attachment 4.3-a: proposed project emissions calculation …

132
ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION METHODOLOGY

Upload: others

Post on 29-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION METHODOLOGY

Page 2: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

 

Page 3: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Attachment 4.3-A: Proposed Project Emissions Calculation Methodology

San Diego Gas & Electric Company August 2009East County Substation Project 4.3-A-1

ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION METHODOLOGY

1.0 INTRODUCTION

The computer model URBEMIS version 9.2.4 (URBEMIS) was used to simulate the potential criteria air pollutant and greenhouse gas emissions from the construction, operation, and maintenance of the Proposed Project. URBEMIS—which stands for "Urban Emissions Model"—was originally developed by the California Air Resources Board as a tool to assist with estimating the potential air quality impacts from projects during the California Environmental Quality Act process.

URBEMIS was used to generate estimates of construction and operational emissions from the Proposed Project for various pollutants, including inhalable particulate matter (PM10), fine particulate matter (PM2.5), carbon monoxide (CO), volatile organic compounds (VOC), sulfur oxides (SOx), oxides of nitrogen (NOx), and carbon dioxide (CO2). URBEMIS was also used to evaluate the effectiveness of applicant-proposed measures on emission rates.

The resulting emissions from the URBEMIS simulations were also used in conjunction with the methods from the California Climate Action Registry General Reporting Protocol (CCAR GRP) version 3.1 and data from the California Statewide Greenhouse Gas (GHG) Inventory to develop estimated methane and nitrous oxide emissions.

1.1 URBEMIS MODELING

1.1.0 Modeling Input Information related to the scope, physical size, and duration of each phase of the Proposed Project was obtained from San Diego Gas and Electric Company (SDG&E) and used to characterize the five distinct components. Data was also provided for the type and quantity of off-road equipment expected to be used during construction of the East County (ECO) Substation and rebuild of the Boulevard Substation. This information is summarized in Attachment 3-B: Typical Construction Equipment. Helicopter emissions were also estimated using URBEMIS. Helicopters were simulated as “other general industrial equipment.”

1.1.1 Construction Equipment Use in Imperial County Approximately 10,000 truck trips will be required to supply the 140,000 cubic yards of fill material to construct and rebuild the substations. In addition, construction of the ECO Substation will require approximately 30 million gallons of water. If drilling wells in the vicinity of the ECO Substation proves to be unsuccessful, then approximately 3,000 truck trips will be required to import this water. In order to simulate the worst-case scenario, 13,000 truck trips were added to the URBEMIS model. These trucks were assumed to make an 80-mile roundtrip that originated and terminated in the City of El Centro in Imperial County. Interstate 8 will provide the most direct access route, with approximately 90 percent of the roundtrip distance occurring in Imperial County and the remainder occurring in San Diego County. As a result, 90 percent of the air emissions from these truck trips were analyzed using the Imperial County Air Pollution

Page 4: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Attachment 4.3-A: Proposed Project Emissions Calculation Methodology

August 2009 San Diego Gas & Electric Company4.9-3-2 East County Substation Project

Control District (APCD) significance criteria. The remaining 10 percent were analyzed using guidance from the San Diego APCD. This information is summarized in Table 1: URBEMIS Input Parameters – On-Road Truck Travel.

Table 1: URBEMIS Input Parameters – On-Road Truck Travel

Phase Duration

On-Road Truck Travel (miles per day)

San Diego County

Imperial County

ECO Substation

Water Delivery June 1, 2010 to September 30, 2010 -- 1,260

Site Grading February 1, 2010 to September 30, 2010 140 1,260

October 1, 2010 to May 31, 2011 480 4,320

Boulevard Substation Rebuild

Site Grading May 1, 2010 to June 30, 2010 931 --

1.1.2 Modeling Output Two separate modeling runs—one for the annual emissions and a second for the summer season—were created for each of the Proposed Project’s components. The truck trip emissions occurring in Imperial County were modeled separately. The output files from all of the URBEMIS simulations have been included at the end of this document.

1.2 SUPPLEMENTAL CALCULATIONS

1.2.0 Generator Use Up to two propane generators will be used during construction of the ECO Substation to provide power to temporary work areas before the 12 kilovolt temporary distribution tap can be installed. Two diesel-powered generators will be installed at the ECO Substation and one propane-powered generator will be installed at the White Star Communication Facility for emergency power during operation of the facilities. The criteria air pollutant (CAP) emissions calculations from the use of these generators during construction and operation are provided in Table 2: CAP Emissions from Generator Use – Construction and Table 3: CAP Emissions from Generator Use – Operation.

Page 5: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Attachment 4.3-A: Proposed Project Emissions Calculation Methodology

San Diego Gas & Electric Company August 2009East County Substation Project 4.3-A-3

Table 2: CAP Emissions from Generator Use – Construction

Constant Value Units Source

Btu per standard cubic foot

1020 - - AP-42; Section 3.2, Natural Gas-Fired Reciprocating Engines

Daily hours of operation 24 hours

Number of Generators 2 - -

Equipment Pollutant Emission

Factor

(lb/MMBtu)

Fuel Use

(ft3/hour)

Hourly Emissions

(lb/hr)

Daily Emissions

(lbs/day)

50 kW Generators (Calculations are for 2)

CO 0.557 230 0.26 6.27

NOX 0.847 230 0.40 9.54

PM10* 0.009987 230 0.00 0.11

TOC 1.47 230 0.69 16.55

SO2 0.000588 230 0.00 0.01

CO2 110 230 51.61 1,238.69

Emission factors from AP-42; Section 3.2, Natural Gas-Fired Reciprocating Engines *Includes filterable and condensable emissions

Page 6: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Attachment 4.3-A: Proposed Project Emissions Calculation Methodology

August 2009 San Diego Gas & Electric Company4.9-3-4 East County Substation Project

Table 3: CAP Emissions from Generator Use – Operation

Constant Value Units Source

Btu per gallon of Diesel 13,7000 - - AP-42; Appendix A

Annual hours of operation 50 - - - -

Equipment Pollutant Emission

Factor

(lb/MMBtu)

Fuel Use

(gal/hour)

Hourly Emissions

(lb/hr)

Annual Emissions

(tons/year)

Kohler 200REOZJD

CO 0.95 15.3 1.99 0.05

NOX 4.41 15.3 9.24 0.23

PM10* 0.31 15.3 0.65 0.02

TOC 0.36 15.3 0.75 0.02

SO2 0.29 15.3 0.61 0.02

CO2 164 15.3 343.76 8.59

Kohler 100REOZJD

CO 0.95 8.2 1.07 0.03

NOX 4.41 8.2 4.95 0.12

PM10* 0.31 8.2 0.35 0.01

TOC 0.36 8.2 0.40 0.01

SO2 0.29 8.2 0.33 0.01

CO2 164 8.2 184.24 4.61

Emission Factors from AP-42; Section 3.3, Gas and Industrial Engines

*Includes filterable and condensable emissions

Page 7: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Attachment 4.3-A: Proposed Project Emissions Calculation Methodology

San Diego Gas & Electric Company August 2009East County Substation Project 4.3-A-5

1.2.1 GHG Calculations GHG emissions were calculated for the following sources:

• On-road and off-road vehicle and equipment used during construction, operation, and maintenance;

• Generators used during construction, operation, and maintenance; • Auxiliary power consumption at the ECO Substation, Boulevard Substation, and White

Star Communication Facility; and • Fugitive sulfur hexafluoride (SF6)-containing equipment located at the ECO and

Boulevard substations. These GHG calculations have been provided at the end of this attachment.

Page 8: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …
Page 9: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

URBEMIS SIMULATION RESULTS

Page 10: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …
Page 11: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/

2009

9:4

6:58

AM

Pag

e: 1

File

Nam

e: B

:\Pro

ject

\SD

GE

\urb

emis

_upd

ate\

8-04

-09

SD

GE

EC

O.u

rb92

4

Pro

ject

Nam

e: E

ast C

ount

y su

bsta

tion

Pro

ject

Loc

atio

n: C

alifo

rnia

Sta

te-w

ide

On-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Off-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

OF

FR

OA

D20

07

Com

bine

d A

nnua

l Em

issi

ons

Rep

orts

(T

ons/

Yea

r)

Urb

emis

200

7 V

ersi

on 9

.2.4

Per

cent

Red

uctio

n0.

000.

000.

000.

0062

.80

0.00

49.9

461

.57

0.00

29.2

50.

00

2011

TO

TA

LS (

tons

/yea

r m

itiga

ted)

2.66

19.9

325

.19

0.02

1.27

0.88

2.15

0.28

0.81

1.09

4,19

1.91

2012

TO

TA

LS (

tons

/yea

r m

itiga

ted)

0.31

2.59

4.75

0.00

0.02

0.08

0.10

0.01

0.07

0.08

740.

77

2012

TO

TA

LS (

tons

/yea

r un

miti

gate

d)0.

312.

594.

750.

000.

020.

080.

100.

010.

070.

0874

0.77

Per

cent

Red

uctio

n0.

000.

000.

000.

000.

000.

000.

000.

000.

000.

000.

00

2010

TO

TA

LS (

tons

/yea

r un

miti

gate

d)1.

7015

.00

7.13

0.00

23.5

60.

6924

.25

4.92

0.64

5.56

1,57

0.94

2011

TO

TA

LS (

tons

/yea

r un

miti

gate

d)2.

6619

.93

25.1

90.

023.

420.

884.

300.

730.

811.

534,

191.

91

2010

TO

TA

LS (

tons

/yea

r m

itiga

ted)

1.70

15.0

07.

130.

008.

350.

689.

021.

740.

622.

361,

570.

94

Per

cent

Red

uctio

n0.

000.

000.

000.

0064

.58

2.34

62.8

164

.56

2.34

57.4

50.

00

RO

GN

Ox

CO

SO

2P

M10

Dus

tPM

10 E

xhau

stP

M10

PM

2.5

Dus

tP

M2.

5 E

xhau

stP

M2.

5C

O2

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S

Sum

mar

y R

epor

t:

Page 12: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/2009 9:46:58 AM

Page: 2

Construction U

nmitigated D

etail Report:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S A

nnual Tons P

er Year, U

nmitigated

RO

GN

Ox

CO

SO

2P

M10 D

ustPM10 Exhaust

PM

10P

M2.5 D

ustPM2.5 Exhaust

PM

2.5C

O2

TO

TA

LS (tons/year, unm

itigated)1.12

3.9213.11

0.010.17

0.131,274.51

SU

M O

F A

RE

A S

OU

RC

E A

ND

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (tons/year, unm

itigated)1.12

3.9213.11

0.010.17

0.131,274.51

OP

ER

AT

ION

AL (V

EH

ICLE

) EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (tons/year, unm

itigated)

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

Page 13: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/

2009

9:4

6:58

AM

Pag

e: 3

2010

1.70

15.0

07.

130.

0024

.25

5.56

1,57

0.94

23.5

60.

694.

920.

64

0.10

Tre

nchi

ng 1

1/01

/201

0-06

/30/

2011

0.26

2.21

0.96

0.00

0.09

278.

220.

000.

100.

000.

09

Tre

nchi

ng W

orke

r T

rips

0.00

0.01

0.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12.1

8

Tre

nchi

ng O

ff R

oad

Die

sel

0.26

2.21

0.83

0.00

0.00

0.10

0.10

0.00

0.09

0.09

266.

04

10.2

4F

ine

Gra

ding

10/

01/2

010-

01/3

1/20

110.

272.

331.

040.

002.

2325

6.85

10.1

20.

122.

110.

11

Fin

e G

radi

ng O

n R

oad

Die

sel

0.04

0.55

0.19

0.00

0.00

0.02

0.02

0.00

0.02

0.02

76.3

3

Fin

e G

radi

ng W

orke

r T

rips

0.00

0.01

0.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12.1

1

Fin

e G

radi

ng D

ust

0.00

0.00

0.00

0.00

10.1

10.

0010

.11

2.11

0.00

2.11

0.00

Fin

e G

radi

ng O

ff R

oad

Die

sel

0.23

1.77

0.72

0.00

0.00

0.10

0.10

0.00

0.09

0.09

168.

41

13.9

1M

ass

Gra

ding

06/

01/2

010-

09/3

0/20

101.

1610

.46

5.12

0.00

3.24

1,03

5.86

13.4

50.

462.

810.

43

Mas

s G

radi

ng O

n R

oad

Die

sel

0.05

0.73

0.25

0.00

0.00

0.03

0.03

0.00

0.03

0.03

101.

46

Mas

s G

radi

ng W

orke

r T

rips

0.01

0.02

0.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30.8

4

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

13.4

40.

0013

.44

2.81

0.00

2.81

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

1.10

9.71

4.54

0.00

0.00

0.44

0.44

0.00

0.40

0.40

903.

57

Page 14: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/2009 9:46:58 AM

Page: 4

20120.31

2.594.75

0.000.10

0.08740.77

0.020.08

0.010.07

0.10B

uilding 03/01/2012-04/30/20120.31

2.594.75

0.000.08

740.770.02

0.080.01

0.07

Building W

orker Trips

0.130.22

4.050.00

0.020.01

0.030.01

0.010.02

438.61

Building V

endor Trips

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Building O

ff Road D

iesel0.19

2.380.70

0.000.00

0.070.07

0.000.06

0.06302.16

20112.66

19.9325.19

0.024.30

1.534,191.91

3.420.88

0.730.81

0.61B

uilding 02/01/2011-09/30/20111.78

12.0021.72

0.020.50

3,092.710.09

0.520.03

0.47

Building W

orker Trips

0.560.95

17.500.02

0.090.05

0.130.03

0.040.07

1,753.86

Building V

endor Trips

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Building O

ff Road D

iesel1.22

11.054.23

0.000.00

0.470.47

0.000.43

0.431,338.85

0.06M

ass Grading 02/01/2011-

09/30/20110.09

1.310.45

0.000.05

200.980.01

0.050.00

0.05

Mass G

rading On R

oad Diesel

0.091.31

0.450.00

0.010.05

0.060.00

0.050.05

200.98

Mass G

rading Worker T

rips0.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

Mass G

rading Dust

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Mass G

rading Off R

oad Diesel

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

3.37F

ine Grading 10/01/2010-

01/31/20110.08

0.710.33

0.000.73

84.533.33

0.040.70

0.04

Fine G

rading On R

oad Diesel

0.010.16

0.060.00

0.000.01

0.010.00

0.010.01

25.12

Fine G

rading Worker T

rips0.00

0.000.04

0.000.00

0.000.00

0.000.00

0.003.99

Fine G

rading Dust

0.000.00

0.000.00

3.330.00

3.330.70

0.000.70

0.00

Fine G

rading Off R

oad Diesel

0.070.54

0.230.00

0.000.03

0.030.00

0.030.03

55.43

0.28T

renching 11/01/2010-06/30/20110.71

5.922.69

0.000.25

813.680.00

0.270.00

0.25

Trenching W

orker Trips

0.010.02

0.360.00

0.000.00

0.000.00

0.000.00

35.64

Trenching O

ff Road D

iesel0.70

5.902.34

0.000.00

0.270.27

0.000.25

0.25778.05

Page 15: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/

2009

9:4

6:58

AM

Pag

e: 5

1 C

rush

ing/

Pro

cess

ing

Equ

ip (

142

hp)

oper

atin

g at

a 0

.78

load

fact

or fo

r 6

hour

s pe

r da

y

Off-

Roa

d E

quip

men

t:

2 O

ff H

ighw

ay T

ruck

s (4

79 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

4 ho

urs

per

day

2 G

rade

rs (

174

hp)

oper

atin

g at

a 0

.61

load

fact

or fo

r 6

hour

s pe

r da

y

Fug

itive

Dus

t Lev

el o

f Det

ail:

Def

ault

On

Roa

d T

ruck

Tra

vel (

VM

T):

480

20 lb

s pe

r ac

re-d

ay

3 W

ater

Tru

cks

(189

hp)

ope

ratin

g at

a 0

.5 lo

ad fa

ctor

for

6 ho

urs

per

day

3 R

ubbe

r T

ired

Doz

ers

(357

hp)

ope

ratin

g at

a 0

.59

load

fact

or fo

r 8

hour

s pe

r da

y

3 P

late

Com

pact

ors

(8 h

p) o

pera

ting

at a

0.4

3 lo

ad fa

ctor

for

8 ho

urs

per

day

4 T

ract

ors/

Load

ers/

Bac

khoe

s (1

08 h

p) o

pera

ting

at a

0.5

5 lo

ad fa

ctor

for

5.5

hour

s pe

r da

y

5 S

crap

ers

(313

hp)

ope

ratin

g at

a 0

.72

load

fact

or fo

r 8

hour

s pe

r da

y

20 lb

s pe

r ac

re-d

ay

Fug

itive

Dus

t Lev

el o

f Det

ail:

Def

ault

Off-

Roa

d E

quip

men

t:

On

Roa

d T

ruck

Tra

vel (

VM

T):

480

Pha

se: F

ine

Gra

ding

10/

1/20

10 -

1/3

1/20

11 -

Fin

al g

radi

ng o

f site

(12

.8 a

cres

/day

max

imum

)

Max

imum

Dai

ly A

crea

ge D

istu

rbed

: 12.

8

Max

imum

Dai

ly A

crea

ge D

istu

rbed

: 12.

8

Tot

al A

cres

Dis

turb

ed: 9

0.2

3 W

ater

Tru

cks

(189

hp)

ope

ratin

g at

a 0

.5 lo

ad fa

ctor

for

6 ho

urs

per

day

Tot

al A

cres

Dis

turb

ed: 9

0.2

Pha

se: M

ass

Gra

ding

6/1

/201

0 -

9/30

/201

0 -

Cle

arin

g an

d gr

adin

g (1

2.8

acre

s/da

y m

axim

um)

2 P

aver

s (1

00 h

p) o

pera

ting

at a

0.6

2 lo

ad fa

ctor

for

6 ho

urs

per

day

3 O

ff H

ighw

ay T

ruck

s (4

79 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

2.7

hour

s pe

r da

y

3 R

olle

rs (

95 h

p) o

pera

ting

at a

0.5

6 lo

ad fa

ctor

for

6 ho

urs

per

day

1 P

avin

g E

quip

men

t (10

4 hp

) op

erat

ing

at a

0.5

3 lo

ad fa

ctor

for

6 ho

urs

per

day

Pha

se A

ssum

ptio

ns

Page 16: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/2009 9:46:58 AM

Page: 6

5 Other E

quipment (190 hp) operating at a 0.62 load factor for 6 hours per day

5 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 5.6 hours per day

2 Rough T

errain Forklifts (93 hp) operating at a 0.6 load factor for 6 hours per day

2 Plate C

ompactors (8 hp) operating at a 0.43 load factor for 6 hours per day

Off-R

oad Equipm

ent:

Phase: B

uilding Construction 2/1/2011 - 9/30/2011 - C

onstruction of 138 kV, 230 kV

, and 500 kV yards, above grade construction

4 Forklifts (145 hp) operating at a 0.3 load factor for 6 hours per day

6 Cranes (399 hp) operating at a 0.43 load factor for 5 hours per day

2 Aerial Lifts (60 hp) operating at a 0.46 load factor for 4 hours per day

Off-R

oad Equipm

ent:

1 Water T

rucks (189 hp) operating at a 0.5 load factor for 6 hours per day

2 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 7 hours per day

Phase: B

uilding Construction 3/1/2012 - 4/30/2012 - T

esting and comm

issioning

0 lbs per acre-day

Fugitive D

ust Level of Detail: D

efault

Off-R

oad Equipm

ent:

On R

oad Truck T

ravel (VM

T): 480

Phase: M

ass Grading 2/1/2011 - 9/30/2011 - H

aul truck trips separate from grading (10,000 trips over 8 m

onths, 80 miles R

/T)

Maxim

um D

aily Acreage D

isturbed: 0

Total A

cres Disturbed: 0

3 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 6 hours per day

11 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 2.9 hours per day

2 Trenchers (63 hp) operating at a 0.75 load factor for 7 hours per day

Phase: T

renching 11/1/2010 - 6/30/2011 - Prep for F

oundation, below grade construction

2 Bore/D

rill Rigs (291 hp) operating at a 0.75 load factor for 6 hours per day

Off-R

oad Equipm

ent:

Page 17: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/

2009

9:4

6:58

AM

Pag

e: 7

Con

stru

ctio

n M

itiga

ted

Det

ail R

epor

t:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S A

nnua

l Ton

s P

er Y

ear,

Miti

gate

d

RO

GN

Ox

CO

SO

2P

M10

Dus

tPM

10 E

xhau

stP

M10

PM

2.5

Dus

tPM

2.5 E

xhau

stP

M2.

5C

O2

2010

1.70

15.0

07.

130.

009.

022.

361,

570.

948.

350.

681.

740.

62

0.10

Tre

nchi

ng 1

1/01

/201

0-06

/30/

2011

0.26

2.21

0.96

0.00

0.09

278.

220.

000.

100.

000.

09

Tre

nchi

ng W

orke

r T

rips

0.00

0.01

0.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12.1

8

Tre

nchi

ng O

ff R

oad

Die

sel

0.26

2.21

0.83

0.00

0.00

0.10

0.10

0.00

0.09

0.09

266.

04

3.71

Fin

e G

radi

ng 1

0/01

/201

0-01

/31/

2011

0.27

2.33

1.04

0.00

0.86

256.

853.

580.

120.

750.

11

Fin

e G

radi

ng O

n R

oad

Die

sel

0.04

0.55

0.19

0.00

0.00

0.02

0.02

0.00

0.02

0.02

76.3

3

Fin

e G

radi

ng W

orke

r T

rips

0.00

0.01

0.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12.1

1

Fin

e G

radi

ng D

ust

0.00

0.00

0.00

0.00

3.58

0.00

3.58

0.75

0.00

0.75

0.00

Fin

e G

radi

ng O

ff R

oad

Die

sel

0.23

1.77

0.72

0.00

0.00

0.10

0.10

0.00

0.09

0.09

168.

41

5.21

Mas

s G

radi

ng 0

6/01

/201

0-09

/30/

2010

1.16

10.4

65.

120.

001.

411,

035.

864.

760.

451.

000.

41

Mas

s G

radi

ng O

n R

oad

Die

sel

0.05

0.73

0.25

0.00

0.00

0.03

0.03

0.00

0.03

0.03

101.

46

Mas

s G

radi

ng W

orke

r T

rips

0.01

0.02

0.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30.8

4

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

4.76

0.00

4.76

0.99

0.00

0.99

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

1.10

9.71

4.54

0.00

0.00

0.42

0.42

0.00

0.39

0.39

903.

57

1 G

ener

ator

Set

s (6

70 h

p) o

pera

ting

at a

0.7

4 lo

ad fa

ctor

for

24 h

ours

per

day

1 C

rane

s (3

99 h

p) o

pera

ting

at a

0.4

3 lo

ad fa

ctor

for

5 ho

urs

per

day

Page 18: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/2009 9:46:58 AM

Page: 8

20120.31

2.594.75

0.000.10

0.08740.77

0.020.08

0.010.07

0.10B

uilding 03/01/2012-04/30/20120.31

2.594.75

0.000.08

740.770.02

0.080.01

0.07

Building W

orker Trips

0.130.22

4.050.00

0.020.01

0.030.01

0.010.02

438.61

Building V

endor Trips

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Building O

ff Road D

iesel0.19

2.380.70

0.000.00

0.070.07

0.000.06

0.06302.16

20112.66

19.9325.19

0.022.15

1.094,191.91

1.270.88

0.280.81

0.61B

uilding 02/01/2011-09/30/20111.78

12.0021.72

0.020.50

3,092.710.09

0.520.03

0.47

Building W

orker Trips

0.560.95

17.500.02

0.090.05

0.130.03

0.040.07

1,753.86

Building V

endor Trips

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Building O

ff Road D

iesel1.22

11.054.23

0.000.00

0.470.47

0.000.43

0.431,338.85

0.06M

ass Grading 02/01/2011-

09/30/20110.09

1.310.45

0.000.05

200.980.01

0.050.00

0.05

Mass G

rading On R

oad Diesel

0.091.31

0.450.00

0.010.05

0.060.00

0.050.05

200.98

Mass G

rading Worker T

rips0.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

Mass G

rading Dust

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Mass G

rading Off R

oad Diesel

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

1.22F

ine Grading 10/01/2010-

01/31/20110.08

0.710.33

0.000.28

84.531.18

0.040.25

0.04

Fine G

rading On R

oad Diesel

0.010.16

0.060.00

0.000.01

0.010.00

0.010.01

25.12

Fine G

rading Worker T

rips0.00

0.000.04

0.000.00

0.000.00

0.000.00

0.003.99

Fine G

rading Dust

0.000.00

0.000.00

1.180.00

1.180.25

0.000.25

0.00

Fine G

rading Off R

oad Diesel

0.070.54

0.230.00

0.000.03

0.030.00

0.030.03

55.43

0.28T

renching 11/01/2010-06/30/20110.71

5.922.69

0.000.25

813.680.00

0.270.00

0.25

Trenching W

orker Trips

0.010.02

0.360.00

0.000.00

0.000.00

0.000.00

35.64

Trenching O

ff Road D

iesel0.70

5.902.34

0.000.00

0.270.27

0.000.25

0.25778.05

Page 19: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/

2009

9:4

6:58

AM

Pag

e: 9

PM

10: 6

1% P

M25

: 61%

For

Unp

aved

Roa

ds M

easu

res,

the

Red

uce

spee

d on

unp

aved

roa

ds to

less

than

15

mph

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 5

0% P

M25

: 50%

For

Soi

l Sta

bliz

ing

Mea

sure

s, th

e W

ater

exp

osed

sur

face

s 3x

dai

ly w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 6

1% P

M25

: 61%

For

Gra

ders

, the

Die

sel P

artic

ulat

e F

ilter

(D

PF

) 2n

d T

ier

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 4

4% P

M25

: 44%

For

Unp

aved

Roa

ds M

easu

res,

the

Man

age

haul

roa

d du

st 3

x da

ily w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

For

Soi

l Sta

bliz

ing

Mea

sure

s, th

e W

ater

exp

osed

sur

face

s 3x

dai

ly w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 6

1% P

M25

: 61%

The

follo

win

g m

itiga

tion

mea

sure

s ap

ply

to P

hase

: Mas

s G

radi

ng 6

/1/2

010

- 9/

30/2

010

- C

lear

ing

and

grad

ing

(12.

8 ac

res/

day

max

imum

)

The

follo

win

g m

itiga

tion

mea

sure

s ap

ply

to P

hase

: Fin

e G

radi

ng 1

0/1/

2010

- 1

/31/

2011

- F

inal

gra

ding

of s

ite (

12.8

acr

es/d

ay m

axim

um)

For

Unp

aved

Roa

ds M

easu

res,

the

Man

age

haul

roa

d du

st 3

x da

ily w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 6

1% P

M25

: 61%

For

Unp

aved

Roa

ds M

easu

res,

the

Red

uce

spee

d on

unp

aved

roa

ds to

less

than

15

mph

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 4

4% P

M25

: 44%

Con

stru

ctio

n R

elat

ed M

itiga

tion

Mea

sure

s

Arc

hite

ctur

al C

oatin

gs

Con

sum

er P

rodu

cts

Hea

rth

Land

scap

e

Nat

ural

Gas

TO

TA

LS (

tons

/yea

r, u

nmiti

gate

d)

Sou

rce

RO

GN

Ox

CO

SO

2P

M10

PM

2.5

CO

2

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

Ann

ual T

ons

Per

Yea

r, U

nmiti

gate

d

Are

a S

ourc

e U

nmiti

gate

d D

etai

l Rep

ort:

Page 20: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/2009 9:46:58 AM

Page: 10

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S A

nnual Tons P

er Year, U

nmitigated

General heavy industry

1.123.92

13.110.01

0.170.13

1,274.51

TO

TA

LS (tons/year, unm

itigated)1.12

3.9213.11

0.010.17

0.131,274.51

Source

RO

GN

OX

CO

SO

2P

M10

PM

25C

O2

Operational U

nmitigated D

etail Report:

Light Truck <

3750 lbs30.0

3.790.8

5.5

Light Auto

25.01.6

98.00.4

Light Truck 3751-5750 lbs

15.00.9

98.60.5

Vehicle F

leet Mix

Vehicle T

ypeP

ercent Type

Non-C

atalystC

atalystD

iesel

General heavy industry

6.75acres

90.20608.85

5,653.17

608.855,653.17

Sum

mary of Land U

ses

Land Use T

ypeA

creageT

rip Rate

Unit T

ypeN

o. Units

Total T

ripsT

otal VM

T

Analysis Y

ear: 2009 Season: A

nnual

Em

fac: Version : E

mfac2007 V

2.3 Nov 1 2006

Does not include correction for passby trips

Does not include double counting adjustm

ent for internal trips

Operational S

ettings:

Area S

ource Changes to D

efaults

Page 21: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/

2009

9:4

6:58

AM

Pag

e: 1

1

% o

f Trip

s -

Res

iden

tial

32.9

18.0

49.1

Trip

spe

eds

(mph

)35

.035

.035

.035

.035

.035

.0

% o

f Trip

s -

Com

mer

cial

(by

land

use

)

Gen

eral

hea

vy in

dust

ry90

.05.

05.

