAWINGS AND WRITTEN MATERIAL APPEARINGHEREIN CONSTITUTE ORIGINAL AND UNPUBLISHEDWORK OF THE ARCHITECT AND MAY NOT BEDUPLICATED, USED OR DISCLOSED WITHOUTWRITTEN CONSENT OF THE ARCHITECT

TRUENORTH

09.16.2009 Use Permit TT

PROJECT NAME

CONSULTANTS

NOT FOR CONSTRUCTION

02.20.2010

847 Folsom Street, ste.201San Francisco, CA 94107

t.415.753.1810f.415.564.6911

PROJECTNORTH

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO ZETA COMMUNITIES AND IS FURNISHED FOR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT PRIOR WRITTEN CONSENT.

ZETA Communities

1. 02.20.2010 Use Permit TT

2/19

/201

0 8:

31:2

4 AM

G:\0

109_

SSP_

V2\0

109-

SSP_

0220

10_Z

AB.rv

t

A4.1

0109-SSP

BUILDING SECTIONS

1/8" = 1'-0"

2Section 7

ATTACHMENT 4 DRC 10-16-14 Page 11 of 12

mjacob
Steve Sig
mjacob
Steve Sig
mjacob
Steve Sig
mjacob
Steve Sig
Page 12: ATTACHMENT DRC 10161 Pe 1 12 - Berkeley, California€¦ · 16/10/2014  · architectural 1 cover sheet 2 gross building area plans a 1.0 site plan a 2.0 floor plan a 2.1 floor plan

1 5 6 74

GRADE0"

PARAPET49' - 11 1/2"

1ST LEVEL2' - 1 1/2"

2ND LEVEL13' - 0 1/2"

3RD LEVEL23' - 11"

4TH LEVEL34' - 9 1/2"

2 3

ROOF46' - 7 1/2"

3' -

4"11

' - 1

0 1/

2"10

' - 1

0 1/

2"10

' - 1

0 1/

2"10

' - 1

0 1/

2"2'

- 1

1/2"

49' -

11

1/2"

47' -

10"

GRADE0"

PARAPET49' - 11 1/2"

1ST LEVEL2' - 1 1/2"

2ND LEVEL13' - 0 1/2"

3RD LEVEL23' - 11"

4TH LEVEL34' - 9 1/2"

SOLO207

SOLO307

SOLO407

SOLO107

ROOF LEVEL44' - 7 1/2"

9' -

0"9'

- 0"

9' -

0"

ROOF46' - 7 1/2"

9' -

0"

10' -

10

1/2"

10' -

10

1/2"

10' -

10

1/2"

9' -

10 1

/2"

REARYARD

3' -

4"

5' -

4"

49' -

11

1/2"

2' -

1 1/

2"

FRONTYARD

1 5 6 74

GRADE0"

PARAPET49' - 11 1/2"

1ST LEVEL2' - 1 1/2"

2ND LEVEL13' - 0 1/2"

3RD LEVEL23' - 11"

4TH LEVEL34' - 9 1/2"

2 3

ROOF46' - 7 1/2"

3' -

4"11

' - 1

0 1/

2"10

' - 1

0 1/

2"10

' - 1

0 1/

2"10

' - 1

0 1/

2"2'

- 1

1/2"

49' -

11

1/2"

47' -

10"

OPENTO

BEYOND

2711 SHATTUCK AVE.BERKELEY, CA 94705

NO. DATE ISSUES AND REVISIONS BY

1.

DATE:

DRAWN BY: TT

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

ALL DRAWINGS AND WRITTEN MATERIAL APPEARINGHEREIN CONSTITUTE ORIGINAL AND UNPUBLISHEDWORK OF THE ARCHITECT AND MAY NOT BEDUPLICATED, USED OR DISCLOSED WITHOUTWRITTEN CONSENT OF THE ARCHITECT

TRUENORTH

09.16.2009 Use Permit TT

PROJECT NAME

CONSULTANTS

NOT FOR CONSTRUCTION

02.20.2010

847 Folsom Street, ste.201San Francisco, CA 94107

t.415.753.1810f.415.564.6911

PROJECTNORTH

THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO ZETA COMMUNITIES AND IS FURNISHED FOR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT PRIOR WRITTEN CONSENT.

ZETA Communities

1. 02.20.2010 Use Permit TT

2/19

/201

0 8:

31:3

4 AM

G:\0

109_

SSP_

V2\0

109-

SSP_

0220

10_Z

AB.rv

t

A4.2

0109-SSP

BUILDING SECTIONS

1/8" = 1'-0"2 Section 4 1/8" = 1'-0"3 Section 5

1/8" = 1'-0"1 Section 2

ATTACHMENT 4 DRC 10-16-14 Page 12 of 12

mjacob
Steve Sig