attachment 1 page 1 of 41 - federal highway administrationtea-21 demo id project state totals...

41
TEA-21 HIGH PRIORITY PROJECTS - FY 1999 ALLOCATIONS FY 1999 ALLOCATION PROJECT DESCRIPTION STATE PROJ. NO. SECT. 1602 TEA-21 DEMO ID STATE TOTALS PROJECT 1,500,000 Florence Construct bridge over Tennessee River connecting Muscle Shoals and Alabama 957 AL002 150,000 Florence Construct bridge over Tennessee River connecting Muscle Shoals and Alabama 1498 AL002 150,000 Florence Construct bridge over Tennessee River connecting Muscle Shoals and Alabama 1837 AL002 1,617,187 Construct new I-10 bridge over the Mobile River in Mobile, Alabama. Alabama 760 AL006 1,535,625 Construct the Montgomery Outer Loop from US-80 to I-85 via I-65 Alabama 423 AL007 1,770,000 Construct Montgomery outer loop from US 80 to I-85 via I-65 Alabama 1506 AL007 150,000 Construct Montgomery Outer Loop from US 80 to I-85 via I-65 Alabama 1835 AL007 1,950,000 Construct Eastern Black Warrior River Bridge. Alabama 156 AL008 1,162,500 Construction of Eastern Black Warrior River Bridge Alabama 1500 AL008 6,021,000 Calhoun County Construct Anniston Eastern Bypass from I-20 to Fort McClellan in Alabama 777 AL009 300,000 Calhoun County Construct Anniston Eastern Bypass from I-20 to Fort McClellan in Alabama 1505 AL009 150,000 Construct Anniston Eastern Bypass Alabama 1832 AL009 450,000 edge of Madison County and Mississippi State line. Initiate construction on controlled access highway between the Eastern Alabama 102 AL011 180,000 Construct Crepe Myrtle Trail near Mobile, Alabama Alabama 189 AL015 2,550,000 Birmingham Northern Beltline in Jefferson County. Conduct engineering, acquire right-of-way and construct the Alabama 206 AL016 1,337,550 Northern Beltline in Jefferson County Engineering, right-of-way, acquisition and construction of Birmingham Alabama 1502 AL016 217,500 Develop Birmingham Northern Beltline Alabama 1836 AL016 112,500 Airport Highway, Birmingham Construct improvements to 41st Street between 1st Ave. South and Alabama 310 AL017 90,000 and Baptist Princeton Hospital, Birmingham Construct enhancements along 12th Street between State Highway 11 Alabama 314 AL018 300,000 Construct Decatur Southern Bypass Alabama 440 AL019 150,000 Construct Decatur Southern Bypass Alabama 1504 AL019 150,000 Construct Decatur Southern Bypass Alabama 1834 AL019 157,500 Upgrade Opoto-Madrid Blvd., Birmingham Alabama 534 AL020 151,875 Dothan Construct US-231/I-10 Freeway Connector from the Alabama border to Alabama 599 AL021 300,000 Dothan Develop U.S. 231/I-10 Freeway Connector from Alabama border to Alabama 1507 AL021 2,025,000 Extend I-759 in Etowah County Alabama 621 AL022 175,050 Extend I-759 in Etowah County Alabama 1503 AL022 67,500 Birmingham Construct repairs to viaducts connecting downtown and midtown areas, Alabama 677 AL023 438,750 Construct Finley Ave. Extension East project Alabama 775 AL024 75,375 Construct Historic Whistler Bike Trail in Prichard, Alabama Alabama 796 AL025 787,500 to State Highway 59 in Alabama. Construct East Foley corridor project from Baldwin County Highway 20 Alabama 857 AL026 150,000 to State Highway 59 in Alabama Construct East Foley Corridor Project from Baldwin County Highway 20 Alabama 1501 AL026 112,500 to State Highway 59 in Alabama Construct East Foley Corridor Project from Baldwin County Highway 20 Alabama 1833 AL026 810,000 Expand US-278 in Cullman County Alabama 986 AL027 191,250 Upgrade SR 5 in Perry Co. Alabama 1047 AL028 152,438 Construct Eastern Shore Trail project in Fairhope, Alabama. Alabama 1098 AL029 337,500 Replace bridge over Tombigbee River, Naheola Alabama 1100 AL030 450,000 Replace bridge over Tombigbee River, Naheola Alabama 1508 AL030 150,000 Replace bridge over Tombigbee River, Naheola Alabama 1831 AL030 101,250 Junction, Birmingham Construct improvements to 19th Street between I-59 and Tuxedo Alabama 1106 AL031 11,250 Birmingham Replace pedestrian bridges at Village Creek and Valley Creek, Alabama 1265 AL032 67,500 Construct repairs to Pratt Highway Bridge, Birmingham Alabama 1270 AL033 112,500 Warrior Rd., Birmingham Construct improvements to Ensley Avenue between 20th St. and Alabama 1347 AL034 540,000 Complete I-59 interchange in Dekalb County Alabama 1412 AL035 112,500 Clarke Co. Upgrade County Road 39 between Highway 84 and Silver Creek Park, Alabama 1465 AL036 Attachment 1 Page 1 of 41

Upload: others

Post on 25-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

TEA-21 HIGH PRIORITY PROJECTS - FY 1999 ALLOCATIONS

FY 1999 ALLOCATIONPROJECT DESCRIPTIONSTATE

PROJ. NO.SECT. 1602

TEA-21DEMO ID

STATE TOTALSPROJECT

1,500,000FlorenceConstruct bridge over Tennessee River connecting Muscle Shoals andAlabama957AL002

150,000FlorenceConstruct bridge over Tennessee River connecting Muscle Shoals andAlabama1498AL002

150,000FlorenceConstruct bridge over Tennessee River connecting Muscle Shoals andAlabama1837AL002

1,617,187Construct new I-10 bridge over the Mobile River in Mobile, Alabama.Alabama760AL006

1,535,625Construct the Montgomery Outer Loop from US-80 to I-85 via I-65Alabama423AL007

1,770,000Construct Montgomery outer loop from US 80 to I-85 via I-65Alabama1506AL007150,000Construct Montgomery Outer Loop from US 80 to I-85 via I-65Alabama1835AL007

1,950,000Construct Eastern Black Warrior River Bridge.Alabama156AL0081,162,500Construction of Eastern Black Warrior River BridgeAlabama1500AL0086,021,000

Calhoun CountyConstruct Anniston Eastern Bypass from I-20 to Fort McClellan inAlabama777AL009

300,000Calhoun CountyConstruct Anniston Eastern Bypass from I-20 to Fort McClellan inAlabama1505AL009

150,000Construct Anniston Eastern BypassAlabama1832AL009450,000

edge of Madison County and Mississippi State line.Initiate construction on controlled access highway between the EasternAlabama102AL011

180,000Construct Crepe Myrtle Trail near Mobile, AlabamaAlabama189AL0152,550,000

Birmingham Northern Beltline in Jefferson County.Conduct engineering, acquire right-of-way and construct theAlabama206AL016

1,337,550Northern Beltline in Jefferson CountyEngineering, right-of-way, acquisition and construction of BirminghamAlabama1502AL016

217,500Develop Birmingham Northern BeltlineAlabama1836AL016112,500

Airport Highway, BirminghamConstruct improvements to 41st Street between 1st Ave. South andAlabama310AL017

90,000and Baptist Princeton Hospital, BirminghamConstruct enhancements along 12th Street between State Highway 11Alabama314AL018

300,000Construct Decatur Southern BypassAlabama440AL019150,000Construct Decatur Southern BypassAlabama1504AL019150,000Construct Decatur Southern BypassAlabama1834AL019157,500Upgrade Opoto-Madrid Blvd., BirminghamAlabama534AL020151,875

DothanConstruct US-231/I-10 Freeway Connector from the Alabama border toAlabama599AL021

300,000DothanDevelop U.S. 231/I-10 Freeway Connector from Alabama border toAlabama1507AL021

2,025,000Extend I-759 in Etowah CountyAlabama621AL022175,050Extend I-759 in Etowah CountyAlabama1503AL02267,500

BirminghamConstruct repairs to viaducts connecting downtown and midtown areas,Alabama677AL023

438,750Construct Finley Ave. Extension East projectAlabama775AL02475,375Construct Historic Whistler Bike Trail in Prichard, AlabamaAlabama796AL025

787,500to State Highway 59 in Alabama.Construct East Foley corridor project from Baldwin County Highway 20Alabama857AL026

150,000to State Highway 59 in AlabamaConstruct East Foley Corridor Project from Baldwin County Highway 20Alabama1501AL026

112,500to State Highway 59 in AlabamaConstruct East Foley Corridor Project from Baldwin County Highway 20Alabama1833AL026

810,000Expand US-278 in Cullman CountyAlabama986AL027191,250Upgrade SR 5 in Perry Co.Alabama1047AL028152,438Construct Eastern Shore Trail project in Fairhope, Alabama.Alabama1098AL029337,500Replace bridge over Tombigbee River, NaheolaAlabama1100AL030450,000Replace bridge over Tombigbee River, NaheolaAlabama1508AL030150,000Replace bridge over Tombigbee River, NaheolaAlabama1831AL030101,250

Junction, BirminghamConstruct improvements to 19th Street between I-59 and TuxedoAlabama1106AL031

11,250BirminghamReplace pedestrian bridges at Village Creek and Valley Creek,Alabama1265AL032

67,500Construct repairs to Pratt Highway Bridge, BirminghamAlabama1270AL033112,500

Warrior Rd., BirminghamConstruct improvements to Ensley Avenue between 20th St. andAlabama1347AL034

540,000Complete I-59 interchange in Dekalb CountyAlabama1412AL035112,500

Clarke Co.Upgrade County Road 39 between Highway 84 and Silver Creek Park,Alabama1465AL036

Attachment 1 Page 1 of 41

Page 2: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

150,000Southern BypassEngineering, right-of-way acquisition and construction of HuntsvilleAlabama1499AL037

150,000Develop Huntsville Southern BypassAlabama1830AL037270,000

AlabamaCreate National University Transportation Center at the University ofAlabama1838AL038

337,500University at Alabama at Birmingham-Trauma Care CenterAlabama1839AL039300,000

University of Alabama TuscaloosaConduct advance vehicle transportation research program at theAlabama1840AL040

75,000Conduct asphalt research program at Auburn UniversityAlabama1841AL04137,500

Alabama at HuntsvilleConduct Global Climate Reserach Program at the University ofAlabama1842AL042

30,791,10052 ProjectsAlabama39,375Construct Spruce Creek Bridge in SoldotnaAlaska40AK003

675,000

the entire amount of funds providedwhich owns the current intermodal facilities carries out this project withtransportation modes in Seward provided that the state public authorityfacilities servicing the Alaska Marine Highway and other relatedConstruct capital improvements to intermodal freight and passengerAlaska240AK004

264,375Improve roads in KotzebueAlaska311AK0051,012,500Construct Pt. Mackenzie Intermodal FacilityAlaska517AK006

337,500Construct Coffman Cove ferryboatAlaska761AK008562,500Improve Dalton HighwayAlaska826AK009900,000Extend Kenai Spur Highway-North Road in Kenai Peninsula BoroughAlaska990AK010

371,250Extend West Douglas RoadAlaska1348AK0112,250,000

Ketchikan on Revilla IslandConstruct a bridge joining the Island of Gravina to the Community ofAlaska1450AK012

816,450Construct Gravina Island Bridge in KetchikanAlaska1492AK013375,000Construct N.W. Alaska Road/Rail accessAlaska1493AK014225,000Construct North Denali access routeAlaska1494AK015112,500

Prince of Wales IslandConstruct capital improvements to marine transportation facilities forAlaska1495AK016

337,500Section 368]For the purposes set forth in item number 1496 [See PL 105-277Alaska577AK017

112,500Improve marine dry dock and facilities in KetchikanAlaska1496AK0171,791,450Construct New Access Route to Ship Creek Access in AnchorageAlaska1497AK018

150,000Construct Bradfield Canal RoadAlaska525AK01910,332,90017 ProjectsAlaska

562,500construction on Tutilla Island, American SamoaConstruct drainage system improvements associated with highwayAmerican Samoa1262AS003

1,237,500Upgrade village roads on Tutuila/Manua Island, American SamoaAmerican Samoa1373AS004

1,800,0002 ProjectsAmerican Samoa1,687,500Construct Veterans' Memorial overpass in Pima Co.Arizona1177AZ0061,500,000Replace US-93 Hoover Dam BridgeArizona383AZ0121,125,000

Drive, NogalesReconstruct I-19, East Side Frontage Road, Ruby Road to Rio RicoArizona1313AZ013

112,500YumaDesign, engineering and ROW acquisition for Area Service Highway,Arizona1441AZ014

4,661,400High priority highway and bridge projectsArizona1814AZ0159,086,4005 ProjectsArizona

225,000Construct US 63 interchange with Washington Ave. and Highway 63BArkansas1341AR002

750,000Interchange) on U.S. 63 in JonesboroUpgrade 2 bypasses (Washington Ave. Interchange and Highway 63BArkansas1512AR002

562,500of Fort Chaffee, Fort SmithConduct design study and acquire right of way on US-71 in the vicinityArkansas627AR003

1,050,000Devlopment of U.S. 71 from Fort Chaffee to TexarkanaArkansas1514AR003187,500

Chaffee and Fort SmithConstruct improvements to U.S. Highway 71 to I-40 through FortArkansas1527AR003

787,500Construct North Belt FreewayArkansas1150AR006900,000

Arkansas.Widen West Phoenix Avenue and related improvements in Fort Smith,Arkansas411AR008

300,000Continue development of West Phoenix Ave, Ft. SmithArkansas1523AR008399,375Upgrade US Route 412, Harrison to Mountain Home, ArkansasArkansas610AR010

1,125,000Upgrade US Rt. 412, Fulton County line to Missouri State lineArkansas1172AR010

583,125Improve U.S. Highway 412 From Harrison to Mountain HomeArkansas1516AR010112,500

and Slackwater Harbor, Little RockConstruct access routes between interstate highway, industrial parkArkansas22AR014

300,000Development of Little Rock Port AuthorityArkansas1509AR014

Attachment 1 Page 2 of 41

Page 3: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

112,500Widen 28th Street and related improvements in Van Buren, ArkansasArkansas152AR015

37,500Improvements to 28th Street, Van BurenArkansas1524AR015806,250Widen Highway 65/82 from Pine Bluff to the Mississippi State lineArkansas174AR016

225,000Upgrade US Rt. 67, Newport to Missouri State lineArkansas215AR0171,800,000

Highfill, Arkansas.Construct access route to Northwest Arkansas Regional Airport inArkansas238AR018

56,250Northwest Arkansas Regional AirportImprove Arkansas State Highway 12 from US-71 at Rainbow Curve toArkansas246AR018

18,750to the Northwest Arkansas Regional AirportImprove Arkansas State Highway 12 From U.S. 71 at Rainbow CurveArkansas1521AR018

600,000Regional AirportConstruct intermodal connector access road to the Northwest Ark.Arkansas1522AR018

112,500Study and construct a multi-modal facility Russellville, Arkansas.Arkansas268AR019

37,500RussellvilleFurther study and development of Russellville Intermodal Complex inArkansas1518AR019

112,500Construct Geyer Springs RR grade separation, Little RockArkansas346AR020562,500Construct Baseline Road RR grade separation, Little RockArkansas381AR020356,250Construct Highway 371 from Magnolia to PrescottArkansas478AR021450,000Upgrade U.S. 65 in Faulkner and Van Buren CountiesArkansas514AR02233,750