0

Rur

al T

rip L

engt

h (m

iles)

16.8

7.1

7.9

14.7

6.6

6.6

Urb

an T

rip L

engt

h (m

iles)

10.8

7.3

7.5

9.5

7.4

7.4

Tra

vel C

ondi

tions

Hom

e-W

ork

Hom

e-S

hop

Hom

e-O

ther

Com

mut

eN

on-W

ork

Cus

tom

er

Res

iden

tial

Com

mer

cial

Oth

er B

us0.

00.

00.

010

0.0

Hea

vy-H

eavy

Tru

ck 3

3,00

1-60

,000

lbs

5.0

0.0

0.0

100.

0

Urb

an B

us0.

00.

00.

010

0.0

Sch

ool B

us0.

00.

00.

010

0.0

Mot

orcy

cle

0.0

71.4

28.6

0.0

Mot

or H

ome

0.0

10.0

80.0

10.0

Med

Tru

ck 5

751-

8500

lbs

10.0

1.1

98.9

0.0

Med

-Hea

vy T

ruck

14,

001-

33,0

00 lb

s5.

00.

020

.080

.0

Lite

-Hea

vy T

ruck

10,

001-

14,0

00 lb

s5.

00.

050

.050

.0

Lite

-Hea

vy T

ruck

850

1-10

,000

lbs

5.0

0.0

75.0

25.0

Veh

icle

Fle

et M

ix

Veh

icle

Typ

eP

erce

nt T

ype

Non

-Cat

alys

tC

atal

yst

Die

sel

Ope

ratio

nal C

hang

es to

Def

aults

Page 22: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

 

Page 23: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/

2009

9:4

6:25

AM

Pag

e: 1

File

Nam

e: B

:\Pro

ject

\SD

GE

\urb

emis

_upd

ate\

8-04

-09

SD

GE

EC

O.u

rb92

4

Pro

ject

Nam

e: E

ast C

ount

y su

bsta

tion

Pro

ject

Loc

atio

n: C

alifo

rnia

Sta

te-w

ide

On-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Off-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

OF

FR

OA

D20

07

Com

bine

d S

umm

er E

mis

sion

s R

epor

ts (

Pou

nds/

Day

)

Urb

emis

200

7 V

ersi

on 9

.2.4

Page 24: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/2009 9:46:25 AM

Page: 2

Construction U

nmitigated D

etail Report:

TO

TA

LS (lbs/day, unm

itigated)6.11

19.4770.93

0.070.95

0.717,201.53

SU

M O

F A

RE

A S

OU

RC

E A

ND

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (lbs/day, unm

itigated)6.11

19.4770.93

0.070.95

0.717,201.53

OP

ER

AT

ION

AL (V

EH

ICLE

) EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (lbs/day, unm

itigated)

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

2011 TO

TA

LS (lbs/day m

itigated)27.11

204.32247.95

0.1990.72

9.0197.20

18.968.24

24.9242,169.26

2012 TO

TA

LS (lbs/day m

itigated)12.06

99.80182.75

0.160.82

3.073.89

0.302.77

3.0728,491.10

2012 TO

TA

LS (lbs/day unm

itigated)12.06

99.80182.75

0.160.82

3.073.89

0.302.77

3.0728,491.10

2010 TO

TA

LS (lbs/day unm

itigated)22.14

199.2097.59

0.03256.11

8.84264.94

53.508.14

61.6319,730.76

2011 TO

TA

LS (lbs/day unm

itigated)27.11

204.32247.95

0.19256.11

9.01262.59

53.508.24

59.4642,169.26

2010 TO

TA

LS (lbs/day m

itigated)22.14

199.2097.59

0.0390.72

8.5499.25

18.967.85

26.8119,730.76

RO

GN

Ox

CO

SO

2P

M10 D

ustPM

10 Exhaust

PM

10P

M2.5 D

ustP

M2.5

Exhaust

PM

2.5C

O2

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S

Sum

mary R

eport:

Page 25: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/

2009

9:4

6:25

AM

Pag

e: 3

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S S

umm

er P

ound

s P

er D

ay, U

nmiti

gate

d

RO

GN

Ox

CO

SO

2P

M10

Dus

tPM

10 E

xhau

stP

M10

PM

2.5

Dus

tPM

2.5 E

xhau

stP

M2.

5C

O2

Tim

e S

lice

6/1/

2010

-9/3

0/20

10

Act

ive

Day

s: 1

0522

.14

199.

2097

.59

0.02

264.

9461

.63

19,7

30.7

625

6.10

8.84

53.5

08.

14

264.

94M

ass

Gra

ding

06/

01/2

010-

09/3

0/20

1022

.14

199.

2097

.59

0.02

61.6

319

,730

.76

256.

108.

8453

.50

8.14

Mas

s G

radi

ng O

n R

oad

Die

sel

0.91

13.9

74.

710.

020.

070.

530.

600.

020.

490.

511,

932.

48

Mas

s G

radi

ng W

orke

r T

rips

0.21

0.35

6.32

0.01

0.03

0.02

0.04

0.01

0.01

0.02

587.

42

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

256.

000.

0025

6.00

53.4

60.

0053

.46

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

21.0

318

4.88

86.5

60.

000.

008.

308.

300.

007.

637.

6317

,210

.85

Tim

e S

lice

10/1

/201

0-10

/30/

2010

A

ctiv

e D

ays:

26

6.93

58.9

326

.31

0.02

259.

2456

.39

6,50

2.47

256.

083.

1553

.49

2.90

259.

24F

ine

Gra

ding

10/

01/2

010-

01/3

1/20

116.

9358

.93

26.3

10.

0256

.39

6,50

2.47

256.

083.

1553

.49

2.90

Fin

e G

radi

ng O

n R

oad

Die

sel

0.91

13.9

74.

710.

020.

070.

530.

600.

020.

490.

511,

932.

48

Fin

e G

radi

ng W

orke

r T

rips

0.11

0.18

3.30

0.00

0.01

0.01

0.02

0.01

0.01

0.01

306.

48

Fin

e G

radi

ng D

ust

0.00

0.00

0.00

0.00

256.

000.

0025

6.00

53.4

60.

0053

.46

0.00

Fin

e G

radi

ng O

ff R

oad

Die

sel

5.91

44.7

818

.30

0.00

0.00

2.61

2.61

0.00

2.40

2.40

4,26

3.50

Page 26: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/2009 9:46:25 AM

Page: 4

Tim

e Slice 11/1/2010-12/31/2010

Active D

ays: 5316.73

142.4262.69

0.03263.12

59.9517,001.47

256.117.02

53.506.45

3.89T

renching 11/01/2010-06/30/20119.81

83.4936.38

0.003.56

10,499.010.02

3.870.01

3.55

Trenching W

orker Trips

0.160.27

4.940.00

0.020.01

0.030.01

0.010.02

459.72

Trenching O

ff Road D

iesel9.65

83.2231.44

0.000.00

3.853.85

0.003.54

3.5410,039.29

259.24F

ine Grading 10/01/2010-

01/31/20116.93

58.9326.31

0.0256.39

6,502.47256.08

3.1553.49

2.90

Fine G

rading On R

oad Diesel

0.9113.97

4.710.02

0.070.53

0.600.02

0.490.51

1,932.48

Fine G

rading Worker T

rips0.11

0.183.30

0.000.01

0.010.02

0.010.01

0.01306.48

Fine G

rading Dust

0.000.00

0.000.00

256.000.00

256.0053.46

0.0053.46

0.00

Fine G

rading Off R

oad Diesel

5.9144.78

18.300.00

0.002.61

2.610.00

2.402.40

4,263.50

Tim

e Slice 1/1/2011-1/31/2011

Active D

ays: 2615.66

130.8759.85

0.03262.59

59.4617,001.72

256.116.48

53.505.96

3.56T

renching 11/01/2010-06/30/20119.16

76.3934.77

0.003.26

10,499.160.02

3.540.01

3.26

Trenching W

orker Trips

0.150.25

4.590.00

0.020.01

0.030.01

0.010.02

459.86

Trenching O

ff Road D

iesel9.01

76.1530.18

0.000.00

3.533.53

0.003.25

3.2510,039.29

259.03F

ine Grading 10/01/2010-

01/31/20116.50

54.4825.08

0.0256.20

6,502.56256.08

2.9453.49

2.71

Fine G

rading On R

oad Diesel

0.8412.58

4.290.02

0.070.48

0.540.02

0.440.46

1,932.48

Fine G

rading Worker T

rips0.10

0.173.06

0.000.01

0.010.02

0.010.01

0.01306.58

Fine G

rading Dust

0.000.00

0.000.00

256.000.00

256.0053.46

0.0053.46

0.00

Fine G

rading Off R

oad Diesel

5.5641.73

17.730.00

0.002.46

2.460.00

2.262.26

4,263.50

Page 27: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/

2009

9:4

6:25

AM

Pag

e: 5

Tim

e S

lice

7/1/

2011

-9/3

0/20

11

Act

ive

Day

s: 7

917

.95

127.

9321

3.18

0.18

6.36

5.30

31,6

70.1

00.

895.

470.

324.

98

0.54

Mas

s G

radi

ng 0

2/01

/201

1-09

/30/

2011

0.84

12.5

84.

290.

020.

461,

932.

480.

070.

480.

020.

44

Mas

s G

radi

ng O

n R

oad

Die

sel

0.84

12.5

84.

290.

020.

070.

480.

540.

020.

440.

461,

932.

48

Mas

s G

radi

ng W

orke

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.82

Bui

ldin

g 02

/01/

2011

-09/

30/2

011

17.1

111

5.35

208.

890.

164.

8429

,737

.62

0.82

4.99

0.30

4.54

Bui

ldin

g W

orke

r T

rips

5.37

9.10

168.

220.

160.

820.

451.

270.

300.

360.

6616

,864

.03

Bui

ldin

g V

endo

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Bui

ldin

g O

ff R

oad

Die

sel

11.7

310

6.24

40.6

70.

000.

004.

544.

540.

004.

184.

1812

,873

.59

Tim

e S

lice

2/1/

2011

-6/3

0/20

11

Act

ive

Day

s: 1

2927

.11

204.

3224

7.95

0.19

9.92

8.57

42,1

69.2

60.

919.

010.

338.

24

3.56

Tre

nchi

ng 1

1/01

/201

0-06

/30/

2011

9.16

76.3

934

.77

0.00

3.26

10,4

99.1

60.

023.

540.

013.

26

Tre

nchi

ng W

orke

r T

rips

0.15

0.25

4.59

0.00

0.02

0.01

0.03

0.01

0.01

0.02

459.

86

Tre

nchi

ng O

ff R

oad

Die

sel

9.01

76.1

530

.18

0.00

0.00

3.53

3.53

0.00

3.25

3.25

10,0

39.2

9

0.54

Mas

s G

radi

ng 0

2/01

/201

1-09

/30/

2011

0.84

12.5

84.

290.

020.

461,

932.

480.

070.

480.

020.

44

Mas

s G

radi

ng O

n R

oad

Die

sel

0.84

12.5

84.

290.

020.

070.

480.

540.

020.

440.

461,

932.

48

Mas

s G

radi

ng W

orke

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.82

Bui

ldin

g 02

/01/

2011

-09/

30/2

011

17.1

111

5.35

208.

890.

164.

8429

,737

.62

0.82

4.99

0.30

4.54

Bui

ldin

g W

orke

r T

rips

5.37

9.10

168.

220.

160.

820.

451.

270.

300.

360.

6616

,864

.03

Bui

ldin

g V

endo

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Bui

ldin

g O

ff R

oad

Die

sel

11.7

310

6.24

40.6

70.

000.

004.

544.

540.

004.

184.

1812

,873

.59

Page 28: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/2009 9:46:25 AM

Page: 6

1 Crushing/P

rocessing Equip (142 hp) operating at a 0.78 load factor for 6 hours per day

Off-R

oad Equipm

ent:

Fugitive D

ust Level of Detail: D

efault

On R

oad Truck T

ravel (VM

T): 480

20 lbs per acre-day

20 lbs per acre-day

Fugitive D

ust Level of Detail: D

efault

Off-R

oad Equipm

ent:

On R

oad Truck T

ravel (VM

T): 480

Phase: F

ine Grading 10/1/2010 - 1/31/2011 - F

inal grading of site (12.8 acres/day maxim

um)

Maxim

um D

aily Acreage D

isturbed: 12.8

Maxim

um D

aily Acreage D

isturbed: 12.8

Total A

cres Disturbed: 90.2

3 Water T

rucks (189 hp) operating at a 0.5 load factor for 6 hours per day

Total A

cres Disturbed: 90.2

Phase: M

ass Grading 6/1/2010 - 9/30/2010 - C

learing and grading (12.8 acres/day maxim

um)

2 Pavers (100 hp) operating at a 0.62 load factor for 6 hours per day

3 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 2.7 hours per day

3 Rollers (95 hp) operating at a 0.56 load factor for 6 hours per day

1 Paving E

quipment (104 hp) operating at a 0.53 load factor for 6 hours per day

Phase A

ssumptions

Tim

e Slice 3/1/2012-4/30/2012

Active D

ays: 5212.06

99.80182.75

0.163.89

3.0728,491.10

0.823.07

0.302.77

3.89B

uilding 03/01/2012-04/30/201212.06

99.80182.75

0.163.07

28,491.100.82

3.070.30

2.77

Building W

orker Trips

4.898.32

155.850.16

0.820.45

1.280.30

0.360.66

16,869.50

Building V

endor Trips

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Building O

ff Road D

iesel7.17

91.4926.91

0.000.00

2.622.62

0.002.41

2.4111,621.60

Page 29: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/

2009

9:4

6:25

AM

Pag

e: 7

2 T

renc

hers

(63

hp)

ope

ratin

g at

a 0

.75

load

fact

or fo

r 7

hour

s pe

r da

y

3 T

ract

ors/

Load

ers/

Bac

khoe

s (1

08 h

p) o

pera

ting

at a

0.5

5 lo

ad fa

ctor

for

6 ho

urs

per

day

Pha

se: B

uild

ing

Con

stru

ctio

n 2/

1/20

11 -

9/3

0/20

11 -

Con

stru

ctio

n of

138

kV

, 230

kV

, and

500

kV

yar

ds, a

bove

gra

de c

onst

ruct

ion

Off-

Roa

d E

quip

men

t:

Pha

se: T

renc

hing

11/

1/20

10 -

6/3

0/20

11 -

Pre

p fo

r F

ound

atio

n, b

elow

gra

de c

onst

ruct

ion

11 O

ff H

ighw

ay T

ruck

s (4

79 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

2.9

hour

s pe

r da

y

2 B

ore/

Dril

l Rig

s (2

91 h

p) o

pera

ting

at a

0.7

5 lo

ad fa

ctor

for

6 ho

urs

per

day

2 P

late

Com

pact

ors

(8 h

p) o

pera

ting

at a

0.4

3 lo

ad fa

ctor

for

6 ho

urs

per

day

5 O

ther

Equ

ipm

ent (

190

hp)

oper

atin

g at

a 0

.62

load

fact

or fo

r 6

hour

s pe

r da

y

6 C

rane

s (3

99 h

p) o

pera

ting

at a

0.4

3 lo

ad fa

ctor

for

5 ho

urs

per

day

Off-

Roa

d E

quip

men

t:

5 O

ff H

ighw

ay T

ruck

s (4

79 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

5.6

hour

s pe

r da

y

4 F

orkl

ifts

(145

hp)

ope

ratin

g at

a 0

.3 lo

ad fa

ctor

for

6 ho

urs

per

day

4 T

ract

ors/

Load

ers/

Bac

khoe

s (1

08 h

p) o

pera

ting

at a

0.5

5 lo

ad fa

ctor

for

5.5

hour

s pe

r da

y

5 S

crap

ers

(313

hp)

ope

ratin

g at

a 0

.72

load

fact

or fo

r 8

hour

s pe

r da

y

3 W

ater

Tru

cks

(189

hp)

ope

ratin

g at

a 0

.5 lo

ad fa

ctor

for

6 ho

urs

per

day

2 O

ff H

ighw

ay T

ruck

s (4

79 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

4 ho

urs

per

day

2 G

rade

rs (

174

hp)

oper

atin

g at

a 0

.61

load

fact

or fo

r 6

hour

s pe

r da

y

3 R

ubbe

r T

ired

Doz

ers

(357

hp)

ope

ratin

g at

a 0

.59

load

fact

or fo

r 8

hour

s pe

r da

y

3 P

late

Com

pact

ors

(8 h

p) o

pera

ting

at a

0.4

3 lo

ad fa

ctor

for

8 ho

urs

per

day

On

Roa

d T

ruck

Tra

vel (

VM

T):

480

0 lb

s pe

r ac

re-d

ay

Off-

Roa

d E

quip

men

t:

Tot

al A

cres

Dis

turb

ed: 0

Pha

se: M

ass

Gra

ding

2/1

/201

1 -

9/30

/201

1 -

Hau

l tru

ck tr

ips

sepa

rate

from

gra

ding

(10

,000

trip

s ov

er 8

mon

ths,

80

mile

s R

/T)

Fug

itive

Dus

t Lev

el o

f Det

ail:

Def

ault

Max

imum

Dai

ly A

crea

ge D

istu

rbed

: 0

Page 30: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/2009 9:46:25 AM

Page: 8

Construction M

itigated Detail R

eport:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S S

umm

er Pounds P

er Day, M

itigated

RO

GN

Ox

CO

SO

2P

M10 D

ustPM10 Exhaust

PM

10P

M2.5 D

ustPM2.5 Exhaust

PM

2.5C

O2

Tim

e Slice 6/1/2010-9/30/2010

Active D

ays: 10522.14

199.2097.59

0.0299.25

26.8119,730.76

90.718.54

18.967.85

99.25M

ass Grading 06/01/2010-

09/30/201022.14

199.2097.59

0.0226.81

19,730.7690.71

8.5418.96

7.85

Mass G

rading On R

oad Diesel

0.9113.97

4.710.02

0.070.53

0.600.02

0.490.51

1,932.48

Mass G

rading Worker T

rips0.21

0.356.32

0.010.03

0.020.04

0.010.01

0.02587.42

Mass G

rading Dust

0.000.00

0.000.00

90.610.00

90.6118.92

0.0018.92

0.00

Mass G

rading Off R

oad Diesel

21.03184.88

86.560.00

0.007.99

7.990.00

7.357.35

17,210.85

2 Aerial Lifts (60 hp) operating at a 0.46 load factor for 4 hours per day

Off-R

oad Equipm

ent:

1 Cranes (399 hp) operating at a 0.43 load factor for 5 hours per day

1 Generator S

ets (670 hp) operating at a 0.74 load factor for 24 hours per day

2 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 7 hours per day

2 Rough T

errain Forklifts (93 hp) operating at a 0.6 load factor for 6 hours per day

1 Water T

rucks (189 hp) operating at a 0.5 load factor for 6 hours per day

Phase: B

uilding Construction 3/1/2012 - 4/30/2012 - T

esting and comm

issioning

Page 31: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/

2009

9:4

6:25

AM

Pag

e: 9

Tim

e S

lice

10/1

/201

0-10

/30/

2010

A

ctiv

e D

ays:

26

6.93

58.9

326

.31

0.02

93.8

521

.85

6,50

2.47

90.7

03.

1518

.95

2.90

93.8

5F

ine

Gra

ding

10/

01/2

010-

01/3

1/20

116.

9358

.93

26.3

10.

0221

.85

6,50

2.47

90.7

03.

1518

.95

2.90

Fin

e G

radi

ng O

n R

oad

Die

sel

0.91

13.9

74.

710.

020.

070.

530.

600.

020.

490.

511,

932.

48

Fin

e G

radi

ng W

orke

r T

rips

0.11

0.18

3.30

0.00

0.01

0.01

0.02

0.01

0.01

0.01

306.

48

Fin

e G

radi

ng D

ust

0.00

0.00

0.00

0.00

90.6

10.

0090

.61

18.9

20.

0018

.92

0.00

Fin

e G

radi

ng O

ff R

oad

Die

sel

5.91

44.7

818

.30

0.00

0.00

2.61

2.61

0.00

2.40

2.40

4,26

3.50

Tim

e S

lice

11/1

/201

0-12

/31/

2010

A

ctiv

e D

ays:

53

16.7

314

2.42

62.6

90.

0397

.74

25.4

117

,001

.47

90.7

27.

0218

.96

6.45

3.89

Tre

nchi

ng 1

1/01

/201

0-06

/30/

2011

9.81

83.4

936

.38

0.00

3.56

10,4

99.0

10.

023.

870.

013.

55

Tre

nchi

ng W

orke

r T

rips

0.16

0.27

4.94

0.00

0.02

0.01

0.03

0.01

0.01

0.02

459.

72

Tre

nchi

ng O

ff R

oad

Die

sel

9.65

83.2

231

.44

0.00

0.00

3.85

3.85

0.00

3.54

3.54

10,0

39.2

9

93.8

5F

ine

Gra

ding

10/

01/2

010-

01/3

1/20

116.

9358

.93

26.3

10.

0221

.85

6,50

2.47

90.7

03.

1518

.95

2.90

Fin

e G

radi

ng O

n R

oad

Die

sel

0.91

13.9

74.

710.

020.

070.

530.

600.

020.

490.

511,

932.

48

Fin

e G

radi

ng W

orke

r T

rips

0.11

0.18

3.30

0.00

0.01

0.01

0.02

0.01

0.01

0.01

306.

48

Fin

e G

radi

ng D

ust

0.00

0.00

0.00

0.00

90.6

10.

0090

.61

18.9

20.

0018

.92

0.00

Fin

e G

radi

ng O

ff R

oad

Die

sel

5.91

44.7

818

.30

0.00

0.00

2.61

2.61

0.00

2.40

2.40

4,26

3.50

Page 32: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/2009 9:46:25 AM

Page: 10

Tim

e Slice 1/1/2011-1/31/2011

Active D

ays: 2615.66

130.8759.85

0.0397.20

24.9217,001.72

90.726.48

18.965.96

3.56T

renching 11/01/2010-06/30/20119.16

76.3934.77

0.003.26

10,499.160.02

3.540.01

3.26

Trenching W

orker Trips

0.150.25

4.590.00

0.020.01

0.030.01

0.010.02

459.86

Trenching O

ff Road D

iesel9.01

76.1530.18

0.000.00

3.533.53

0.003.25

3.2510,039.29

93.64F

ine Grading 10/01/2010-

01/31/20116.50

54.4825.08

0.0221.66

6,502.5690.70

2.9418.95

2.71

Fine G

rading On R

oad Diesel

0.8412.58

4.290.02

0.070.48

0.540.02

0.440.46

1,932.48

Fine G

rading Worker T

rips0.10

0.173.06

0.000.01

0.010.02

0.010.01

0.01306.58

Fine G

rading Dust

0.000.00

0.000.00

90.610.00

90.6118.92

0.0018.92

0.00

Fine G

rading Off R

oad Diesel

5.5641.73

17.730.00

0.002.46

2.460.00

2.262.26

4,263.50

Tim

e Slice 2/1/2011-6/30/2011

Active D

ays: 12927.11

204.32247.95

0.199.92

8.5742,169.26

0.919.01

0.338.24

3.56T

renching 11/01/2010-06/30/20119.16

76.3934.77

0.003.26

10,499.160.02

3.540.01

3.26

Trenching W

orker Trips

0.150.25

4.590.00

0.020.01

0.030.01

0.010.02

459.86

Trenching O

ff Road D

iesel9.01

76.1530.18

0.000.00

3.533.53

0.003.25

3.2510,039.29

0.54M

ass Grading 02/01/2011-

09/30/20110.84

12.584.29

0.020.46

1,932.480.07

0.480.02

0.44

Mass G

rading On R

oad Diesel

0.8412.58

4.290.02

0.070.48

0.540.02

0.440.46

1,932.48

Mass G

rading Worker T

rips0.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

Mass G

rading Dust

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Mass G

rading Off R

oad Diesel

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

5.82B

uilding 02/01/2011-09/30/201117.11

115.35208.89

0.164.84

29,737.620.82

4.990.30

4.54

Building W

orker Trips

5.379.10

168.220.16

0.820.45

1.270.30

0.360.66

16,864.03

Building V

endor Trips

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Building O

ff Road D

iesel11.73

106.2440.67

0.000.00

4.544.54

0.004.18

4.1812,873.59

Page 33: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/

2009

9:4

6:25

AM

Pag

e: 1

1

Tim

e S

lice

3/1/

2012

-4/3

0/20

12

Act

ive

Day

s: 5

212

.06

99.8

018

2.75

0.16

3.89

3.07

28,4

91.1

00.

823.

070.

302.

77

3.89

Bui

ldin

g 03

/01/

2012

-04/

30/2

012

12.0

699

.80

182.

750.

163.

0728

,491

.10

0.82

3.07

0.30

2.77

Bui

ldin

g W

orke

r T

rips

4.89

8.32

155.

850.

160.

820.

451.

280.

300.

360.

6616

,869

.50

Bui

ldin

g V

endo

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Bui

ldin

g O

ff R

oad

Die

sel

7.17

91.4

926

.91

0.00

0.00

2.62

2.62

0.00

2.41

2.41

11,6

21.6

0

Tim

e S

lice

7/1/

2011

-9/3

0/20

11

Act

ive

Day

s: 7

917

.95

127.

9321

3.18

0.18

6.36

5.30

31,6

70.1

00.

895.

470.

324.

98

0.54

Mas

s G

radi

ng 0

2/01

/201

1-09

/30/

2011

0.84

12.5

84.

290.

020.

461,

932.

480.

070.

480.

020.

44

Mas

s G

radi

ng O

n R

oad

Die

sel

0.84

12.5

84.

290.

020.

070.

480.

540.

020.

440.

461,

932.

48

Mas

s G

radi

ng W

orke

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.82

Bui

ldin

g 02

/01/

2011

-09/

30/2

011

17.1

111

5.35

208.

890.

164.

8429

,737

.62

0.82

4.99

0.30

4.54

Bui

ldin

g W

orke

r T

rips

5.37

9.10

168.

220.

160.

820.

451.

270.

300.

360.

6616

,864

.03

Bui

ldin

g V

endo

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Bui

ldin

g O

ff R

oad

Die

sel

11.7

310

6.24

40.6

70.

000.

004.

544.

540.

004.

184.

1812

,873

.59

For

Soi

l Sta

bliz

ing

Mea

sure

s, th

e W

ater

exp

osed

sur

face

s 3x

dai

ly w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 6

1% P

M25

: 61%

The

follo

win

g m

itiga

tion

mea

sure

s ap

ply

to P

hase

: Mas

s G

radi

ng 6

/1/2

010

- 9/

30/2

010

- C

lear

ing

and

grad

ing

(12.

8 ac

res/

day

max

imum

)

The

follo

win

g m

itiga

tion

mea

sure

s ap

ply

to P

hase

: Fin

e G

radi

ng 1

0/1/

2010

- 1

/31/

2011

- F

inal

gra

ding

of s

ite (

12.8

acr

es/d

ay m

axim

um)

For

Unp

aved

Roa

ds M

easu

res,

the

Man

age

haul

roa

d du

st 3

x da

ily w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 6

1% P

M25

: 61%

For

Unp

aved

Roa

ds M

easu

res,

the

Red

uce

spee

d on

unp

aved

roa

ds to

less

than

15

mph

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 4

4% P

M25

: 44%

Con

stru

ctio

n R

elat

ed M

itiga

tion

Mea

sure

s

Page 34: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/2009 9:46:25 AM

Page: 12

PM

10: 61% P

M25: 61%

For U

npaved Roads M

easures, the Manage haul road dust 3x daily w

atering mitigation reduces em

issions by:

PM

10: 50% P

M25: 50%

For G

raders, the Diesel P

articulate Filter (D

PF

) 2nd Tier m

itigation reduces emissions by:

PM

10: 61% P

M25: 61%

For S

oil Stablizing M

easures, the Water exposed surfaces 3x daily w

atering mitigation reduces em

issions by:

PM

10: 44% P

M25: 44%

For U

npaved Roads M

easures, the Reduce speed on unpaved roads to less than 15 m

ph mitigation reduces em

issions by:

Architectural C

oatings

Consum

er Products

Hearth

Landscape

Natural G

as

TO

TA

LS (lbs/day, unm

itigated)

Source

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

Sum

mer P

ounds Per D

ay, Unm

itigated

Area S

ource Unm

itigated Detail R

eport:

Area S

ource Changes to D

efaults

Page 35: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/

2009

9:4

6:25

AM

Pag

e: 1

3

OP

ER

AT

ION

AL

EM

ISS

ION

ES

TIM

AT

ES

Sum

mer

Pou

nds

Per

Day

, Unm

itiga

ted

Gen

eral

hea

vy in

dust

ry6.

1119

.47

70.9

30.

070.

950.

717,

201.

53

TO

TA

LS (

lbs/

day,

unm

itiga

ted)

6.11

19.4

770

.93

0.07

0.95

0.71

7,20

1.53

Sou

rce

RO

GN

OX

CO

SO

2P

M10

PM

25C

O2

Ope

ratio

nal U

nmiti

gate

d D

etai

l Rep

ort:

Ligh

t Tru

ck <

375

0 lb

s30

.03.

790

.85.

5

Ligh

t Aut

o25

.01.

698

.00.

4

Lite

-Hea

vy T

ruck

10,

001-

14,0

00 lb

s5.

00.

050

.050

.0

Lite

-Hea

vy T

ruck

850

1-10

,000

lbs

5.0

0.0

75.0

25.0

Med

Tru

ck 5

751-

8500

lbs

10.0

1.1

98.9

0.0

Ligh

t Tru

ck 3

751-

5750

lbs

15.0

0.9

98.6

0.5

Veh

icle

Fle

et M

ix

Veh

icle

Typ

eP

erce

nt T

ype

Non

-Cat

alys

tC

atal

yst

Die

sel

Gen

eral

hea

vy in

dust

ry6.

