Task Force CMRCF Report
ATTACHMENT “A”
A. BRIMA CONSTRUCTION Photos
The contract has 12 components, however, the provision for the construction
of: (a) Toilet & Bath; and (b) Training Center, were deleted. Other components are
the following:
Figure 1. Construction of Material Recovery Facility Bldg. 1 in the amount of
P4,277,053.22.
8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 2/12
Page 2 of 12
Figure 2. Construction of Material Recovery Facility Bldg. 2 in the amount of
P4,948,650.86.
8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 3/12
Page 3 of 12
Figure 3. Construction of Motorpool Bldg. (MRF) in the amount of P3,596,756.91.
8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 4/12
Page 4 of 12
Figure 4. Construction of Warehouse Bldg. 1 & 2 in the amount of P10,483,635.32.
8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 5/12
Page 5 of 12
Figure 5. Construction of Administrative Bldg. (MRF) in the amount ofP2,839,611.93.
8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 6/12
Page 6 of 12
Figure 6. Construction of Guard House (MRF) in the amount of P126,624.35 with
Electrical Works of P24,795.97.
8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 7/12
Page 7 of 12
Figures 7 & 8. Construction of 5-Hectares Perimeter Fence at MRF in the amount of
P1,243,375.34.
8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 8/12
Page 8 of 12
Figure 9. Water Supply for MRF P320,841.23, (a) Supply of labor, materials, tools
and equipment to do the installation of pipes and accessories for the water supply sys-
tem of the MRF facilities); and
8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 9/12
Page 9 of 12
Figure 10. Site Development for Admin. Bldg. in the amount of P3,638,308.07.
8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 10/12
Page 10 of 12
Variation Order No.1 as Extra Work No 1. for the following:
Figures 11 & 12. Riprapping Works (Slope Protection and Existing Open Canal) in
the amount of P628,065.22;
8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 11/12
8/12/2019 ATTACHMENT "A" - Brima Construction Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/attachment-a-brima-construction-photos-task-force-cmrcf-report 12/12
Page 12 of 12
(4) Ceiling Works at Admin Bldg. in the amount of P196,847.28; (5) Perimeter Fence
in the amount of P870,745.65.
In Variation Order No. 2 (Extra Work), the total amount of the change order
is P2,188,001.19 and was added for the construction of the following:
Figure 14. I. Steel Works (Warehouse) 1 & 2), Motorpool in the amount of
P721,155.81;
II. Concrete Works (Warehouse 1 & 2), Motorpool;
III. Steel Reinforcement (Warehouse 1 & 2)/Motorpool in the amount of
P871,050.80.