ArkansasStudy and construct Van Buren intermodal port facility in Van Buren,Arkansas620AR023

11,250Conduct feasibility studies for Van Buren Intermodal PortArkansas1525AR023281,250

Uniontown Road in Van BurenImprove Arkansas State Highway 59 from Rena Road to OldArkansas783AR024

97,500Uniontown Road in Van BurenUpgrade Arkansas State Highway 59 from Rena Road to OldArkansas1526AR024

806,250Construct Highway 82 from Hamburg to MontroseArkansas948AR025581,250Construct the Ashdown Bypass/Overpass in AshdownArkansas1008AR026187,500Construct bypass at AshdownArkansas1513AR026

1,500,000Upgrade Highway 63, Marked Tree to Lake DavidArkansas1018AR027168,750Enhance area in the vicinity of Dickson Street in FayettevilleArkansas1093AR02856,250Transportation Enhancements in the Vicinity of Dickson St., FayettevilleArkansas1520AR028

1,031,250Construct US-270 East-West Arterial in Hot SpringsArkansas1210AR02928,125Construct turning lanes at US-71/AR-8 intersection in MenaArkansas1220AR0309,375

Arkansas State Highway 8 in MenaConstruct turning lanes at the Intersection of U.S. Highway 71 andArkansas1519AR030

45,000

ArkansasScenic Highway 22 and Arkansas Scenic Highway 309, ParisEnhance area around the Paris Courthouse in the vicinity of ArkansasArkansas1284AR031

15,000Complete Courthouse Improvement Enhancements Project in ParisArkansas1517AR031

806,250Construct Highway 425 from Pine Bluff to the Louisiana State lineArkansas1289AR032

131,250

Sanders Road in Pine Bluff"]connector road and railroad overpass from Highway 15 to EmmettPine Bluff [Typo - Project description should read: Construct aConstruct Highway 15 from Connector Road to Railroad Overpass inArkansas1319AR033

131,250Arkansas Intermodal ComplexConduct planning for highway 278 and rail for the Warren/MonticelloArkansas1420AR034

300,000Development of Little Rock River Rail ProjectArkansas1510AR035300,000Improvements to I-30 From Benton to Geyer Springs Exit in Little RockArkansas1511AR036

900,000West MemphisDevelopment of Interchange at Intersection of I-40 and Airport Road inArkansas1515AR037

2,250,000High priority highway and bridge projectsArkansas1818AR038750,000Conduct Seismic Design and Deployment ProjectsArkansas1824AR039

22,991,25050 ProjectsArkansas1,575,000Construct Ontario International Airport ground access program.California60CA001

997,500

4.7 (commencing with the Section 2190), Los Angelesdefined by California Streets and Highways Code, Division 3, ChapterNorth end of an Intermodal corridor of economic significance, asConstruct grade separation project at Redondo Junction, located in theCalifornia410CA005

2,250,000in Long Beach, California.Construct Ocean Boulevard and Terminal Island Freeway interchangeCalifornia742CA005

375,000Construct Phase 3 of Alameda Street project, Los AngelesCalifornia834CA0051,275,000Upgrade Route 4 East in Contra Costa Co.California859CA0151,125,000Upgrade I-880, AlamedaCalifornia176CA018

Attachment 1 Page 3 of 41

Page 4: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

247,500Construct Prunedale Bypass segment of U.S. 101, Monerey Co.California566CA019

337,500Construct four-lane highway facility (Hollister Bypass), San Benito Co.California701CA022

562,500Construct SR-78/Rancho Del Oro interchange in OceansideCalifornia548CA0252,263,500

Los Angeles and Orange CountiesConstruct I-5 rail grade crossings between I-605 and State Route 91,California280CA027

787,500Upgrade Bristol St., Santa AnaCalifornia738CA0332,400,000

Crossing, San Diego Co.Construct State Route 905 between I-805 and the Otay Mesa BorderCalifornia568CA036

5,775,000Construct state Rte 905 between I-805 and Otay Mesa border crossingCalifornia1532CA036

1,012,500Construct Gene Autry Way/I-5 Access project, AnaheimCalifornia1176CA039112,500Seismic retrofit of Golden Gate BridgeCalifornia357CA040

3,900,000Conduct Golden Gate Seismic Retrofit ProjectCalifornia1843CA0402,550,000Construct Sta Monica Transit PkwyCalifornia1531CA0482,520,000

in Ventura CountyImprove and modify the Port of Hueneme Intermodal Corridor - Phase IICalifornia664CA050

165,000Widen US-101 from Windsor to Arata InterchangeCalifornia806CA051787,500Modify HOV lanes, Marin Co.California1339CA051

1,312,500Widen US-101 from Petaluma Bridge to NovatoCalifornia1340CA0511,725,000

interchange with Road 102, WoodlandConstruct connector between I-5 and SR 113 and reconstruct I-5California234CA058

825,000Extend Highway 41 in Madera CountyCalifornia1191CA0602,700,000Widen I-15 in San Bernardino County, California.California829CA061

112,500Upgrade access road to Mare IslandCalifornia11CA0621,950,000Widen SR-71 from Riverside County to SR-91California1105CA063

330,750Extend I-10 HOV lanes, Los AngelesCalifornia5CA0671,125,000

FontanaReconstruct State Route 81 (Sierra Ave.) and I-10 Interchange inCalifornia16CA068

731,250Improve SR-91/Green River Road interchangeCalifornia24CA069675,000Improve the interchange at Cabo and Nason Street in Moreno ValleyCalifornia27CA070

57,600Construct bikeways, Santa MariaCalifornia29CA0711,500,000Construct San Diego and Arizona Eastern Intermodal Yard, San YsidroCalifornia35CA072

35,400Improve streets and construct bicycle path, Westlake VillageCalifornia65CA073

112,500Improve streets and construct bicycle path, CalabasasCalifornia69CA0741,406,250Construct Third Street South Bay Basin Bridge, San FranciscoCalifornia78CA075

75,000Improve Mission Boulevard in San Bernardino, CaliforniaCalifornia106CA076112,500Reconstruct Tennessee Valley Bridge, Marin Co.California135CA07741,250Enhance Fort Bragg and Willitis passenger stationsCalifornia161CA078

1,563,750Widen and improve I-5/State Route 126 interchange in ValenciaCalifornia173CA079

393,750Rehabilitate historic train depot in San BernadinoCalifornia187CA080675,000Realign and improve California Route 79 in Riverside CountyCalifornia193CA081

1,434,375Construct Alameda Corridor East projectCalifornia198CA082330,750Construct Alameda Corridor East, San Gabriel ValleyCalifornia1017CA082

2,587,500Los Angeles CountyUpgrade and synchronize traffic lights in the Alameda Corridor East inCalifornia1138CA082

15,000,000America" project in San Gabriel ValleyConstruct hwy grade separation/other improvements for "Gateway forCalifornia1533CA082

168,750Upgrade Ft. Irwin Road from I-15 to Fort IrwinCalifornia213CA08393,750Construct bike paths, Thousand OaksCalifornia221CA08456,250

Westfield Village, Los AngelesUpgrade access to Sylmar/San Fernando Metrolink Station andCalifornia226CA085

937,500Improve SR-70 from Marysville Bypass to Oroville FreewayCalifornia232CA0861,125,000Upgrade I-680 Corridor, Alameda Co.California236CA087

309,3759th Street, San BernardinoReconstruct I-215 and construct HOV lanes between 2nd Street andCalifornia254CA088

1,095,000Upgrade Highway 99, Sutter Co.California263CA089

168,750Upgrade call boxes throughout Santa Barbara CountyCalifornia271CA0901,125,000Construct State Route 76 in Northern San Diego.California296CA091

97,500Willits Bypass, Highway 101in Mendocino County, CaliforniaCalifornia299CA0920

**FLH PROJECT**Improve and widen Forest Hill Road in Placer CountyCalifornia320CA093

41,250Improve highway access to Humboldt Bay and Harbor PortCalifornia331CA09456,250

Promenade at Pismo Creek and Grande Avenue in Gover BeachConstruct pedestrian boardwalk between terminus of PismoCalifornia336CA095

1,406,250Construct San Francisco Regional Intermodal TerminalCalifornia354CA096

Attachment 1 Page 4 of 41

Page 5: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

315,000San BrunoConstruct I-380 connector between Sneath Lane and San Bruno Ave.,California373CA097

337,500Construct interchanges for I-10 in Coachella Valley, Riverside CountyCalifornia377CA098

352,500Walters Road Extension SegmentsImprove and construct I-80 reliever route project; Walters Road andCalifornia398CA099

416,250Upgrade SR 92/El Camino interchange, San MateoCalifornia401CA1001,800,000

efficiency improvements to Glendale Boulevard in Los AngelesUpgrade CA Rt. 2 Southern Freeway terminus and transportationCalifornia413CA101

337,500Construct capital improvements along I-680 corridorCalifornia427CA102150,000

improve intermodal transportation in Yorba LindaConstruct parking lot, pedestrian bridge and related improvements toCalifornia433CA103

56,250Implement traffic management improvements, Grover BeachCalifornia437CA104900,000

Mateo Co.Construct tunnel with approaches as part of Devils Slide project in SanCalifornia441CA105

315,000highway grade, Monerey Co.Undertake safety enhancements along Monterey County RailroadCalifornia448CA106

900,000Construct Palisades Bluff Stabilization project, Santa MonicaCalifornia453CA107

2,925,000Urban Access Project in Los AngelesConstruct the South Central Los Angeles Exposition Park IntermodalCalifornia465CA108

123,750between San Luis Obispo and Pismo BeachUpgrade Price Canyon Road including construction of bikewayCalifornia470CA109

22,500Construct pedestrian promenade, Pismo BeachCalifornia480CA11056,250Construct railroad at-grade crossings, San LeandroCalifornia481CA111

1,650,000Construct VC Campus Parkway Loop System in MercedCalifornia484CA112975,000

Angeles County, California.Construct Nogales Street at Railroad Street grade separation in LosCalifornia491CA113

990,000Construct I-10/Pepper Ave. InterchangeCalifornia499CA114168,750Rehabilitate pavement throughout Santa Barbara Co.California536CA115900,000Extend State Route 7 in Imperial CountyCalifornia545CA11656,250

Arroyo GrandeReconstruct Grand Avenue between Elm Street and Halcyon Road,California550CA117

990,000Construct Los Angeles County Gateway Cities NHS AccessCalifornia552CA118900,000Construct Port of Oakland intermodal terminalCalifornia558CA119225,000

Blvd., FreemontUpgrade Osgood Road between Washington Blvd. and South GrimmerCalifornia575CA120

365,625Reconstruct and widen Mission Road, AlhambraCalifornia654CA121450,000Rehabilitate Artesia Blvd.California673CA122337,500Improve Rancho Sante Fe Road in CarlsbadCalifornia689CA12397,500

Pacific Coast Highway, MalibuImplement safety and congestion mitigation improvements alongCalifornia707CA124

187,500OaksImprove streets and highways, and/or construct sound walls, ThousandCalifornia731CA125

900,000Hughes/West DiagonalConstruct extension of State Route 180 between Rt. 99 and theCalifornia741CA126

330,000Construct new I-5 interchange with Highway 99W, Tehama Co.California769CA127

900,000Recreation AreaCreate recreational trails in Santa Monica Mountains NationalCalifornia779CA128

1,125,000Upgrade Route 4 West in Contra Costa Co.California793CA129147,750Improve State Route 57 interchange at Lambert Road in BreaCalifornia799CA130

280,950Warner Center/Canoga Park, Los AngelesConstruct bike path between Sepulveda Basin Recreation Area andCalifornia802CA131

641,250Improve Folsom Boulevard - Highway 50 in the city of FolsomCalifornia811CA132

765,000Upgrade Greenville Rd. and construct railroad underpass, LivermoreCalifornia816CA133

112,500Widen 5th Street and replace 5th Street bridge in Highland, California.California852CA134

337,500Construct I-5/Avenida Vista Hermosa interchange in San ClementeCalifornia869CA135

1,125,000California.Construct interchange between I-15 and Main Street in Hesperia,California883CA136

41,250Widen State Route 29 between Route 281 and Route 175California885CA137641,250Conduct highway 65 improvement and mitigation projectCalifornia894CA138112,500Undertake median improvements along E. 14th St., San LeandroCalifornia918CA139

450,000Road in Barstow, California.Plan, design and construct interchange between I-15 and Sante FeCalifornia926CA140

97,500Improve streets and construct bicycle paths, Agoura HillsCalifornia939CA141

Attachment 1 Page 5 of 41

Page 6: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

562,500Implement City of Compton traffic signal systems improvementsCalifornia940CA142

225,000Reconstruct Harbor Blvd./SR22 Interchange, City of Garden GroveCalifornia942CA143

112,500Los AngelesImprove roadway to provide access to Hansen Dam Recreation Area inCalifornia972CA144

975,000Construct improvements to Harry Bridges Blvd., Los AngelesCalifornia978CA145

78,750Rehabilitate B Street between Foothill Blvd. and Kelly St., HaywardCalifornia982CA146

69,900Improve streets and related bicycle lane in Oak Park, Ventura Co.California984CA147

686,250Improve the Avenue H overpass in Lancaster, CaliforniaCalifornia987CA148150,000Improve streets in Canoga Park and Reseda areas, Los AngelesCalifornia995CA149

97,500Upgrade US-101 from Eureka to ArcataCalifornia998CA150562,500Construct I-10/Barton Road West/Anderson Street connectionCalifornia1001CA151

225,000southern portion of Loma LindaImplement enhanced traffic access between I-10, area hospitals andCalifornia1004CA152

450,000connectors at I-15 in San DiegoConstruct State Route 56 North connectors at I-5 and North and SouthCalifornia1007CA153

225,000Extend 7th St. between F St. and North 7th St., SacramentoCalifornia1052CA154

337,500Complete Citraeado Parkway project in San Diego CountyCalifornia1054CA15556,250Rehabilitate Highway 1 in GuadalupeCalifornia1070CA156

135,000Upgrade D Street between Grand and Second Streets, HaywardCalifornia1080CA157

32,400101 and junction with Highway 33Install call boxes along Highway 166 between intersection with HighwayCalifornia1089CA158

1,125,000Upgrade intersection of Folsom Blvd. and Power Inn Rd., SacramentoCalifornia1109CA159

1,485,000Construct I-580 interchange, LivermoreCalifornia1114CA16067,500

improved segment of the parkway, HaywardUpgrade Industrial Parkway Southwest between Whipple Rd. andCalifornia1119CA161

750,000Construct Olympic Training Center Access road, Chula VistaCalifornia1125CA162

1,575,000Widen SR-23 between Moorpark and Thousand OaksCalifornia1142CA163168,750Undertake San Pedro Bridge project at SR 1, PacificaCalifornia1165CA164750,000Upgrade Del Almo Boulevard at I-405California1173CA165562,500Construct Overland Drive overcrossing in TemeculaCalifornia1188CA166956,250Construct I-15 Galinas interchange in Riverside CountyCalifornia1198CA167337,500Reconstruct La Loma Bridge in PasadenaCalifornia1208CA168

1,877,250Esperanza Road/Orangethorpe Avenue in Yorba Linda, California.Construct Imperial Highway grade separation and sound walls atCalifornia1215CA169

900,000Construct Airport Blvd. interchange in SalinasCalifornia1235CA170225,000

Orange CountyConstruct Cabot-Camino Capistrano Bridge project in SouthernCalifornia1255CA171