75ac

res

90.2

060

8.85

5,65

3.17

608.

855,

653.

17

Sum

mar

y of

Lan

d U

ses

Land

Use

Typ

eA

crea

geT

rip R

ate

Uni

t Typ

eN

o. U

nits

Tot

al T

rips

Tot

al V

MT

Ana

lysi

s Y

ear:

200

9 T

empe

ratu

re (

F):

85

Sea

son:

Sum

mer

Em

fac:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Doe

s no

t inc

lude

cor

rect

ion

for

pass

by tr

ips

Doe

s no

t inc

lude

dou

ble

coun

ting

adju

stm

ent f

or in

tern

al tr

ips

Ope

ratio

nal S

ettin

gs:

Page 36: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

8/5/2009 9:46:25 AM

Page: 14

% of T

rips - Residential

32.918.0

49.1

Trip speeds (m

ph)35.0

35.035.0

35.035.0

35.0

% of T

rips - Com

mercial (by land use)

General heavy industry

90.05.0

5.0

Rural T

rip Length (miles)

16.87.1

7.914.7

6.66.6

Urban T

rip Length (miles)

10.87.3

7.59.5

7.47.4

Travel C

onditions

Hom

e-Work

Hom

e-Shop

Hom

e-Other

Com

mute

Non-W

orkC

ustomer

Residential

Com

mercial

Urban B

us0.0

0.00.0

100.0

Motor H

ome

0.010.0

80.010.0

School B

us0.0

0.00.0

100.0

Motorcycle

0.071.4

28.60.0

Other B

us0.0

0.00.0

100.0

Med-H

eavy Truck 14,001-33,000 lbs

5.00.0

20.080.0

Heavy-H

eavy Truck 33,001-60,000 lbs

5.00.0

0.0100.0

Vehicle F

leet Mix

Vehicle T

ypeP

ercent Type

Non-C

atalystC

atalystD

iesel

Operational C

hanges to Defaults

Page 37: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:19:

44 A

M

Pag

e: 1

File

Nam

e: C

:\SD

GE

\urb

emis

_upd

ate\

7-09

-09

500

kV lo

op.u

rb92

4

Pro

ject

Nam

e: S

DG

E 5

00 k

V L

oop

Pro

ject

Loc

atio

n: C

alifo

rnia

Sta

te-w

ide

On-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Off-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

OF

FR

OA

D20

07

Com

bine

d A

nnua

l Em

issi

ons

Rep

orts

(T

ons/

Yea

r)

Urb

emis

200

7 V

ersi

on 9

.2.4

Page 38: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:19:44 AM

Page: 2

Construction U

nmitigated D

etail Report:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S A

nnual Tons P

er Year, U

nmitigated

TO

TA

LS (tons/year, unm

itigated)0.04

0.160.52

0.000.01

0.0153.06

SU

M O

F A

RE

A S

OU

RC

E A

ND

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (tons/year, unm

itigated)0.04

0.160.52

0.000.01

0.0153.06

OP

ER

AT

ION

AL (V

EH

ICLE

) EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (tons/year, unm

itigated)

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

2012 TO

TA

LS (tons/year unm

itigated)0.08

0.700.33

0.000.00

0.030.03

0.000.02

0.02109.04

2012 TO

TA

LS (tons/year m

itigated)0.08

0.700.33

0.000.00

0.030.03

0.000.02

0.02109.04

Percent R

eduction0.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

Percent R

eduction0.00

0.000.00

0.0059.14

0.0056.82

59.120.00

50.130.00

2011 TO

TA

LS (tons/year unm

itigated)0.01

0.060.03

0.000.06

0.000.06

0.010.00

0.016.55

2011 TO

TA

LS (tons/year m

itigated)0.01

0.060.03

0.000.02

0.000.03

0.010.00

0.016.55

RO

GN

Ox

CO

SO

2P

M10 D

ustPM

10 Exhaust

PM

10P

M2.5 D

ustP

M2.5

Exhaust

PM

2.5C

O2

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S

Sum

mary R

eport:

Page 39: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:19:

44 A

M

Pag

e: 3

Max

imum

Dai

ly A

crea

ge D

istu

rbed

: 0.5

Fug

itive

Dus

t Lev

el o

f Det

ail:

Def

ault

Tot

al A

cres

Dis

turb

ed: 2

.53

Pha

se: M

ass

Gra

ding

6/1

/201

1 -

6/16

/201

1 -

Cle

ar a

nd g

rade

for

acce

ss r

oad

and

pads

20 lb

s pe

r ac

re-d

ay

1 R

ubbe

r T

ired

Doz

ers

(357

hp)

ope

ratin

g at

a 0

.59

load

fact

or fo

r 4

hour

s pe

r da

y

1 O

ff H

ighw

ay T

ruck

s (4

79 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

2 ho

urs

per

day

On

Roa

d T

ruck

Tra

vel (

VM

T):

0

Off-

Roa

d E

quip

men

t:

Pha

se A

ssum

ptio

ns

RO

GN

Ox

CO

SO

2P

M10

Dus

tPM

10 E

xhau

stP

M10

PM

2.5

Dus

tPM

2.5 E

xhau

stP

M2.

5C

O2

2012

0.08

0.70

0.33

0.00

0.03

0.02

109.

040.

000.

030.

000.

02

0.02

Bui

ldin

g 05

/01/

2012

-05/

16/2

012

0.05

0.46

0.20

0.00

0.02

70.0

70.

000.

020.

000.

01

Bui

ldin

g W

orke

r T

rips

0.00

0.00

0.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.35

Bui

ldin

g V

endo

r T

rips

0.00

0.02

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.06

Bui

ldin

g O

ff R

oad

Die

sel

0.05

0.44

0.15

0.00

0.00

0.02

0.02

0.00

0.01

0.01

61.6

6

0.01

Tre

nchi

ng 0

4/01

/201

2-04

/30/

2012

0.03

0.24

0.12

0.00

0.01

38.9

70.

000.

010.

000.

01

Tre

nchi

ng W

orke

r T

rips

0.00

0.00

0.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.47

Tre

nchi

ng O

ff R

oad

Die

sel

0.03

0.24

0.10

0.00

0.00

0.01

0.01

0.00

0.01

0.01

36.5

0

2011

0.01

0.06

0.03

0.00

0.06

0.01

6.55

0.06

0.00

0.01

0.00

0.06

Mas

s G

radi

ng 0

6/01

/201

1-06

/16/

2011

0.01

0.06

0.03

0.00

0.01

6.55

0.06

0.00

0.01

0.00

Mas

s G

radi

ng O

n R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng W

orke

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.47

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

0.06

0.00

0.06

0.01

0.00

0.01

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

0.01

0.06

0.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.08

Page 40: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:19:44 AM

Page: 4

Construction M

itigated Detail R

eport:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S A

nnual Tons P

er Year, M

itigated

RO

GN

Ox

CO

SO

2P

M10 D

ustPM10 Exhaust

PM

10P

M2.5 D

ustPM2.5 Exhaust

PM

2.5C

O2

20110.01

0.060.03

0.000.03

0.016.55

0.020.00

0.010.00

0.03M

ass Grading 06/01/2011-

06/16/20110.01

0.060.03

0.000.01

6.550.02

0.000.01

0.00

Mass G

rading On R

oad Diesel

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Mass G

rading Worker T

rips0.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.47

Mass G

rading Dust

0.000.00

0.000.00

0.020.00

0.020.01

0.000.01

0.00

Mass G

rading Off R

oad Diesel

0.010.06

0.030.00

0.000.00

0.000.00

0.000.00

6.08

2 Cranes (399 hp) operating at a 0.43 load factor for 6 hours per day

Off-R

oad Equipm

ent:

Phase: B

uilding Construction 5/1/2012 - 5/16/2012 - T

ower installation and conductor stringing

4 Other E

quipment (190 hp) operating at a 0.62 load factor for 8 hours per day

4 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 8 hours per day

Off-R

oad Equipm

ent:

Phase: T

renching 4/1/2012 - 4/30/2012 - Install foundations

2 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 6 hours per day

3 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 3 hours per day

1 Bore/D

rill Rigs (291 hp) operating at a 0.75 load factor for 6 hours per day

Page 41: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:19:

44 A

M

Pag

e: 5

2012

0.08

0.70

0.33

0.00

0.03

0.02

109.

040.

000.

030.

000.

02

0.02

Bui

ldin

g 05

/01/

2012

-05/

16/2

012

0.05

0.46

0.20

0.00

0.02

70.0

70.

000.

020.

000.

01

Bui

ldin

g W

orke

r T

rips

0.00

0.00

0.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.35

Bui

ldin

g V

endo

r T

rips

0.00

0.02

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.06

Bui

ldin

g O

ff R

oad

Die

sel

0.05

0.44

0.15

0.00

0.00

0.02

0.02

0.00

0.01

0.01

61.6

6

0.01

Tre

nchi

ng 0

4/01

/201

2-04

/30/

2012

0.03

0.24

0.12

0.00

0.01

38.9

70.

000.

010.

000.

01

Tre

nchi

ng W

orke

r T

rips

0.00

0.00

0.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.47

Tre

nchi

ng O

ff R

oad

Die

sel

0.03

0.24

0.10

0.00

0.00

0.01

0.01

0.00

0.01

0.01

36.5

0

For

Unp

aved

Roa

ds M

easu

res,

the

Red

uce

spee

d on

unp

aved

roa

ds to

less

than

15

mph

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 4

4% P

M25

: 44%

For

Unp

aved

Roa

ds M

easu

res,

the

Man

age

haul

roa

d du

st 2

x da

ily w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 5

5% P

M25

: 55%

PM

10: 5

5% P

M25

: 55%

The

follo

win

g m

itiga

tion

mea

sure

s ap

ply

to P

hase

: Mas

s G

radi

ng 6

/1/2

011

- 6/

16/2

011

- C

lear

and

gra

de fo

r ac

cess

roa

d an

d pa

ds

For

Soi

l Sta

bliz

ing

Mea

sure

s, th

e W

ater

exp

osed

sur

face

s 2x

dai

ly w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

Con

stru

ctio

n R

elat

ed M

itiga

tion

Mea

sure

s

Page 42: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:19:44 AM

Page: 6

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S A

nnual Tons P

er Year, U

nmitigated

General heavy industry

0.040.16

0.520.00

0.010.01

53.06

TO

TA

LS (tons/year, unm

itigated)0.04

0.160.52

0.000.01

0.0153.06

Source

RO

GN

OX

CO

SO

2P

M10

PM

25C

O2

Operational U

nmitigated D

etail Report:

Architectural C

oatings

Consum

er Products

Hearth

Landscape

Natural G

as

TO

TA

LS (tons/year, unm

itigated)

Source

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

Annual T

ons Per Y

ear, Unm

itigated

Area S

ource Unm

itigated Detail R

eport:

Analysis Y

ear: 2009 Season: A

nnual

Em

fac: Version : E

mfac2007 V

2.3 Nov 1 2006

Does not include correction for passby trips

Does not include double counting adjustm

ent for internal trips

Operational S

ettings:

Area S

ource Changes to D

efaults

Page 43: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:19:

44 A

M

Pag

e: 7

Urb

an T

rip L

engt

h (m

iles)

10.8

7.3

7.5

9.5

7.4

7.4

Tra

vel C

ondi

tions

Hom

e-W

ork

Hom

e-S

hop

Hom

e-O

ther

Com

mut

eN

on-W

ork

Cus

tom

er

Res

iden

tial

Com

mer

cial

Hea

vy-H

eavy

Tru

ck 3

3,00

1-60

,000

lbs

5.0

0.0

0.0

100.

0

Med

-Hea

vy T

ruck

14,

001-

33,0

00 lb

s5.

00.

020

.080

.0

Mot

or H

ome

0.0

10.0

80.0

10.0

Oth

er B

us0.

00.

00.

010

0.0

Sch

ool B

us0.

00.

00.

010

0.0

Mot

orcy

cle

0.0

77.1

22.9

0.0

Urb

an B

us0.

00.

00.

010

0.0

Ligh

t Tru

ck <

375

0 lb

s30

.03.

790

.85.

5

Ligh

t Aut

o25

.02.

097

.60.

4

Lite

-Hea

vy T

ruck

10,

001-

14,0

00 lb

s5.

00.

050

.050

.0

Lite

-Hea

vy T

ruck

850

1-10

,000

lbs

5.0

0.0

75.0

25.0

Med

Tru

ck 5

751-

8500

lbs

10.0

1.1

98.9

0.0

Ligh

t Tru

ck 3

751-

5750

lbs

15.0

0.9

98.6

0.5

Veh

icle

Fle

et M

ix

Veh

icle

Typ

eP

erce

nt T

ype

Non

-Cat

alys

tC

atal

yst

Die

sel

Gen

eral

hea

vy in

dust

ry6.

75ac

res

2.53

17.0

823

7.21

17.0

823

7.21

Sum

mar

y of

Lan

d U

ses

Land

Use

Typ

eA

crea

geT

rip R

ate

Uni

t Typ

eN

o. U

nits

Tot

al T

rips

Tot

al V

MT

Page 44: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:19:44 AM

Page: 8

% of T

rips - Residential

32.918.0

49.1

General heavy industry

90.05.0

5.0

% of T

rips - Com

mercial (by land use)

Trip speeds (m

ph)35.0

35.035.0

35.035.0

35.0

Rural T

rip Length (miles)

16.87.1

7.914.7

6.66.6

Travel C

onditions

Hom

e-Work

Hom

e-Shop

Hom

e-Other

Com

mute

Non-W

orkC

ustomer

Residential

Com

mercial

The percentage of paved roads changed from

100% to 90%

The percentage of unpaved roads changed from

0% to 10%

The urban/rural selection has been changed from

Urban to R

ural Operational C

hanges to Defaults

Page 45: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:18:

35 A

M

Pag

e: 1

File

Nam

e: C

:\SD

GE

\urb

emis

_upd

ate\

7-09

-09

500

kV lo

op.u

rb92

4

Pro

ject

Nam

e: S

DG

E 5

00 k

V L

oop

Pro

ject

Loc

atio

n: C

alifo

rnia

Sta

te-w

ide

On-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Off-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

OF

FR

OA

D20

07

Com

bine

d S

umm

er E

mis

sion

s R

epor

ts (

Pou

nds/

Day

)

Urb

emis

200

7 V

ersi

on 9

.2.4

Page 46: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:18:35 AM

Page: 2

Construction U

nmitigated D

etail Report:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S S

umm

er Pounds P

er Day, U

nmitigated

RO

GN

Ox

CO

SO

2P

M10 D

ustPM10 Exhaust

PM

10P

M2.5 D

ustPM2.5 Exhaust

PM

2.5C

O2

TO

TA

LS (lbs/day, unm

itigated)0.23

0.812.83

0.000.04

0.03299.87

SU

M O

F A

RE

A S

OU

RC

E A

ND

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (lbs/day, unm

itigated)0.23

0.812.83

0.000.04

0.03299.87

OP

ER

AT

ION

AL (V

EH

ICLE

) EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (lbs/day, unm

itigated)

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

2012 TO

TA

LS (lbs/day unm

itigated)8.35

76.5533.49

0.010.06

2.702.76

0.022.48

2.5111,678.67

2012 TO

TA

LS (lbs/day m

itigated)8.35

76.5533.49

0.010.06

2.702.76

0.022.48

2.5111,678.67

2011 TO

TA

LS (lbs/day m

itigated)1.17

10.235.56

0.004.09

0.414.50

0.850.37

1.231,091.03

2011 TO

TA

LS (lbs/day unm

itigated)1.17

10.235.56

0.0010.00

0.4110.41

2.090.37

2.461,091.03

RO

GN

Ox

CO

SO

2P

M10 D

ustPM

10 Exhaust

PM

10P

M2.5 D

ustP

M2.5

Exhaust

PM

2.5C

O2

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S

Sum

mary R

eport:

Page 47: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:18:

35 A

M

Pag

e: 3

Max

imum

Dai

ly A

crea

ge D

istu

rbed

: 0.5

Fug

itive

Dus

t Lev

el o

f Det

ail:

Def

ault

Tot

al A

cres

Dis

turb

ed: 2

.53

Pha

se: M

ass

Gra

ding

6/1

/201

1 -

6/16

/201

1 -

Cle

ar a

nd g

rade

for

acce

ss r

oad

and

pads

20 lb

s pe

r ac

re-d

ay

1 O

ff H

ighw

ay T

ruck

s (4

79 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

2 ho

urs

per

day

On

Roa

d T

ruck

Tra

vel (

VM

T):

0

Off-

Roa

d E

quip

men

t:

Pha

se A

ssum

ptio

ns

Tim

e S

lice

5/1/

2012

-5/1

6/20

12

Act

ive

Day

s: 1

28.

3576

.55

33.4

90.

012.

762.

5111

,678

.67

0.06

2.70

0.02

2.48

2.76

Bui

ldin

g 05

/01/

2012

-05/

16/2

012

8.35

76.5

533

.49

0.01

2.51

11,6

78.6

70.

062.

700.

022.

48

Bui

ldin

g W

orke

r T

rips

0.17

0.34

6.26

0.01

0.04

0.02

0.05

0.01

0.02

0.03

724.

88

Bui

ldin

g V

endo

r T

rips

0.24

3.04

2.31

0.01

0.02

0.12

0.14

0.01

0.11

0.12

677.

02

Bui

ldin

g O

ff R

oad

Die

sel

7.94

73.1

824

.92

0.00

0.00

2.57

2.57

0.00

2.36

2.36

10,2

76.7

8

Tim

e S

lice

4/2/

2012

-4/3

0/20

12

Act

ive

Day

s: 2

12.

7922

.52

11.8

70.

001.

030.

943,

711.

430.

011.

020.

000.

94

1.03

Tre

nchi

ng 0

4/01

/201

2-04

/30/

2012

2.79

22.5

211

.87

0.00

0.94

3,71

1.43

0.01

1.02

0.00

0.94

Tre

nchi

ng W

orke

r T

rips

0.06

0.11

2.03

0.00

0.01

0.01

0.02

0.00

0.01

0.01

234.

91

Tre

nchi

ng O

ff R

oad

Die

sel

2.73

22.4

19.

840.

000.

001.

011.

010.

000.

930.

933,

476.

52

Tim

e S

lice

6/1/

2011

-6/1

6/20

11

Act

ive

Day

s: 1

21.

1710

.23

5.56

0.00

10.4

12.

461,

091.

0310

.00

0.41

2.09

0.37

10.4

1M

ass

Gra

ding

06/

01/2

011-

06/1

6/20

111.

1710

.23

5.56

0.00

2.46

1,09

1.03

10.0

00.

412.

090.

37

Mas

s G

radi

ng O

n R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng W

orke

r T

rips

0.02

0.04

0.73

0.00

0.00

0.00

0.01

0.00

0.00

0.00

78.2

7

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

10.0

00.

0010

.00

2.09

0.00

2.09

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

1.15

10.1

94.

830.

000.

000.

410.

410.

000.

370.

371,

012.

76

Page 48: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:18:36 AM

Page: 4

Construction M

itigated Detail R

eport:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S S

umm

er Pounds P

er Day, M

itigated

RO

GN

Ox

CO

SO

2P

M10 D

ustPM10 Exhaust

PM

10P

M2.5 D

ustPM2.5 Exhaust

PM

2.5C

O2

Tim

e Slice 6/1/2011-6/16/2011

Active D

ays: 121.17

10.235.56

0.004.50

1.231,091.03

4.090.41

0.850.37

4.50M

ass Grading 06/01/2011-

06/16/20111.17

10.235.56

0.001.23

1,091.034.09

0.410.85

0.37

Mass G

rading On R

oad Diesel

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Mass G

rading Worker T

rips0.02

0.040.73

0.000.00

0.000.01

0.000.00

0.0078.27

Mass G

rading Dust

0.000.00

0.000.00

4.080.00

4.080.85

0.000.85

0.00

Mass G

rading Off R

oad Diesel

1.1510.19

4.830.00

0.000.41

0.410.00

0.370.37

1,012.76

Off-R

oad Equipm

ent:

Phase: B

uilding Construction 5/1/2012 - 5/16/2012 - T

ower installation and conductor stringing

2 Cranes (399 hp) operating at a 0.43 load factor for 6 hours per day

4 Other E

quipment (190 hp) operating at a 0.62 load factor for 8 hours per day

4 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 8 hours per day

Phase: T

renching 4/1/2012 - 4/30/2012 - Install foundations

1 Rubber T

ired Dozers (357 hp) operating at a 0.59 load factor for 4 hours per day

Off-R

oad Equipm

ent:

2 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 6 hours per day

3 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 3 hours per day

1 Bore/D

rill Rigs (291 hp) operating at a 0.75 load factor for 6 hours per day

Page 49: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:18:

36 A

M

Pag

e: 5

Tim

e S

lice

5/1/

2012

-5/1

6/20

12

Act

ive

Day

s: 1

28.

3576

.55

33.4

90.

012.

762.

5111

,678

.67

0.06

2.70

0.02

2.48

2.76

Bui

ldin

g 05

/01/

2012

-05/

16/2

012

8.35

76.5

533

.49

0.01

2.51

11,6

78.6

70.

062.

700.

022.

48

Bui

ldin

g W

orke

r T

rips

0.17

0.34

6.26

0.01

0.04

0.02

0.05

0.01

0.02

0.03

724.

88

Bui

ldin

g V

endo

r T

rips

0.24

3.04

2.31

0.01

0.02

0.12

0.14

0.01

0.11

0.12

677.

02

Bui

ldin

g O

ff R

oad

Die

sel

7.94

73.1

824

.92

0.00

0.00

2.57

2.57

0.00

2.36

2.36

10,2

76.7

8

Tim

e S

lice

4/2/

2012

-4/3

0/20

12

Act

ive

Day

s: 2

12.

7922

.52

11.8

70.

001.

030.

943,

711.

430.

011.

020.

000.

94

1.03

Tre

nchi

ng 0

4/01

/201

2-04

/30/

2012

2.79

22.5

211

.87

0.00

0.94

3,71

1.43

0.01

1.02

0.00

0.94

Tre

nchi

ng W

orke

r T

rips

0.06

0.11

2.03

0.00

0.01

0.01

0.02

0.00

0.01

0.01

234.

91

Tre

nchi

ng O

ff R

oad

Die

sel

2.73

22.4

19.

840.

000.

001.

011.

010.

000.

930.

933,

476.

52

For

Unp

aved

Roa

ds M

easu

res,

the

Red

uce

spee

d on

unp

aved

roa

ds to

less

than

15

mph

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 4

4% P

M25

: 44%

For

Unp

aved

Roa

ds M

easu

res,

the

Man

age

haul

roa

d du

st 2

x da

ily w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 5

5% P

M25

: 55%

PM

10: 5

5% P

M25

: 55%

The

follo

win

g m

itiga

tion

mea

sure

s ap

ply

to P

hase

: Mas

s G

radi

ng 6

/1/2

011

- 6/

16/2

011

- C

lear

and

gra

de fo

r ac

cess

roa

d an

d pa

ds

For

Soi

l Sta

bliz

ing

Mea

sure

s, th

e W

ater

exp

osed

sur

face

s 2x

dai

ly w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

Con

stru

ctio

n R

elat

ed M

itiga

tion

Mea

sure

s

Page 50: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:18:36 AM

Page: 6

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S S

umm

er Pounds P

er Day, U

nmitigated

General heavy industry

0.230.81

2.830.00

0.040.03

299.87

TO

TA

LS (lbs/day, unm

itigated)0.23

0.812.83

0.000.04

0.03299.87

Source

RO

GN

OX

CO

SO

2P

M10

PM

25C

O2

Operational U

nmitigated D

etail Report:

Architectural C

oatings

Consum

er Products

Hearth

Landscape

Natural G

as

TO

TA

LS (lbs/day, unm

itigated)

Source

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

Sum

mer P

ounds Per D

ay, Unm

itigated

Area S

ource Unm

itigated Detail R

eport:

Analysis Y

ear: 2009 Tem

perature (F): 85 S

eason: Sum

mer

Em

fac: Version : E

mfac2007 V

2.3 Nov 1 2006

Does not include correction for passby trips

Does not include double counting adjustm

ent for internal trips

Operational S

ettings:

Area S

ource Changes to D

efaults

Page 51: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:18:

36 A

M

Pag

e: 7

Urb

an T

rip L

engt

h (m

iles)

10.8

7.3

7.5

9.5

7.4

7.4

Tra

vel C

ondi

tions

Hom

e-W

ork

Hom

e-S

hop

Hom

e-O

ther

Com

mut

eN

on-W

ork

Cus

tom

er

Res

iden

tial

Com

mer

cial

Hea

vy-H

eavy

Tru

ck 3

3,00

1-60

,000

lbs

5.0

0.0

0.0

100.

0

Med

-Hea

vy T

ruck

14,

001-

33,0

00 lb

s5.

00.

020

.080

.0

Mot

or H

ome

0.0

10.0

80.0

10.0

Oth

er B

us0.

00.

00.

010

0.0

Sch

ool B

us0.

00.

00.

010

0.0

Mot

orcy

cle

0.0

77.1

22.9

0.0

Urb

an B

us0.

00.

00.

010

0.0

Ligh

t Tru

ck <

375

0 lb

s30

.03.

790

.85.

5

Ligh

t Aut

o25

.02.

097

.60.

4

Lite

-Hea

vy T

ruck

10,

001-

14,0

00 lb

s5.

00.

050

.050

.0

Lite

-Hea

vy T

ruck

850

1-10

,000

lbs

5.0

0.0

75.0

25.0

Med

Tru

ck 5

751-

8500

lbs

10.0

1.1

98.9

0.0

Ligh

t Tru

ck 3

751-

5750

lbs

15.0

0.9

98.6

0.5

Veh

icle

Fle

et M

ix

Veh

icle

Typ

eP

erce

nt T

ype

Non

-Cat

alys

tC

atal

yst

Die

sel

Gen

eral

hea

vy in

dust

ry6.

75ac

res

2.53

17.0

823

7.21

17.0

823

7.21

Sum

mar

y of

Lan

d U

ses

Land

Use

Typ

eA

crea

geT

rip R

ate

Uni

t Typ

eN

o. U

nits

Tot

al T

rips

Tot

al V

MT

Page 52: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:18:36 AM

Page: 8

% of T

rips - Residential

32.918.0

49.1

General heavy industry

90.05.0

5.0

% of T

rips - Com

mercial (by land use)

Trip speeds (m

ph)35.0

35.035.0

35.035.0

35.0

Rural T

rip Length (miles)

16.87.1

7.914.7

6.66.6

Travel C

onditions

Hom

e-Work

Hom

e-Shop

Hom

e-Other

Com

mute

Non-W

orkC

ustomer

Residential

Com

mercial

The percentage of paved roads changed from

100% to 90%

The percentage of unpaved roads changed from

0% to 10%

The urban/rural selection has been changed from

Urban to R

ural Operational C

hanges to Defaults

Page 53: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:23:

37 A

M

Pag

e: 1

File

Nam

e: C

:\SD

GE

\urb

emis

_upd

ate\

7-09

-09

SD

GE

138

kV tr

ansm

it.ur

b924

Pro

ject

Nam

e: S

DG

E 1

38 k

V li

ne

Pro

ject

Loc

atio

n: C

alifo

rnia

Sta

te-w

ide

On-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Off-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

OF

FR

OA

D20

07

Com

bine

d A

nnua

l Em

issi

ons

Rep

orts

(T

ons/

Yea

r)

Urb

emis

200

7 V

ersi

on 9

.2.4

Page 54: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:23:37 AM

Page: 2

Construction U

nmitigated D

etail Report:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S A

nnual Tons P

er Year, U

nmitigated

RO

GN

Ox

CO

SO

2P

M10 D

ustPM10 Exhaust

PM

10P

M2.5 D

ustPM2.5 Exhaust

PM

2.5C

O2

TO

TA

LS (tons/year, unm

itigated)0.49

1.695.71

0.010.07

0.06549.05

SU

M O

F A

RE

A S

OU

RC

E A

ND

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (tons/year, unm

itigated)0.49

1.695.71

0.010.07

0.06549.05

OP

ER

AT

ION

AL (V

EH

ICLE

) EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (tons/year, unm

itigated)

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

2011 TO

TA

LS (tons/year m

itigated)1.71

15.4211.69

0.012.14

0.612.75

0.450.56

1.012,650.75

Percent R

eduction0.00

0.000.00

0.0058.57

0.0052.40

58.180.00

38.440.00

2011 TO

TA

LS (tons/year unm

itigated)1.71

15.4211.69

0.015.17

0.615.78

1.090.56

1.652,650.75

RO

GN

Ox

CO

SO

2P

M10 D

ustPM

10 Exhaust

PM

10P

M2.5 D

ustP

M2.5

Exhaust

PM

2.5C

O2

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S

Sum

mary R

eport:

Page 55: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:23:

38 A

M

Pag

e: 3

20 lb

s pe

r ac

re-d

ay

Fug

itive

Dus

t Lev

el o

f Det

ail:

Def

ault

On

Roa

d T

ruck

Tra

vel (

VM

T):

0

Pha

se: M

ass

Gra

ding

2/1

/201

1 -

4/30

/201

1 -

Cle

ar a

nd g

rade

for

pole

s an

d ac

cess

roa

d

Max

imum

Dai

ly A

crea

ge D

istu

rbed

: 8

Tot

al A

cres

Dis

turb

ed: 3

8.85

Pha

se A

ssum

ptio

ns

2011

1.71

15.4

211

.69

0.01

5.78

1.65

2,65

0.75

5.17

0.61

1.09

0.56

0.28

Bui

ldin

g 06

/01/

2011

-08/

31/2

011

0.72

6.42

5.32

0.01

0.24

1,15

0.74

0.03

0.26

0.01

0.23

Bui

ldin

g W

orke

r T

rips

0.08

0.13

2.39

0.00

0.01

0.01

0.02

0.00

0.01

0.01

239.

70

Bui

ldin

g V

endo

r T

rips

0.15

1.91

1.39

0.00

0.01

0.07

0.09

0.00

0.07

0.07

381.

87

Bui

ldin

g O

ff R

oad

Die

sel

0.49

4.37

1.54

0.00

0.00

0.18

0.18

0.00

0.16

0.16

529.

18

0.28

Bui

ldin

g 10

/01/

2011

-12/

31/2

011

0.71

6.32

5.23

0.01

0.24

1,13

3.31

0.03

0.25

0.01

0.23

Bui

ldin

g W

orke

r T

rips

0.08

0.13

2.35

0.00

0.01

0.01

0.02

0.00

0.01

0.01

236.

06

Bui

ldin

g V

endo

r T

rips

0.15

1.89

1.37

0.00

0.01

0.07

0.09

0.00

0.07

0.07

376.

09

Bui

ldin

g O

ff R

oad

Die

sel

0.49

4.31

1.51

0.00

0.00

0.17

0.17

0.00

0.16

0.16

521.

16

5.15

Mas

s G

radi

ng 0

2/01

/201

1-04

/30/

2011

0.08

0.67

0.37

0.00

1.10

68.4

45.

120.

031.

070.

03

Mas

s G

radi

ng O

n R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng W

orke

r T

rips

0.00

0.00

0.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.91

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

5.12

0.00

5.12

1.07

0.00

1.07

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

0.08

0.67

0.32

0.00

0.00

0.03

0.03

0.00

0.03

0.03

63.5

3

0.07

Tre

nchi

ng 0

3/01

/201

1-06

/30/

2011

0.21

2.02

0.77

0.00

0.06

298.

250.

000.

070.

000.

06

Tre

nchi

ng W

orke

r T

rips

0.00

0.01

0.11

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.2

4

Tre

nchi

ng O

ff R

oad

Die

sel

0.21

2.01

0.66

0.00

0.00

0.07

0.07

0.00

0.06

0.06

287.

01

Page 56: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:23:38 AM

Page: 4

3 Other G

eneral Industrial Equipm

ent (238 hp) operating at a 0.51 load factor for 4 hours per day

15 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 4.4 hours per day

1 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 5 hours per day

3 Aerial Lifts (60 hp) operating at a 0.46 load factor for 5 hours per day

Off-R

oad Equipm

ent:

3 Cranes (399 hp) operating at a 0.43 load factor for 4.7 hours per day

4 Air C

ompressors (106 hp) operating at a 0.48 load factor for 4 hours per day

15 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 4.4 hours per day

3 Cranes (399 hp) operating at a 0.43 load factor for 4.7 hours per day

Off-R

oad Equipm

ent:

Phase: B

uilding Construction 10/1/2011 - 12/31/2011 - C

onductor stringing and sagging

4 Air C

ompressors (106 hp) operating at a 0.48 load factor for 4 hours per day

3 Aerial Lifts (60 hp) operating at a 0.46 load factor for 5 hours per day

1 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 5 hours per day

1 Rubber T

ired Dozers (357 hp) operating at a 0.59 load factor for 5 hours per day

1 Water T

rucks (189 hp) operating at a 0.5 load factor for 5 hours per day

1 Graders (174 hp) operating at a 0.61 load factor for 5 hours per day

Off-R

oad Equipm

ent:

1 Plate C

ompactors (8 hp) operating at a 0.43 load factor for 5 hours per day

1 Other M

aterial Handling E

quipment (191 hp) operating at a 0.59 load factor for 3 hours per day

2 Other G

eneral Industrial Equipm

ent (238 hp) operating at a 0.51 load factor for 4 hours per day

2 Other E

quipment (190 hp) operating at a 0.62 load factor for 4 hours per day

Phase: B

uilding Construction 6/1/2011 - 8/31/2011 - P

ole installation

Off-R

oad Equipm

ent:

Phase: T

renching 3/1/2011 - 6/30/2011 - Pole foundation installation

4 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 4 hours per day

2 Bore/D

rill Rigs (291 hp) operating at a 0.75 load factor for 5 hours per day

Page 57: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:23:

38 A

M

Pag

e: 5

Con

stru

ctio

n M

itiga

ted

Det

ail R

epor

t:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S A

nnua

l Ton

s P

er Y

ear,

Miti

gate

d

RO

GN

Ox

CO

SO

2P

M10

Dus

tPM

10 E

xhau

stP

M10

PM

2.5

Dus

tPM

2.5 E

xhau

stP

M2.

5C

O2

2011

1.71

15.4

211

.69

0.01

2.75

1.01

2,65

0.75

2.14

0.61

0.45

0.56

0.28

Bui

ldin

g 06

/01/

2011

-08/

31/2

011

0.72

6.42

5.32

0.01

0.24

1,15

0.74

0.03

0.26

0.01

0.23

Bui

ldin

g W

orke

r T

rips

0.08

0.13

2.39

0.00

0.01

0.01

0.02

0.00

0.01

0.01

239.

70

Bui

ldin

g V

endo

r T

rips

0.15

1.91

1.39

0.00

0.01

0.07

0.09

0.00

0.07

0.07

381.

87

Bui

ldin

g O

ff R

oad

Die

sel

0.49

4.37

1.54

0.00

0.00

0.18

0.18

0.00

0.16

0.16

529.

18

0.28

Bui

ldin

g 10

/01/

2011

-12/

31/2

011

0.71

6.32

5.23

0.01

0.24

1,13

3.31

0.03

0.25

0.01

0.23

Bui

ldin

g W

orke

r T

rips

0.08

0.13

2.35

0.00

0.01

0.01

0.02

0.00

0.01

0.01

236.

06

Bui

ldin

g V

endo

r T

rips

0.15

1.89

1.37

0.00

0.01

0.07

0.09

0.00

0.07

0.07

376.

09

Bui

ldin

g O

ff R

oad

Die

sel

0.49

4.31

1.51

0.00

0.00

0.17

0.17

0.00

0.16

0.16

521.

16

2.12

Mas

s G

radi

ng 0

2/01

/201

1-04

/30/

2011

0.08

0.67

0.37

0.00

0.47

68.4

42.

090.

030.

440.

03

Mas

s G

radi

ng O

n R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng W

orke

r T

rips

0.00

0.00

0.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.91

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

2.09

0.00

2.09

0.44

0.00

0.44

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

0.08

0.67

0.32

0.00

0.00

0.03

0.03

0.00

0.03

0.03

63.5

3

0.07

Tre

nchi

ng 0

3/01

/201

1-06

/30/

2011

0.21

2.02

0.77

0.00

0.06

298.

250.

000.

070.

000.

06

Tre

nchi

ng W

orke

r T

rips

0.00

0.01

0.11

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.2

4

Tre

nchi

ng O

ff R

oad

Die

sel

0.21

2.01

0.66

0.00

0.00

0.07

0.07

0.00

0.06

0.06

287.

01

1 T

ract

ors/

Load

ers/

Bac

khoe

s (1

08 h

p) o

pera

ting

at a

0.5

5 lo

ad fa

ctor

for

5 ho

urs

per

day

3 O

ther

Gen

eral

Indu

stria

l Equ

ipm

ent (

238

hp)

oper

atin

g at

a 0

.51

load

fact

or fo

r 4

hour

s pe

r da

y

Page 58: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:23:38 AM

Page: 6

For U

npaved Roads M

easures, the Reduce speed on unpaved roads to less than 15 m

ph mitigation reduces em

issions by:

PM

10: 44% P

M25: 44%

For U

npaved Roads M

easures, the Manage haul road dust 2x daily w

atering mitigation reduces em

issions by:

PM

10: 55% P

M25: 55%

PM

10: 55% P

M25: 55%

The follow

ing mitigation m

easures apply to Phase: M

ass Grading 2/1/2011 - 4/30/2011 - C

lear and grade for poles and access road

For S

oil Stablizing M

easures, the Water exposed surfaces 2x daily w

atering mitigation reduces em

issions by:

Construction R

elated Mitigation M

easures

Architectural C

oatings

Consum

er Products

Hearth

Landscape

Natural G

as

TO

TA

LS (tons/year, unm

itigated)

Source

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

Annual T

ons Per Y

ear, Unm

itigated

Area S

ource Unm

itigated Detail R

eport:

Area S

ource Changes to D

efaults

Page 59: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:23:

38 A

M

Pag

e: 7

OP

ER

AT

ION

AL

EM

ISS

ION

ES

TIM

AT

ES

Ann

ual T

ons

Per

Yea

r, U

nmiti

gate

d

Gen

eral

hea

vy in

dust

ry0.

491.

695.

710.

010.

070.

0654

9.05

TO

TA

LS (

tons

/yea

r, u

nmiti

gate

d)0.

491.

695.

710.

010.

070.

0654

9.05

Sou

rce

RO

GN

OX

CO

SO

2P

M10

PM

25C

O2

Ope

ratio

nal U

nmiti

gate

d D

etai

l Rep

ort:

Ligh

t Tru

ck <

375

0 lb

s30

.03.

790

.85.

5

Ligh

t Aut

o25

.02.

097

.60.

4

Lite

-Hea

vy T

ruck

10,

001-

14,0

00 lb

s5.

00.

050

.050

.0

Lite

-Hea

vy T

ruck

850

1-10

,000

lbs

5.0

0.0

75.0

25.0

Med

Tru

ck 5

751-

8500

lbs

10.0

1.1

98.9

0.0

Ligh

t Tru

ck 3

751-

5750

lbs

15.0

0.9

98.6

0.5

Veh

icle

Fle

et M

ix

Veh

icle

Typ

eP

erce

nt T

ype

Non

-Cat

alys

tC

atal

yst

Die

sel

Gen

eral

hea

vy in

dust

ry6.

75ac

res

38.8

526

2.24

2,43

4.88

262.

242,

434.

88

Sum

mar

y of

Lan

d U

ses

Land

Use

Typ

eA

crea

geT

rip R

ate

Uni

t Typ

eN

o. U

nits

Tot

al T

rips

Tot

al V

MT

Ana

lysi

s Y

ear:

200

9 S

easo

n: A

nnua

l

Em

fac:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Doe

s no

t inc

lude

cor

rect

ion

for

pass

by tr

ips

Doe

s no

t inc

lude

dou

ble

coun

ting

adju

stm

ent f

or in

tern

al tr

ips

Ope

ratio

nal S

ettin

gs:

Page 60: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:23:38 AM

Page: 8

% of T

rips - Residential

32.918.0

49.1

Trip speeds (m

ph)35.0

35.035.0

35.035.0

35.0

% of T

rips - Com

mercial (by land use)

General heavy industry

90.05.0

5.0

Rural T

rip Length (miles)

16.87.1

7.914.7

6.66.6

Urban T

rip Length (miles)

10.87.3

7.59.5

7.47.4

Travel C

onditions

Hom

e-Work

Hom

e-Shop

Hom

e-Other

Com

mute

Non-W

orkC

ustomer

Residential

Com

mercial

Urban B

us0.0

0.00.0

100.0

Motor H

ome

0.010.0

80.010.0

School B

us0.0

0.00.0

100.0

Motorcycle

0.077.1

22.90.0

Other B

us0.0

0.00.0

100.0

Med-H

eavy Truck 14,001-33,000 lbs

5.00.0

20.080.0

Heavy-H

eavy Truck 33,001-60,000 lbs

5.00.0

0.0100.0

Vehicle F

leet Mix

Vehicle T

ypeP

ercent Type

Non-C

atalystC

atalystD

iesel

Operational C

hanges to Defaults

Page 61: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:21:

34 A

M

Pag

e: 1

File

Nam

e: C

:\SD

GE

\urb

emis

_upd

ate\

7-09

-09

SD

GE

138

kV tr

ansm

it.ur

b924

Pro

ject

Nam

e: S

DG

E 1

38 k

V li

ne

Pro

ject

Loc

atio

n: C

alifo

rnia

Sta

te-w

ide

On-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Off-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

OF

FR

OA

D20

07

Com

bine

d S

umm

er E

mis

sion

s R

epor

ts (

Pou

nds/

Day

)

Urb

emis

200

7 V

ersi

on 9

.2.4

TO

TA

LS (

lbs/

day,

unm

itiga

ted)

2.67

8.40

30.8

80.

030.

410.

313,

102.

31

SU

M O

F A

RE

A S

OU

RC

E A

ND

OP

ER

AT

ION

AL

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5

CO

2

TO

TA

LS (

lbs/

day,

unm

itiga

ted)

2.67

8.40

30.8

80.

030.

410.

313,

102.

31

OP

ER

AT

ION

AL

(VE

HIC

LE)

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5

CO

2

TO

TA

LS (

lbs/

day,

unm

itiga

ted)

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5

CO

2

2011

TO

TA

LS (

lbs/

day

miti

gate

d)26

.48

240.

2417

8.55

0.18

65.3

79.

3367

.96

13.6

58.

5516

.03

41,6

49.5

8

2011

TO

TA

LS (

lbs/

day

unm

itiga

ted)

26.4

824

0.24

178.

550.

1816

0.02

9.33

162.

6133

.42

8.55

35.8

041

,649

.58

RO

GN

Ox

CO

SO

2P

M10

Dus

tPM

10 E

xhau

stP

M10

PM

2.5

Dus

tP

M2.

5 E

xhau

stP

M2.

5C

O2

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S

Sum

mar

y R

epor

t:

Page 62: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:21:34 AM

Page: 2

Construction U

nmitigated D

etail Report:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S S

umm

er Pounds P

er Day, U

nmitigated

RO

GN

Ox

CO

SO

2P

M10 D

ustPM10 Exhaust

PM

10P

M2.5 D

ustPM2.5 Exhaust

PM

2.5C

O2

Tim

e Slice 2/1/2011-2/28/2011

Active D

ays: 202.50

20.8811.66

0.00161.01

34.342,138.64

160.011.00

33.420.92

161.01M

ass Grading 02/01/2011-

04/30/20112.50

20.8811.66

0.0034.34

2,138.64160.01

1.0033.42

0.92

Mass G

rading On R

oad Diesel

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Mass G

rading Worker T

rips0.05

0.081.53

0.000.01

0.000.01

0.000.00

0.01153.29

Mass G

rading Dust

0.000.00

0.000.00

160.000.00

160.0033.41

0.0033.41

0.00

Mass G

rading Off R

oad Diesel

2.4520.80

10.130.00

0.000.99

0.990.00

0.920.92

1,985.35

Tim

e Slice 3/1/2011-4/29/2011

Active D

ays: 447.24

66.7129.15

0.00162.61

35.808,917.16

160.022.59

33.422.38

1.60T

renching 03/01/2011-06/30/20114.74

45.8317.49

0.001.47

6,778.520.01

1.590.00

1.46

Trenching W

orker Trips

0.080.14

2.550.00

0.010.01

0.020.00

0.010.01

255.48

Trenching O

ff Road D

iesel4.66

45.6914.94

0.000.00

1.581.58

0.001.46

1.466,523.04

161.01M

ass Grading 02/01/2011-

04/30/20112.50

20.8811.66

0.0034.34

2,138.64160.01

1.0033.42

0.92

Mass G

rading On R

oad Diesel

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Mass G

rading Worker T

rips0.05

0.081.53

0.000.01

0.000.01

0.000.00

0.01153.29

Mass G

rading Dust

0.000.00

0.000.00

160.000.00

160.0033.41

0.0033.41

0.00

Mass G

rading Off R

oad Diesel

2.4520.80

10.130.00

0.000.99

0.990.00

0.920.92

1,985.35

Tim

e Slice 5/2/2011-5/31/2011

Active D

ays: 224.74

45.8317.49

0.001.60

1.476,778.52

0.011.59

0.001.46

1.60T

renching 03/01/2011-06/30/20114.74

45.8317.49

0.001.47

6,778.520.01

1.590.00

1.46

Trenching W

orker Trips

0.080.14

2.550.00

0.010.01

0.020.00

0.010.01

255.48

Trenching O

ff Road D

iesel4.66

45.6914.94

0.000.00

1.581.58

0.001.46

1.466,523.04

Page 63: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:21:

35 A

M

Pag

e: 3

Fug

itive

Dus

t Lev

el o

f Det

ail:

Def

ault

Pha

se: M

ass

Gra

ding

2/1

/201

1 -

4/30

/201

1 -

Cle

ar a

nd g

rade

for

pole

s an

d ac

cess

roa

d

Max

imum

Dai

ly A

crea

ge D

istu

rbed

: 8

Tot

al A

cres

Dis

turb

ed: 3

8.85

Pha

se A

ssum

ptio

ns

Tim

e S

lice

10/3

/201

1-12

/30/

2011

A

ctiv

e D

ays:

65

21.7

419

4.41

161.

070.

188.

527.

3634

,871

.06

0.78

7.74

0.27

7.09

8.52

Bui

ldin

g 10

/01/

2011

-12/

31/2

011

21.7

419

4.41

161.

070.

187.

3634

,871

.06

0.78

7.74

0.27

7.09

Bui

ldin

g W

orke

r T

rips

2.31

3.92

72.4

60.

070.

360.

190.

550.

130.

160.

297,

263.

50

Bui

ldin

g V

endo

r T

rips

4.47

58.0

342

.09

0.11

0.42

2.24

2.66

0.14

2.05

2.19

11,5

71.9

3

Bui

ldin

g O

ff R

oad

Die

sel

14.9

513

2.46

46.5

20.

000.

005.

315.

310.

004.

894.

8916

,035

.63

Tim

e S

lice

7/1/

2011

-8/3

1/20

11

Act

ive

Day

s: 4

421

.74

194.

4116

1.07

0.18

8.52

7.36

34,8

71.0

60.

787.

740.

277.

09

8.52

Bui

ldin

g 06

/01/

2011

-08/

31/2

011

21.7

419

4.41

161.

070.

187.

3634

,871

.06

0.78

7.74

0.27

7.09

Bui

ldin

g W

orke

r T

rips

2.31

3.92

72.4

60.

070.

360.

190.

550.

130.

160.

297,

263.

50

Bui

ldin

g V

endo

r T

rips

4.47

58.0

342

.09

0.11

0.42

2.24

2.66

0.14

2.05

2.19

11,5

71.9

3

Bui

ldin

g O

ff R

oad

Die

sel

14.9

513

2.46

46.5

20.

000.

005.

315.

310.

004.

894.

8916

,035

.63

Tim

e S

lice

6/1/

2011

-6/3

0/20

11

Act

ive

Day

s: 2

226

.48

240.

2417

8.55

0.18

10.1

28.

8341

,649

.58

0.79

9.33

0.27

8.55

1.60

Tre

nchi

ng 0

3/01

/201

1-06

/30/

2011

4.74

45.8

317

.49

0.00

1.47

6,77

8.52

0.01

1.59

0.00

1.46

Tre

nchi

ng W

orke

r T

rips

0.08

0.14

2.55

0.00

0.01

0.01

0.02

0.00

0.01

0.01

255.

48

Tre

nchi

ng O

ff R

oad

Die

sel

4.66

45.6

914

.94

0.00

0.00

1.58

1.58

0.00

1.46

1.46

6,52

3.04

8.52

Bui

ldin

g 06

/01/

2011

-08/

31/2

011

21.7

419

4.41

161.

070.

187.

3634

,871

.06

0.78

7.74

0.27

7.09

Bui

ldin

g W

orke

r T

rips

2.31

3.92

72.4

60.

070.

360.

190.

550.

130.

160.

297,

263.

50

Bui

ldin

g V

endo

r T

rips

4.47

58.0

342

.09

0.11

0.42

2.24

2.66

0.14

2.05

2.19

11,5

71.9

3

Bui

ldin

g O

ff R

oad

Die

sel

14.9

513

2.46

46.5

20.

000.

005.

315.

310.

004.

894.

8916

,035

.63

Page 64: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:21:35 AM

Page: 4

3 Cranes (399 hp) operating at a 0.43 load factor for 4.7 hours per day

4 Air C

ompressors (106 hp) operating at a 0.48 load factor for 4 hours per day

3 Other G

eneral Industrial Equipm

ent (238 hp) operating at a 0.51 load factor for 4 hours per day

15 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 4.4 hours per day

Phase: B

uilding Construction 6/1/2011 - 8/31/2011 - P

ole installation

3 Aerial Lifts (60 hp) operating at a 0.46 load factor for 5 hours per day

Off-R

oad Equipm

ent:

4 Air C

ompressors (106 hp) operating at a 0.48 load factor for 4 hours per day

3 Aerial Lifts (60 hp) operating at a 0.46 load factor for 5 hours per day

1 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 5 hours per day

Off-R

oad Equipm

ent:

Phase: B

uilding Construction 10/1/2011 - 12/31/2011 - C

onductor stringing and sagging

1 Plate C

ompactors (8 hp) operating at a 0.43 load factor for 5 hours per day

1 Other M

aterial Handling E

quipment (191 hp) operating at a 0.59 load factor for 3 hours per day

1 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 5 hours per day

1 Rubber T

ired Dozers (357 hp) operating at a 0.59 load factor for 5 hours per day

On R

oad Truck T

ravel (VM

T): 0

20 lbs per acre-day

1 Graders (174 hp) operating at a 0.61 load factor for 5 hours per day

Off-R

oad Equipm

ent:

4 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 4 hours per day

2 Bore/D

rill Rigs (291 hp) operating at a 0.75 load factor for 5 hours per day

2 Other G

eneral Industrial Equipm

ent (238 hp) operating at a 0.51 load factor for 4 hours per day

2 Other E

quipment (190 hp) operating at a 0.62 load factor for 4 hours per day

1 Water T

rucks (189 hp) operating at a 0.5 load factor for 5 hours per day

Off-R

oad Equipm

ent:

Phase: T

renching 3/1/2011 - 6/30/2011 - Pole foundation installation

Page 65: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:21:

35 A

M

Pag

e: 5

Con

stru

ctio

n M

itiga

ted

Det

ail R

epor

t:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S S

umm

er P

ound

s P

er D

ay, M

itiga

ted

RO

GN

Ox

CO

SO

2P

M10

Dus

tPM

10 E

xhau

stP

M10

PM

2.5

Dus

tPM

2.5 E

xhau

stP

M2.

5C

O2

Tim

e S

lice

2/1/

2011

-2/2

8/20

11

Act

ive

Day

s: 2

02.

5020

.88

11.6

60.

0066

.35

14.5

72,

138.

6465

.35

1.00

13.6

50.

92

66.3

5M

ass

Gra

ding

02/

01/2

011-

04/3

0/20

112.

5020

.88

11.6

60.

0014

.57

2,13

8.64

65.3

51.

0013

.65

0.92

Mas

s G

radi

ng O

n R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng W

orke

r T

rips

0.05

0.08

1.53

0.00

0.01

0.00

0.01

0.00

0.00

0.01

153.

29

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

65.3

50.

0065

.35

13.6

50.

0013

.65

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

2.45

20.8

010

.13

0.00

0.00

0.99

0.99

0.00

0.92

0.92

1,98

5.35

Tim

e S

lice

3/1/

2011

-4/2

9/20

11

Act

ive

Day

s: 4

47.

2466

.71

29.1

50.

0067

.96

16.0

38,

917.

1665

.37

2.59

13.6

52.

38

1.60

Tre

nchi

ng 0

3/01

/201

1-06

/30/

2011

4.74

45.8

317

.49

0.00

1.47

6,77

8.52

0.01

1.59

0.00

1.46

Tre

nchi

ng W

orke

r T

rips

0.08

0.14

2.55

0.00

0.01

0.01

0.02

0.00

0.01

0.01

255.

48

Tre

nchi

ng O

ff R

oad

Die

sel

4.66

45.6

914

.94

0.00

0.00

1.58

1.58

0.00

1.46

1.46

6,52

3.04

66.3

5M

ass

Gra

ding

02/

01/2

011-

04/3

0/20

112.

5020

.88

11.6

60.

0014

.57

2,13

8.64

65.3

51.

0013

.65

0.92

Mas

s G

radi

ng O

n R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng W

orke

r T

rips

0.05

0.08

1.53

0.00

0.01

0.00

0.01

0.00

0.00

0.01

153.

29

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

65.3

50.

0065

.35

13.6

50.

0013

.65

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

2.45

20.8

010

.13

0.00

0.00

0.99

0.99

0.00

0.92

0.92

1,98

5.35

1 T

ract

ors/

Load

ers/

Bac

khoe

s (1

08 h

p) o

pera

ting

at a

0.5

5 lo

ad fa

ctor

for

5 ho

urs

per

day

3 O

ther

Gen

eral

Indu

stria

l Equ

ipm

ent (

238

hp)

oper

atin

g at

a 0

.51

load

fact

or fo

r 4

hour

s pe

r da

y

3 C

rane

s (3

99 h

p) o

pera

ting

at a

0.4

3 lo

ad fa

ctor

for

4.7

hour

s pe

r da

y

15 O

ff H

ighw

ay T

ruck

s (4

79 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

4.4

hour

s pe

r da

y

Page 66: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:21:35 AM

Page: 6

Tim

e Slice 7/1/2011-8/31/2011

Active D

ays: 4421.74

194.41161.07

0.188.52

7.3634,871.06

0.787.74

0.277.09

8.52B

uilding 06/01/2011-08/31/201121.74

194.41161.07

0.187.36

34,871.060.78

7.740.27

7.09

Building W

orker Trips

2.313.92

72.460.07

0.360.19

0.550.13

0.160.29

7,263.50

Building V

endor Trips

4.4758.03

42.090.11

0.422.24

2.660.14

2.052.19

11,571.93

Building O

ff Road D

iesel14.95

132.4646.52

0.000.00

5.315.31

0.004.89

4.8916,035.63

Tim

e Slice 10/3/2011-12/30/2011

Active D

ays: 6521.74

194.41161.07

0.188.52

7.3634,871.06

0.787.74

0.277.09

8.52B

uilding 10/01/2011-12/31/201121.74

194.41161.07

0.187.36

34,871.060.78

7.740.27

7.09

Building W

orker Trips

2.313.92

72.460.07

0.360.19

0.550.13

0.160.29

7,263.50

Building V

endor Trips

4.4758.03

42.090.11

0.422.24

2.660.14

2.052.19

11,571.93

Building O

ff Road D

iesel14.95

132.4646.52

0.000.00

5.315.31

0.004.89

4.8916,035.63

Tim

e Slice 5/2/2011-5/31/2011

Active D

ays: 224.74

45.8317.49

0.001.60

1.476,778.52

0.011.59

0.001.46

1.60T

renching 03/01/2011-06/30/20114.74

45.8317.49

0.001.47

6,778.520.01

1.590.00

1.46

Trenching W

orker Trips

0.080.14

2.550.00

0.010.01

0.020.00

0.010.01

255.48

Trenching O

ff Road D

iesel4.66

45.6914.94

0.000.00

1.581.58

0.001.46

1.466,523.04

Tim

e Slice 6/1/2011-6/30/2011

Active D

ays: 2226.48

240.24178.55

0.1810.12

8.8341,649.58

0.799.33

0.278.55

1.60T

renching 03/01/2011-06/30/20114.74

45.8317.49

0.001.47

6,778.520.01

1.590.00

1.46

Trenching W

orker Trips

0.080.14

2.550.00

0.010.01

0.020.00

0.010.01

255.48

Trenching O

ff Road D

iesel4.66

45.6914.94

0.000.00

1.581.58

0.001.46

1.466,523.04

8.52B

uilding 06/01/2011-08/31/201121.74

194.41161.07

0.187.36

34,871.060.78

7.740.27

7.09

Building W

orker Trips

2.313.92

72.460.07

0.360.19

0.550.13

0.160.29

7,263.50

Building V

endor Trips

4.4758.03

42.090.11

0.422.24

2.660.14

2.052.19

11,571.93

Building O

ff Road D

iesel14.95

132.4646.52

0.000.00

5.315.31

0.004.89

4.8916,035.63

Page 67: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:21:

35 A

M

Pag

e: 7

For

Unp

aved

Roa

ds M

easu

res,

the

Red

uce

spee

d on

unp

aved

roa

ds to

less

than

15

mph

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 4

4% P

M25

: 44%

For

Unp

aved

Roa

ds M

easu

res,

the

Man

age

haul

roa

d du

st 2

x da

ily w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 5

5% P

M25

: 55%

PM

10: 5

5% P

M25

: 55%

The

follo

win

g m

itiga

tion

mea

sure

s ap

ply

to P

hase

: Mas

s G

radi

ng 2

/1/2

011

- 4/

30/2

011

- C

lear

and

gra

de fo

r po

les

and

acce

ss r

oad

For

Soi

l Sta

bliz

ing

Mea

sure

s, th

e W

ater

exp

osed

sur

face

s 2x

dai

ly w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

Con

stru

ctio

n R

elat

ed M

itiga

tion

Mea

sure

s

Arc

hite

ctur

al C

oatin

gs

Con

sum

er P

rodu

cts

Hea

rth

Land

scap

e

Nat

ural

Gas

TO

TA

LS (

lbs/

day,

unm

itiga

ted)

Sou

rce

RO

GN

Ox

CO

SO

2P

M10

PM

2.5

CO

2

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

Sum

mer

Pou

nds

Per

Day

, Unm

itiga

ted

Are

a S

ourc

e U

nmiti

gate

d D

etai

l Rep

ort:

Are

a S

ourc

e C

hang

es to

Def

aults

Page 68: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:21:35 AM

Page: 8

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S S

umm

er Pounds P

er Day, U

nmitigated

General heavy industry

2.678.40

30.880.03

0.410.31

3,102.31

TO

TA

LS (lbs/day, unm

itigated)2.67

8.4030.88

0.030.41

0.313,102.31

Source

RO

GN

OX

CO

SO

2P

M10

PM

25C

O2

Operational U

nmitigated D

etail Report:

Light Truck <

3750 lbs30.0

3.790.8

5.5

Light Auto

25.02.0

97.60.4

Lite-Heavy T

ruck 10,001-14,000 lbs5.0

0.050.0

50.0

Lite-Heavy T

ruck 8501-10,000 lbs5.0

0.075.0

25.0

Med T

ruck 5751-8500 lbs10.0

1.198.9

0.0

Light Truck 3751-5750 lbs

15.00.9

98.60.5

Vehicle F

leet Mix

Vehicle T

ypeP

ercent Type

Non-C

atalystC

atalystD

iesel

General heavy industry

6.75acres

38.85262.24

2,434.88

262.242,434.88

Sum

mary of Land U

ses

Land Use T

ypeA

creageT

rip Rate

Unit T

ypeN

o. Units

Total T

ripsT

otal VM

T

Analysis Y

ear: 2009 Tem

perature (F): 85 S

eason: Sum

mer

Em

fac: Version : E

mfac2007 V

2.3 Nov 1 2006

Does not include correction for passby trips

Does not include double counting adjustm

ent for internal trips

Operational S

ettings:

Page 69: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:21:

35 A

M

Pag

e: 9

% o

f Trip

s -

Res

iden

tial

32.9

18.0

49.1

Trip

spe

eds

(mph

)35

.035

.035

.035

.035

.035

.0

% o

f Trip

s -

Com

mer

cial

(by

land

use

)

Gen

eral

hea

vy in

dust

ry90

.05.