2,362,500Construct Centennial Transportation CorridorCalifornia1273CA17250,625Reconstruct Palos Verdes Drive, Palos Verdes EstatesCalifornia1275CA17397,500Stabilize US-101 at Wilson CreekCalifornia1282CA174

1,800,000Reconstruct the I-710/Firestone Blvd. interchangeCalifornia1307CA175337,500Extend State Route 52 in San DiegoCalifornia1321CA176450,000Construct Sacramento Intermodal StationCalifornia1322CA177900,000Extend Route 46 expressway in San Luis Obispo Co.California1362CA178104,062Upgrade Riverside Avenue/I-10 interchange, RialtoCalifornia1365CA179225,000

Linda and San Bernardino County, California.Construct I-10 Tippecanoe/Anderson interchange project in LomaCalifornia1366CA180

41,250Del Norte County, CaliforniaDesign and initiation of long term improvements along Highway 199 inCalifornia1411CA181

900,000Valley, California.Construct interchange between I-15 and SR-18 in Victorville/AppleCalifornia1439CA182

787,500Main Street, Martinez to Walnut CreekConstruct I-680 HOV lanes between Marina Vista toll plaza to NorthCalifornia1444CA183

900,000Improve Route 99/Route 120 interchange in Manteca CountyCalifornia1449CA184225,000

Ave./I-10 interchange, San Bernardino Co.Conduct planning, preliminary engineering and design for EtiwandaCalifornia1453CA185

393,750Construct Arbor Vitae Street improvements, InglewoodCalifornia1454CA186321,750Install SiliconValley Smart Corridor project along the I-880 corridorCalifornia1457CA187

101,250Upgrade South Higuera Street, San Luis ObispoCalifornia1464CA188399,375

SegundoImplement ITS technologies in Employment Center area of City of ElCalifornia1477CA189

Attachment 1 Page 6 of 41

Page 7: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

1,012,500Construct Tulare County roads in Tulare CountyCalifornia1484CA1901,815,000Construct I-80 reliever route system, Solano CtyCalifornia1528CA1911,305,000Replace Maxwell Bridge, Napa CtyCalifornia1529CA1921,080,000Construct March Inland Port ground access project, Riverside CtyCalifornia1530CA193

131,190,187156 ProjectsCalifornia1,350,000Complete the Powers Boulevard north extension in Colorado SpringsColorado217CO005

337,500in Douglas CountyConstruct I-25 truck lane from Lincoln Avenue to Castle Pines ParkwayColorado292CO006

37,500Construct Wadsworth Boulevard improvement project in ArvadaColorado675CO007

630,000Construct alternative truck route in MontroseColorado766CO008543,750Reconstruct I-225/Iliff Avenue interchange in AuroraColorado875CO009

1,350,000Reconstruct and upgrade I-70/I-25 Interchange, DenverColorado1009CO010628,200

County, Colorado.Improve SH-74/JC-73 interchange, City of Evergreen in JeffersonColorado1163CO011

450,000Construct Broadway Viaduct, DenverColorado1184CO012628,050Construct C-470/I-70 ramps in Jefferson Co.Colorado1367CO013

3,510,150State Priority ProjectsColorado1534CO014750,000High priority highway and bridge projectsColorado1829CO015

10,215,15011 ProjectsColorado396,000Construct Hartford Riverwalk South, HartfordConnecticut1129CT004300,000

improvements at/adjacent to Riverside Park, HartfordReconstruct and expand access road and related riverwalkConnecticut1537CT004

421,875Plainville, ConnecticutRevise interchange ramp on to Route 72 northbound from I-84 East inConnecticut39CT008

225,000Replace Windham Road bridge, WindhamConnecticut49CT009375,000Construct Seaview Avenue Corridor projectConnecticut90CT010168,750Reconstruct Post Office/Town Farm Road in Enfield, ConnecticutConnecticut393CT011

508,500downtown New LondonImprove pedestrian and bicycle connections between Union Station andConnecticut394CT012

450,000Realign and extend Hart Street in New BritainConnecticut542CT013562,500

lineConstruct the US Rt. 7 bypass project, Brookfield to New Milford townConnecticut587CT014

810,000Improve Route 7 utility and landscaping in New MilfordConnecticut608CT015360,000Reconstruct Broad Street in New BritainConnecticut683CT016

2,925,000Construct I-95 interchange, New HavenConnecticut724CT017945,000

feasibility study, in towns of Groton, Stonington and MysticConstruct Greenmanville Ave. streetscape extension, includingConnecticut776CT018

315,000Widen Route 4 in TorringtonConnecticut851CT019736,875Replace bridges over Harbor Brook, MeridenConnecticut874CT020675,000

Avenue in SouthingtonReconstruct I-84 between vicinity of Route 69 in Waterbury and MarionConnecticut876CT021

303,750Rehabilitate Route 202 bridge in New Milford, ConnecticutConnecticut935CT022522,000

Southington, ConnecticutWiden Route 10 from vicinity of Lazy Lane to River Street inConnecticut1034CT023

135,000Construct bicycle and pedestrian walkway, Town of East HartfordConnecticut1045CT024

766,125Implement Trinity College Area road improvements, HartfordConnecticut1048CT025202,500Improve Route 4 intersection in Harwinton, Connecticut.Connecticut1056CT026227,250Improve and realign Route 8 in WinchesterConnecticut1217CT027315,000Realign Route 4 intersection in FarmingtonConnecticut1397CT028608,625Relocate and realign Route 72 in BristolConnecticut1423CT029346,500Construct overlook and access to Niantic BayConnecticut1440CT030225,000Reconstruct cross road over I-95, WaterfordConnecticut1442CT031

1,065,375Reconstruct I-84, HartfordConnecticut1469CT03250,625Upgrade bridge over Naugatuck River, AnsoniaConnecticut1482CT033

3,514,950between New Haven and StamfordReconstruction of railroad electrical catenary serving commuter linesConnecticut1535CT034

75,000Historic SitePedestrian/disabled access improvements at Mark Twain HouseConnecticut1536CT035

225,000existing trails in neighboring townsDevelop Winsted, Winchester, and Torrington rail trail, linkage toConnecticut1538CT036

225,000Develop Quinipiac River linear trail in Wallingford and MeridenConnecticut1539CT037

225,000Extend Farmington Canal Rail Trail in Hamden and New HavenConnecticut1540CT038

19,207,20033 ProjectsConnecticut1,330,200Highway and bridge projects that Delaware provides for by lawDelaware1815DE002

1,330,2001 ProjectDelaware

Attachment 1 Page 7 of 41

Page 8: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

1,125,000Implement Geographical Information System, Washington, D.C.District of Columbia233DC011

7,162Enhance recreational facilities along Rock Creek ParkwayDistrict of Columbia547DC0121,125,000Rehabilitate Theodore Roosevelt Memorial BridgeDistrict of Columbia554DC0131,275,000

Union Station to Silver SpringConstruct bicycle and pedestrian walkway (Metropolitan Branch Trail),District of Columbia680DC014

112,500intermodal transportation Center, D.C.Conduct studies and related activities pertaining to proposedDistrict of Columbia708DC015

112,500Conduct MIS of light rail corridors, D.C.District of Columbia1092DC016900,000

information systems, Washington, D.C.Implement traffic signalization, freeway management and motor vehicleDistrict of Columbia1384DC017

4,657,1627 ProjectsDistrict of Columbia180,000Construct North East Dade Bike Path in North Miami Beach, Florida.Florida541FL014

1,012,500Jacksonville, Florida.Construct South Connector Road and Airport Road interchange inFlorida374FL024

1,687,500West Palm Beach Traffic Calming Project on US-1 and Flagur DriveFlorida31FL029

1,237,500Construct US-98/Thomas Drive interchangeFlorida84FL030Deploy magnetic lane marking system on I-4Florida242FL031

112,500Construct access road to St. Johns Ave. Industrial ParkFlorida258FL032225,000ITS improvements on US-19 in Pasco CountyFlorida321FL033

4,158,750County, Florida.Construct Wonderwood Connector from Mayport to Arlington, DuvalFlorida335FL034

135,000access roads, JacksonvilleEnhance access to Gateway Marketplace through improvements toFlorida363FL035

2,362,500County, Florida.Construct Port of Palm Beach road access improvements, Palm BeachFlorida368FL036

112,500County, Florida.Purchase and install I-275 traffic management system in PinellasFlorida518FL037

825,000Sarasota and Charlotte CountiesConstruct Englewood Interstate connector from River Road to I-75 inFlorida612FL038

562,500TallahaseeUpgrade U.S. 319 between Four Points and Oak Ridge Road,Florida625FL039

322,500over I-4Construct pedestrian overpass from the Florida National Scenic TrailFlorida635FL040

150,863Access in OrlandoConstruct Greater Orlando Aviation Authority Consolidated SurfaceFlorida691FL041

1,421,250Marine TerminalConstruct interchange at 21st Street to provide access to TalleyrandFlorida695FL042

1,500,000Construct I-4 reversible safety lane in OrlandoFlorida702FL043900,000Construct County Road 470 Interchange with Florida TurnpikeFlorida706FL044

225,000Construct Cross Seminole Trail connection in Seminole CountyFlorida755FL045

150,000Widen US-17/92 in Volusia CountyFlorida770FL046150,000

Orange/Osceola/Seminole County regionConstruct US17/92 and SR-436 interchange inFlorida789FL047

1,536,637Construct I-4/John Young Parkway interchange project in OrlandoFlorida794FL048

900,000Construct John Young Parkway/I-4 interchangeFlorida1181FL048225,000

Hillsborough CountyWiden Gunn Highway between Erlich Road and South Mobley Road inFlorida888FL049

2,100,000Replace St. Johns River Bridge in Volusia and Seminole CountiesFlorida902FL050

495,000A-1-A Beautification project in Daytona, FloridaFlorida1028FL0512,812,500

Osceola CountiesWiden US-192 between County Route 532 and I-95 in Brevard andFlorida1035FL052

Widen State Road 44 in Volusia CountyFlorida1065FL053202,500

Beach, Florida.Restore and rehabilitate Miami Beach Bridge and waterfront in MiamiFlorida1073FL054

765,000Pedestrian safety initiative on US-19 in Pinellas CountyFlorida1126FL055630,000Widen and realign Eller Drive in Port Everglades, Florida.Florida1131FL056465,000Expand Palm Valley Bridge in St. Johns CountyFlorida1160FL057562,500Upgrade U.S. 319 between I-10 and the Florida/Georgia State lineFlorida1162FL058

112,500Construct improvements to JFK Boulevard, EatonvilleFlorida1228FL05952,500Construct Alden Road Improvement Project in Orange CountyFlorida1383FL060

337,500Daytona BeachConstruct safety improvements and beautification along U.S. 92,Florida1390FL061

13,814,400State Priority ProjectsFlorida1541FL06242,441,90035 ProjectsFlorida

1,800,000Construct multi-modal passenger terminal, AtlantaGeorgia461GA008

Attachment 1 Page 8 of 41

Page 9: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

1,215,000Construct multimodal passenger terminal, AtlantaGeorgia1552GA008255,000I-75 advanced transportation management system in Cobb CountyGeorgia1GA013

399,375Reconstruct SR-26/US-60 from Bull River to Lazaretto CreekGeorgia23GA0144,860,000Improve GA-316 in Gwinnett CountyGeorgia82GA015

900,000Construct Athens to Atlanta Transportation CorridorGeorgia101GA0161,200,000Construct Athens to Atlanta transportation corridorGeorgia1545GA016

87,600Construct Rome to Memphis Highway in Floyd and Bartow CountiesGeorgia109GA017

300,000Construct Rome to Memphis hwy in Floyd and Bartow CtesGeorgia1544GA017616,800Construct Rome to Memphis hwy in Floyd and Bartow CtesGeorgia1553GA01745,000

Warner RobinsResurface Davis Drive, Green Street, and North Houston Road inGeorgia116GA018

1,237,500Upgrade I-75 between the Crisp/Dooly Co. line to the Florida State lineGeorgia118GA019

1,299,900Widen Georgia Route 6/US-278 in Polk CountyGeorgia151GA0202,587,500

363]and construct improvements to said corridor [See PL 105-277 SectionConduct study of a multimodal transportation corridor along GA-400Georgia178GA021

3,750,000

363]and construct improvements to said corridor [See PL 105-277 SectionConduct study of a multimodal transportation corridor along GA-400Georgia1547GA021

56,250Upgrade Lithonia Industrial Boulevard, DeKalb Co.Georgia251GA02252,500Upgrade Lithonia Industrial Blvd, DeKalb CtyGeorgia1542GA022

750,000between Atlanta and Chattanooga.Conduct a study of transportation alternatives in Northwest GeorgiaGeorgia288GA023

Atlanta to ChattanoogaConduct a study of Interstate multimodal transportation corridor fromGeorgia1546GA023

Atlanta to ChattanoogaConduct study of interstate multimodal transportation corridor fromGeorgia1549GA023

399,375Construct Harry S. Truman ParkwayGeorgia303GA024532,500Construct Harry S. Truman PkwyGeorgia1551GA024

1,732,500

Memorial Drive and $675,000 for Bufford Highwayprovided as follows: $5,250,000 for Candler Rd., $5,625,000 forUndertake major arterial enhancements in DeKalb Co. with the amountGeorgia342GA025

999,000Memorial Dr, and Buford HwyUndertake major arterial enhancement in DeKalb Cty: Candler Rd,Georgia1550GA025

360,000Lawrenceville to MariettaConduct a study of a mutimodal transportation corridor fromGeorgia508GA026

300,000Construct noise barriers along GA-400Georgia540GA027360,000

and Ware CountiesWiden US-84 South from US-82 to the Ware County Line in WaycrossGeorgia714GA028

240,000CtesWiden US 84 South from US 82 to Ware Cte in Waycross and WareGeorgia1543GA028

326,250Construct North River Causeway and Bridge, St. Mary's CountyGeorgia751GA029

382,500ParkwayWiden and reconstruct Corder Road from Pineview Drive to the RussellGeorgia780GA030

4,387,500corridorConstruct surface transportation facilities along Atlanta-Griffin-MaconGeorgia910GA031

2,587,500Construct the Fall Line Freeway from Bibb to Richmond CountiesGeorgia964GA032

1,425,000Construct Fall Line Freeway from Bibb to Richmond CtesGeorgia1554GA0323,450,000Construct Fall Line Freeway from Bibb to Richmond CtesGeorgia1555GA032

562,500Upgrade U.S. Rt. 19 between Albany and ThomastonGeorgia966GA033112,500

Highway in the Atlanta areaand Airport Thruway and on I-75 between Mt. Zion Road and Old DixieConstruct noise barriers on the westside of I-185 between Macon RoadGeorgia967GA034

11,250Dunwoody interchange improvements at I-285, DeKalb Co.Undertake Perimeter Central Parkway Overpass project and AshfordGeorgia1014GA035

1,125,000and Effinghaus CountiesConstruct the Savannah River Parkway in Bullock, Jenkins, ScrevenGeorgia1260GA036

750,000Effingham CountiesConstruct Savannah River Pkwy in Bulloch, Jenkins Screven, andGeorgia1548GA036

1,125,000Upgrade US Rt. 27Georgia1326GA03742,580,80038 ProjectsGeorgia

1,012,500Blvd.Upgrade Puuloa Road between Kamehameha Highway and Salt LakeHawaii759HI005

2,250,000the Halawa interchangeConstruct improvements to H-1 between the Waiawa interchange andHawaii768HI006

1,237,500Construct Kapaa BypassHawaii879HI007112,500Replace Sand Island bridgeHawaii1158HI008