05.

0

Rur

al T

rip L

engt

h (m

iles)

16.8

7.1

7.9

14.7

6.6

6.6

Urb

an T

rip L

engt

h (m

iles)

10.8

7.3

7.5

9.5

7.4

7.4

Tra

vel C

ondi

tions

Hom

e-W

ork

Hom

e-S

hop

Hom

e-O

ther

Com

mut

eN

on-W

ork

Cus

tom

er

Res

iden

tial

Com

mer

cial

Urb

an B

us0.

00.

00.

010

0.0

Mot

or H

ome

0.0

10.0

80.0

10.0

Sch

ool B

us0.

00.

00.

010

0.0

Mot

orcy

cle

0.0

77.1

22.9

0.0

Oth

er B

us0.

00.

00.

010

0.0

Med

-Hea

vy T

ruck

14,

001-

33,0

00 lb

s5.

00.

020

.080

.0

Hea

vy-H

eavy

Tru

ck 3

3,00

1-60

,000

lbs

5.0

0.0

0.0

100.

0

Veh

icle

Fle

et M

ix

Veh

icle

Typ

eP

erce

nt T

ype

Non

-Cat

alys

tC

atal

yst

Die

sel

Ope

ratio

nal C

hang

es to

Def

aults

Page 70: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

 

Page 71: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28

/200

9 5:

12:3

2 P

M

Pag

e: 1

File

Nam

e: B

:\Pro

ject

\SD

GE

\urb

emis

_upd

ate\

7-09

-09

SD

GE

Bou

leva

rd s

ub.u

rb92

4

Pro

ject

Nam

e: S

DG

E B

oule

vard

Sub

stat

ion

Pro

ject

Loc

atio

n: C

alifo

rnia

Sta

te-w

ide

On-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Off-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

OF

FR

OA

D20

07

Com

bine

d A

nnua

l Em

issi

ons

Rep

orts

(T

ons/

Yea

r)

Urb

emis

200

7 V

ersi

on 9

.2.4

Page 72: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28/2009 5:12:32 PM

Page: 2

Construction U

nmitigated D

etail Report:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S A

nnual Tons P

er Year, U

nmitigated

TO

TA

LS (tons/year, unm

itigated)0.05

0.160.55

0.000.01

0.0152.99

SU

M O

F A

RE

A S

OU

RC

E A

ND

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (tons/year, unm

itigated)0.05

0.160.55

0.000.01

0.0152.99

OP

ER

AT

ION

AL (V

EH

ICLE

) EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (tons/year, unm

itigated)

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

2012 TO

TA

LS (tons/year unm

itigated)0.10

0.790.56

0.000.00

0.040.04

0.000.04

0.04124.99

2012 TO

TA

LS (tons/year m

itigated)0.10

0.790.56

0.000.00

0.040.04

0.000.04

0.04124.99

Percent R

eduction0.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

Percent R

eduction0.00

0.000.00

0.0059.63

0.0053.45

59.480.00

39.460.00

2011 TO

TA

LS (tons/year unm

itigated)0.83

7.103.61

0.002.94

0.343.27

0.610.31

0.93915.80

2011 TO

TA

LS (tons/year m

itigated)0.83

7.103.61

0.001.19

0.341.52

0.250.31

0.56915.80

RO

GN

Ox

CO

SO

2P

M10 D

ustPM

10 Exhaust

PM

10P

M2.5 D

ustP

M2.5

Exhaust

PM

2.5C

O2

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S

Sum

mary R

eport:

Page 73: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28

/200

9 5:

12:3

2 P

M

Pag

e: 3

RO

GN

Ox

CO

SO

2P

M10

Dus

tPM

10 E

xhau

stP

M10

PM

2.5

Dus

tPM

2.5 E

xhau

stP

M2.

5C

O2

2011

0.83

7.10

3.61

0.00

3.27

0.93

915.

802.

940.

340.

610.

31

0.08

Tre

nchi

ng 0

6/01

/201

1-08

/31/

2011

0.18

1.48

0.75

0.00

0.07

186.

000.

000.

080.

000.

07

Tre

nchi

ng W

orke

r T

rips

0.00

0.01

0.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12.6

5

Tre

nchi

ng O

ff R

oad

Die

sel

0.18

1.47

0.62

0.00

0.00

0.08

0.08

0.00

0.07

0.07

173.

35

1.53

Fin

e G

radi

ng 0

4/01

/201

1-05

/31/

2011

0.15

1.28

0.61

0.00

0.36

161.

531.

460.

060.

310.

06

Fin

e G

radi

ng O

n R

oad

Die

sel

0.02

0.31

0.11

0.00

0.00

0.01

0.01

0.00

0.01

0.01

48.3

1

Fin

e G

radi

ng W

orke

r T

rips

0.00

0.00

0.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.69

Fin

e G

radi

ng D

ust

0.00

0.00

0.00

0.00

1.46

0.00

1.46

0.31

0.00

0.31

0.00

Fin

e G

radi

ng O

ff R

oad

Die

sel

0.12

0.96

0.43

0.00

0.00

0.05

0.05

0.00

0.05

0.05

105.

53

0.03

Dem

oliti

on 0

2/01

/201

1-03

/31/

2011

0.06

0.44

0.26

0.00

0.02

44.7

50.

000.

030.

000.

02

Dem

o O

n R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Dem

o W

orke

r T

rips

0.00

0.00

0.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.20

Fug

itive

Dus

t0.

000.

000.

000.

000.

000.

000.

000.

000.

000.

000.

00

Dem

o O

ff R

oad

Die

sel

0.06

0.44

0.24

0.00

0.00

0.02

0.02

0.00

0.02

0.02

42.5

5

1.56

Mas

s G

radi

ng 0

2/01

/201

1-03

/31/

2011

0.20

2.19

0.93

0.00

0.39

284.

661.

470.

090.

310.

08

Mas

s G

radi

ng O

n R

oad

Die

sel

0.08

1.15

0.39

0.00

0.01

0.04

0.05

0.00

0.04

0.04

177.

14

Mas

s G

radi

ng W

orke

r T

rips

0.00

0.00

0.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.94

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

1.46

0.00

1.46

0.31

0.00

0.31

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

0.12

1.03

0.49

0.00

0.00

0.05

0.05

0.00

0.04

0.04

102.

57

Page 74: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28/2009 5:12:32 PM

Page: 4

Off-R

oad Equipm

ent:

On R

oad Truck T

ravel (VM

T): 0

1 Rubber T

ired Dozers (357 hp) operating at a 0.59 load factor for 6 hours per day

1 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 2 hours per day

Phase: D

emolition 2/1/2011 - 3/31/2011 - D

emolition of residential structures on new

parcel

Building V

olume D

aily (cubic feet): 0

Building V

olume T

otal (cubic feet): 0

2 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 8 hours per day

Phase: D

emolition 5/1/2012 - 6/30/2012 - D

emo existing substation P

hase Assum

ptions

20120.10

0.790.56

0.000.04

0.04124.99

0.000.04

0.000.04

0.03D

emolition 05/01/2012-

06/30/20120.08

0.610.33

0.000.03

79.220.00

0.030.00

0.03

Dem

o On R

oad Diesel

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Dem

o Worker T

rips0.00

0.000.05

0.000.00

0.000.00

0.000.00

0.005.62

Fugitive D

ust0.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

Dem

o Off R

oad Diesel

0.080.61

0.270.00

0.000.03

0.030.00

0.030.03

73.60

0.01B

uilding 01/01/2012-02/29/20120.02

0.180.24

0.000.01

45.760.00

0.010.00

0.01

Building W

orker Trips

0.000.01

0.140.00

0.000.00

0.000.00

0.000.00

15.08

Building V

endor Trips

0.010.11

0.080.00

0.000.00

0.010.00

0.000.00

24.02

Building O

ff Road D

iesel0.01

0.060.02

0.000.00

0.000.00

0.000.00

0.006.67

0.08B

uilding 09/01/2011-11/30/20110.24

1.701.05

0.000.08

238.870.00

0.080.00

0.08

Building W

orker Trips

0.010.01

0.230.00

0.000.00

0.000.00

0.000.00

22.79

Building V

endor Trips

0.010.18

0.130.00

0.000.01

0.010.00

0.010.01

36.30

Building O

ff Road D

iesel0.22

1.510.69

0.000.00

0.070.07

0.000.07

0.07179.78

Page 75: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28

/200

9 5:

12:3

2 P

M

Pag

e: 5

5 O

ff H

ighw

ay T

ruck

s (4

79 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

2.8

hour

s pe

r da

y

1 E

xcav

ator

s (1

68 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

4 ho

urs

per

day

1 P

avin

g E

quip

men

t (10

4 hp

) op

erat

ing

at a

0.5

3 lo

ad fa

ctor

for

6 ho

urs

per

day

1 P

aver

s (1

00 h

p) o

pera

ting

at a

0.6

2 lo

ad fa

ctor

for

6 ho

urs

per

day

On

Roa

d T

ruck

Tra

vel (

VM

T):

558

.14

20 lb

s pe

r ac

re-d

ay

1 C

rush

ing/

Pro

cess

ing

Equ

ip (

142

hp)

oper

atin

g at

a 0

.78

load

fact

or fo

r 6

hour

s pe

r da

y

Off-

Roa

d E

quip

men

t:

Pha

se: M

ass

Gra

ding

2/1

/201

1 -

3/31

/201

1 -

Cle

arin

g an

d gr

adin

g ne

ar s

ite, i

mpo

rt a

nd e

xpor

t fill

1 R

olle

rs (

95 h

p) o

pera

ting

at a

0.5

6 lo

ad fa

ctor

for

4 ho

urs

per

day

2 P

late

Com

pact

ors

(8 h

p) o

pera

ting

at a

0.4

3 lo

ad fa

ctor

for

4 ho

urs

per

day

1 W

ater

Tru

cks

(189

hp)

ope

ratin

g at

a 0

.5 lo

ad fa

ctor

for

5 ho

urs

per

day

1 T

ract

ors/

Load

ers/

Bac

khoe

s (1

08 h

p) o

pera

ting

at a

0.5

5 lo

ad fa

ctor

for

6 ho

urs

per

day

1 C

rane

s (3

99 h

p) o

pera

ting

at a

0.4

3 lo

ad fa

ctor

for

6 ho

urs

per

day

2 A

eria

l Lift

s (6

0 hp

) op

erat

ing

at a

0.4

6 lo

ad fa

ctor

for

8 ho

urs

per

day

1 R

olle

rs (

95 h

p) o

pera

ting

at a

0.5

6 lo

ad fa

ctor

for

4 ho

urs

per

day

3 O

ff H

ighw

ay T

ruck

s (4

79 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

3 ho

urs

per

day

Bui

ldin

g V

olum

e D

aily

(cu

bic

feet

): 0

Bui

ldin

g V

olum

e T

otal

(cu

bic

feet

): 0

Off-

Roa

d E

quip

men

t:

On

Roa

d T

ruck

Tra

vel (

VM

T):

0

Tot

al A

cres

Dis

turb

ed: 3

.75

Pha

se: F

ine

Gra

ding

4/1

/201

1 -

5/31

/201

1 -

Fin

al g

radi

ng, i

mpo

rt a

nd e

xpor

t fill

Fug

itive

Dus

t Lev

el o

f Det

ail:

Def

ault

Max

imum

Dai

ly A

crea

ge D

istu

rbed

: 3.4

1 T

ract

ors/

Load

ers/

Bac

khoe

s (1

08 h

p) o

pera

ting

at a

0.5

5 lo

ad fa

ctor

for

6 ho

urs

per

day

1 R

ough

Ter

rain

For

klift

s (9

3 hp

) op

erat

ing

at a

0.6

load

fact

or fo

r 6

hour

s pe

r da

y

1 W

ater

Tru

cks

(189

hp)

ope

ratin

g at

a 0

.5 lo

ad fa

ctor

for

2 ho

urs

per

day

Page 76: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28/2009 5:12:32 PM

Page: 6

1 Trenchers (63 hp) operating at a 0.75 load factor for 4 hours per day

3 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 5.3 hours per day

1 Water T

rucks (189 hp) operating at a 0.5 load factor for 2 hours per day

2 Other E

quipment (190 hp) operating at a 0.62 load factor for 4 hours per day

3 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 5.3 hours per day

1 Rough T

errain Forklifts (93 hp) operating at a 0.6 load factor for 6 hours per day

2 Plate C

ompactors (8 hp) operating at a 0.43 load factor for 4 hours per day

2 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 4 hours per day

1 Generator S

ets (49 hp) operating at a 0.74 load factor for 24 hours per day

Off-R

oad Equipm

ent:

Phase: B

uilding Construction 9/1/2011 - 11/30/2011 - A

bove grade building construction

1 Cranes (399 hp) operating at a 0.43 load factor for 6 hours per day

2 Aerial Lifts (60 hp) operating at a 0.46 load factor for 6 hours per day

Off-R

oad Equipm

ent:

On R

oad Truck T

ravel (VM

T): 2046.51

2 Plate C

ompactors (8 hp) operating at a 0.43 load factor for 4 hours per day

1 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 2 hours per day

Maxim

um D

aily Acreage D

isturbed: 3.4

Total A

cres Disturbed: 3.75

20 lbs per acre-day

Fugitive D

ust Level of Detail: D

efault

Phase: T

renching 6/1/2011 - 8/31/2011 - Foundation excavation of new

building, below grade construction

2 Aerial Lifts (60 hp) operating at a 0.46 load factor for 6 hours per day

Off-R

oad Equipm

ent:

2 Scrapers (313 hp) operating at a 0.72 load factor for 6 hours per day

1 Rubber T

ired Dozers (357 hp) operating at a 0.59 load factor for 6 hours per day

1 Water T

rucks (189 hp) operating at a 0.5 load factor for 5 hours per day

2 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 8 hours per day

Page 77: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28

/200

9 5:

12:3

2 P

M

Pag

e: 7

Con

stru

ctio

n M

itiga

ted

Det

ail R

epor

t:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S A

nnua

l Ton

s P

er Y

ear,

Miti

gate

d

RO

GN

Ox

CO

SO

2P

M10

Dus

tPM

10 E

xhau

stP

M10

PM

2.5

Dus

tPM

2.5 E

xhau

stP

M2.

5C

O2

2011

0.83

7.10

3.61

0.00

1.52

0.56

915.

801.

190.

340.

250.

31

0.03

Dem

oliti

on 0

2/01

/201

1-03

/31/

2011

0.06

0.44

0.26

0.00

0.02

44.7

50.

000.

030.

000.

02

Dem

o O

n R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Dem

o W

orke

r T

rips

0.00

0.00

0.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.20

Fug

itive

Dus

t0.

000.

000.

000.

000.

000.

000.

000.

000.

000.

000.

00

Dem

o O

ff R

oad

Die

sel

0.06

0.44

0.24

0.00

0.00

0.02

0.02

0.00

0.02

0.02

42.5

5

0.68

Mas

s G

radi

ng 0

2/01

/201

1-03

/31/

2011

0.20

2.19

0.93

0.00

0.21

284.

660.

590.

090.

120.

08

Mas

s G

radi

ng O

n R

oad

Die

sel

0.08

1.15

0.39

0.00

0.01

0.04

0.05

0.00

0.04

0.04

177.

14

Mas

s G

radi

ng W

orke

r T

rips

0.00

0.00

0.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.94

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

0.59

0.00

0.59

0.12

0.00

0.12

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

0.12

1.03

0.49

0.00

0.00

0.05

0.05

0.00

0.04

0.04

102.

57

Off-

Roa

d E

quip

men

t:

Pha

se: B

uild

ing

Con

stru

ctio

n 1/

1/20

12 -

2/2

9/20

12 -

Tes

ting

and

com

mis

sion

ing

2 O

ther

Gen

eral

Indu

stria

l Equ

ipm

ent (

238

hp)

oper

atin

g at

a 0

.51

load

fact

or fo

r 2

hour

s pe

r da

y

2 O

ther

Gen

eral

Indu

stria

l Equ

ipm

ent (

238

hp)

oper

atin

g at

a 0

.51

load

fact

or fo

r 2

hour

s pe

r da

y

7 O

ther

Equ

ipm

ent (

190

hp)

oper

atin

g at

a 0

.62

load

fact

or fo

r 2.

9 ho

urs

per

day

1 R

ough

Ter

rain

For

klift

s (9

3 hp

) op

erat

ing

at a

0.6

load

fact

or fo

r 6

hour

s pe

r da

y

Page 78: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28/2009 5:12:32 PM

Page: 8

20120.10

0.790.56

0.000.04

0.04124.99

0.000.04

0.000.04

0.03D

emolition 05/01/2012-

06/30/20120.08

0.610.33

0.000.03

79.220.00

0.030.00

0.03

Dem

o On R

oad Diesel

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Dem

o Worker T

rips0.00

0.000.05

0.000.00

0.000.00

0.000.00

0.005.62

Fugitive D

ust0.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

Dem

o Off R

oad Diesel

0.080.61

0.270.00

0.000.03

0.030.00

0.030.03

73.60

0.01B

uilding 01/01/2012-02/29/20120.02

0.180.24

0.000.01

45.760.00

0.010.00

0.01

Building W

orker Trips

0.000.01

0.140.00

0.000.00

0.000.00

0.000.00

15.08

Building V

endor Trips

0.010.11

0.080.00

0.000.00

0.010.00

0.000.00

24.02

Building O

ff Road D

iesel0.01

0.060.02

0.000.00

0.000.00

0.000.00

0.006.67

0.08B

uilding 09/01/2011-11/30/20110.24

1.701.05

0.000.08

238.870.00

0.080.00

0.08

Building W

orker Trips

0.010.01

0.230.00

0.000.00

0.000.00

0.000.00

22.79

Building V

endor Trips

0.010.18

0.130.00

0.000.01

0.010.00

0.010.01

36.30

Building O

ff Road D

iesel0.22

1.510.69

0.000.00

0.070.07

0.000.07

0.07179.78

0.08T

renching 06/01/2011-08/31/20110.18

1.480.75

0.000.07

186.000.00

0.080.00

0.07

Trenching W

orker Trips

0.000.01

0.130.00

0.000.00

0.000.00

0.000.00

12.65

Trenching O

ff Road D

iesel0.18

1.470.62

0.000.00

0.080.08

0.000.07

0.07173.35

0.65F

ine Grading 04/01/2011-

05/31/20110.15

1.280.61

0.000.18

161.530.59

0.060.12

0.06

Fine G

rading On R

oad Diesel

0.020.31

0.110.00

0.000.01

0.010.00

0.010.01

48.31

Fine G

rading Worker T

rips0.00

0.000.08

0.000.00

0.000.00

0.000.00

0.007.69

Fine G

rading Dust

0.000.00

0.000.00

0.590.00

0.590.12

0.000.12

0.00

Fine G

rading Off R

oad Diesel

0.120.96

0.430.00

0.000.05

0.050.00

0.050.05

105.53

Page 79: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28

/200

9 5:

12:3

2 P

M

Pag

e: 9

For

Soi

l Sta

bliz

ing

Mea

sure

s, th

e W

ater

exp

osed

sur

face

s 2x

dai

ly w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

The

follo

win

g m

itiga

tion

mea

sure

s ap

ply

to P

hase

: Mas

s G

radi

ng 2

/1/2

011

- 3/

31/2

011

- C

lear

ing

and

grad

ing

near

site

, im

port

and

exp

ort f

ill

PM

10: 6

1% P

M25

: 61%

PM

10: 5

5% P

M25

: 55%

For

Unp

aved

Roa

ds M

easu

res,

the

Man

age

haul

roa

d du

st 3

x da

ily w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 4

4% P

M25

: 44%

For

Unp

aved

Roa

ds M

easu

res,

the

Red

uce

spee

d on

unp

aved

roa

ds to

less

than

15

mph

miti

gatio

n re

duce

s em

issi

ons

by:

For

Soi

l Sta

bliz

ing

Mea

sure

s, th

e W

ater

exp

osed

sur

face

s 2x

dai

ly w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

The

follo

win

g m

itiga

tion

mea

sure

s ap

ply

to P

hase

: Fin

e G

radi

ng 4

/1/2

011

- 5/

31/2

011

- F

inal

gra

ding

, im

port

and

exp

ort f

ill

PM

10: 6

1% P

M25

: 61%

PM

10: 5

5% P

M25

: 55%

For

Unp

aved

Roa

ds M

easu

res,

the

Man

age

haul

roa

d du

st 3

x da

ily w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 4

4% P

M25

: 44%

For

Unp

aved

Roa

ds M

easu

res,

the

Red

uce

spee

d on

unp

aved

roa

ds to

less

than

15

mph

miti

gatio

n re

duce

s em

issi

ons

by:

Con

stru

ctio

n R

elat

ed M

itiga

tion

Mea

sure

s

Arc

hite

ctur

al C

oatin

gs

Con

sum

er P

rodu

cts

Hea

rth

Land

scap

e

Nat

ural

Gas

TO

TA

LS (

tons

/yea

r, u

nmiti

gate

d)

Sou

rce

RO

GN

Ox

CO

SO

2P

M10

PM

2.5

CO

2

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

Ann

ual T

ons

Per

Yea

r, U

nmiti

gate

d

Are

a S

ourc

e U

nmiti

gate

d D

etai

l Rep

ort:

Page 80: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28/2009 5:12:32 PM

Page: 10

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S A

nnual Tons P

er Year, U

nmitigated

General heavy industry

0.050.16

0.550.00

0.010.01

52.99

TO

TA

LS (tons/year, unm

itigated)0.05

0.160.55

0.000.01

0.0152.99

Source

RO

GN

OX

CO

SO

2P

M10

PM

25C

O2

Operational U

nmitigated D

etail Report:

Light Truck <

3750 lbs30.0

3.790.8

5.5

Light Auto

25.01.6

98.00.4

Med T

ruck 5751-8500 lbs10.0

1.198.9

0.0

Light Truck 3751-5750 lbs

15.00.9

98.60.5

Vehicle F

leet Mix

Vehicle T

ypeP

ercent Type

Non-C

atalystC

atalystD

iesel

General heavy industry

6.75acres

3.7525.31

235.03

25.31235.03

Sum

mary of Land U

ses

Land Use T

ypeA

creageT

rip Rate

Unit T

ypeN

o. Units

Total T

ripsT

otal VM

T

Analysis Y

ear: 2009 Season: A

nnual

Em

fac: Version : E

mfac2007 V

2.3 Nov 1 2006

Does not include correction for passby trips

Does not include double counting adjustm

ent for internal trips

Operational S

ettings:

Area S

ource Changes to D

efaults

Page 81: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28

/200

9 5:

12:3

2 P

M

Pag

e: 1

1

% o

f Trip

s -

Res

iden

tial

32.9

18.0

49.1

Trip

spe

eds

(mph

)35

.035

.035

.035

.035

.035

.0

% o

f Trip

s -

Com

mer

cial

(by

land

use

)

Gen

eral

hea

vy in

dust

ry90

.05.

05.

0

Rur

al T

rip L

engt

h (m

iles)

16.8

7.1

7.9

14.7

6.6

6.6

Urb

an T

rip L

engt

h (m

iles)

10.8

7.3

7.5

9.5

7.4

7.4

Tra

vel C

ondi

tions

Hom

e-W

ork

Hom

e-S

hop

Hom

e-O

ther

Com

mut

eN

on-W

ork

Cus

tom

er

Res

iden

tial

Com

mer

cial

Oth

er B

us0.

00.

00.

010

0.0

Mot

or H

ome

0.0

10.0

80.0

10.0

Urb

an B

us0.

00.

00.

010

0.0

Sch

ool B

us0.

00.

00.

010

0.0

Mot

orcy

cle

0.0

71.4

28.6

0.0

Lite

-Hea

vy T

ruck

850

1-10

,000

lbs

5.0

0.0

75.0

25.0

Hea

vy-H

eavy

Tru

ck 3

3,00

1-60

,000

lbs

5.0

0.0

0.0

100.

0

Med

-Hea

vy T

ruck

14,

001-

33,0

00 lb

s5.

00.

020

.080

.0

Lite

-Hea

vy T

ruck

10,

001-

14,0

00 lb

s5.

00.

050

.050

.0

Veh

icle

Fle

et M

ix

Veh

icle

Typ

eP

erce

nt T

ype

Non

-Cat

alys

tC

atal

yst

Die

sel

Ope

ratio

nal C

hang

es to

Def

aults

Page 82: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

 

Page 83: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28

/200

9 5:

11:2

4 P

M

Pag

e: 1

File

Nam

e: B

:\Pro

ject

\SD

GE

\urb

emis

_upd

ate\

7-09

-09

SD

GE

Bou

leva

rd s

ub.u

rb92

4

Pro

ject

Nam

e: S

DG

E B

oule

vard

Sub

stat

ion

Pro

ject

Loc

atio

n: C

alifo

rnia

Sta

te-w

ide

On-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Off-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

OF

FR

OA

D20

07

Com

bine

d S

umm

er E

mis

sion

s R

epor

ts (

Pou

nds/

Day

)

Urb

emis

200

7 V

ersi

on 9

.2.4

Page 84: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28/2009 5:11:24 PM

Page: 2

Construction U

nmitigated D

etail Report:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S S

umm

er Pounds P

er Day, U

nmitigated

RO

GN

Ox

CO

SO

2P

M10 D

ustPM10 Exhaust

PM

10P

M2.5 D

ustPM2.5 Exhaust

PM

2.5C

O2

TO

TA

LS (lbs/day, unm

itigated)0.25

0.812.95

0.000.04

0.03299.40

SU

M O

F A

RE

A S

OU

RC

E A

ND

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (lbs/day, unm

itigated)0.25

0.812.95

0.000.04

0.03299.40

OP

ER

AT

ION

AL (V

EH

ICLE

) EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (lbs/day, unm

itigated)

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

2012 TO

TA

LS (lbs/day unm

itigated)3.60

27.7414.82

0.020.07

1.461.47

0.031.34

1.353,601.05

2012 TO

TA

LS (lbs/day m

itigated)3.60

27.7414.82

0.020.07

1.461.47

0.031.34

1.353,601.05

2011 TO

TA

LS (lbs/day m

itigated)11.87

122.2855.77

0.0827.60

5.4233.02

5.804.99

10.7915,321.30

2011 TO

TA

LS (lbs/day unm

itigated)11.87

122.2855.77

0.0868.30

5.4273.72

14.304.99

19.2915,321.30

RO

GN

Ox

CO

SO

2P

M10 D

ustPM

10 Exhaust

PM

10P

M2.5 D

ustP

M2.5

Exhaust

PM

2.5C

O2

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S

Sum

mary R

eport:

Page 85: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28

/200

9 5:

11:2

4 P

M

Pag

e: 3

Tim

e S

lice

2/1/

2011

-3/3

1/20

11

Act

ive

Day

s: 4

311

.87

122.

2855

.77

0.08

73.7

219

.29

15,3

21.3

068

.30

5.42

14.3

04.

99

72.5

6M

ass

Gra

ding

02/

01/2

011-

03/3

1/20

119.

2310

1.76

43.4

70.

0818

.22

13,2

40.0

368

.30

4.26

14.3

03.

92

Mas

s G

radi

ng O

n R

oad

Die

sel

3.60

53.6

518

.30

0.08

0.29

2.03

2.32

0.09

1.87

1.96

8,23

9.27

Mas

s G

radi

ng W

orke

r T

rips

0.07

0.12

2.29

0.00

0.01

0.01

0.02

0.00

0.00

0.01

229.

93

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

68.0

00.

0068

.00

14.2

00.

0014

.20

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

5.56

47.9

922

.87

0.00

0.00

2.22

2.22

0.00

2.04

2.04

4,77

0.82

1.17

Dem

oliti

on 0

2/01

/201

1-03

/31/

2011

2.64

20.5

112

.31

0.00

1.07

2,08

1.27

0.00

1.16

0.00

1.07

Dem

o O

n R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Dem

o W

orke

r T

rips

0.03

0.06

1.02

0.00

0.00

0.00

0.01

0.00

0.00

0.00

102.

19

Fug

itive

Dus

t0.

000.

000.

000.

000.

000.

000.

000.

000.

000.

000.

00

Dem

o O

ff R

oad

Die

sel

2.61

20.4

611

.29

0.00

0.00

1.16

1.16

0.00

1.07

1.07

1,97

9.08

Tim

e S

lice

4/1/

2011

-5/3

1/20

11

Act

ive

Day

s: 4

36.

8059

.63

28.4

70.

0271

.06

16.9

67,

513.

2068

.10

2.96

14.2

32.

73

71.0

6F

ine

Gra

ding

04/

01/2

011-

05/3

1/20

116.

8059

.63

28.4

70.

0216

.96

7,51

3.20

68.1

02.

9614

.23

2.73

Fin

e G

radi

ng O

n R

oad

Die

sel

0.98

14.6

34.

990.

020.

080.

550.

630.

030.

510.

532,

247.

07

Fin

e G

radi

ng W

orke

r T

rips

0.11

0.19

3.57

0.00

0.02

0.01

0.03

0.01

0.01

0.01

357.

67

Fin

e G

radi

ng D

ust

0.00

0.00

0.00

0.00

68.0

00.

0068

.00

14.2

00.

0014

.20

0.00

Fin

e G

radi

ng O

ff R

oad

Die

sel

5.70

44.8

019

.91

0.00

0.00

2.40

2.40

0.00

2.21

2.21

4,90

8.46

Tim

e S

lice

6/1/

2011

-8/3

1/20

11

Act

ive

Day

s: 6

65.

6044

.84

22.7

60.

002.

332.

145,

636.

260.

022.

320.

012.

13

2.33

Tre

nchi

ng 0

6/01

/201

1-08

/31/

2011

5.60

44.8

422

.76

0.00

2.14

5,63

6.26

0.02

2.32

0.01

2.13

Tre

nchi

ng W

orke

r T

rips

0.12

0.21

3.82

0.00

0.02

0.01

0.03

0.01

0.01

0.02

383.

22

Tre

nchi

ng O

ff R

oad

Die

sel

5.48

44.6

418

.93

0.00

0.00

2.31

2.31

0.00

2.12

2.12

5,25

3.04

Page 86: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28/2009 5:11:24 PM

Page: 4

Off-R

oad Equipm

ent:

On R

oad Truck T

ravel (VM

T): 0

1 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 2 hours per day

Phase: D

emolition 2/1/2011 - 3/31/2011 - D

emolition of residential structures on new

parcel

Building V

olume D

aily (cubic feet): 0

Building V

olume T

otal (cubic feet): 0

Phase A

ssumptions

Tim

e Slice 5/1/2012-6/29/2012

Active D

ays: 443.60

27.7414.82

0.001.47

1.353,601.05

0.011.46

0.001.34

1.47D

emolition 05/01/2012-

06/30/20123.60

27.7414.82

0.001.35

3,601.050.01

1.460.00

1.34

Dem

o On R

oad Diesel

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Dem

o Worker T

rips0.07

0.132.36

0.000.01

0.010.02

0.000.01

0.01255.56

Fugitive D

ust0.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

Dem

o Off R

oad Diesel

3.5327.62

12.460.00

0.001.45

1.450.00

1.341.34

3,345.49

Tim

e Slice 1/2/2012-2/29/2012

Active D

ays: 430.88

8.2811.00

0.020.38

0.312,128.59

0.070.31

0.030.28

0.38B

uilding 01/01/2012-02/29/20120.88

8.2811.00

0.020.31

2,128.590.07

0.310.03

0.28

Building W

orker Trips

0.200.35

6.480.01

0.030.02

0.050.01

0.020.03

701.34

Building V

endor Trips

0.405.01

3.770.01

0.040.19

0.230.01

0.180.19

1,117.02

Building O

ff Road D

iesel0.28

2.930.75

0.000.00

0.100.10

0.000.09

0.09310.23

Tim

e Slice 9/1/2011-11/30/2011

Active D

ays: 657.46

52.4532.32

0.022.61

2.367,349.72

0.072.54

0.032.33

2.61B

uilding 09/01/2011-11/30/20117.46

52.4532.32

0.022.36

7,349.720.07

2.540.03

2.33

Building W

orker Trips

0.220.38

6.990.01

0.030.02

0.050.01

0.020.03

701.11

Building V

endor Trips

0.435.60

4.060.01

0.040.22

0.260.01

0.200.21

1,116.98

Building O

ff Road D

iesel6.80

46.4721.26

0.000.00

2.302.30

0.002.12

2.125,531.63

Page 87: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28

/200

9 5:

11:2

4 P

M

Pag

e: 5

On

Roa

d T

ruck

Tra

vel (

VM

T):

558

.14

20 lb

s pe

r ac

re-d

ay

1 C

rush

ing/

Pro

cess

ing

Equ

ip (

142

hp)

oper

atin

g at

a 0

.78

load

fact

or fo

r 6

hour

s pe

r da

y

Off-

Roa

d E

quip

men

t:

Tot

al A

cres

Dis

turb

ed: 3

.75

Pha

se: F

ine

Gra

ding

4/1

/201

1 -

5/31

/201

1 -

Fin

al g

radi

ng, i

mpo

rt a

nd e

xpor

t fill

Fug

itive

Dus

t Lev

el o

f Det

ail:

Def

ault

Max

imum

Dai

ly A

crea

ge D

istu

rbed

: 3.4

1 R

olle

rs (

95 h

p) o

pera

ting

at a

0.5

6 lo

ad fa

ctor

for

4 ho

urs

per

day

2 P

late

Com

pact

ors

(8 h

p) o

pera

ting

at a

0.4

3 lo

ad fa

ctor

for

4 ho

urs

per

day

5 O

ff H

ighw

ay T

ruck

s (4

79 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

2.8

hour

s pe

r da

y

1 E

xcav

ator

s (1

68 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

4 ho

urs

per

day

1 P

avin

g E

quip

men

t (10

4 hp

) op

erat

ing

at a

0.5

3 lo

ad fa

ctor

for

6 ho

urs

per

day

1 P

aver

s (1

00 h

p) o

pera

ting

at a

0.6

2 lo

ad fa

ctor

for

6 ho

urs

per

day

Bui

ldin

g V

olum

e D

aily

(cu

bic

feet

): 0

Bui

ldin

g V

olum

e T

otal

(cu

bic

feet

): 0

Off-

Roa

d E

quip

men

t:

On

Roa

d T

ruck

Tra

vel (

VM

T):

0

2 T

ract

ors/

Load

ers/

Bac

khoe

s (1

08 h

p) o

pera

ting

at a

0.5

5 lo

ad fa

ctor

for

8 ho

urs

per

day

1 R

ubbe

r T

ired

Doz

ers

(357

hp)

ope

ratin

g at

a 0

.59

load

fact

or fo

r 6

hour

s pe

r da

y

Pha

se: D

emol

ition

5/1

/201

2 -

6/30

/201

2 -

Dem

o ex

istin

g su

bsta

tion

1 T

ract

ors/

Load

ers/

Bac

khoe

s (1

08 h

p) o

pera

ting

at a

0.5

5 lo

ad fa

ctor

for

6 ho

urs

per

day

1 R

ough

Ter

rain

For

klift

s (9

3 hp

) op

erat

ing

at a

0.6

load

fact

or fo

r 6

hour

s pe

r da

y

1 W

ater

Tru

cks

(189

hp)

ope

ratin

g at

a 0

.5 lo

ad fa

ctor

for

2 ho

urs

per

day

1 C

rane

s (3

99 h

p) o

pera

ting

at a

0.4

3 lo

ad fa

ctor

for

6 ho

urs

per

day

2 A

eria

l Lift

s (6

0 hp

) op

erat

ing

at a

0.4

6 lo

ad fa

ctor

for

8 ho

urs

per

day

1 R

olle

rs (

95 h

p) o

pera

ting

at a

0.5

6 lo

ad fa

ctor

for

4 ho

urs

per

day

3 O

ff H

ighw

ay T

ruck

s (4

79 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

3 ho

urs

per

day

Page 88: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28/2009 5:11:24 PM

Page: 6

2 Other E

quipment (190 hp) operating at a 0.62 load factor for 4 hours per day

3 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 5.3 hours per day

1 Rough T

errain Forklifts (93 hp) operating at a 0.6 load factor for 6 hours per day

2 Plate C

ompactors (8 hp) operating at a 0.43 load factor for 4 hours per day

Phase: T

renching 6/1/2011 - 8/31/2011 - Foundation excavation of new

building, below grade construction

2 Aerial Lifts (60 hp) operating at a 0.46 load factor for 6 hours per day

Off-R

oad Equipm

ent:

Off-R

oad Equipm

ent:

Phase: B

uilding Construction 9/1/2011 - 11/30/2011 - A

bove grade building construction

1 Trenchers (63 hp) operating at a 0.75 load factor for 4 hours per day

3 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 5.3 hours per day

1 Water T

rucks (189 hp) operating at a 0.5 load factor for 2 hours per day

Maxim

um D

aily Acreage D

isturbed: 3.4

Total A

cres Disturbed: 3.75

20 lbs per acre-day

Fugitive D

ust Level of Detail: D

efault

1 Water T

rucks (189 hp) operating at a 0.5 load factor for 5 hours per day

1 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 6 hours per day

Phase: M

ass Grading 2/1/2011 - 3/31/2011 - C

learing and grading near site, import and export fill

2 Scrapers (313 hp) operating at a 0.72 load factor for 6 hours per day

1 Rubber T

ired Dozers (357 hp) operating at a 0.59 load factor for 6 hours per day

1 Water T

rucks (189 hp) operating at a 0.5 load factor for 5 hours per day

2 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 8 hours per day

Off-R

oad Equipm

ent:

On R

oad Truck T

ravel (VM

T): 2046.51

2 Plate C

ompactors (8 hp) operating at a 0.43 load factor for 4 hours per day

1 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 2 hours per day

Page 89: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28

/200

9 5:

11:2

4 P

M

Pag

e: 7

Con

stru

ctio

n M

itiga

ted

Det

ail R

epor

t:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S S

umm

er P

ound

s P

er D

ay, M

itiga

ted

RO

GN

Ox

CO

SO

2P

M10

Dus

tPM

10 E

xhau

stP

M10

PM

2.5

Dus

tPM

2.5 E

xhau

stP

M2.

5C

O2

Pha

se: B

uild

ing

Con

stru

ctio

n 1/

1/20

12 -

2/2

9/20

12 -

Tes

ting

and

com

mis

sion

ing

1 R

ough

Ter

rain

For

klift

s (9

3 hp

) op

erat

ing

at a

0.6

load

fact

or fo

r 6

hour

s pe

r da

y

2 O

ther

Gen

eral

Indu

stria

l Equ

ipm

ent (

238

hp)

oper

atin

g at

a 0

.51

load

fact

or fo

r 2

hour

s pe

r da

y

Off-

Roa

d E

quip

men

t:

1 G

ener

ator

Set

s (4

9 hp

) op

erat

ing

at a

0.7

4 lo

ad fa

ctor

for

24 h

ours

per

day

1 C

rane

s (3

99 h

p) o

pera

ting

at a

0.4

3 lo

ad fa

ctor

for

6 ho

urs

per

day

2 A

eria

l Lift

s (6

0 hp

) op

erat

ing

at a

0.4

6 lo

ad fa

ctor

for

6 ho

urs

per

day

2 O

ther

Gen

eral

Indu

stria

l Equ

ipm

ent (

238

hp)

oper

atin

g at

a 0

.51

load

fact

or fo

r 2

hour

s pe

r da

y

7 O

ther

Equ

ipm

ent (

190

hp)

oper

atin

g at

a 0

.62

load

fact

or fo

r 2.

9 ho

urs

per

day

2 O

ff H

ighw

ay T

ruck

s (4

79 h

p) o

pera

ting

at a

0.5

7 lo

ad fa

ctor

for

4 ho

urs

per

day

Page 90: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28/2009 5:11:24 PM

Page: 8

Tim

e Slice 2/1/2011-3/31/2011

Active D

ays: 4311.87

122.2855.77

0.0833.02

10.7915,321.30

27.605.42

5.804.99

31.85M

ass Grading 02/01/2011-

03/31/20119.23

101.7643.47

0.089.71

13,240.0327.59

4.265.80

3.92

Mass G

rading On R

oad Diesel

3.6053.65

18.300.08

0.292.03

2.320.09

1.871.96

8,239.27

Mass G

rading Worker T

rips0.07

0.122.29

0.000.01

0.010.02

0.000.00

0.01229.93

Mass G

rading Dust

0.000.00

0.000.00

27.290.00

27.295.70

0.005.70

0.00

Mass G

rading Off R

oad Diesel

5.5647.99

22.870.00

0.002.22

2.220.00

2.042.04

4,770.82

1.17D

emolition 02/01/2011-

03/31/20112.64

20.5112.31

0.001.07

2,081.270.00

1.160.00

1.07

Dem

o On R

oad Diesel

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Dem

o Worker T

rips0.03

0.061.02

0.000.00

0.000.01

0.000.00

0.00102.19

Fugitive D

ust0.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

Dem

o Off R

oad Diesel

2.6120.46

11.290.00

0.001.16

1.160.00

1.071.07

1,979.08

Tim

e Slice 4/1/2011-5/31/2011

Active D

ays: 436.80

59.6328.47

0.0230.35

8.467,513.20

27.392.96

5.732.73

30.35F

ine Grading 04/01/2011-

05/31/20116.80

59.6328.47

0.028.46

7,513.2027.39

2.965.73

2.73

Fine G

rading On R

oad Diesel

0.9814.63

4.990.02

0.080.55

0.630.03

0.510.53

2,247.07

Fine G

rading Worker T

rips0.11

0.193.57

0.000.02

0.010.03

0.010.01

0.01357.67

Fine G

rading Dust

0.000.00

0.000.00

27.290.00

27.295.70

0.005.70

0.00

Fine G

rading Off R

oad Diesel

5.7044.80

19.910.00

0.002.40

2.400.00

2.212.21

4,908.46

Tim

e Slice 6/1/2011-8/31/2011

Active D

ays: 665.60

44.8422.76

0.002.33

2.145,636.26

0.022.32

0.012.13

2.33T

renching 06/01/2011-08/31/20115.60

44.8422.76

0.002.14

5,636.260.02

2.320.01

2.13

Trenching W

orker Trips

0.120.21

3.820.00

0.020.01

0.030.01

0.010.02

383.22

Trenching O

ff Road D

iesel5.48

44.6418.93

0.000.00

2.312.31

0.002.12

2.125,253.04

Page 91: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28

/200

9 5:

11:2

4 P

M

Pag

e: 9

Tim

e S

lice

5/1/

2012

-6/2

9/20

12

Act

ive

Day

s: 4

43.

6027

.74

14.8

20.

001.

471.

353,

601.

050.

011.

460.

001.

34

1.47

Dem

oliti

on 0

5/01

/201

2-06

/30/

2012

3.60

27.7

414

.82

0.00

1.35

3,60

1.05

0.01

1.46

0.00

1.34

Dem

o O

n R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Dem

o W

orke

r T

rips

0.07

0.13

2.36

0.00

0.01

0.01

0.02

0.00

0.01

0.01

255.

56

Fug

itive

Dus

t0.

000.

000.

000.

000.

000.

000.

000.

000.

000.

000.

00

Dem

o O

ff R

oad

Die

sel

3.53

27.6

212

.46

0.00

0.00

1.45

1.45

0.00

1.34

1.34

3,34

5.49

Tim

e S

lice

1/2/

2012

-2/2

9/20

12

Act

ive

Day

s: 4

30.

888.

2811

.00

0.02

0.38

0.31

2,12

8.59

0.07

0.31

0.03

0.28

0.38

Bui

ldin

g 01

/01/

2012

-02/

29/2

012

0.88

8.28

11.0

00.

020.

312,

128.

590.

070.

310.

030.

28

Bui

ldin

g W

orke

r T

rips

0.20

0.35

6.48

0.01

0.03

0.02

0.05

0.01

0.02

0.03

701.

34

Bui

ldin

g V

endo

r T

rips

0.40

5.01

3.77

0.01

0.04

0.19

0.23

0.01

0.18

0.19

1,11

7.02

Bui

ldin

g O

ff R

oad

Die

sel

0.28

2.93

0.75

0.00

0.00

0.10

0.10

0.00

0.09

0.09

310.

23

Tim

e S

lice

9/1/

2011

-11/

30/2

011

Act

ive

Day

s: 6

57.

4652

.45

32.3

20.

022.

612.

367,

349.

720.

072.

540.

032.

33

2.61

Bui

ldin

g 09

/01/

2011

-11/

30/2

011

7.46

52.4

532

.32

0.02

2.36

7,34

9.72

0.07

2.54

0.03

2.33

Bui

ldin

g W

orke

r T

rips

0.22

0.38

6.99

0.01

0.03

0.02

0.05

0.01

0.02

0.03

701.

11

Bui

ldin

g V

endo

r T

rips

0.43

5.60

4.06

0.01

0.04

0.22

0.26

0.01

0.20

0.21

1,11

6.98

Bui

ldin

g O

ff R

oad

Die

sel

6.80

46.4

721

.26

0.00

0.00

2.30

2.30

0.00

2.12

2.12

5,53

1.63

For

Soi

l Sta

bliz

ing

Mea

sure

s, th

e W

ater

exp

osed

sur

face

s 2x

dai

ly w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

The

follo

win

g m

itiga

tion

mea

sure

s ap

ply

to P

hase

: Fin

e G

radi

ng 4

/1/2

011

- 5/

31/2

011

- F

inal

gra

ding

, im

port

and

exp

ort f

ill

PM

10: 5

5% P

M25

: 55%

For

Unp

aved

Roa

ds M

easu

res,

the

Man

age

haul

roa

d du

st 3

x da

ily w

ater

ing

miti

gatio

n re

duce

s em

issi

ons

by:

PM

10: 4

4% P

M25

: 44%

For

Unp

aved

Roa

ds M

easu

res,

the

Red

uce

spee

d on

unp

aved

roa

ds to

less

than

15

mph

miti

gatio

n re

duce

s em

issi

ons

by:

Con

stru

ctio

n R

elat

ed M

itiga

tion

Mea

sure

s

Page 92: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28/2009 5:11:24 PM

Page: 10

PM

10: 44% P

M25: 44%

For U

npaved Roads M

easures, the Reduce speed on unpaved roads to less than 15 m

ph mitigation reduces em

issions by:

PM

10: 61% P

M25: 61%

For U

npaved Roads M

easures, the Manage haul road dust 3x daily w

atering mitigation reduces em

issions by:

The follow

ing mitigation m

easures apply to Phase: M

ass Grading 2/1/2011 - 3/31/2011 - C

learing and grading near site, import and export fill

PM

10: 61% P

M25: 61%

PM

10: 55% P

M25: 55%

For S

oil Stablizing M

easures, the Water exposed surfaces 2x daily w

atering mitigation reduces em

issions by:

Architectural C

oatings

Consum

er Products

Hearth

Landscape

Natural G

as

TO

TA

LS (lbs/day, unm

itigated)

Source

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

Sum

mer P

ounds Per D

ay, Unm

itigated

Area S

ource Unm

itigated Detail R

eport:

Area S

ource Changes to D

efaults

Page 93: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28

/200

9 5:

11:2

4 P

M

Pag

e: 1

1

OP

ER

AT

ION

AL

EM

ISS

ION

ES

TIM

AT

ES

Sum

mer

Pou

nds

Per

Day

, Unm

itiga

ted

Gen

eral

hea

vy in

dust

ry0.

250.

812.

950.

000.

040.

0329

9.40

TO

TA

LS (

lbs/

day,

unm

itiga

ted)

0.25

0.81

2.95

0.00

0.04

0.03

299.

40

Sou

rce

RO

GN

OX

CO

SO

2P

M10

PM

25C

O2

Ope

ratio

nal U

nmiti

gate

d D

etai

l Rep

ort:

Ligh

t Tru

ck <

375

0 lb

s30

.03.

790

.85.

5

Ligh

t Aut

o25

.01.

698

.00.

4

Lite

-Hea

vy T

ruck

10,

001-

14,0

00 lb

s5.

00.

050

.050

.0

Lite

-Hea

vy T

ruck

850

1-10

,000

lbs

5.0

0.0

75.0

25.0

Med

Tru

ck 5

751-

8500

lbs

10.0

1.1

98.9

0.0

Ligh

t Tru

ck 3

751-

5750

lbs

15.0

0.9

98.6

0.5

Veh

icle

Fle

et M

ix

Veh

icle

Typ

eP

erce

nt T

ype

Non

-Cat

alys

tC

atal

yst

Die

sel

Gen

eral

hea

vy in

dust

ry6.

75ac

res

3.75

25.3

123

5.03

25.3

123

5.03

Sum

mar

y of

Lan

d U

ses

Land

Use

Typ

eA

crea

geT

rip R

ate

Uni

t Typ

eN

o. U

nits

Tot

al T

rips

Tot

al V

MT

Ana

lysi

s Y

ear:

200

9 T

empe

ratu

re (

F):

85

Sea

son:

Sum

mer

Em

fac:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Doe

s no

t inc

lude

cor

rect

ion

for

pass

by tr

ips

Doe

s no

t inc

lude

dou

ble

coun

ting

adju

stm

ent f

or in

tern

al tr

ips

Ope

ratio

nal S

ettin

gs:

Page 94: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/28/2009 5:11:24 PM

Page: 12

% of T

rips - Residential

32.918.0

49.1

Trip speeds (m

ph)35.0

35.035.0

35.035.0

35.0

% of T

rips - Com

mercial (by land use)

General heavy industry

90.05.0

5.0

Rural T

rip Length (miles)

16.87.1

7.914.7

6.66.6

Urban T

rip Length (miles)

10.87.3

7.59.5

7.47.4

Travel C

onditions

Hom

e-Work

Hom

e-Shop

Hom

e-Other

Com

mute

Non-W

orkC

ustomer

Residential

Com

mercial

Urban B

us0.0

0.00.0

100.0

Motor H

ome

0.010.0

80.010.0

School B

us0.0

0.00.0

100.0

Motorcycle

0.071.4

28.60.0

Other B

us0.0

0.00.0

100.0

Med-H

eavy Truck 14,001-33,000 lbs

5.00.0

20.080.0

Heavy-H

eavy Truck 33,001-60,000 lbs

5.00.0

0.0100.0

Vehicle F

leet Mix

Vehicle T

ypeP

ercent Type

Non-C

atalystC

atalystD

iesel

Operational C

hanges to Defaults

Page 95: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:11:

53 A

M

Pag

e: 1

File

Nam

e: C

:\SD

GE

\urb

emis

_upd

ate\

7-09

-09

Com

m to

wer

.urb

924

Pro

ject

Nam

e: C

omm

unic

atio

n T

ower

Whi

te S

tar

Pro

ject

Loc

atio

n: C

alifo

rnia

Sta

te-w

ide

On-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Off-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

OF

FR

OA

D20

07

Com

bine

d A

nnua

l Em

issi

ons

Rep

orts

(T

ons/

Yea

r)

Urb

emis

200

7 V

ersi

on 9

.2.4

Page 96: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:11:53 AM

Page: 2

Phase: B

uilding Construction 8/1/2010 - 9/30/2010 - B

uilding and tower installation

1 Cranes (399 hp) operating at a 0.43 load factor for 6 hours per day

Off-R

oad Equipm

ent:

Phase: T

renching 6/1/2010 - 7/31/2010 - Site developm

ent and foundation installation

1 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 6 hours per day

Off-R

oad Equipm

ent:

10 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 6 hours per day

1 Bore/D

rill Rigs (291 hp) operating at a 0.75 load factor for 6 hours per day

Phase A

ssumptions

Construction U

nmitigated D

etail Report:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S A

nnual Tons P

er Year, U

nmitigated

RO

GN

Ox

CO

SO

2P

M10 D

ustPM10 Exhaust

PM

10P

M2.5 D

ustPM2.5 Exhaust

PM

2.5C

O2

20100.28

2.520.92

0.000.09

0.09308.90

0.000.09

0.000.09

0.00B

uilding 08/01/2010-09/30/20100.01

0.120.05

0.000.00

12.310.00

0.000.00

0.00

Building W

orker Trips

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.04

Building V

endor Trips

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.07

Building O

ff Road D

iesel0.01

0.120.04

0.000.00

0.000.00

0.000.00

0.0012.20

0.09T

renching 06/01/2010-07/31/20100.26

2.400.87

0.000.08

296.590.00

0.090.00

0.08

Trenching W

orker Trips

0.000.00

0.070.00

0.000.00

0.000.00

0.000.00

6.74

Trenching O

ff Road D

iesel0.26

2.400.80

0.000.00

0.090.09

0.000.08

0.08289.85

Page 97: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:11:

53 A

M

Pag

e: 3

OP

ER

AT

ION

AL

EM

ISS

ION

ES

TIM

AT

ES

Ann

ual T

ons

Per

Yea

r, U

nmiti

gate

d

Gen

eral

hea

vy in

dust

ry0.

000.

000.

000.

000.

000.

000.

14

TO

TA

LS (

tons

/yea

r, u

nmiti

gate

d)0.

000.

000.

000.

000.

000.

000.

14

Sou

rce

RO

GN

OX

CO

SO

2P

M10

PM

25C

O2

Ope

ratio

nal U

nmiti

gate

d D

etai

l Rep

ort:

Arc

hite

ctur

al C

oatin

gs

Con

sum

er P

rodu

cts

Hea

rth

Land

scap

e

Nat

ural

Gas

TO

TA

LS (

tons

/yea

r, u

nmiti

gate

d)

Sou

rce

RO

GN

Ox

CO

SO

2P

M10

PM

2.5

CO

2

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

Ann

ual T

ons

Per

Yea

r, U

nmiti

gate

d

Are

a S

ourc

e U

nmiti

gate

d D

etai

l Rep

ort:

Ana

lysi

s Y

ear:

200

9 S

easo

n: A

nnua

l

Em

fac:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Doe

s no

t inc

lude

cor

rect

ion

for

pass

by tr

ips

Doe

s no

t inc

lude

dou

ble

coun

ting

adju

stm

ent f

or in

tern

al tr

ips

Ope

ratio

nal S

ettin

gs:

Are

a S

ourc

e C

hang

es to

Def

aults

Page 98: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:11:53 AM

Page: 4

Urban T

rip Length (miles)

10.87.3

7.59.5

7.47.4

Travel C

onditions

Hom

e-Work

Hom

e-Shop

Hom

e-Other

Com

mute

Non-W

orkC

ustomer

Residential

Com

mercial

Heavy-H

eavy Truck 33,001-60,000 lbs

5.00.0

0.0100.0

Med-H

eavy Truck 14,001-33,000 lbs

5.00.0

20.080.0

Motor H

ome

0.010.0

80.010.0

Other B

us0.0

0.00.0

100.0

School B

us0.0

0.00.0

100.0

Motorcycle

0.071.4

28.60.0

Urban B

us0.0

0.00.0

100.0

Light Truck <

3750 lbs30.0

3.790.8

5.5

Light Auto

25.01.6

98.00.4

Lite-Heavy T

ruck 10,001-14,000 lbs5.0

0.050.0

50.0

Lite-Heavy T

ruck 8501-10,000 lbs5.0

0.075.0

25.0

Med T

ruck 5751-8500 lbs10.0

1.198.9

0.0

Light Truck 3751-5750 lbs

15.00.9

98.60.5

Vehicle F

leet Mix

Vehicle T

ypeP

ercent Type

Non-C

atalystC

atalystD

iesel

General heavy industry

6.75acres

0.010.07

0.63

0.070.63

Sum

mary of Land U

ses

Land Use T

ypeA

creageT

rip Rate

Unit T

ypeN

o. Units

Total T

ripsT

otal VM

T

Page 99: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:11:

53 A

M

Pag

e: 5

% o

f Trip

s -

Res

iden

tial

32.9

18.0

49.1

Gen

eral

hea

vy in

dust

ry90

.05.

05.