Attachment 1 Page 9 of 41

Page 10: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

225,000H-1Construct interchange at junction of proposed North-South road andHawaii1227HI009

1,237,500Upgrade Kaumualii HighwayHawaii1302HI0101,556,850High priority highway and bridge projectsHawaii1816HI011

7,631,8507 ProjectsHawaii1,350,000Reconstruct US-95 from Bellgrove to MicaIdaho123ID0111,125,000

Idaho Falls and ChesterConstruct critical interchanges and grade-crossings on US-20 betweenIdaho275ID012

2,025,000Construct US-95: Sandcreek Alternate Route in SandpointIdaho1253ID0132,850,000Reconstruct 184/I-84 interchange (mileposts 0.0--0.6)Idaho1562ID014

562,500(mileposts 363.3--363.5)Rehabilitate US 20 Ashton/Ashton Hill Bridge and Intersection ProjectIdaho1563ID015

825,000Construct Cheyenne Street Railroad Overpass, PocatelloIdaho1564ID0161,950,000

30 north (mileposts 45--48)Stage 1, US 93 Twin Falls Alternate Rte from junction of US 93/HwyIdaho1565ID017

2,400,000331--345)Safety improvements on US 95 from Genesee to Moscow (milepostsIdaho1566ID018

1,050,000Curves (mileposts 91.2--94.8)Safety improvements/bridge replacement on US-95 at Mann's CreekIdaho1567ID019

2,700,000Round Valley (mileposts 94.9--101.0)Alignment/bridge replacement State Hwy 55 between Smith's Ferry andIdaho1568ID020

750,000High priority highway and bridge projectsIdaho1823ID02117,587,50011 ProjectsIdaho

573,750Upgrade Illinois 336 between Illinois 61 to south of LoraineIllinois76IL0241,500,000Design and construct US-67 corridor from Jacksonville to BeardstownIllinois483IL025

1,012,500Reconstruct US-30, Will County.Illinois385IL033157,500

Clair County and St. Louis, MO.Study for new bridge over Mississippi River with terminus points in St.Illinois203IL043

705,000Rehabilitate WPA Streets in ChicagoIllinois125IL046585,000

terminus points in Venice, Illinois, and St. Louis, MissouriConstruct improvements to McKinley Bridge over Mississippi River withIllinois1481IL067

750,000Construct 34 from Burlington IA to Monmouth ILIllinois1573IL074450,000

143 to Illinois 140 near AltonRight-of-way acquisition for segment of Alton Bypass between IllinoisIllinois177IL076

281,250Construct Alton Bypass from IL-40 to Fosterburg RoadIllinois201IL076787,500Construct Orchard Road Bridge over the Fox RiverIllinois141IL078

1,125,000Construct Sullivan Road Bridge over the Fox RiverIllinois403IL0781,406,250Construct crossings over Fox River in Kane CountyIllinois1386IL078

750,000Engineering for Peoria to Chicago expresswayIllinois133IL080765,000Construct US-67 in Madison and Jersey CountiesIllinois1388IL082

1,019,700Construct US 67 in Madison and Jersey CtesIllinois1570IL082135,000Construct elevated walkway between Centre Station and arenaIllinois33IL084

540,000Construct I-64/North Greenmount Rd. interchange, St. Clair Co.Illinois85IL085

225,000Undertake improvements to Campus Transportation System, ChicagoIllinois93IL086

112,500Undertake improvements to Campus Transportation SystemIllinois1286IL086300,000Improve Campus Transportation System, ChicagoIllinois1569IL086300,000

Lake Shore DriveUndertake traffic mitigation and circulation enhancements, 57th andIllinois108IL087

119,250Resurface S. Chicago Ave. From 71st to 95th Streets, ChicagoIllinois112IL088

337,500Improve access to 93rd Street Station, ChicagoIllinois124IL089843,750Construct an interchange at I-90 and Illinois Route 173 in RockfordIllinois132IL090

1,182,000Parkway in BloomingtonConstruct Veterans Parkway from Eastland Drive to CommerceIllinois137IL091

300,000connector, Decatur.Planning, engineering and first phase construction of beltwayIllinois149IL092

90,000LawnRehabilitate 95th Street between 54th Place and 50th Avenue, OakIllinois158IL093

146,250Co.Construct improvements to segment of Town Creek Road, JacksonIllinois168IL094

55,575Reconstruct Dixie Highway, HarveyIllinois179IL09515,750

roadway, Perry Co.Rehabilitate Timber Bridge over Little Muddy River and approachIllinois195IL096

5,400Upgrade St. Marie Township Road, Jasper CountyIllinois228IL097351,000

ChicagoResurface 95th St. between Western Ave. and Stony Island Blvd.,Illinois229IL098

213,750Construct improvements to Pleasant Hill Road, CarbondaleIllinois241IL099225,000Construct Richton Road, CreteIllinois256IL100

Attachment 1 Page 10 of 41

Page 11: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

240,000Improve access to Rantoul Aviation Center in RantoulIllinois261IL101111,375

Dixmore, Harvey, Markham, Hazel CrestUpgrade Wood Street between Little Calumet River to 171st St.,Illinois283IL102

507,750Reconstruct Mt. Erie Blacktop in Mt. ErieIllinois285IL1031,350,000

intersection in AlgonquinCongestion mitigation for Illinois Route 31 and Illinois Route 62Illinois297IL104

195,750Intersection improvements at 79th and Stoney Island Blvd., ChicagoIllinois307IL105

832,500Improve IL-113 in KankakeeIllinois316IL106168,750

Gateway Intermodal Terminal access projectConsolidate rail tracks and eliminate grade crossings as part ofIllinois343IL107

68,625Resurface Cicero Ave. between 127th St. and 143rd St., ChicagoIllinois361IL108

640,125Extend and reconstruct roadways through industrial corridor in AltonIllinois387IL109

225,000Construct Marion Street multi-modal project in Village of Oak ParkIllinois397IL110

281,250Improve Sugar Grove US30Illinois402IL111121,500Improve roads in the Peoria Park DistrictIllinois445IL11256,250Extend South 74th Street, BellevilleIllinois471IL11314,175Upgrade Western Ave., Park ForestIllinois488IL114

873,000Construct Towanda-Barnes Road in Mclean CountyIllinois504IL1151,316,250Construct US Route 67 bypass project around RosevilleIllinois519IL116

618,788SpringfieldDesign and construct I-72/MacArthur Boulevard interchange inIllinois537IL117

399,375Improve Constitution Avenue in PeoriaIllinois538IL118213,750Extend Rogers Street to mitigate congestion, WaterlooIllinois636IL119

1,530,000Upgrade U.S. 45 between Eldorado and HarrisburgIllinois652IL120421,875Undertake access improvements to U.S. Rt. 41, ChicagoIllinois674IL121554,513

Broadway Road in Pekin, IllinoisConstruct VFW Road/Veteran's Drive from Townline Road toIllinois678IL122

600,000Widen 143rd Street in Orland ParkIllinois704IL123236,250

PinckneyvilleStudy upgrading Illinois 13/127 between Murphysboro andIllinois712IL124

45,000RochelleConduct Midwest Regional intermodal facility feasibility study inIllinois719IL125

270,000Improve and construct grade separation on Cockrell Lane in SpringfieldIllinois745IL126

168,750Madison Co.Construct access road to Melvin Price Locks and Dam Visitors Center,Illinois772IL127

258,750Improve Illinois Route 29 in Sangamon and Christian CountiesIllinois812IL128

3,524,250ramps to the Tri-State Tollway, AlsipReconstruct interchange at I-294, 127th St. and Cicero Ave. with newIllinois823IL129

450,000Constuct Peoria City River Center parking facility in PeoriaIllinois848IL130112,500Replace Lebanon Ave. Bridge and approaches, BellevilleIllinois871IL131168,750Upgrade Bishop Ford Expressway/142nd St. interchangeIllinois897IL13232,400Reconstruct Midlothian Turnpike, RobbinsIllinois925IL133

186,750Reconstruct U.S. 6, HarveyIllinois932IL134489,375Undertake Industrial Transportation Improvement Program in ChicagoIllinois938IL135

84,375Resurface 63rd Street from Western Avenue to Wallace, ChicagoIllinois958IL136

300,000to improve safety and facilitate traffic flow, CrestwoodUndertake improvements to 127th Street, Cicero Avenue and Route 83Illinois996IL137

1,222,500Construct I-57 interchange, Coles Co.Illinois1037IL138410,250

St., EffinghamConstruct Technology Avenue between US Rt. 45 East to WillenborgIllinois1040IL139

157,500vicinity of John A. Logan College in CartervilleReconstruct Greenbriar Rd. with construction of new turn lanes inIllinois1059IL140

123,750Rehabilitate Western Springs Arterial Roadway, Cook Co.Illinois1069IL141222,750Reconstruct Cossitt Ave. in LaGrangeIllinois1101IL14239,375Reconstruct Broad Street between Maple St. to Sixth St., EvansvilleIllinois1104IL143

135,000Replace Gaumer Bridge near AlvinIllinois1110IL144877,500Upgrade South Lake Shore Driver between 47th and Hayes, ChicagoIllinois1115IL145

900,000Widen and improve US-34 intechange in AuroraIllinois1128IL146573,750Widen US-20 in FreeportIllinois1139IL147480,937Improve IL-159 in EdwardsvilleIllinois1167IL148265,725

accessRehabilitate and upgrade 87th Street Station to improve intermodalIllinois1182IL149

300,000Reconstruct I-74 through PeoriaIllinois1194IL150

Attachment 1 Page 11 of 41

Page 12: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

14,100Upgrade US 40 in MartinsvilleIllinois1224IL151660,000Construct Raney Street Overpass in EffinghamIllinois1231IL152975,000Construct new entrance to Midway Airport TerminalIllinois1237IL153138,750Construct Western Springs Pedestrian and Tunnel project, Cook Co.Illinois1259IL154

2,137,500Replace State Route 47 Bridge in MorrisIllinois1310IL155225,000Construct I-88 interchange at Peace Road in DekalbIllinois1316IL156555,000Construct Central Ave.-Narragansett Ave. connector, ChicagoIllinois1323IL157

825,000St. Clair co.Construct bicycle/pedestrian trail parallel to light rail transit system inIllinois1329IL158

37,125Reconstruct Claire Blvd., RobbinsIllinois1351IL159393,750Construct improvements to New Era Road, CarbondaleIllinois1363IL16092,250Construct bypass of historic stone bridge, MaeystownIllinois1394IL161

129,375Undertake streetscaping between Damden and HalstedIllinois1415IL162168,750Construct transportation improvements to Industrial Viaduct, ChicagoIllinois1416IL163

506,250Upgrade industrial park road in Village of SaugetIllinois1443IL164150,000Construct confluence bikeway in Madison CtyIllinois1571IL165450,000

VernonExtend Veterans Mem Drive and construct overpass at I-57 in MtIllinois1572IL166

3,750,000Reconstruct Wacker Dr in ChicagoIllinois1574IL1673,750,000Reconstruct Stevenson Expwy, ChicagoIllinois1575IL168

55,700,813102 ProjectsIllinois3,307,500Lafayette Railroad relocation project in Lafayette, Indiana.Indiana1428IN0022,812,500Construct Hoosier Heartland from Lafayette to Ft. WayneIndiana278IN006

150,000Construct Marina Access Road in East ChicagoIndiana956IN0074,050,000Improve Southwest Highway from Bloomington to EvansvilleIndiana1277IN010

495,000Upgrade Ridge Road between Griffith and HighlandIndiana960IN015663,750Upgrade 93rd Avenue in MerrillvilleIndiana64IN016

1,125,000Construct Gary Marina access road (Buffington Harbor)Indiana407IN0172,244,375Construct I-70/Six Points interchange in Marion and Hendricks CountyIndiana676IN023

216,000Widen 116th Street in CarmelIndiana107IN0261,023,750Safety improvements to McKinley and Riverside Avenues in MuncieIndiana150IN027

45,000EvansvilleUpgrade 4 warning devices on north/south rail line from Terre Haute toIndiana231IN028

CarmelConstruct Hazel Dell Parkway from 96th Street to 146th Street inIndiana250IN029

731,250Extend East 56th Street in LawrenceIndiana264IN03090,000

Co. lineReconstruct US Rt. 231 between junction of State Road 66 to DuboisIndiana329IN031

157,500Upgrade 14 warning devices on east/west rail line from Gary to AuburnIndiana364IN032

450,000LawrenceConstruct East 79th from Sunnyside Road to Oaklandon Road inIndiana439IN033

67,500and MarionFeasibility study of State Road 37 improvements in Noblesville, ElwoodIndiana531IN034

56,250Improve State Road 31 in ColumbusIndiana647IN035481,500Expand 126th Street in CarmelIndiana887IN03641,250

Cityprotections along South Shore Railroad between Gary and MichiganRepair signal wires, grade-crossing warning devices and other safetyIndiana901IN037

6,750Conduct railroad relocation study in MuncieIndiana1055IN038675,000Upgrade Route 31 and other roads, St. Joseph and Elkhart CountiesIndiana1088IN039

180,000Reconstruct Wheeling Avenue in MuncieIndiana1095IN040240,750Remove and replace Walnut Street in MuncieIndiana1209IN041101,250Install traffic signalization system in MuncieIndiana1223IN042354,375Construct SR-9 bypass in GreenfieldIndiana1225IN04311,250Conduct rail-highway feasibility project study in MuncieIndiana1325IN044

225,000crossings and Conrail line, ElkhartUndertake safety and mobility improvements involving street and streetIndiana1354IN045

450,000Extend SR 149 between SR 130 to US Rt. 30, ValparaisoIndiana1447IN046900,000Upgrade County roads in LaPorte County.Indiana1476IN047

7,056,900State Priority ProjectsIndiana1576IN0481,710,000Ohio River Major Investment Study Project, Kentucky and IndianaIndiana436IN049

202,500Gilford RoadReconstruct Old Merridan Corridor from Pennsylvania Avenue toIndiana250IN050

30,321,90032 Projects (includes Project 436, which is joint project with KY)Indiana450,000Relocate US 61 to bypass Fort MadisonIowa255IA002

1,428,750and BurlingtonConstruct controlled access four-lane highway between Des MoinesIowa1249IA004

Attachment 1 Page 12 of 41

Page 13: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

1,800,000King Jr. Parkway in DesMoines from Center ST. to Fleur Dr.Design, right-of-way and construction of segments of Martin LutherIowa1561IA005

750,000Improve US 65/IA 5 interchange, Warren Co.Iowa1445IA0171,125,000

MarshalltownConstruct four-lane expressway between Des Moines andIowa61IA018

412,500MarshalltownConstruction of a 4-lane expressway between DesMoines andIowa1557IA018

375,000center turn lane from Hubenthal Place to Carbide Lane, KeokukReconstruct US Highway 218 between 7th and 20th Streets inlcudingIowa183IA019

776,250MLKing ParkwayReconstruct I-235 and improve the interchange for access to theIowa273IA020

990,000Improve IA-60 Corridor from LeMar to MN State lineIowa616IA02111,250Conduct study of Port of Des Moines, Des MoinesIowa798IA022

3,150,000DubuqueConstruct the Julien Dubuque Bridge over the Mississippi River atIowa819IA023

1,050,000Construct the D116 Dubuque Bridge over the MI River at DubuqueIowa1560IA023

675,000Relocate IA-192 and Avenue G viaduct in Council BluffsIowa832IA0241,050,000

related roadway in Council BluffsDesign, right-of-way and construction of the Avenue G viaduct andIowa1558IA024