0

% o

f Trip

s -

Com

mer

cial

(by

land

use

)

Trip

spe

eds

(mph

)35

.035

.035

.035

.035

.035

.0

Rur

al T

rip L

engt

h (m

iles)

16.8

7.1

7.9

14.7

6.6

6.6

Tra

vel C

ondi

tions

Hom

e-W

ork

Hom

e-S

hop

Hom

e-O

ther

Com

mut

eN

on-W

ork

Cus

tom

er

Res

iden

tial

Com

mer

cial

Page 100: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

 

Page 101: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:10:

58 A

M

Pag

e: 1

File

Nam

e: C

:\SD

GE

\urb

emis

_upd

ate\

7-09

-09

Com

m to

wer

.urb

924

Pro

ject

Nam

e: C

omm

unic

atio

n T

ower

Whi

te S

tar

Pro

ject

Loc

atio

n: C

alifo

rnia

Sta

te-w

ide

On-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Off-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

OF

FR

OA

D20

07

Com

bine

d S

umm

er E

mis

sion

s R

epor

ts (

Pou

nds/

Day

)

Urb

emis

200

7 V

ersi

on 9

.2.4

TO

TA

LS (

lbs/

day,

unm

itiga

ted)

0.00

0.00

0.01

0.00

0.00

0.00

0.80

SU

M O

F A

RE

A S

OU

RC

E A

ND

OP

ER

AT

ION

AL

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5

CO

2

TO

TA

LS (

lbs/

day,

unm

itiga

ted)

0.00

0.00

0.01

0.00

0.00

0.00

0.80

OP

ER

AT

ION

AL

(VE

HIC

LE)

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5

CO

2

TO

TA

LS (

lbs/

day,

unm

itiga

ted)

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5

CO

2

2010

TO

TA

LS (

lbs/

day

unm

itiga

ted)

11.9

410

9.21

39.6

80.

000.

014.

094.

110.

013.

763.

7713

,481

.48

RO

GN

Ox

CO

SO

2P

M10

Dus

tPM

10 E

xhau

stP

M10

PM

2.5

Dus

tP

M2.

5 E

xhau

stP

M2.

5C

O2

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S

Sum

mar

y R

epor

t:

Page 102: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:10:58 AM

Page: 2

Phase: B

uilding Construction 8/1/2010 - 9/30/2010 - B

uilding and tower installation

1 Cranes (399 hp) operating at a 0.43 load factor for 6 hours per day

Off-R

oad Equipm

ent:

Phase: T

renching 6/1/2010 - 7/31/2010 - Site developm

ent and foundation installation

1 Tractors/Loaders/B

ackhoes (108 hp) operating at a 0.55 load factor for 6 hours per day

Off-R

oad Equipm

ent:

10 Off H

ighway T

rucks (479 hp) operating at a 0.57 load factor for 6 hours per day

1 Bore/D

rill Rigs (291 hp) operating at a 0.75 load factor for 6 hours per day

Phase A

ssumptions

Construction U

nmitigated D

etail Report:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S S

umm

er Pounds P

er Day, U

nmitigated

RO

GN

Ox

CO

SO

2P

M10 D

ustPM10 Exhaust

PM

10P

M2.5 D

ustPM2.5 Exhaust

PM

2.5C

O2

Tim

e Slice 8/2/2010-9/30/2010

Active D

ays: 440.57

5.482.07

0.000.20

0.19559.44

0.000.20

0.000.19

0.20B

uilding 08/01/2010-09/30/20100.57

5.482.07

0.000.19

559.440.00

0.200.00

0.19

Building W

orker Trips

0.000.00

0.020.00

0.000.00

0.000.00

0.000.00

1.87

Building V

endor Trips

0.000.02

0.010.00

0.000.00

0.000.00

0.000.00

2.98

Building O

ff Road D

iesel0.57

5.462.04

0.000.00

0.200.20

0.000.19

0.19554.59

Tim

e Slice 6/1/2010-7/30/2010

Active D

ays: 4411.94

109.2139.68

0.004.11

3.7713,481.48

0.014.09

0.013.76

4.11T

renching 06/01/2010-07/31/201011.94

109.2139.68

0.003.77

13,481.480.01

4.090.01

3.76

Trenching W

orker Trips

0.110.18

3.300.00

0.010.01

0.020.01

0.010.01

306.48

Trenching O

ff Road D

iesel11.83

109.0336.39

0.000.00

4.084.08

0.003.76

3.7613,175.01

Page 103: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:10:

58 A

M

Pag

e: 3

OP

ER

AT

ION

AL

EM

ISS

ION

ES

TIM

AT

ES

Sum

mer

Pou

nds

Per

Day

, Unm

itiga

ted

Gen

eral

hea

vy in

dust

ry0.

000.

000.

010.

000.

000.

000.

80

TO

TA

LS (

lbs/

day,

unm

itiga

ted)

0.00

0.00

0.01

0.00

0.00

0.00

0.80

Sou

rce

RO

GN

OX

CO

SO

2P

M10

PM

25C

O2

Ope

ratio

nal U

nmiti

gate

d D

etai

l Rep

ort:

Arc

hite

ctur

al C

oatin

gs

Con

sum

er P

rodu

cts

Hea

rth

Land

scap

e

Nat

ural

Gas

TO

TA

LS (

lbs/

day,

unm

itiga

ted)

Sou

rce

RO

GN

Ox

CO

SO

2P

M10

PM

2.5

CO

2

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

Sum

mer

Pou

nds

Per

Day

, Unm

itiga

ted

Are

a S

ourc

e U

nmiti

gate

d D

etai

l Rep

ort:

Ana

lysi

s Y

ear:

200

9 T

empe

ratu

re (

F):

85

Sea

son:

Sum

mer

Em

fac:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Doe

s no

t inc

lude

cor

rect

ion

for

pass

by tr

ips

Doe

s no

t inc

lude

dou

ble

coun

ting

adju

stm

ent f

or in

tern

al tr

ips

Ope

ratio

nal S

ettin

gs:

Are

a S

ourc

e C

hang

es to

Def

aults

Page 104: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:10:58 AM

Page: 4

Urban T

rip Length (miles)

10.87.3

7.59.5

7.47.4

Travel C

onditions

Hom

e-Work

Hom

e-Shop

Hom

e-Other

Com

mute

Non-W

orkC

ustomer

Residential

Com

mercial

Heavy-H

eavy Truck 33,001-60,000 lbs

5.00.0

0.0100.0

Med-H

eavy Truck 14,001-33,000 lbs

5.00.0

20.080.0

Motor H

ome

0.010.0

80.010.0

Other B

us0.0

0.00.0

100.0

School B

us0.0

0.00.0

100.0

Motorcycle

0.071.4

28.60.0

Urban B

us0.0

0.00.0

100.0

Light Truck <

3750 lbs30.0

3.790.8

5.5

Light Auto

25.01.6

98.00.4

Lite-Heavy T

ruck 10,001-14,000 lbs5.0

0.050.0

50.0

Lite-Heavy T

ruck 8501-10,000 lbs5.0

0.075.0

25.0

Med T

ruck 5751-8500 lbs10.0

1.198.9

0.0

Light Truck 3751-5750 lbs

15.00.9

98.60.5

Vehicle F

leet Mix

Vehicle T

ypeP

ercent Type

Non-C

atalystC

atalystD

iesel

General heavy industry

6.75acres

0.010.07

0.63

0.070.63

Sum

mary of Land U

ses

Land Use T

ypeA

creageT

rip Rate

Unit T

ypeN

o. Units

Total T

ripsT

otal VM

T

Page 105: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:10:

58 A

M

Pag

e: 5

% o

f Trip

s -

Res

iden

tial

32.9

18.0

49.1

Gen

eral

hea

vy in

dust

ry90

.05.

05.

0

% o

f Trip

s -

Com

mer

cial

(by

land

use

)

Trip

spe

eds

(mph

)35

.035

.035

.035

.035

.035

.0

Rur

al T

rip L

engt

h (m

iles)

16.8

7.1

7.9

14.7

6.6

6.6

Tra

vel C

ondi

tions

Hom

e-W

ork

Hom

e-S

hop

Hom

e-O

ther

Com

mut

eN

on-W

ork

Cus

tom

er

Res

iden

tial

Com

mer

cial

Page 106: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

 

Page 107: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:32:

38 A

M

Pag

e: 1

File

Nam

e: C

:\SD

GE

\urb

emis

_upd

ate\

7-09

-09

SD

GE

EC

O Im

peria

l Cou

nty.

urb9

24

Pro

ject

Nam

e: E

ast C

ount

y su

bsta

tion,

Impe

rial C

ount

y em

issi

ons

Pro

ject

Loc

atio

n: C

alifo

rnia

Sta

te-w

ide

On-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Off-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

OF

FR

OA

D20

07

Com

bine

d A

nnua

l Em

issi

ons

Rep

orts

(T

ons/

Yea

r)

Urb

emis

200

7 V

ersi

on 9

.2.4

Page 108: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:32:38 AM

Page: 2

Construction U

nmitigated D

etail Report:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S A

nnual Tons P

er Year, U

nmitigated

RO

GN

Ox

CO

SO

2P

M10 D

ustPM10 Exhaust

PM

10P

M2.5 D

ustPM2.5 Exhaust

PM

2.5C

O2

TO

TA

LS (tons/year, unm

itigated)0.34

0.202.72

0.000.00

0.0030.84

SU

M O

F A

RE

A S

OU

RC

E A

ND

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (tons/year, unm

itigated)0.34

0.202.72

0.000.00

0.0030.84

OP

ER

AT

ION

AL (V

EH

ICLE

) EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (tons/year, unm

itigated)

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

2011 TO

TA

LS (tons/year unm

itigated)0.89

13.254.52

0.020.07

0.500.57

0.020.46

0.482,034.91

2010 TO

TA

LS (tons/year unm

itigated)0.75

11.563.90

0.010.06

0.440.50

0.020.41

0.421,600.10

RO

GN

Ox

CO

SO

2P

M10 D

ustPM

10 Exhaust

PM

10P

M2.5 D

ustP

M2.5

Exhaust

PM

2.5C

O2

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S

Sum

mary R

eport:

Page 109: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:32:

38 A

M

Pag

e: 3

2011

0.89

13.2

54.

520.

020.

570.

482,

034.

910.

070.

500.

020.

46

0.51

Mas

s G

radi

ng 0

2/01

/201

1-09

/30/

2011

0.79

11.7

84.

020.

020.

431,

808.

810.

060.

450.

020.

41

Mas

s G

radi

ng O

n R

oad

Die

sel

0.79

11.7

84.

020.

020.

060.

450.

510.

020.

410.

431,

808.

81

Mas

s G

radi

ng W

orke

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.06

Fin

e G

radi

ng 1

0/01

/201

0-01

/31/

2011

0.10

1.47

0.50

0.00

0.05

226.

100.

010.

060.

000.

05

Fin

e G

radi

ng O

n R

oad

Die

sel

0.10

1.47

0.50

0.00

0.01

0.06

0.06

0.00

0.05

0.05

226.

10

Fin

e G

radi

ng W

orke

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fin

e G

radi

ng D

ust

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fin

e G

radi

ng O

ff R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2010

0.75

11.5

63.

900.

010.

500.

421,

600.

100.

060.

440.

020.

41

0.21

Fin

e G

radi

ng 1

0/01

/201

0-01

/31/

2011

0.32

4.97

1.67

0.01

0.18

687.

000.

020.

190.

010.

17

Fin

e G

radi

ng O

n R

oad

Die

sel

0.32

4.97

1.67

0.01

0.02

0.19

0.21

0.01

0.17

0.18

687.

00

Fin

e G

radi

ng W

orke

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fin

e G

radi

ng D

ust

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fin

e G

radi

ng O

ff R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.28

Mas

s G

radi

ng 0

6/01

/201

0-09

/30/

2010

0.43

6.60

2.23

0.01

0.24

913.

100.

030.

250.

010.

23

Mas

s G

radi

ng O

n R

oad

Die

sel

0.43

6.60

2.23

0.01

0.03

0.25

0.28

0.01

0.23

0.24

913.

10

Mas

s G

radi

ng W

orke

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 110: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:32:38 AM

Page: 4

Off-R

oad Equipm

ent:

Phase: M

ass Grading 2/1/2011 - 9/30/2011 - H

aul truck trips separate from grading (10,000 trips over 8 m

onths, 72 miles R

/T, Im

,perial County)

0 lbs per acre-day

On R

oad Truck T

ravel (VM

T): 4320

0 lbs per acre-day

On R

oad Truck T

ravel (VM

T): 4320

Off-R

oad Equipm

ent:

Total A

cres Disturbed: 0

Maxim

um D

aily Acreage D

isturbed: 0

Fugitive D

ust Level of Detail: D

efault

Maxim

um D

aily Acreage D

isturbed: 0

Fugitive D

ust Level of Detail: D

efault

0 lbs per acre-day

Fugitive D

ust Level of Detail: D

efault

Phase: F

ine Grading 10/1/2010 - 1/31/2011 - W

ater truck traffic in Imperial C

ounty

Total A

cres Disturbed: 0

Phase: M

ass Grading 6/1/2010 - 9/30/2010 - W

ater truck traffic in Imperial C

ounty (3,000 trips, 72 miles R

/T, Im

perial County)

Total A

cres Disturbed: 0

Maxim

um D

aily Acreage D

isturbed: 0

On R

oad Truck T

ravel (VM

T): 4320

Off-R

oad Equipm

ent:

Phase A

ssumptions

Page 111: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:32:

38 A

M

Pag

e: 5

Con

stru

ctio

n M

itiga

ted

Det

ail R

epor

t:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S A

nnua

l Ton

s P

er Y

ear,

Miti

gate

d

Con

stru

ctio

n R

elat

ed M

itiga

tion

Mea

sure

s

Page 112: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

 

Page 113: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:31:

16 A

M

Pag

e: 1

File

Nam

e: C

:\SD

GE

\urb

emis

_upd

ate\

7-09

-09

SD

GE

EC

O Im

peria

l Cou

nty.

urb9

24

Pro

ject

Nam

e: E

ast C

ount

y su

bsta

tion,

Impe

rial C

ount

y em

issi

ons

Pro

ject

Loc

atio

n: C

alifo

rnia

Sta

te-w

ide

On-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

Ver

sion

: E

mfa

c200

7 V

2.3

Nov

1 2

006

Off-

Roa

d V

ehic

le E

mis

sion

s B

ased

on:

OF

FR

OA

D20

07

Com

bine

d S

umm

er E

mis

sion

s R

epor

ts (

Pou

nds/

Day

)

Urb

emis

200

7 V

ersi

on 9

.2.4

Page 114: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:31:16 AM

Page: 2

Construction U

nmitigated D

etail Report:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S S

umm

er Pounds P

er Day, U

nmitigated

RO

GN

Ox

CO

SO

2P

M10 D

ustPM10 Exhaust

PM

10P

M2.5 D

ustPM2.5 Exhaust

PM

2.5C

O2

TO

TA

LS (lbs/day, unm

itigated)2.03

0.9613.08

0.000.02

0.01169.00

SU

M O

F A

RE

A S

OU

RC

E A

ND

OP

ER

AT

ION

AL E

MIS

SIO

N E

ST

IMA

TE

S

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (lbs/day, unm

itigated)2.03

0.9613.08

0.000.02

0.01169.00

OP

ER

AT

ION

AL (V

EH

ICLE

) EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

TO

TA

LS (lbs/day, unm

itigated)

AR

EA

SO

UR

CE

EM

ISS

ION

ES

TIM

AT

ES

RO

GN

Ox

CO

SO

2P

M10

PM

2.5C

O2

2011 TO

TA

LS (lbs/day unm

itigated)7.59

113.2538.63

0.160.61

4.284.89

0.203.94

4.1417,392.36

2010 TO

TA

LS (lbs/day unm

itigated)8.19

125.7042.38

0.160.61

4.805.40

0.204.41

4.6117,392.36

RO

GN

Ox

CO

SO

2P

M10 D

ustPM

10 Exhaust

PM

10P

M2.5 D

ustP

M2.5

Exhaust

PM

2.5C

O2

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S

Sum

mary R

eport:

Page 115: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:31:

16 A

M

Pag

e: 3

Tim

e S

lice

1/1/

2011

-1/3

1/20

11

Act

ive

Day

s: 2

67.

5911

3.25

38.6

30.

164.

894.

1417

,392

.36

0.61

4.28

0.20

3.94

4.89

Fin

e G

radi

ng 1

0/01

/201

0-01

/31/

2011

7.59

113.

2538

.63

0.16

4.14

17,3

92.3

60.

614.

280.

203.

94

Fin

e G

radi

ng O

n R

oad

Die

sel

7.59

113.

2538

.63

0.16

0.61

4.28

4.89

0.20

3.94

4.14

17,3

92.3

6

Fin

e G

radi

ng W

orke

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fin

e G

radi

ng D

ust

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fin

e G

radi

ng O

ff R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Tim

e S

lice

6/1/

2010

-9/3

0/20

10

Act

ive

Day

s: 1

058.

1912

5.70

42.3

80.

165.

404.

6117

,392

.36

0.61

4.80

0.20

4.41

5.40

Mas

s G

radi

ng 0

6/01

/201

0-09

/30/

2010

8.19

125.

7042

.38

0.16

4.61

17,3

92.3

60.

614.

800.

204.

41

Mas

s G

radi

ng O

n R

oad

Die

sel

8.19

125.

7042

.38

0.16

0.61

4.80

5.40

0.20

4.41

4.61

17,3

92.3

6

Mas

s G

radi

ng W

orke

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng D

ust

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Mas

s G

radi

ng O

ff R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Tim

e S

lice

10/1

/201

0-12

/31/

2010

A

ctiv

e D

ays:

79

8.19

125.

7042

.38

0.16

5.40

4.61

17,3

92.3

60.

614.

800.

204.

41

5.40

Fin

e G

radi

ng 1

0/01

/201

0-01

/31/

2011

8.19

125.

7042

.38

0.16

4.61

17,3

92.3

60.

614.

800.

204.

41

Fin

e G

radi

ng O

n R

oad

Die

sel

8.19

125.

7042

.38

0.16

0.61

4.80

5.40

0.20

4.41

4.61

17,3

92.3

6

Fin

e G

radi

ng W

orke

r T

rips

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fin

e G

radi

ng D

ust

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fin

e G

radi

ng O

ff R

oad

Die

sel

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 116: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21/2009 10:31:16 AM

Page: 4

Off-R

oad Equipm

ent:

Phase: M

ass Grading 2/1/2011 - 9/30/2011 - H

aul truck trips separate from grading (10,000 trips over 8 m

onths, 72 miles R

/T, Im

,perial County)

0 lbs per acre-day

On R

oad Truck T

ravel (VM

T): 4320

Total A

cres Disturbed: 0

Maxim

um D

aily Acreage D

isturbed: 0

Fugitive D

ust Level of Detail: D

efault

Maxim

um D

aily Acreage D

isturbed: 0

Fugitive D

ust Level of Detail: D

efault

0 lbs per acre-day

Fugitive D

ust Level of Detail: D

efault

Phase: F

ine Grading 10/1/2010 - 1/31/2011 - W

ater truck traffic in Imperial C

ounty

Total A

cres Disturbed: 0

Phase: M

ass Grading 6/1/2010 - 9/30/2010 - W

ater truck traffic in Imperial C

ounty (3,000 trips, 72 miles R

/T, Im

perial County)

Total A

cres Disturbed: 0

Maxim

um D

aily Acreage D

isturbed: 0

On R

oad Truck T

ravel (VM

T): 4320

Off-R

oad Equipm

ent:

Phase A

ssumptions

Tim

e Slice 2/1/2011-9/30/2011

Active D

ays: 2087.59

113.2538.63

0.164.89

4.1417,392.36

0.614.28

0.203.94

4.89M

ass Grading 02/01/2011-

09/30/20117.59

113.2538.63

0.164.14

17,392.360.61

4.280.20

3.94

Mass G

rading On R

oad Diesel

7.59113.25

38.630.16

0.614.28

4.890.20

3.944.14

17,392.36

Mass G

rading Worker T

rips0.00

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

Mass G

rading Dust

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Mass G

rading Off R

oad Diesel

0.000.00

0.000.00

0.000.00

0.000.00

0.000.00

0.00

Page 117: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

7/21

/200

9 10

:31:

16 A

M

Pag

e: 5

Con

stru

ctio

n M

itiga

ted

Det

ail R

epor

t:

CO

NS

TR

UC

TIO

N E

MIS

SIO

N E

ST

IMA

TE

S S

umm

er P

ound

s P

er D

ay, M

itiga

ted

Con

stru

ctio

n R

elat

ed M

itiga

tion

Mea

sure

s

Off-

Roa

d E

quip

men

t:

0 lb

s pe

r ac

re-d

ay

On

Roa

d T

ruck

Tra

vel (

VM

T):

432

0

Page 118: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

 

Page 119: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

GHG CALCULATIONS

Page 120: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …
Page 121: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

A

ttach

men

t 4.3

-A: P

ropo

sed

Proj

ect E

mis

sion

s Cal

cula

tion

Met

hodo

logy

GH

G E

mis

sion

s fro

m G

ener

ator

Use

- C

onst

ruct

ion

Con

stan

t V

alue

U

nits

So

urce

Gen

erat

or O

utpu

t 50

kW

- -

Num

ber o

f Gen

erat

ors

2 - -

- -

Fuel

Con

sum

ptio

n 23

0 sc

f/hou

r - -

Dai

ly h

ours

of O

pera

tion

24

hour

s - -

Day

s Use

d 60

da

ys

- -

Btu

per

scf

1,02

0 B

tu/ft

3 A

P-42

; Tab

le 3

.2-2

LPG

CO

2 Fac

tor

63.1

6 kg

CO

2/MM

BTU

C

CA

R G

RP

v3.1

Tab

le C

.7

LPG

N2O

Fac

tor

0.00

06

kg N

2O/M

MB

TU

CC

AR

GR

P v3

.1 T

able

C.8

LPG

CH

4 Fac

tor

0.00

3 kg

CH

4/MM

BTU

C

CA

R G

RP

v3.1

Tab

le C

.8

N2O

Glo

bal W

arm

ing

Pote

ntia

l 31

0 - -

C

CA

R G

RP

v3.1

Tab

le C

.1

CH

4 Glo

bal W

arm

ing

Pote

ntia

l 21

- -

C

CA

R G

RP

v3.1

Tab

le C

.1

Dai

ly F

uel C

onsu

mpt

ion

11,2

60,8

00.0

0 B

tu/d

ay

Tota

l Fue

l Con

sum

ptio

n 67

5,64

8,00

0.00

B

tu

Tota

l Fue

l Con

sum

ptio

n 67

5.64

8 M

MB

TU

CO

2 E

mis

sion

s (k

g/ye

ar)

N2O

E

mis

sion

s (k

g/ye

ar)

CH

4 E

mis

sion

s (k

g/ye

ar)

CO

2 E

mis

sion

s (m

etri

c to

ns/y

ear)

N2O

E

mis

sion

s (m

etri

c to

ns/y

ear)

CH

4 E

mis

sion

s (m

etri

c to

ns/y

ear)

N2O

CO

2E

Em

issi

ons

(met

ric

tons

/yea

r)

CH

4 CO

2E

Em

issi

ons

(met

ric

tons

/yea

r)

Tot

al C

O2E

(m

etri

c to

ns/y

ear)

42,6

73.9

3 0.

41

2.03

42

.67

0.00

0.

00

0.13

0.

04

42.8

4

Page 122: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Attachm

ent 4.3-A: Proposed Project Em

issions Calculation M

ethodology

GH

G E

missions from

Generator U

se - Operation

Constant

Value

Units

Source

LPG low

er heating value 1,020

Btu/ft 3

AP-42; Table 3.2-2

LPG C

O2 Factor

63.16 kg C

O2 /M

MB

TU

CC

AR

GR

P v3.1 Table C.7

LPG N

2 O Factor

0.0006 kg N

2 O/M

MB

TU

CC

AR

GR

P v3.1 Table C.8

LPG C

H4 Factor

0.003 kg C

H4 /M

MB

TU

CC

AR

GR

P v3.1 Table C.8

Diesel C

O2 Factor

10.15 kg C

O2 /gallon

CC

AR

GR

P v3.1 Table C.7

Diesel N

2 O Factor

0.0001 kg N

2 O/gallon

CC

AR

GR

P v3.1 Table C.9

Diesel C

H4 Factor

0.0004 kg C

H4 /gallon

CC

AR

GR

P v3.1 Table C.9

N2 O

Global W

arming Potential

310 - -

CC

AR

GR

P v3.1 Table C.1

CH

4 Global W

arming Potential

21 - -

CC

AR

GR

P v3.1 Table C.1

Project Com

ponent Fuel T

ype A

nnual H

ours

Fuel C

onsumption

Rate

Units

Annual Fuel

Consum

ptionU

nits N

otes

ECO

Substation - G

enerator #1 D

iesel 50

15.3 gallons/hr

765 gallons

Kohler

200REO

ZJD

ECO

Substation - G

enerator #2 D

iesel 50

8.2 gallons/hr

410 gallons

Kohler

100REO

ZJD

White Star

Com

munication

Facility LPG

50

166 ft 3/hr

8.47 M

MB

tu K

ohler 25R

ZGB

Page 123: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

A

ttach

men

t 4.3

-A: P

ropo

sed

Proj

ect E

mis

sion

s Cal

cula

tion

Met

hodo

logy

Proj

ect

Com

pone

nt

CO

2 E

mis

sion

s (k

g/ye

ar)

N2O

E

mis

sion

s (k

g/ye

ar)

CH

4 E

mis

sion

s (k

g/ye

ar)

CO

2 E

mis

sion

s (m

etri

c to

ns/y

ear)

N2O

E

mis

sion

s (m

etri

c to

ns/y

ear)

CH

4 E

mis

sion

s (m

etri

c to

ns/y

ear)

N2O

CO

2E

Em

issi

ons

(met

ric

tons

/yea

r)

CH

4 CO

2E

Em

issi

ons

(met

ric

tons

/yea

r)

Tot

al C

O2E

(m

etri

c to

ns/y

ear)

ECO

Su

bsta

tion

11,9

26.2

5 0.

12

0.47

11

.93

0.00

0.

00

0.04

0.

01

11.9

7

Whi

te S

tar

Com

mun

icat

ion

Fac

ility

53

4.71

0.

01

0.03

0.

53

0.00

0.

00

0.00

0.

00

0.54

Tot

al:

12.5

1

Page 124: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Attachm

ent 4.3-A: Proposed Project Em

issions Calculation M

ethodology

GH

G E

missions from

Auxiliary Pow

er Consum

ption

Constant

Value

Units

Source

eGR

ID Subregion

CA

MX

- -

CC

AR

GR

P v3.1 Page 34

CO

2 Electricity Emission Factor

724.12 lbs C

O2 /M

Wh

CC

AR

GR

P v3.1 Table C.2

N2 O

Electricity Emission Factor

0.0081 lbs N

2 O/M

Wh

CC

AR

GR

P v3.1 Table C.2

CH

4 Electricity Emission Factor

0.0302 lbs C

H4 /M

Wh

CC

AR

GR

P v3.1 Table C.2

N2 O

Global W

arming Potential

310 - -

CC

AR

GR

P v3.1 Table C.1

CH

4 Global W

arming Potential

21 - -

CC

AR

GR

P v3.1 Table C.1

Facility A

nnual C

onsumption

Units

Annual

Consum

ption U

nits

ECO

Substation 483,530.00

kWh/year

483.53 M

Wh/year

Boulevard Substation R

ebuild 123,529.00

kWh/year

123.53 M

Wh/year

White Star C

omm

unication Facility 37,000.00

kWh/year

37.00 M

Wh/year

Facility

CO

2 E

missions

(metric

tons/year)

N2 O

E

missions

(metric

tons/year)

CH

4 E

missions

(metric

tons/year)

N2 O

CO

2 E

Em

issions (m

etric tons/year)

CH

4 CO

2 E

Em

issions (m

etric tons/year)

Total C

O2 E

(m

etric tons/year)

ECO

Substation 158.82

1.78 6.62

550.73 139.10

848.64

Boulevard Substation R

ebuild 40.57

0.45 1.69

140.70 35.54

216.81

White Star C

omm

unication Facility 12.15

0.14 0.51

42.14 10.64

64.94

Page 125: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

A

ttach

men

t 4.3

-A: P

ropo

sed

Proj

ect E

mis

sion

s Cal

cula

tion

Met

hodo

logy

Con

stan

t V

alue

U

nits

So

urce

Bre

aker

Ann

ual L

eak

Rat

e 0.

29%

-

SDG

&E

Cyl

inde

r Ann

ual L

eak

Rat

e 0.

29%

-

SDG

&E

SF6 G

loba

l War

min

g Po

tent

ial

23,9

00

- C

CA

R G

RP

v3.1

Tab

le C

.1

Proj

ect C

ompo

nent

E

quip

men

t SF

6 Cap

acity

(p

ound

s)

INIT

IAL

AR

RA

NG

EM

EN

T U

LTIM

ATE

AR

RA

NG

EM

EN

T

Qua

ntity

T

otal

SF 6

(p

ound

s)

Ann

ual S

F 6

Lea

ked

(pou

nds)

Ann

ual S

F 6

Lea

ked

(met

ric

tons

)

Ann

ual C

O2E

L

eake

d (m

etri

c to

ns)

Qua

ntity

T

otal

SF 6

(p

ound

s)

Ann

ual S

F 6

Lea

ked

(pou

nds)

Ann

ual S

F 6

Lea

ked

(met

ric

tons

)

Ann

ual C

O2E

L

eake

d (m

etri

c to

ns)

EC

O S

ubst

atio

n

Bre

aker

s

500

kV

1,15

7 3

3,47

1 10

.066

0.

005

109.

12

15

17,3

55

50.3

30

0.02

3 54

5.62

230

kV

161

9 1,

449

4.20

2 0.

002

45.5

5 26

4,

186

12.1

39

0.00

6 13

1.60

138

kV

128

4 51

2 1.

485

0.00

1 16

.10

18

2,30

4 6.