787,500CountyExtend NW 86th Street from NW 70th Street to Beaver Drive in PolkIowa1006IA025

697,500Construct I-29 airport interchange overpass in Sioux CityIowa1072IA026225,000

on airport access road in Sioux CityDesign, right-of-way and construction of a bridge over railroad tracksIowa1556IA026

521,250Construct overpass to eliminate railroad crossing in BurlingtonIowa1381IA027

114,000center at U.N.I. in Cedar FallsDesign and construction of native roadside vegetation enhancementIowa1559IA028

16,389,00019 ProjectsIowa3,127,500Widen US-81 from Minneapolis, Kansas to Nebraska.Kansas1120KS0111,134,000Construct Diamond interchange at Antioch and I-435Kansas253KS016

900,000Widen US-54 from Liberal, Kansas southwest to Oklahoma.Kansas419KS0171,350,000Construct Phase II improvements to US-59 from US-56 to OttawaKansas457KS018

472,500Construct grade separations on US36 and US77 in Marysville, Kansas.Kansas527KS019

3,937,500Construct road and rail grade separations in WichitaKansas754KS020418,500Reconstruct K-7 from Lone Elm Road to HarrisonKansas1240KS021

1,822,500Widen US-169 in Miami CountyKansas1336KS0223,523,200State Priority ProjectsKansas1577KS023

16,685,7009 ProjectsKansas426,000

in Louisville, Kentucky.Redevelop and improve ground access to Louisville Waterfront DistrictKentucky114KY013

123,750PaducahConstruct highway-rail grade separations along the City Lead inKentucky111KY020

37,500PaducahConstruct highway rail grade separations along the City Lead inKentucky1583KY020

684,000RoadExtend Hurstbourne Parkway from Bardstown Road to Fern ValleyKentucky127KY021

600,000Extend Hurstbourne Pkwy from Bardstown Rd to Fern Valley RdKentucky1586KY021

3,938Correct rock hazard on US127 in Russell CountyKentucky348KY0223,375,000Widen US-27 from Norwood to EubankKentucky349KY023

874,500Widen US 27 from Norwood to EubankKentucky1578KY023112,500Construct Route 259-101 from Brownsville to I-65Kentucky376KY024900,000

CountyReconstruct KY-210 from Hodgenville to Morning Star Road, LarueKentucky443KY025

112,500Construct Kentucky 31E from Bardstowns to Salt RiverKentucky460KY026337,500

Owensboro.Construct connection between Natcher Bridge and KY-60 east ofKentucky462KY027

562,500Complete I-65 upgrade from Elizabethtown to Tennessee State line.Kentucky464KY028

1,068,750Newport and the Clay Wade Bailey Bridge in CovingtonConstruct necessary connections for the Taylor Southgate Bridge inKentucky468KY029

39,375Construct Savage-Cedar Knob Bridge at Koger CreekKentucky658KY030900,000

Limestone in LexingtonConstruct Newton Pike Extension between West Main St. to SouthKentucky717KY031

1,261,687

KY696 and the Tennessee State Line.Clinton County High School and $3,161,250 for the segment betweenConstruct US-127: $5,250,000 for the Albany Bypass from KY696 toKentucky872KY032

Attachment 1 Page 13 of 41

Page 14: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

421,500KY696 to Clinton Cty H.S., and from KY696 to TN state lineConstruction on US 127: Albany Bypass to KY90, Albany Bypass fromKentucky1582KY032

1,687,500Construct a segment of the I-66 corridor from Somerset to I-75Kentucky907KY033

652,500Construct US-127 Jamestown BypassKentucky946KY034900,000Reconstruct Liberty and Todd Roads, LexingtonKentucky1140KY03556,250

(I-74)Conduct feasibility study for Northern Kentucky High Priority CorridorKentucky1226KY036

18,750Conduct feasibility study for No. KY high-priority corridor (I-74)Kentucky1580KY036

225,000Construct KY-70 from Cave City to Mammoth CaveKentucky1298KY0371,293,750

Allen-Warren County line and Dry Ridge RoadRoad and US-231 and US-31; $3,000,000 for the segment betweenReconstruct US-231: $5,625,000 for the segment between Dry RidgeKentucky1353KY038

300,000Reconstruct KY210 from Hodgenville to Morning Star Rd in LaRue CtyKentucky1579KY039

345,000Newport and the Clay Wade Bridge in CovingtonConstruct necessary connections for the Taylor Southgate Bridge inKentucky1581KY040

225,000Reconstruction of the Louisville Trolley BarnKentucky1584KY0412,372,550

projectsCompletion of the Ownsboro Corridor and related State HighwayKentucky1585KY042

4,290,000Ohio River Major Investment Study Project, Kentucky and IndianaKentucky436KY043

24,207,30030 Projects (includes Project 436, which is joint project with IN)Kentucky900,000

improvements, Lake CharlesReconstruct I-10 and Ryan Street access ramps and frontage streetLouisiana237LA009

900,000Construct I-10/Louisiana Ave. interchangeLouisiana1012LA010675,000Nelson Access Road to Port of Lake CharlesLouisiana1596LA010150,000Construct Zachary Taylor Parkway projectLouisiana1010LA012236,250Construct Port of St. Bernard Intermodal facilityLouisiana1331LA016900,000

ParishExtend Louisiana Highway 42 between US-61 and I-10 in AscensionLouisiana425LA017

495,000Extend I-49 from I-220 to Arkansas State lineLouisiana438LA017150,000

LAEast West Corridor/El Camino Real, LA 6 to US 84, Central-NorthwestLouisiana1595LA017

1,200,000Avenue in Jefferson and Orleans ParishesUpgrade and widen I-10 between Williams Boulevard and TulaneLouisiana639LA018

241,875Replace ferry in Plaquemines ParishLouisiana21LA021405,000

and construct an information centerExpand Harding Road from Scenic Highway to the Mississippi RiverLouisiana30LA022

150,000Increase capacity of Lake Pontchartrain CausewayLouisiana144LA02375,000Causeway ProjectLouisiana1587LA023

348,750HoumaConstruct Houma-Thibodaux to I-10 connector from Gramercy toLouisiana202LA024

900,000Extend Howard Avenue to Union Passenger Terminal, New OrleansLouisiana216LA025

1,275,000St. Tammany Parish, Louisiana.Construct State Highway 3241/State Highway 1088/I-12 interchange inLouisiana260LA026

150,000Louisiana.Reconstruct Jefferson Lakefront bikepath in Jefferson Parish,Louisiana289LA027

225,000between Louisiana Highway 44 and I-10Conduct a feasibility and design study of Louisiana Highway 30Louisiana328LA028

562,500between Louisiana Highway 16 to I-12 in Livingston ParishConduct feasibility study, design and construction of connectorLouisiana426LA029

618,750Westbank ExpresswayConstruct the Southern extension of I-49 from Lafayette to theLouisiana456LA030

922,500Expand Perkins Road in Baton RougeLouisiana476LA031225,000Perkins Road, Baton RougeLouisiana1594LA03184,375Construct Louisiana Highway 1 from the Gulf of Mexico to US-90Louisiana560LA032

345,000Construction, LA 1Louisiana1591LA032900,000

Jefferson ParishUpgrade Lapalco Blvd. between Barataria Blvd. and US Hwy. 90,Louisiana592LA033

810,000Preparedness Center in Baton Rouge, Louisiana.Construct and equip Transportation Technology and EmergencyLouisiana665LA034

22,500Construct Florida Expressway in St. Bernard and Orleans ParishesLouisiana750LA035

7,500Florida Expressway Construction, St. Bernard/Orleans ParishesLouisiana1589LA035

Attachment 1 Page 14 of 41

Page 15: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

600,000Jefferson, Parish, Louisiana.Construct Causeway Boulevard/Earhart Expressway interchange inLouisiana778LA036

731,250Install computer signal synchronization system in Baton RougeLouisiana786LA037

4,500,000Improve US-165 from Alexandria to MonroeLouisiana824LA038112,500Construct East-West Corridor project in Southwest LouisianaLouisiana903LA039

78,750ParishConstruct Port of South Louisiana Connector in Saint John the BaptistLouisiana949LA040

42,000I-10 Connector, Port of South LouisianaLouisiana1588LA040900,000

Jefferson and Orleans Parishes, Louisiana.Construct Metairie Rail Improvements and Relocation project inLouisiana951LA041

337,500in Baton RougeCongestion mitigation and safety improvements to the Central thruwayLouisiana1019LA042

168,750Construct Leeville Bridge on LA-1Louisiana1036LA043300,000Leeville Bridge, LA 1Louisiana1592LA043750,000

Louisiana.Construct North/South Road/I-10-US-61 connection in the Kenner,Louisiana1049LA044

112,500Kerner's Ferry Bridge Replacement projectLouisiana1342LA04537,500Kerner Bridge, Jefferson ParishLouisiana1590LA045

630,000Construct I-49 interchange at Caddo Port Road in ShreveportLouisiana1358LA046450,000

Avenue in Jefferson Parish, Louisiana.Widen Lapalco Boulevard from Barataria Boulevard to DestrehanLouisiana1483LA047

150,000Louisiana segment, Gulf Coast high speed railLouisiana1593LA048675,000Tchopitoulas Corridor, New OrleansLouisiana1597LA049675,000Rte 3132 to Caddo-Bossier Port, ShreveportLouisiana1598LA050675,000Kansas Lane, MonroeLouisiana1599LA051750,000New Orleans CBD to New Orleans Int'l Airport, commuter railLouisiana1600LA052

26,550,75048 ProjectsLouisiana900,000Replacement and renovation of Carlton Bridge, Bath/WoolwichMaine1084ME004

300,000replacement)Construct new bridge over Kennebec River (Carlton BridgeMaine1616ME004

225,000Construct I-95/Stillwater Avenue interchangeMaine88ME00522,500Construct I-95/Stillwater Avenue interchangeMaine1608ME005

506,250Construct I-295 connector, PortlandMaine291ME006150,000Construct I-295 connector, PortlandMaine1614ME006450,000Studies and planning for reconstruction of East-West HighwayMaine367ME007

150,000Studies, planning, reconstruction of East-West HwyMaine1617ME007112,500Replace Singing Bridge across Taunton BayMaine469ME008206,250Replace Singing Bridge across Taunton BayMaine1615ME00856,250Improve Route 23Maine578ME00918,750Improve Rte 23Maine1610ME009

590,625Rehabilitate Piscataqua River bridges, KitteryMaine740ME01028,125Implement rural ITSMaine898ME011

318,750Studies and planning for extension of I-95Maine1099ME012300,000Studies, planning for extension of I-95Maine1613ME012450,000Upgrade Route 11Maine1201ME01322,500Upgrade Rte 11Maine1607ME013

168,750Improve Route 26Maine1204ME01456,250Improve Rte 26Maine1611ME014

168,750Replace Ridlonville Bridge across Androscoggin RiverMaine1304ME015131,250Replace Ridlonville Bridge, RumfordMaine1612ME015217,500Reconstruction of the Mack Point Cargo PortMaine1609ME016

1,500,000High priority highway and bridge projectsMaine1819ME0177,050,00024 ProjectsMaine

1,687,500Georges Co.Reconstruct Baltimore Washington Parkway at Route 197, PrinceMaryland1020MD001

1,012,500Reconstruct segment of Baltimore Beltway between U.S. 1 and I-70Maryland764MD018

540,000GeorgesUpgrade I-95/I-495 interchange at Ritchie Marlboro Rd., PrinceMaryland304MD022

1,350,000Upgrade US 29 interchange with Randolph Road, Montgomery Co.Maryland359MD023

202,500Penn Station, BaltimoreConstruct pedestrian and bicycle path between Druid Hill Park andMaryland400MD024

1,646,250Empowerment ZoneUndertake transportation infrastructure improvements within BaltimoreMaryland459MD025

2,700,000MarylandUpgrade US-113 north of US-50 to MD-589 in Worcester County,Maryland670MD026

1,050,000Upgrade US 113 north of US 50 to Jarvis Rd in Worcester CtyMaryland1604MD026

Attachment 1 Page 15 of 41

Page 16: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

825,000Construct improvements a I-270/MD-187 interchangeMaryland774MD027360,000Upgrade roads within Leakin Park Intermodal Corridor, BaltimoreMaryland928MD028

450,000CountyImprove Halfway Boulevard east and west of Exit 5, I-81 in WashingtonMaryland1079MD029

1,991,250improvements in BaltimoreImplement city-wide signal control system replacements andMaryland1263MD030

337,500Anne Arundel Co.Construct intersection improvements to facilitate access to NSA facility,Maryland1296MD031

1,012,500Upgrade MD 32 in the vicinity of NSA Anne Arundel CtyMaryland1605MD0311,687,500

CountyConstruct phase 1A of the I-70/I-270/US-340 interchange in FrederickMaryland1372MD032

2,250,000CtyConstruct Phase 1-A of the I-70/I-270/US 340 interchange in FrederickMaryland1606MD032

360,000Prince Georges Co.Construct improvements to Route 50 interchange with Columbia Pike,Maryland1393MD033

13,650and Allegany CtiesImprove hwy signage for C&O Canal NHP in Frederick, Washington,Maryland1602MD034

187,500between Havre de Grace and PerryvilleConstruct pedestrian bicycle bridge across Susquehanna RiverMaryland1603MD035

19,663,65019 ProjectsMaryland900,000Construct bikeway between Blackstone and WorcesterMassachusetts129MA006112,500Construct Arlington to Boston Bike PathMassachusetts1400MA007472,500

provide access to commuter rail station, LittletonConstruct I-495/Route 2 interchange east of existing interchange toMassachusetts89MA008

28,125Upgrade Sacramento Street underpass, SomervilleMassachusetts170MA009450,000

BostonConstruct accessibility improvments to Charles Street T Station,Massachusetts172MA010

56,250Implement Cape and Islands Rural Roads Initiative, Cape CodMassachusetts247MA011

337,500Reconstruct roadways, SomervilleMassachusetts248MA012270,000Construct improvements to North Main Street in WorcesterMassachusetts267MA013922,500

Hampshire State LineUpgrade Rt. 3 between Rt. 128/I-95 to Massachusetts and NewMassachusetts277MA014

337,500Undertake improvements to South Station Intermodal StationMassachusetts281MA015

450,000Reconstruct Bates Bridge over Merrimack RiverMassachusetts282MA016101,250Construct Greenfield-Montague Bikeways, Franklin Co.Massachusetts330MA017112,500

Town of YarmouthConstruct Packets Landing Enhancement and Restoration Project,Massachusetts404MA018

113,850Replace deck of Chain Bridge over Merrimack RiverMassachusetts408MA019225,000

North-South Connector in Pittsfield to improve access to I-90Environmental studies, preliminary engineering and design ofMassachusetts414MA020

975,000Renovate Union Station Intermodal Transportation Center in WorcesterMassachusetts429MA021

112,500Reconstruct North Street, FitchburgMassachusetts446MA022450,000Reconstruct Huntington Ave. in BostonMassachusetts447MA023150,000Reconsruct Huntington AvenueMassachusetts1811MA023

1,629,000along Route 140Upgrade I-495 interchange 17 and related improvements inlcudingMassachusetts520MA024

450,000Construct Housatonic-Hoosic bicycle networkMassachusetts586MA025450,000

Amherst, Holyoke, Williamsburg and NorthamptonConstruct Nowottuck-Manhan Bike Trail connections, Easthampton,Massachusetts596MA026

1,800,000waterfront and downtown areas, New BedfordConstruct improvements along Route 18 to provide for access toMassachusetts601MA027

162,000WilmingtonUpgrade Lowell Street between Woburn Street and Route 38, Town ofMassachusetts645MA028

528,750FraminghamReconstruct Route 126 and replace bridge spanning Route 9, Town ofMassachusetts684MA029

43,988Implement Phase II of unified signage system, Essex Co.Massachusetts686MA030787,500

Santilli Highway to the east of the river in Everett, Medord and MaldenCorporation Way to the west of Malden River and with access viaConstruct TeleCom Boulevard with access via Commercial Street andMassachusetts710MA031

1,084,500Replace Brightman Street bridge in Fall RiverMassachusetts716MA032337,500Construct Cambridge Roadways Improvement project, CambridgeMassachusetts723MA033

162,000Construct bicyle and pedestrian facility (The Riverwalk), PeabodyMassachusetts728MA034

405,000Reconstruct Route 2/Jackson Road interchange, LancasterMassachusetts736MA035225,000Preliminary design of Route 2 connector to downtown FitchburgMassachusetts744MA036

Attachment 1 Page 16 of 41

Page 17: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

360,000Construct Hyannis Intermodal Transportation Center, HyannisMassachusetts781MA037

120,000and industrial/business park, AttleboroConduct planning and engineering for connector route between I-95Massachusetts791MA038

1,406,250Upgrade Rt. 9/Calvin Coolidge Bridge, HadleyMassachusetts862MA039562,500Construct I-95/I-93 interchange, BostonMassachusetts864MA040868,162

Turnpike, Beford, Burlington and BillericaConstruct roadway improvements on Crosby Drive and MiddlesexMassachusetts924MA041

191,250Construct bike path between Rt. 16 (Everett) to Lynn OceansideMassachusetts974MA042

180,000Reconstruct Pleasant Street-River Terrace, HolyokeMassachusetts1024MA043450,000Upgrade Route 2 between Philipston and GreenfieldMassachusetts1038MA044225,000Upgrade Spring St. between Bank and Latham Streets, WilliamstownMassachusetts1053MA045

1,800,000Rehabilitate Union Station in SpringfieldMassachusetts1155MA0462,133,750

ImprovementsConstruct South Weymouth Naval Air Station ConnectivityMassachusetts1236MA047

234,000Central Business District of FoxboroughUndertake vehicular and pedestrian movement improvments withinMassachusetts1297MA048

292,500MellroseImprove safety and traffic operations on Main and Green Streets,Massachusetts1406MA049

84,375connector, Cambridge and WatertownConstruct Minuteman Commuter Bikeway-Charles River BikewayMassachusetts1424MA050

225,000WestfieldDesign, engineer and right-of-way aquisition of the Great River Bridge,Massachusetts1432MA051

5,604,750State Priority ProjectsMassachusetts1601MA0523,750,000High priority highway and bridgesMassachusetts1846MA053

33,129,75049 ProjectsMassachusetts1,575,000

Telegraph Road.including segments of Walton Blvd., Baldwin and Joslyn Roads, andUpgrade and make improvements to the Walton Corridor projectMichigan95MI001

168,750South" route of US 31 bypass, Emmet CountyPreliminary engineering and right-of-way acquisition for "IntertownMichigan1375MI005

2,250,000Construct Detroit Metropolitan/Wayne County South Access RoadMichigan931MI007

1,970,250and Saginaw CountiesUpgrade M-84 connector between Tittabawasee Rd. and M-13, BayMichigan143MI009

2,025,000Relocate US-31 from River Road to Naomi Road in Berrian CountyMichigan1076MI010

675,000Construct Monroe Rail Consolidation Project, MonroeMichigan157MI0112,808,000

Grand Rapids, Michigan.Acquire right-of-way and construct M-6 Grand Rapids South Beltline inMichigan493MI013

112,500Upgrade Three Mile Road, Grand TraverseMichigan838MI018337,500Construct US-131 Cadillac Bypass projectMichigan584MI019337,500Improve US-31 from Holland to Grand HavenMichigan1161MI021590,625Improve the I-73 corridor in Jackson and Lenawee CountiesMichigan662MI023

1,575,000Reconstruct I-75/M-57 interchangeMichigan726MI024562,500Construct bike path between Mount Clemens and New BaltimoreMichigan4MI030

292,500Construct I-96/Beck Wixom Road interchangeMichigan67MI03167,500Reconstruct Bagley Street and improve Genschaw Road, AlpenaMichigan77MI032

337,500Co.Upgrade Hill Road corridor between I-75 to Dort Highway, GeneseeMichigan81MI033

146,250Macomb Co.Improvements to Card Road between 21 mile road and 23 mile road inMichigan136MI034

M-53, Macomb CountyConstruct improvements to 23 Mile Road between Mound Road andMichigan166MI035

225,000Industrial Connector, Kalamazoo, Michigan.Early preliminary engineering/preliminary engineering to U.S. 131 B.R./Michigan167MI036

135,000Pierson Rd., Genessee Co.Construct improvements to Linden Rd. between Maple Ave. andMichigan188MI037

405,000

and Janes Ave., SaginawAve. to Johnson St. and East Genesee Ave. between Saginaw RiverConstruct route improvements along Washington Ave. between JanesMichigan192MI038

247,500TawasConstruct Tawas Beach Road/US 23 interchange improvements, EastMichigan194MI039

1,692,000

I-96/Whitneyville interchange.by extending 36th Street, improving 48th Street and constructing theImprove Kent County Airport road access in Grand Rapids, MichiganMichigan211MI040

30,375Repair 48th Avenue, MenomineeMichigan286MI04175,000

Co. borderOperational improvements on M-24 from I-75 to the northern OaklandMichigan384MI042

Attachment 1 Page 17 of 41

Page 18: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

1,125,000and DetroitUndertake capital improvements to facilitate traffic between LansingMichigan391MI043

900,000Upgrade I-94 between M-39 and I-96Michigan405MI044472,500Construct Bridge Street bridge project in SouthfieldMichigan449MI045450,000Construct interchange at US-10/Bay City Road in MidlandMichigan523MI04645,000Upgrade East Jordon Road, Boyne CityMichigan539MI047

150,000Upgrade M.L. King Drive. Genesee Co.Michigan549MI048630,000Upgrade H-58 within Pictured Rocks National LakeshoreMichigan553MI04956,250Upgrade Groveland Mine Road, DickinsonMichigan581MI05045,000Replace Chalk Hills Bridge over Menominee RiverMichigan603MI05175,000

County lineOperation improvements on M-15 from I-75 north to the GeneseeMichigan617MI052

562,500Improve I-94 in Kalamazoo CountyMichigan640MI05356,250

Ste. Mariereconstruction, bikepath construction and related improvements, SaultFacilitate access between I-75 and Soo Locks through roadMichigan657MI054

19,125Rehabilitate Lincoln St., NegauneeMichigan666MI0559,000Widen Arch St., NegauneeMichigan713MI056

16,875Improve drainage on 6th Street in MenomineeMichigan715MI057360,000Construct M-5 Haggerty ConnectorMichigan733MI05828,125

US-127 and Michigan Highway 50.Conduct feasibility study on widening US-12 to three lanes betweenMichigan805MI059

102,375Reconstruct Co.Rd. 612 and Co.Rd. 491, Montmorency Co.Michigan810MI060168,750

I-75/North Down River Road interchangeConduct preliminary engineering, acquire right-of-way and constructMichigan820MI061

787,500Construct grade separation on Sheldon Road, PlymouthMichigan837MI062416,250Upgrade Van Dyke Road between M-59 and Utica City limitsMichigan890MI06327,000Construct road drainage improvements, Suttons Bay VillageMichigan895MI06456,250

MarquetteConstruct arterial connector between US41/M28 and Co.Rd. 480,Michigan908MI065

480,000Upgrade Davison Rd. between Belsay and Irish Roads, Genessee Co.Michigan980MI066

281,250Improve I-69 in Branch, Eaton and Calhoun CountiesMichigan994MI0671,383,750Upgrade Rochester Road between I-75 and Torpsey St.Michigan1011MI068

112,500Swartz Creek and GainesConstruct safety enhancements at rail crossings, Linden, Fenton,Michigan1051MI069

281,250Extend Trowbridge Road from Harrison Rd. to Red Cedar Rd.Michigan1112MI070

112,500Replace Barton Rd./M-14 interchange, Ann ArborMichigan1135MI0712,250Construct deceleration lane in front of 4427 Wilder Road, Bay CityMichigan1146MI072

300,000Construct M-24 Corridor from I-69 to southern Lapeer CountyMichigan1153MI073450,000

Road, Saginaw Co.Upgrade Tittabawasee Road between Mackinaw Road and MidlandMichigan1166MI074

191,250

M 35Upgrade (all weather) on Delta County's reroute of U.S. 2, U.S. 41, andMichigan1200MI075

2,700,000Construct intermodal freight terminal in Wayne Co.Michigan1221MI076416,250Apply ITS technologies relating to traffic control, LansingMichigan1281MI077

1,237,500Construct interchange at Eastman Avenue/US-10 in MidlandMichigan1283MI078126,000Improve Hoban Road and Grand Avenue, City of Mackinac IslandMichigan1327MI079

956,250Construct US-27 between St. Johns and IthacaMichigan1378MI080270,000Replace Chevrolet Ave. bridge in Genesee Co.Michigan1425MI081517,500

and plastic reinforced concrete), Scio TownshipConstruct Jackson Road project (demonstrating performance of paperMichigan1429MI082

40,500Upgrade Lalie St., Frenchtown Rd., and Penshee Rd., IronwoodMichigan1452MI083

Reconstruct I-94 between Michigan Route 14 and US-23Michigan1468MI0843,817,050State Priority ProjectsMichigan1618MI0854,715,700State Priority ProjectsMichigan1619MI085

900,000improvements for the Detroit Waterfront Dock, DetroitReconstruct and rehabilitate, including rail and interstate accessMichigan1620MI086

270,000Improve Tenth Street, Port HuronMichigan166MI087

1,350,000Jackson CountiesConduct engineering and design and improve I-94 in Calhoun andMichigan1468MI088

67,500Construct Bridge-to-Bay bike path, St. Clair CountyMichigan1546MI08946,179,00071 ProjectsMichigan

562,500Complete construction of Forest Highway 11, Lake Co.Minnesota590MN007450,000

Rd. 147Construct highway construction between Highway 494 and Carver Co.Minnesota633MN009

Attachment 1 Page 18 of 41

Page 19: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

150,000Road 147Construct T.H. 212 Construction between I-494 and Carver CountyMinnesota1622MN009

2,565,000RichfieldUpgrade 77th St. between I-35W and 24th Ave. to four lanes inMinnesota473MN010

1,800,000Park to I-94 in Maple GroveConstruct Trunk Highway 610/10 from Trunk Highway 169 in BrooklynMinnesota386MN011

300,000GroveConstruct T.H. 610/10 from T.H. 169 in Brooklyn Park to I-94 in MapleMinnesota1623MN011

1,354,350GroveConstruct T.H. 610/10 from T.H. 169 in Brooklyn Park to I-94 in MapleMinnesota1633MN011

675,000Upgrade Cross-Range Expressway between Coleraine to CSAH 7Minnesota412MN012

911,250Construct Trunk Highway 169 Causeway, Itasca Co.Minnesota327MN015787,500Construct Mankato South Route in MankatoMinnesota435MN021150,000Construct Mankato South Route in MankatoMinnesota1624MN021150,000Construct Mankato South Route, MankatoMinnesota1629MN02156,250

corridor to Rush Cityto commuter rail, Chisago County north of Forest Lake along I-35Conduct study of potential for diversion of traffic from the I-35 corridorMinnesota57MN024

168,750Upgrade 10th Street South, St. CloudMinnesota58MN02579,538Construct pedestrian bridge over TH 169 in Elk RiverMinnesota100MN026

225,000Upgrade TH 13 between TH 77 and I-494Minnesota113MN027202,500Construct grade crossing improvments, Morrison CountyMinnesota126MN02854,000Upgrade CSAH 1 from CSAH 61 to 0.8 miles northMinnesota139MN02927,000Construct Cass County Public Trails CorridorsMinnesota155MN030

585,000Undertake improvements to Hennepin County BikewayMinnesota200MN031607,500Upgrade CSAH 16 between TH 53 and CSAH 4Minnesota244MN03290,000Extend County State Highway 61 extension into Two HarborsMinnesota339MN033

1,462,500Newport, and approachesReconstruct and replace I-494 Wakota Bridge from South St. Paul toMinnesota340MN034

529,350Newport and approachesReconstruct and Replace I-494 Wakota Bridge from South St. Paul toMinnesota1630MN034

150,000Newport, and approachesReconstruct/replace I-494 Wakota Bridge from South St. Paul toMinnesota1631MN034

36,000Reconstruct CSAH 48 extension, Brainerd/BaxterMinnesota463MN0351,158,750

Benton CountiesReplace Sauk Rapids Bridge over Mississippi River, Stearns andMinnesota501MN036

300,000Benton CountiesReplace Sauk Rapids Bridge Over Mississippi River, Stearns andMinnesota1626MN036

150,000Benton CtiesReplace Sauk Rapids Bridge over Mississippi River, Stearns andMinnesota1627MN036

540,000Trunk Highway 53 DWP railroad bridge replacement, St. Louis Co.Minnesota570MN037

27,000Construct TH 1 east of Northome including bicycle/pedestrian trailMinnesota598MN038

67,500Street to Woodland Avenue.Reconstruct St. Louis CSAH 9 (Wallace Avenue) in Duluth from FourthMinnesota613MN039

22,500CrookstonConstruct railroad crossing connecting University of MN with City ofMinnesota727MN040

90,000Construct Gunflint Realignment project, Grand MaraisMinnesota765MN041112,500

371/Brainerd bypassConstruct grade separated interchange at south junction of THMinnesota815MN042

416,250north of FloodwoodUpgrade Highway 73 from 4.5 miles north of Floodwood to 22.5 milesMinnesota843MN043

108,000East Gull LakeUpgrade Cass County Road 105 and Crow Wing County Road 125,Minnesota947MN044

1,462,50063 in RochesterWiden Trunk Highway 14/52 from 75th Street, NW to Trunk HighwayMinnesota969MN045

135,000Upgrade CSAH 61 between TH324 and Snake RiverMinnesota970MN046225,000Upgrade Highway 53 between Virginia and CookMinnesota1015MN04772,000Construct Highway 210 trail/underpass, Brainerd/BaxterMinnesota1027MN048

337,500CountyConstruct bicycle and pedestrian facility (Mesabi Trail), St. LouisMinnesota1064MN049

1,871,250Implement Trunk Highway 8 Corridor projects, Chisago Co.Minnesota1075MN050360,000

intersection of County Roads 12 and 13 at Highway 169Construct Elk River bypass from 171st Avenue at Highway 10 toMinnesota1086MN051

135,000Upgrade TH6 between Talmoon and Highway 1Minnesota1111MN052337,500Construct Shepard Road/Upper Landing interceptor, St. PaulMinnesota1195MN053150,000Construct Shepard Rd.\Upper Landing Interceptor, St. PaulMinnesota1628MN053180,000Upgrade CSAH 116 north of CSAH 88 in ElyMinnesota1213MN054

1,462,500Construct Phalen Blvd. between I-35E and I-94Minnesota1274MN055375,000Construct Phalen Blvd. between I-35 and I-94Minnesota1632MN055

Attachment 1 Page 19 of 41

Page 20: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

315,000Upgrade Perpich Memorial from CR-535 to CSAH 111Minnesota1291MN056675,000Improve roads, Edge of Wilderness, Grand Rapids to EffieMinnesota1312MN057450,000