682

0.00

3 72

.43

69 k

V

33

0 0

0.00

0 0.

000

0.00

0

0 0.

000

0.00

0 0.

00

Cyl

inde

rs

115

6 69

0 2.

001

0.00

1 21

.69

6 69

0 2.

001

0.00

1 21

.69

Bou

leva

rd S

ubst

atio

n R

ebui

ld

Bre

aker

s

500

kV

1,15

7 0

0 0.

000

0.00

0 0.

00

0 0

0.00

0 0.

000

0.00

230

kV

161

0 0

0.00

0 0.

000

0.00

0

0 0.

000

0.00

0 0.

00

138

kV

128

5 64

0 1.

856

0.00

1 20

.12

11

1,40

8 4.

083

0.00

2 44

.27

69 k

V

33

2 66

0.

191

0.00

0 2.

07

5 16

5 0.

479

0.00

0 5.

19

Cyl

inde

rs

115

0 0

0.00

0 0.

000

0.00

0

0 0.

000

0.00

0 0.

00

Page 126: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Table of Constants and Assum

ptions

ecru

oSst

inU

eul a

Vtn

atsn

o Ckg of CO2 per G

allon of Diesel

RAC

Cno

l lag

/ gk

51.0

1le

uF G

RP v3.1 Table C.3g N

2O per G

allon of Diesel Fuel - O

ff-

RAC

Cno

llag

/g6 2

.0da

oR G

RP v3.1 Table C.6g CH

4 per Gallon of D

iesel Fuel - Off

-R

A CC

n oll

ag/g

8 5.0

daoR

GRP v3.1 Table C.6

g N2O

per Gallon of D

iesel Fuel - HD

23

3.0

skcu

rT-

California G

reenhouse Gas Inventory

g CH4 per G

allon of Diesel Fuel - H

D

303.

0sk

c urT

-

California Greenhouse G

as Inventoryg N

2O per G

allon of Diesel Fuel - LD

trucks/cars*0.332

-

California Greenhouse G

as Inventoryg CH

4 per Gallon of D

iesel Fuel - LD trucks/cars*

0.196-

California G

reenhouse Gas Inventory

N2O

Global W

arming

013

lait

net o

P-

CCA

R GRP v3.1 Table C.1

CH4 G

lobal Warm

ing 12

lait

neto

P-

CCA

R GRP v3.1 Table C.1

Convert tons to 2 .

709

gkConvert g to

1 00.

0gk

-

Convert pounds to 50

00.0

snot

-

Convert kg to metric

1 00.

0sn

ot-

* Values from

light duty trucks and passenger vehicles were averaged to develop these em

ission rates in order to be more conservative

Referenceskn

ilre

pyH

ycn e

gA

tne

muco

D /el

tiT

Date V

isitedCalifornia Clim

ate Action Registry G

eneral Reporting Protocol Version 3.1California Clim

ate Action Registry

http://w

ww.clim

ateregistry.org/tools/protocols/general -reporting-32

lmt

h .loc

otor

p-A

pr- 09California G

reenhouse Gas

ain r

ofila

Cyr

otne

v nI

Air Resources Board

http://w

ww.arb.ca.gov/cc/inventory/doc/doc.htm

23-Apr- 09

Passenger Vehicles, Distillate, CH

4, 2004California A

ir Resources 32

mth.

4002

_4HC

_eta

llits

iD_

noit

sub

mocl

euF _

s rac

regn

essa

P_da

orn

O_ib

3A1

/1sc

od/c

o d/y

r ot n

evni

/cc/

vog.

ac.b

ra.

ww

w//:

ptth

drao

B-A

pr-09Passenger Vehicles, D

istillate, N2O

, ai

nrofi

laC

4 002

Air Resources

32mt

h .40

02_

O2N _

etall

itsi

D_no

itsu

bmo

cleu

F_sr

acre

gnes

saP_

daor

nO_

ib3

A1/1

scod

/cod

/yro

tnev

ni/c

c/vo

g.ac

.bra

.w

ww/

/:pt

t hdr

aoB

-Apr-09

Light-Duty Trucks, D

istillate, CH4,

ainr

ofila

C40

02 A

ir Resources Boardhtt

p://www.arb.ca.gov/cc/inventory/doc/docs1/1A

3bii_Onroad_Light-

32mt

h.40

02_4

HC_e

talli

tsi

D_no

itsu

bmo

cleu

F_sk

curT

ytu

D-A

pr-09Light-D

uty Trucks, Distillate, N

2O,

ainr

ofila

C40

02 A

ir Resources Boardhtt

p://www.arb.ca.gov/cc/inventory/doc/docs1/1A

3bii_Onroad_Light-

32mt

h.40

02_

O2N_

etall

itsi

D _no

itsu

bmo

cleu

F_sk

curT

ytu

D-A

pr-09H

eavy-Duty Vehicles, D

istillate, CH4,

ainr

ofila

C40

02 A

ir Resources Boardhtt

p://www.arb.ca.gov/cc/inventory/doc/docs1/1A

3biii_Onroad_H

eavy-DutyVehicles_Fuelcom

bustion_Distillate_CH

4_2004.htm23-A

pr-09H

eavy- Duty Vehicles, D

istillate, N2O

, ai

nro fi

laC

4002

Air Resources Board

http://w

ww.arb.ca.gov/cc/inventory/doc/docs1/1A

3biii_Onroad_H

eavy-DutyVehicles_Fuelcom

bustion_Distillate_N

2O_2004.htm

23- Apr-09

Kohler Power 300REO

ZDD

Industrial Generato r

Kohler ak

caP0

2%k

naT/

seru

sol c

nE=1

_ retl

if&1

6221

=re b

muNy

roge

t ac

& 162

31=r

e bmu

N no it

ces ?

mth.l

iate

d /l a

i rts

u dn i

/mo

c.re

wopr

elh o

k .w

ww/

/:pt

t hre

woP

ges&prodnu

23-Apr- 09

Kohler Power 25RZG

B Industrial re

l hoK

rota

rene

G

216

4421

=mu

ndor

p&z

H02

%06=

1_re

tlif

& 16 0

21=r

ebmu

Nyro

g eta

c&1

6231

=reb

muN n

oitce

s ?mt

h.lia

ted /

l ai r

tsud

ni/

moc.

rewo

prel

hok .

ww

w//:

ptth

rew o

P3- A

pr- 09

Notes

1. All CO

2 Emissions (tons/year) presented in the Construction Equipm

ent calculations have been extracted from the U

RBEMIS output further described in A

ttachm

ent 4.3-A: Proposed Project Em

issions Calculation Methodolog y

2. All vehicles and construction equipm

ent were assum

ed to be diesel-powered for a w

orst-case scenari o

Page 127: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Attachm

ent 4

.3‐A: Propo

sed Project E

mission

sCalculation Metho

dology

Total Emission

s

ECO Sub

station

CO2 

Emission

s (ton

s/year)

CO2 Em

ission

s (kg)

CO2 Em

ission

s (m

etric tons)

Total D

iesel 

Consum

ed 

(gallons)

N2O

 Emission

s (kg)

CH4 Em

ission

s (kg)

N2O

 CO2E

 Em

ission

s (kg)

CH4 CO

2E 

Emission

s (kg)

N2O

 CO2E

 Em

ission

s (m

etric tons)

CH4 CO

2E 

Emission

s (m

etric tons)

Total CO2E

 (kg)

Total CO2E

 (m

etric tons)

Constructio

nOn‐Ro

ad1,00

0,15

1.71

     

1,00

0.15

            

98,537

.11

      

32.71

              

29.86

              

10,141

.44

        

626.99

            

10.14

              

0.63

                

1,01

0,92

0.14

 1,01

0.92

        

2010

177.79

        

2011

226.10

        

2012

698.57

        

On‐Ro

ad ‐ LD

2,07

7,40

6.3 5

     

2,07

7.41

            

204,67

0.58

    

67.95

              

40.12

              

21,064

.70

        

842.42

            

21.06

              

0.84

                

2,09

9,31

3.47

 2,09

9.31

        

2010

57.81

          

2011

1,79

3.49

     

2012

438.61

        

Off‐Road

3,35

1,62

3.18

     

3,35

1.62

            

330,20

9.18

    

85.85

              

191.52

            

26,614

.86

        

4,02

1.95

        

26.61

              

4.02

                

3,38

2,25

9.99

 3,38

2.26

        

2010

1,48

5.8 4

     

2011

2,17

2.33

     

2012

36.30

          

Ope

ration

 & M

ainten

ance

1,15

6,23

5.47

     

1,15

6.24

              

113,91

4.82

      

37.82

                

34.52

                

11,724

.11

        

724.84

             

11.72

                

0.72

                  

1,16

8,68

4.43

   1,16

8.68

          

On‐Ro

ad1,27

4.51

     

2010

 Con

struction To

tal

1,72

1.44

     

2011

 Con

struction To

tal

4,19

1.92

     

2012

 Con

struction To

tal

1,17

3.48

     

Construction

 Total

7,08

6.84

     

6,42

9,18

1.25

     

6,42

9.18

              

633,41

6.87

      

186.52

             

261.49

             

57,821

.00

        

5,49

1.36

          

57.82

                

5.49

                  

6,49

2,49

3.61

   6,49

2.49

          

Emission

 Rates

ECO Sub

station

CO2 

Emission

s (ton

s/year)

CO2 Em

ission

s (kg)

CO2 Em

ission

s (m

etric tons)

Total D

iesel 

Consum

ed 

(gallons)

N2O

 Emission

s (kg)

CH4 Em

ission

s (kg)

N2O

 CO2E

 Em

ission

s (kg)

CH4 CO

2E 

Emission

s (kg)

N2O

 CO2E

 Em

ission

s (m

etric tons)

CH4 CO

2E 

Emission

s (m

etric tons)

Total CO2E

 (kg)

Total CO2E

 (m

etric tons)

Constructio

nGen

erators (LPG

)47

.03

          

42,673

.93

           

42.67

                   

n/a

0.41

                  

2.03

                  

125.67

              

42.57

                

0.13

                  

0.04

                  

42,842

.16

        

42.84

                

On‐Ro

ad22

6.10

        

205,11

7.92

         

205.12

                 

20,208

.66

        

6.71

                  

6.12

                  

2,07

9.88

          

128.59

              

2.08

                  

0.13

                  

207,32

6.38

      

207.33

              

On‐Ro

ad ‐ LD

1,79

3.49

     

1,62

7,05

4.13

      

1,62

7.05

              

160,30

0.90

      

53.22

                

31.42

                

16,498

.17

        

659.80

              

16.50

                

0.66

                  

1,64

4,21

2.10

   1,64

4.21

          

Off‐Road

2,17

2.33

     

1,97

0,73

7.78

      

1,97

0.74

              

194,16

1.36

      

50.48

                

112.61

              

15,649

.41

        

2,36

4.89

          

15.65

                

2.36

                  

1,98

8,75

2.07

   1,98

8.75

          

Construction

 Total

4,23

8.95

     

3,84

5,58

3.75

     

3,84

5.58

              

374,67

0.92

      

110.82

             

152.18

             

34,353

.12

        

3,19

5.84

          

34.35

                

3.20

                  

3,88

3,13

2.71

   3,88

3.13

          

Ope

ration

 & M

ainten

ance

1,27

4.51

     

1,15

6,23

5.47

     

1,15

6.24

              

113,91

4.82

      

37.82

                

34.52

                

11,724

.11

        

724.84

             

11.72

                

0.72

                  

1,16

8,68

4.43

   1,16

8.68

          

Page 128: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Attachm

ent 4.3‐A: Proposed Project Em

issionsCalculation M

ethodology

Total Emissions

SWPL Loop‐In

CO2 

Emissions 

(tons/year)

CO2 Em

issions (kg)

CO2 Em

issions (m

etric tons)

Total Diesel 

Consumed 

(gallons)

N2O

 Emissions 

(kg)CH

4 Emissions 

(kg)N2O

 CO2E 

Emissions (kg)

CH4 CO

2E Em

issions (kg)

N2O

 CO2E 

Emissions 

(metric tons)

CH4 CO

2E Em

issions (m

etric tons)Total CO

2E (kg)Total CO

2E (m

etric tons)

ConstructionOn‐Road

3,683.23            

3.68                    

362.88            

0.12                

0.11                

37.35                

2.31                

0.04                

0.00                

3,722.89        

3.72                

2010‐

              2011

‐              

20124.06

            On‐Road ‐ LD

6,613.49            

6.61                    

651.58            

0.22                

0.13                

67.06                

2.68                

0.07                

0.00                

6,683.23        

6.68                

2010‐

              2011

0.47            

20126.82

            Off‐Road

94,566.53          

94.57                 

9,316.9 0        

2.42                

5.40                

750.94              

113.48            

0.75                

0.11                

95,430.95      

95.43              

2010‐

              2011

6.08            

201298.16

          Operation &

 Maintenance

48,136.03           

48.14                   

4,742.47          

1.57                  

1.44                  

488.09             

30.18                

0.49                  

0.03                  

48,654.30        

48.65                

On‐Road

53.06          

2010 Construction Total‐

              2011 Construction Total

6.55            

2012 Construction Total109.04

        Construction Total

115.59        

104,863.25         

104.86                 

10,331.35        

2.76                  

5.64                  

855.35             

118.47             

0.86                  

0.12                  

105,837.07      

105.84             

Emission Rates

SWPL Loop‐In

CO2 

Emissions 

(tons/year)

CO2 Em

issions (kg)

CO2 Em

issions (m

etric tons)

Total Diesel 

Consumed 

(gallons)

N2O

 Emissions 

(kg)CH

4 Emissions 

(kg)N2O

 CO2E 

Emissions (kg)

CH4 CO

2E Em

issions (kg)

N2O

 CO2E 

Emissions 

(metric tons)

CH4 CO

2E Em

issions (m

etric tons)Total CO

2E (kg)Total CO

2E (m

etric tons)

ConstructionOn‐Road

4.06            

3,683.23             

3.68                      

362.88              

0.12                  

0.11                  

37.35                

2.31                  

0.04                  

0.00                  

3,722.89          

3.72                  

On‐Road ‐ LD

6.82            

6,187.10             

6.19                      

609.57              

0.20                  

0.12                  

62.74                

2.51                  

0.06                  

0.00                  

6,252.35          

6.25                  

Off‐Road

98.16          

89,050.75           

89.05                   

8,773.47          

2.28                  

5.09                  

707.14              

106.86              

0.71                  

0.11                  

89,864.75        

89.86                

Construction Total109.04

        98,921.09

           98.92

                   9,745.92

          2.60

                  5.32

                  807.23

             111.68

             0.81

                  0.11

                  99,839.99

        99.84

                Operation &

 Maintenance

53.06          

48,136.03           

48.14                   

4,742.47          

1.57                  

1.44                  

488.09             

30.18                

0.49                  

0.03                  

48,654.30        

48.65                

Page 129: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Attachm

ent 4

.3‐A: Propo

sed Project E

mission

sCalculation Metho

dology

Total Emission

s

138 kV

 Transmission

 Line

CO2 

Emission

s (ton

s/year)

CO2 Em

ission

s (kg)

CO2 Em

ission

s (m

etric tons)

Total D

iesel 

Consum

ed 

(gallons)

N2O

 Emission

s (kg)

CH4 Em

ission

s (kg)

N2O

 CO2E

 Em

ission

s (kg)

CH4 CO

2E 

Emission

s (kg)

N2O

 CO2E

 Em

ission

s (m

etric tons)

CH4 CO

2E 

Emission

s (m

etric tons)

Total CO2E

 (kg)

Total CO2E

 (m

etric tons)

Constructio

nOn‐Ro

ad68

7,62

1.31

        

687.62

               

67,745

.94

      

22.49

              

20.53

              

6,97

2.41

          

431.07

            

6.97

                

0.43

                

695,02

4.79

    

695.02

            

2010

‐              

2011

757.96

        

2012

‐              

On‐Ro

ad ‐ LD

446,26

0.75

        

446.26

               

43,966

.58

      

14.60

              

8.62

                

4,52

5.04

          

180.97

            

4.53

                

0.18

                

450,96

6.76

    

450.97

            

2010

‐              

2011

491.91

        

2012

‐              

Off‐Road

1,27

0,87

8.34

     

1,27

0.88

            

125,20

9.69

    

32.55

              

72.62

              

10,091

.90

        

1,52

5.05

        

10.09

              

1.53

                

1,28

2,49

5.29

 1,28

2.50

        

2010

‐              

2011

1,40

0.88

     

2012

‐              

Ope

ration

 & M

ainten

ance

498,09

8.16

         

498.10

                 

49,073

.71

        

16.29

                

14.87

                

5,05

0.67

          

312.26

             

5.05

                  

0.31

                  

503,46

1.08

      

503.46

             

On‐Ro

ad54

9.05

        

2010

 Con

struction To

tal

‐              

2011

 Con

struction To

tal

2,65

0.75

     

2012

 Con

struction To

tal

‐              

Construction

 Total

2,65

0.75

     

2,40

4,76

0.40

     

2,40

4.76

              

236,92

2.21

      

69.64

                

101.77

             

21,589

.35

        

2,13

7.09

          

21.59

                

2.14

                  

2,42

8,48

6.84

   2,42

8.49

          

Emission

 Rates

138 kV

 Transmission

 Line

CO2 

Emission

s (ton

s/year)

CO2 Em

ission

s (kg)

CO2 Em

ission

s (m

etric tons)

Total D

iesel 

Consum

ed 

(gallons)

N2O

 Emission

s (kg)

CH4 Em

ission

s (kg)

N2O

 CO2E

 Em

ission

s (kg)

CH4 CO

2E 

Emission

s (kg)

N2O

 CO2E

 Em

ission

s (m

etric tons)

CH4 CO

2E 

Emission

s (m

etric tons)

Total CO2E

 (kg)

Total CO2E

 (m

etric tons)

Constructio

nOn‐Ro

ad75

7.96

        

687,62

1.31

         

687.62

                 

67,745

.94

        

22.49

                

20.53

                

6,97

2.41

          

431.07

              

6.97

                  

0.43

                  

695,02

4.79

      

695.02

              

On‐Ro

ad ‐ LD

491.91

        

446,26

0.75

         

446.26

                 

43,966

.58

        

14.60

                

8.62

                  

4,52

5.04

          

180.97

              

4.53

                  

0.18

                  

450,96

6.76

      

450.97

              

Off‐Road

1,40

0.88

     

1,27

0,87

8.34

      

1,27

0.88

              

125,20

9.69

      

32.55

                

72.62

                

10,091

.90

        

1,52

5.05

          

10.09

                

1.53

                  

1,28

2,49

5.29

   1,28

2.50

          

Construction

 Total

2,65

0.75

     

2,40

4,76

0.40

     

2,40

4.76

              

236,92

2.21

      

69.64

                

101.77

             

21,589

.35

        

2,13

7.09

          

21.59

                

2.14

                  

2,42

8,48

6.84

   2,42

8.49

          

Ope

ration

 & M

ainten

ance

549.05

        

498,09

8.16

         

498.10

                 

49,073

.71

        

16.29

                

14.87

                

5,05

0.67

          

312.26

             

5.05

                  

0.31

                  

503,46

1.08

      

503.46

             

Page 130: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Attachm

ent 4.3‐A: Proposed Project Em

issionsCalculation M

ethodology

Total Emissions

Boulevard Substation

CO2 

Emissions 

(tons/year)

CO2 Em

issions (kg)

CO2 Em

issions (m

etric tons)

Total Diesel 

Consumed 

(gallons)

N2O

 Emissions 

(kg)CH

4 Emissions 

(kg)N2O

 CO2E 

Emissions (kg)

CH4 CO

2E Em

issions (kg)

N2O

 CO2E 

Emissions 

(metric tons)

CH4 CO

2E Em

issions (m

etric tons)Total CO

2E (kg)Total CO

2E (m

etric tons)

ConstructionOn‐Road

259,250.5 4        

259.25               

25,541.93      

8.48                

7.74                

2,628.77          

162.52            

2.63                

0.16                

262,041.84    

262.04            

2010‐

              2011

261.75        

201224.02

          On‐Road ‐ LD

64,383.98          

64.38                 

6,343.25        

2.11                

1.24                

652.85              

26.11              

0.65                

0.03                

65,062.94      

65.06              

2010‐

              2011

50.27          

201220.70

          Off‐Road

620,570.16         

620.57                 

61,139.92        

15.90                

35.46                

4,927.88          

744.68              

4.93                  

0.74                  

626,242.72      

626.24              

2010‐

              2011

603.78        

201280.27

          Operation &

 Maintenance

48,072.53           

48.07                   

4,736.21          

1.57                  

1.44                  

487.45             

30.14                

0.49                  

0.03                  

48,590.12        

48.59                

On‐Road

52.99          

2010 Construction Total‐

              2011 Construction Total

915.80        

2012 Construction Total124.99

        Construction Total

1,040.79     

944,204.69         

944.20                 

93,025.09        

26.48                

44.44                

8,209.50          

933.32             

8.21                  

0.93                  

953,347.50      

953.35             

Emission Rates

Boulevard Substation

CO2 

Emissions 

(tons/year)

CO2 Em

issions (kg)

CO2 Em

issions (m

etric tons)

Total Diesel 

Consumed 

(gallons)

N2O

 Emissions 

(kg)CH

4 Emissions 

(kg)N2O

 CO2E 

Emissions (kg)

CH4 CO

2E Em

issions (kg)

N2O

 CO2E 

Emissions 

(metric tons)

CH4 CO

2E Em

issions (m

etric tons)Total CO

2E (kg)Total CO

2E (m

etric tons)

ConstructionOn ‐Road

261.75        

237,459.60         

237.46                 

23,395.03        

7.77                  

7.09                  

2,407.82          

148.86              

2.41                  

0.15                  

240,016.28      

240.02              

On‐Road ‐ LD

50.27          

45,604.94           

45.60                   

4,493.10          

1.49                  

0.88                  

462.43              

18.49                

0.46                  

0.02                  

46,085.87        

46.09                

Off‐Road

603.78        

547,749.22         

547.75                 

53,965.44        

14.03                

31.30                

4,349.61          

657.30              

4.35                  

0.66                  

552,756.13      

552.76              

Construction Total915.80

        830,813.76

         830.81

                 81,853.57

        23.29

                39.27

                7,219.86

          824.66

             7.22

                  0.82

                  838,858.28

      838.86

             Operation &

 Maintenance

52.99          

48,072.53           

48.07                   

4,736.21          

1.57                  

1.44                  

487.45             

30.14                

0.49                  

0.03                  

48,590.12        

48.59                

Page 131: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Attachm

ent 4

.3‐A: Propo

sed Project E

mission

sCalculation Metho

dology

Total Emission

s

White Star Co

mmun

ication Facility

CO2 

Emission

s (ton

s/year)

CO2 Em

ission

s (kg)

CO2 Em

ission

s (m

etric tons)

Total D

iesel 

Consum

ed 

(gallons)

N2O

 Emission

s (kg)

CH4 Em

ission

s (kg)

N2O

 CO2E

 Em

ission

s (kg)

CH4 CO

2E 

Emission

s (kg)

N2O

 CO2E

 Em

ission

s (m

etric tons)

CH4 CO

2E 

Emission

s (m

etric tons)

Total CO2E

 (kg)

Total CO2E

 (m

etric tons)

Constructio

nOn‐Ro

ad63

.50

                  

0.06

                    

6.26

                

0.00

                

0.00

                

0.64

                 

0.04

                

0.00

                

0.00

                

64.19

              

0.06

                

2010

0.07

            

2011

‐              

2012

‐              

On‐Ro

ad ‐ LD

6,15

0.82

            

6.15

                    

605.99

            

0.20

                

0.12

                

62.37

                

2.49

                

0.06

                

0.00

                

6,21

5.6 8

        

6.22

                

2010

6.78

            

2011

‐              

2012

‐              

Off‐Road

274,01

9.76

         

274.02

                 

26,997

.02

        

7.02

                  

15.66

                

2,17

5.96

          

328.82

              

2.18

                  

0.33

                  

276,52

4.54

      

276.52

              

2010

302.05

        

2011

‐              

2012

‐              

Ope

ration

 & M

ainten

ance

127.01

                

0.13

                      

12.51

                

0.00

                  

0.00

                  

1.29

                  

0.08

                  

0.00

                  

0.00

                  

128.38

             

0.13

                  

On‐Ro

ad0.14

            

2010

 Con

struction To

tal

308.90

        

2011

 Con

struction To

tal

‐              

2012

 Con

struction To

tal

‐              

Construction

 Total

308.90

        

280,23

4.08

         

280.23

                 

27,609

.27

        

7.22

                  

15.78

                

2,23

8.97

          

331.36

             

2.24

                  

0.33

                  

282,80

4.41

      

282.80

             

Emission

 Rates

White Star Co

mmun

ication Facility

CO2 

Emission

s (ton

s/year)

CO2 Em

ission

s (kg)

CO2 Em

ission

s (m

etric tons)

Total D

iesel 

Consum

ed 

(gallons)

N2O

 Emission

s (kg)

CH4 Em

ission

s (kg)

N2O

 CO2E

 Em

ission

s (kg)

CH4 CO

2E 

Emission

s (kg)

N2O

 CO2E

 Em

ission

s (m

etric tons)

CH4 CO

2E 

Emission

s (m

etric tons)

Total CO2E

 (kg)

Total CO2E

 (m

etric tons)

Constructio

nOn‐Ro

ad0.07

            

63.50

                   

0.06

                      

6.26

                  

0.00

                  

0.00

                  

0.64

                  

0.04

                  

0.00

                  

0.00

                  

64.19

                

0.06

                  

On‐Ro

ad ‐ LD

6.78

            

6,15

0.82

             

6.15

                      

605.99

              

0.20

                  

0.12

                  

62.37

                

2.49

                  

0.06

                  

0.00

                  

6,21

5.68

          

6.22

                  

Off‐Road

302.05

        

274,01

9.76

         

274.02

                 

26,997

.02

        

7.02

                  

15.66

                

2,17

5.96

          

328.82

              

2.18

                  

0.33

                  

276,52

4.54

      

276.52

              

Construction

 Total

308.90

        

280,23

4.08

         

280.23

                 

27,609

.27

        

7.22

                  

15.78

                

2,23

8.97

          

331.36

             

2.24

                  

0.33

                  

282,80

4.41

      

282.80

             

Ope

ration

 & M

ainten

ance

0.14

            

127.01

                

0.13

                      

12.51

                

0.00

                  

0.00

                  

1.29

                  

0.08

                  

0.00

                  

0.00

                  

128.38

             

0.13

                  

Page 132: ATTACHMENT 4.3-A: PROPOSED PROJECT EMISSIONS CALCULATION …

Attachm

ent 4.3‐A: Proposed Project Em

issionsCalculation M

ethodology

Total Emissions

Imperial County

CO2 

Emissions 

(tons/year)

CO2 Em

issions (kg)

CO2 Em

issions (m

etric tons)

Total Diesel 

Consumed 

(gallons)

N2O

 Emissions 

(kg)CH

4 Emissions 

(kg)N2O

 CO2E 

Emissions (kg)

CH4 CO

2E Em

issions (kg)

N2O

 CO2E 

Emissions 

(metric tons)

CH4 CO

2E Em

issions (m

etric tons)Total CO

2E (kg)Total CO

2E (m

etric tons)

ConstructionOn‐Road

3,297,681.0 7     

3,297.68            

324,894.69    

107.87            

98.44              

33,438.16        

2,067.30        

33.44              

2.07                

3,333,186.54 

3,333.19        

20101,600.10

     2011

2,034.91     

2012‐

              On‐Road ‐ LD

‐                      

‐                      

‐                  

‐                  

‐                  

‐                   

‐                  

‐                  

‐                  

‐                  

‐                  

2010‐

              2011

‐              

2012‐

              Off‐Road

‐                       

‐                        

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

2010‐

              2011

‐              

2012‐

              Operation &

 Maintenance

‐                       

‐                        

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

On‐Road

‐              

2010 Construction Total1,600.10

     2011 Construction Total

2,034.91     

2012 Construction Total‐

              Construction Total

3,635.01     

3,297,681.07     

3,297.68              

324,894.69      

107.87             

98.44                

33,438.16        

2,067.30          

33.44                

2.07                  

3,333,186.54   

3,333.19          

Emission Rates

Imperial County

CO2 

Emissions 

(tons/year)

CO2 Em

issions (kg)

CO2 Em

issions (m

etric tons)

Total Diesel 

Consumed 

(gallons)

N2O

 Emissions 

(kg)CH

4 Emissions 

(kg)N2O

 CO2E 

Emissions (kg)

CH4 CO

2E Em

issions (kg)

N2O

 CO2E 

Emissions 

(metric tons)

CH4 CO

2E Em

issions (m

etric tons)Total CO

2E  (kg)Total CO

2E (m

etric tons)

ConstructionOn‐Road

2,034.91     

1,846,070.35      

1,846.07              

181,878.85      

60.38                

55.11                

18,718.97        

1,157.30          

18.72                

1.16                  

1,865,946.62   

1,865.95          

On‐Road ‐ LD

‐              

‐                       

‐                        

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

Off‐Road

‐              

‐                       

‐                        

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

Construction Total2,034.91

     1,846,070.35

     1,846.07

              181,878.85

      60.38

                55.11

                18,718.97

        1,157.30

          18.72

                1.16

                  1,865,946.62   

1,865.95          

Operation &

 Maintenance

‐              

‐                       

‐                        

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐                    

‐