Street Corridor project, MoorheadReconstruct SE Main Ave. and related improvements, completing 34thMinnesota1404MN058

150,000Reconstruct S.E. Main Ave./I-94 Interchange, MoorheadMinnesota1621MN058300,000Reconstruct SE Main Avenue/I-94 Interchange, MoorheadMinnesota1625MN058112,500

PaulRestore MN Transportation facility, Jackson Street Roundhouse, St.Minnesota1455MN059

67,500Construct pedestrian overpass on Highway 169, Mille Lacs ReservationMinnesota1478MN060

300,000Design and Construct Access to I-35W at Lake St., MinneapolisMinnesota1634MN061

150,000Construct Third Street North, CSAH 81, Waite Park and St. CloudMinnesota242MN062

26,744,73859 ProjectsMinnesota562,500Construct I-20 /Norrell Road interchange, Hinds CountyMississippi209MS005

1,125,000High Street to the Jackson International Airport in Jackson, Mississippi.Construct Jackson International Airport Parkway and connectors fromMississippi1002MS006

337,500Build an interchange at I-55 with connectors to Madison and RidgelandMississippi569MS007

150,000Replace Greenville River Bridge in Washington CountyMississippi1350MS0085,700,000

Bridge, at PascagoulaReplace functionally obsolete drawbridge with new crossing, High RiseMississippi1645MS009

103,125Construct US-84 from Eddiceton to Auburn RoadMississippi1387MS010103,125Widen US-98 from Pike County to FoxworthMississippi1133MS011103,125Widen US-61 from Louisiana State line to Adams CountyMississippi507MS012103,125Widen US-84 from I-55 at Brookhaven to US-49 at CollinsMississippi899MS013393,750Construct East Metro Corridor in Rankin County, Mississippi.Mississippi628MS015

112,500

Mississippi Highway 468 [See PL 105-277 Section 347]Construct I-20 interchange at Pirates' Cove and 4-lane connector toMississippi1132MS016

103,125Construct segment 2 of the Jackson University Parkway in JacksonMississippi120MS019

1,275,000Upgrade Cowan-Lorraine Rd. between I-10 and U.S. 90, Harrison Co.Mississippi197MS020

1,125,000Widen MS-15 from Laurel to LouisevilleMississippi220MS021168,750Upgrade Alva-Stage Rd., Montgomery Co.Mississippi479MS022168,750Construct Lincoln Road extension, Lamar Co.Mississippi516MS023103,125

CountyConstruct segment 2 and 3 of the Bryam-Clinton Corridor in HindsMississippi521MS024

56,250Refurbish Satartia Bridge, Yazoo CityMississippi561MS02522,500Upgrade Goose Pond Subdivision Roads, Tallahatchie Co.Mississippi583MS026

112,500Upgrade Land Fill Road, Panola Co.Mississippi801MS027103,125Widen State Route 24 from Liberty to I-55Mississippi828MS02857,375

Tallahatchie Co.Upgrade Brister Rd. between Tutwiler and Coahoma County line,Mississippi893MS029

1,687,500Widen State Route 6 from Pontotoc to US-45 at Tupelo in Mississippi.Mississippi976MS030

496,125Upgrade roads, Washington Co.Mississippi1179MS031506,250Widen MS-45 from Brooksville to US-82 in Mississippi.Mississippi1190MS032

1,237,500Upgrade West County Line Road, City of JacksonMississippi1214MS033112,500Construct access improvments to various roads, Humphreys Co.Mississippi1229MS034

956,250Construct connector between US-90 and I-10 in BiloxiMississippi1261MS03599,000Upgrade Hampton Lake Road, Tallahatchie Co.Mississippi1285MS036

103,125CountiesUpgrade and widen US-49 in Rankin, Simpson, and CovingtonMississippi1305MS037

17,287,50030 ProjectsMississippi150,000Upgrade US-71 interchange in Carthage, Missouri.Missouri854MO001

3,683,587County, Missouri.Construction and upgrade of US-71/I-49 in Newton and McDonaldMissouri1192MO001

4,725,000Widen US-63 in Randolph and Boone Counties, MissouriMissouri1057MO0024,500,000

DeSotoRelocate and reconstruct Route 21 between Schenk Rd. to Town ofMissouri370MO007

900,000Construction US-67/Route 60 interchange in Popular Bluff, Missouri.Missouri667MO009

3,037,500Upgrade US-60 in Carter County, Missouri.Missouri963MO009675,000Upgrade Eastern Jackson County, Jackson Co.Missouri752MO017900,000Construct Chouteau Bridge at Kansas CityMissouri1641MO019360,000

CountyConstruct Highway 36 Hannibal Bridge and approaches in MarionMissouri154MO021

900,000Construct Mississippi River Bridge at HannibalMissouri1642MO021

Attachment 1 Page 20 of 41

Page 21: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

900,000Construct US-412 corridor from Kennett to Hayti, Missouri.Missouri142MO0231,237,500Construct Jefferson Ave. viaduct over Mill Creek Valley in St. LouisMissouri509MO024

103,913Bull Shoals Lake Ferry in Taney County, Missouri.Missouri576MO02590,000

University City loop business district in St. LouisConstruct bike/pedestrian path between Delmar Metrolink Station andMissouri650MO026

750,000Upgrade Route 169 between Smithville and north of I-435, Clay Co.Missouri692MO027

150,000Replace bridge on Route 92, Platte Co.Missouri763MO028750,000Upgrade Route 6 between I-29 and Route AC, St. JosephMissouri797MO029900,000Upgrade US-63 in Howell County, Missouri.Missouri856MO030450,000Construct Strother Rd./I-470 interchange, Jackson Co.Missouri861MO031

3,000,000Upgrade Route 36 between Hamilton and ChillicotheMissouri870MO032165,000

Gasconade CountiesConstruct Hermann Bridge on Highway 19 in Montgomery andMissouri961MO033

750,000Construct Missouri River Bridge at HermannMissouri1644MO033675,000Upgrade Mo. Rt. 150, Jackson Co.Missouri1066MO034247,500Construct Grand Ave. viaduct over Mill Creek Valley in St. LouisMissouri1242MO035

90,000Riverfront bike trail in St. LouisConstruct extension of bike path between Soulard market area andMissouri1294MO036

562,500Springfield/Branson Airport intermodal facility in Springfield, Missouri.Construction of airport ground transportation terminal for theMissouri1376MO037

900,000Improve safety and traffic flow on Rt. 13 through ClintonMissouri1382MO038135,000Construct an intermodal center at Missouri Botanical GardenMissouri1486MO039

51,150in Kansas CityDevelop bike/pedestrian paths for Town of Kansas and Riverfront ParkMissouri1635MO040

450,000Construct Cuivre River Bridge at Lincoln CountyMissouri1636MO041450,000Construct Rte 13 MO River Bridge at LexingtonMissouri1637MO042450,000Construct Hwy 47 MO River Bridge at WashingtonMissouri1638MO043450,000Construct Rte 5 Bridge at the Lake of the OzarksMissouri1639MO044

1,500,000Upgrade Interstate 70 in the State of MOMissouri1640MO0451,200,000Construct Bill Emerson Memorial BridgeMissouri1643MO0461,500,000High priority highway and bridge projectsMissouri1825MO047

750,000Resurface and maintain roads located in Missouri State parksMissouri1850MO04838,488,65037 ProjectsMissouri

2,985,750

and Montanathe Beartooth Highway between mile markers 24.5 to 43.1 in WyomingConduct Environmental review planning and design of construction ofMontana1646MT008

2,985,7501 ProjectMontana39,375Corridor study for Plattsmouth Bridge area to US-75 and Horning RoadNebraska46NE007

61,875Conduct corridor study from Wayne to Vermillion-Newcastle bridgeNebraska322NE008

618,750Construct South Beltway in LincolnNebraska492NE00911,250

State Highway 50Corridor study for Louisville South bypass from State Highway 66 toNebraska619NE010

506,250Norfolkand WayneConstruct NE-35 alternative and modified route expressway inNebraska979NE011

450,000Construct bridge in NewcastleNebraska1067NE012843,750Construct the Antelope Valley Overpass in LincolnNebraska1136NE013168,750

County, NebaskaReplace US-81 bridge between Yankton, south Dakota and CedarNebraska1272NE014

112,500Norfolk, Wayne and Dakota CityConduct corridor study of NE-35 alternative and modified route inNebraska1451NE015

450,000Improve Nebraska Highways 8 and 15 in FairburyNebraska1650NE016717,900

Dodge Park through Omaha to BellevueConstruct Riverfront Trails and Bridges Along Missouri River fromNebraska1651NE017

3,980,40011 ProjectsNebraska750,000

North Las VegasReconstruction of I-15 Interchange at Sahara Ave. and Rancho Rd. inNevada1668NV003

562,500Extend I-580 in Washie and Douglas CountiesNevada743NV008750,000I-580\U.S. 395 Freeway Extension to Carson CityNevada1667NV008562,500Construct the US-395 Carson City BypassNevada530NV010281,250Widen I-15 from California State line to Las VegasNevada1216NV013900,000Widen I-15 in San Bernadino County, CANevada1670NV013787,500Canamex Corridor Innovative Urban Renovation project in HendersonNevada28NV016

450,000Widen I-50 between Fallon and FernleyNevada663NV017281,250Improve at-grade railroad crossings in RenoNevada1062NV018

Attachment 1 Page 21 of 41

Page 22: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

229,650Canamex Corridor Innovative Urban Renovation Project in HendersonNevada1665NV019

150,000Widen US 50 between Fallon and FernleyNevada1666NV020300,000Widening of Craig Rd. in North Las VegasNevada1669NV021

6,004,65012 ProjectsNevada1,876,650Construct the Broad Street Parkway in NashuaNew Hampshire355NH003

798,750Construct Conway bypass from Madison to BartlettNew Hampshire356NH00475,000Conway bypass/Rte 16 mitigation, ConwayNew Hampshire1654NH004

1,203,750Construct Manchester Airport access road in ManchesterNew Hampshire687NH009150,000Construct Manchester Airport Access Road, ManchesterNew Hampshire1653NH009476,250Construct Manchester Access Rd, ManchesterNew Hampshire1658NH009300,000Advance completion of Rte 101 project from Raymond to HamptonNew Hampshire1656NH010

267,900Reconstruct US-3 Carroll town line 2.1 miles northNew Hampshire472NH012155,400Improve the Bridge Street bridge in PlymouthNew Hampshire785NH013150,000Improve Bridge Street bridge, PlymouthNew Hampshire1655NH013

1,404,000Widen I-93 from Salem northNew Hampshire916NH014176,250Widen I-93 from Salem to ManchesterNew Hampshire1652NH014425,400Construct Orford BridgeNew Hampshire923NH015127,500Construct Orford Bridge, OrfordNew Hampshire1659NH015380,400Construct Chestersfield BridgeNew Hampshire1090NH016734,850Construct the Keene bypassNew Hampshire1206NH017380,400Construct Hindsale BridgeNew Hampshire1247NH018247,500

borderImprove 3 Pisquataqua River Bridges on the New Hampshire - MaineNew Hampshire1300NH019

97,500Rehabilitate/reconstruct Bath-Haverhill Bridge, Bath and HaverhillNew Hampshire1657NH020

750,000High priority highway and bridge projectsNew Hampshire1822NH02110,177,50020 ProjectsNew Hampshire

337,500Toms River BoroughConstruct Toms River bridge project connecting Dover and SouthNew Jersey919NJ003

558,750Upgrade I-78 interchange and West Peddie St. ramps, NewarkNew Jersey1003NJ009

3,750,000Jersey.Replace the Ocean City-Longport bridge in Cape May County, NewNew Jersey891NJ021

956,250Construct Route 4/17 interchange in ParamusNew Jersey475NJ022562,500

access to Routes 17 and 80, Bergen Co.Upgrade Market St./Essex St. and Rochelle Ave./Main St. to facilitateNew Jersey19NJ023

112,500in Sussex CountyReplace Clove Road bridge over tributary of Mill Brook and Clove BrookNew Jersey36NJ024

3,656,250

Blvd. interchange reconstruction project.Avenue reconstruction project, and $3,075,000 for the Route 46/Unionreconstruction project, $12,675,000 for the Route 46/Van Houtonprovided, $8,625,000 for the Route 46/Riverview Drive InterchangeConduct Route 46 Corridor Improvement Project with the amountNew Jersey119NJ025

750,000County, New Jersey.Improve grade separations on the Garden State Parkway in Cape MayNew Jersey121NJ026

300,000Trumbull St.)Construct New Jersey Exit 13A Flyover (extension of Kapowski Rd. toNew Jersey163NJ027

337,500Construct pedestrian bridge in Washington TownshipNew Jersey185NJ028787,500

CountyWiden Route 1 from Pierson Avenue to Inman Avenue in MiddlesexNew Jersey293NJ029

3,375,000Upgrade Garden State Parkway Exit 142New Jersey338NJ030281,250Reconstruct Essex Street Bridge, Bergen Co.New Jersey369NJ031375,000

ferry, WeehawkenUpgrade Baldwin Ave. intersection to facilitate access to waterfront andNew Jersey418NJ032

1,800,000WeehawkenRelocate and complete construction of new multi-modal facility,New Jersey474NJ033

450,000Revitalize Route 130 from Cinnaminson to WillingboroNew Jersey477NJ03440,500Construct East Windsor Bear Brook pathway systemNew Jersey497NJ035

405,000Rehabilitate East Ridgewood Avenue over Roue 17 in Bergan CountyNew Jersey522NJ036

450,000Pier, BayonneConstruct road from the Military Ocean Terminal to the Port JerseyNew Jersey588NJ037

450,000

35 underpass easttraffic which will ease delays and traffic at Turnpike Exit 12 and Routewith Woodbridge, and Route 35 with Perth Amboy for increased truckDesign, construct, and expand industrial Roads connecting CarteretNew Jersey614NJ038

1,275,000Route 23N in Passaic Co.Construct interchange improvements and flyover ramps at I-80W toNew Jersey681NJ039

1,732,500Construct Route 31 Fleming Bypass in Hunterdon County, New Jersey.New Jersey709NJ040

Attachment 1 Page 22 of 41

Page 23: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

618,750improvement planConsrtuct Route29/129 bicycle, pedestrian and landscapeNew Jersey849NJ041

150,000

Center and the contiguous light rail station in NewarkWaterfront Park over Route 21 to the New Jersey Performing ArtsDesign and construct pedestrian access facility from Joseph G. MinishNew Jersey906NJ042

360,000Replace Groveville-Allentown Road bridge in HaniltonNew Jersey962NJ043300,000

depotmaintenance facility in Union City in order to replace the NJ TransitConstruct and/or reconstruct intermodal transportation andNew Jersey1039NJ044

202,500CountyReplace Maple Grange Road bridge over Pochuck Creek in SussexNew Jersey1041NJ045

517,500Design and construction Belford Ferry Terminal in Belford, New Jersey.New Jersey1050NJ046

1,800,000Intermodal CenterUndertake improvements associated with the South Amboy RegionalNew Jersey1081NJ047

56,250intersection at Garden State Parkway in Bergan CountyUpgrade Montvale/Chestnut Ridge Road and Grand AvenueNew Jersey1141NJ048

747,000Improve Old York Road/Rising Run Road intersection in BurlingtonNew Jersey1145NJ049

900,000Eliminate Berlin Circle and signalize intersection in CamdenNew Jersey1171NJ050180,000

countyReplace Kinnaman Avenue bridge over Pohatcong Creek in WarrenNew Jersey1199NJ051

562,500Shrewsbury Avenue in MonmouthConstruct grade separation of Route 35 and Tinton falls and extendNew Jersey1207NJ052

2,587,500Construct US-22/Chimney Rock Road interchange in Somerset CountyNew Jersey1239NJ053

146,250Replace Calhoun Street Bridge in TrentonNew Jersey1254NJ054525,000

arterial roadwayRail Station and the Trans Hudson Corridor at the Bergen ArchesAve.) and the New Jersey Turnpike at Secaucus Intermodal TransferConstruct highway connector between Interstate Route 1&9 (TonelleNew Jersey1338NJ055

900,000Reconstruct South Pembrton Road from Route 206 to Hanover StreetNew Jersey1352NJ056

300,000

and Newark, New Jerseycenter and corridor between and within the cities of Bayonne, Elizabethbrownfields -- to establish an international intermodal transportationinternational airport and seaport, rail, national highway system andConstruct, reconstruct and integrate multi-transportation modes --New Jersey1357NJ057

900,000Construct Collingswood Circle eliminator, CamenNew Jersey1401NJ058168,750

line in Rochelle ParkConstruct Route 17 bridge over the Susquehanna and Western RailNew Jersey1414NJ059

1,091,250Upgrade Urban University Heights Connector, NewarkNew Jersey1471NJ060105,000Construct bicycle trails and riverside improvements, West DeptfordNew Jersey1660NJ061

1,200,000RiverConstruct Del. River tram to link destinations on both sides of Del.New Jersey1661NJ062

2,100,000Construct new ramp between NJ 42 and south section of I-295New Jersey1662NJ063

4,125,000right-of-way, Hudson CtyConstruct roadway network through the Bergen Arches railroadNew Jersey1663NJ064

225,000Relocate/construct Cooper Hospital Med Ctr helipad, CamdenNew Jersey1664NJ065

43,511,25047 ProjectsNew Jersey1,350,000Improve I-25 at Raton PassNew Mexico79NM013

675,000Improve 84/285 between Espanola and HernandezNew Mexico378NM0142,025,000Reconstruct US-84/US-285 from Santa Fe to EspanolaNew Mexico392NM0151,350,000Improve US-70 southwest of PortalesNew Mexico409NM016

153,750Improve Uptown in Bernalillo CountyNew Mexico513NM01797,500Extend Unser Boulevard in AlbuquerqueNew Mexico685NM018

498,750Complete the Paseo del Norte East Corridor in Bernalillo CountyNew Mexico1118NM019

2,812,500Improve US-70 from I-25 to Organ in New Mexico.New Mexico1267NM0203,000,000Northwest Albuquerque/Rio Rancho high priority roadsNew Mexico1810NM021

11,962,5009 ProjectsNew Mexico1,462,500

enhancements between E. 161st St. and Fordham Rd., New York CityRedesign Grand Concourse to enhance traffic flow and relatedNew York933NY011

900,000preliminary work for the Miller Highway relocation project in New YorkComplete engineering, design, environment reviews and otherNew York732NY014

300,000Redevelopment projectConstruct Phase II of the City of Mount Vernon's New Haven RailroadNew York309NY017

Attachment 1 Page 23 of 41

Page 24: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

2,700,000

(Gowanus tunnel project)tunnel alternative to reconstruction of existing elevated expresswayUndertake studies, planning, engineering, design and construction of aNew York41NY018

2,250,000Renovate Hellgate Bridge, NYCNew York1680NY023900,000Rehabilitate Queens Blvd./Sunnyside Yard Bridge, New York CityNew York204NY030

2,100,000York.Upgrade and relocate Utica-Rome Expressway in Oneida County, NewNew York572NY036

3,000,000Stuart Int.'l Airport, NewburgDesign/construct upgraded interchange between I-84 and I-87 nrNew York1678NY046

3,000,000Construct US-219 from Route 39 to Route 17New York988NY0473,000,000Construct Rte 219 from Springville to Salamanica (Rte 13 to Rte 17)New York1677NY047

112,500Improve Cross Westchester ExpresswayNew York877NY050210,000

State lineImprove Long Ridge Road from Pound Ridge Road to ConnecticutNew York9NY053

1,125,000I-87 Noise Abatement ProgramNew York10NY054171,000Improve Route 9 in Dutchess CountyNew York15NY055450,000

south to Rockaway Blvd., Queens CountyReconstruct Springfield Blvd. between the Long Island Rail main lineNew York17NY056

1,830,000corridorUpgrade and improve Saratoga to Albany intermodal transportationNew York44NY057

1,890,000Upgrade Route 17 between Five Mile Point and Occanum, Broome Co.New York54NY058

150,000Construct Hutton Bridge ProjectNew York70NY0591,316,250

capabilities at I-90 Exit 8Construct interchange and connector road using ITS testbedNew York74NY060

1,350,000Construct Edgewater Road Dedicated Truck RouteNew York75NY061240,000Upgrade Chenango County Route 32 in NorwichNew York87NY062225,000Rehabilitate Broadway Bridge, New York CityNew York104NY06318,000Rehabilitate roads, Village of Great NeckNew York130NY06460,000Conduct safety study and improve I-90 in Downtown BuffaloNew York138NY065

1,856,250Construct Hamilton Street interchange in Erwin, New York.New York159NY066660,000Construct Hamilton St interchange between Rte 17 and Rte 15 in ErwinNew York1674NY066

78,750Improve 6th and Columbia Street project in ElmiraNew York160NY0672,100,000

York, for the New York City Economic Development Corp.Capital improvements for the car float operations in Brooklyn, NewNew York162NY068

127,500Reconstruct Route 23/Route 205 intersection in OneontaNew York190NY069225,000Reconstruct 127th Street viaduct, New York CityNew York214NY070112,500Reconstruct Route 25/Route 27 intersection in St. Lawrence CountyNew York225NY071

900,000Construct new exit 46A on I-90 at Route 170 in North ChiliNew York230NY0721,575,000

facility in Nassau countyConstruct the Mineola intermodal facility and Hicksville intermodalNew York265NY073

1,800,000Construct Mineola and Hicksville Intermodal Centers in Nassau Co.New York1427NY073

4,545,000Judd Road Connector in New Hartford and Whitestown, New YorkNew York269NY074

45,000HamburgConduct traffic calming study on National Scenic Byway Route 5 inNew York279NY075

450,000Construct Midtown West Intermodal Ferry Terminal, New York CityNew York290NY076

281,250Construct intermodal transportation hub in PatchogueNew York294NY0771,012,500Improve Route 281 in CortlandNew York295NY078

65,250CountyConstruct CR-82 from Montauk Highway to Sunrise Highway in SuffolkNew York305NY079

101,250Construct CR-85 from Foster Avenue to CR97 in Suffolk CountyNew York308NY080

1,321,875Improve Route 31 from Baldwinsville to County Route 57New York371NY08178,750FJ&G Rail/Trail Project in Fulton CountyNew York417NY082

204,000Construct County Road 50 in the vicinity of Windsor Avenue.New York432NY083540,000Construct Route 17-Lowman Crossover in AshlandNew York444NY084278,212

should be Route 3]Improve the Route 31/I-81 Bridge in Watertown [Typo - Route 31New York454NY085

450,000Replace Route 92 Limestone Creek Bridge in ManliusNew York494NY086180,000

Avenue in IslipConstruct Furrows Road from Patchogue/Holbrook Road to WaverlyNew York496NY087

337,500Niagara FallsConstruct access road and entranceway improvments to airport inNew York500NY088

450,000Conduct extended needs study for the Tappan Zee BridgeNew York510NY089360,000Replace Route 28 bridge over NY State Thruway, Ulster Co.New York544NY090

Attachment 1 Page 24 of 41

Page 25: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

180,000Highway in LindenhurstConstruct Wellwood Avenue from Freemont Street to MontaukNew York559NY091

36,000Construct access road from Lake Avenue to Milestrip Road in BlasdellNew York567NY092

37,500Construct pedestrian access bridge from Utica Union StationNew York580NY093

377,325Reconstruct Route 9 in PlattsburghNew York582NY094168,000

Island Expressway and Colonial SpringsConstruct CR-3 at Southern State Parkway overpass between LongNew York600NY095

218,250between 172nd Street to Chevy Chase RoadConstruct sound barriers on both sides of Grand Central ParkwayNew York607NY096

168,750Conduct North Road Corridor study in Oswego CountyNew York609NY097675,000

Parkville, Sullivan Co.Construct full access controlled expressway along NY Route 17 atNew York611NY098

24,000Reconstruct Ridge Road Bridge in Orange CountyNew York623NY099909,000Design and construct Outer Harbor Bridge in Buffalo.New York630NY100600,000Reconstruct and widen Route 78 from I-90 to Route 15New York637NY101562,500

AvenueReconstruct Flushing Avenue between Humboldt Street and CypressNew York649NY102

965,700Construct intermodal facility in New Rochelle, Westchester Co.New York659NY103

225,000Upgrade Riverside Drive between 97th St. and Tiemann, New York CityNew York668NY104

525,000Authority of NY/NJCapital improvements for the Red Hook Barge in NY/NJ for the PortNew York669NY105

576,000Renovate State Route 9 in PhillipstownNew York690NY106562,500Construct congestion mitigation project for BrookhavenNew York748NY107787,500Undertake Linden Place reconstruction project, QueensNew York822NY108225,000

Bridge and Dyckman St., New York CityRehabilitate segment of Henry Hudson Parkway between WashingtonNew York831NY109

656,250MamaroneckReconstruct Mamaroneck Ave., White Plains, Harrison andNew York844NY110

262,500Construct Fordham University regional transportation facilityNew York855NY111600,000Construct Fordham Univ Regional Transportation Facility, BronxNew York1673NY111

255,000Reconstruct Washington County covered bridge projectNew York858NY11250,400

PoughkeepsieConstruct Hudson River scenic overlook from Route 9 to Waterfront inNew York886NY113

77,250Construct County Road 93 between NYS 27 and NYS 454.New York892NY11442,000Improve and reconstruct Commerce Street in York TownNew York904NY115

112,500Improve ferry infrastructure in GreenportNew York920NY116632,250Construct NYS Route 27 at intersection of North Monroe AvenueNew York930NY117

150,000Parkway and New England Thruway through the Northeast BronxStudy transportation improvements for segments of Hutchinson RiverNew York953NY118

337,500Construct Erie Canal Preserve I-90 rest stop in Port ByronNew York973NY119210,600Construct Maybrook Corridor bikeway in Dutchess CountyNew York1000NY120

1,136,550Construct County Route 21, Peeksill Hollow Road renovation projectNew York1013NY121

225,000international trade corridor in St. Lawrence CountyInitiate study and subsequent development and engineering of anNew York1016NY122

41,250CountyConstruct CR-96 from Great South Bay to Montauk Highway in SuffolkNew York1042NY123

562,500Construct city of Glen Cove waterfront improvementsNew York1058NY1244,500,000Replace Kennedy-class ferries, Staten IslandNew York1082NY125

300,000Replace Kennedy-class ferries in Staten IslandNew York1672NY125112,500Rahabilitate Jay Covered Bridge in Essex CountyNew York1085NY126189,000Improve Broadway in North Castle in Westchester CountyNew York1102NY127

1,800,000RochesterConstruct access improvements to Port of Rochester Harbor,New York1103NY128

337,500StreetReconstruct Flushing Avenue between Wycoff Avenue and GatesNew York1113NY129

56,250Street and Douglaston ParkwayConstruct sound barriers on Grand Central Parkway between 244thNew York1121NY130

37,500Construct Bike Paths along the Bronx River in Bronx ParkNew York1122NY131150,000Rehabilitate transportation facilities in CO-OP CityNew York1130NY132393,750

Qual St. and 8th Ave. in Niagara FallsReconstruct Niagara St., Quay St., and 8th St. including realignment ofNew York1137NY133

450,000Cheektowaga.Traffic Mitigation Project on William Street and Losson Road inNew York1149NY134

1,129,500Construct Bay Shore Road SR-231 to SR-27 in Suffolk CountyNew York1185NY135

Attachment 1 Page 25 of 41

Page 26: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

225,000Rehabilitate Third Avenue Bridge over Harlem River, New York CityNew York1205NY136

337,500Construct Elmira Arterial from Miller to CedarNew York1233NY137525,000Conduct Trans-Hudson Freight Improvement MIS, New York CityNew York1245NY138

1,687,500Construct Eastern Long Island Scenic Byway in Suffolk CountyNew York1257NY139

112,500Implement Melrose Commons geographic information systemNew York1269NY140

1,303,050Construct intermodal facility in Yonkers, Westchester Co.New York1295NY141331,500

CountyImprove access to I-84/Dutchess intermodal facility in DutchessNew York1315NY142

1,050,000Reconstruct 79th Street Traffic Circle, New York CityNew York1320NY143112,500

Ave. between E. 188th and 189th StreetsConstruct bridge deck over the Metro North right-of-way along ParkNew York1332NY144

1,350,000Upgrade Frederick Douglas Circle, New York CityNew York1344NY14545,000

between 15th Road and Willets Point Blvd.Construct sound barriers on east side of Clearview ExpresswayNew York1355NY146

281,250Construct congestion mitigation project for RiverheadNew York1364NY147150,000Construct Olana Visitor Center in OlanaNew York1405NY148294,450Reconstruct Jackson Avenue in New Windsor, Orange CountyNew York1407NY149

112,500Construct congestion mitigation project for SmithtownNew York1408NY150278,213Reconstruct County Route 24 in Franklin CountyNew York1409NY151253,125Improve Hiawatha Boulevard and Harrison Street corridors in SyracuseNew York1413NY152

433,500Reconstruct Stoneleigh Avenue in Putnam CountyNew York1435NY153216,000

lineImprove Bedford-Banksville Road from Millbrook to Connecticut StateNew York1438NY154

562,500Construct Poughkeepsie Intermodal Facility in PoughkeepsieNew York1459NY155

56,250NY/Canada borderConduct feasibility study of new International bridges on theNew York1461NY156

52,500Improve and reconstruct Stony Street in York TownNew York1473NY157150,000

Rockaway Blvd in Queens CountyReconstruct Springfield Blvd between the LIRR Main Line South toNew York1671NY158

900,000Construct intermodal project at Castle Clinton and Battery Pk, NYCNew York1675NY159

915,000Relocate toll barrier in WilliamsvilleNew York1676NY1606,000,000

Amtrak StaRenovate/reconstruct James A Farley Post Office, NYC, as newNew York1679NY161

90,000Center for Advanced Simulation and Technology, at Dowling CollegeNew York1549NY16289,351,250125 ProjectsNew York

112,500Construct US-64/264 in Dare CountyNorth Carolina1175NC001506,250Construct US Route 17, Elizabeth City BypassNorth Carolina524NC003393,750Construct US-117, the Elizabeth City Bypass in Pasquotank CountyNorth Carolina1360NC003

393,750Wayne and Wilson CountiesConstruct US-13 from the Wilson the US-264 Bypass to Goldsboro inNorth Carolina564NC010

1,800,000between East of US 401 to I-95, and bridge over Cape Fear RiverConstruct segment of new freeway, including right-of-way acquisition,North Carolina83NC011

1,800,000Construct Charlotte Western Outer Loop freeway, Mecklenburg Co.North Carolina96NC018

225,000Robeson Co.Construct segment of I-74 between Maxton Bypass and NC 710,North Carolina205NC019

1,462,500Construct I-540 from east of NC Rt. 50 to east of US Rt. 1 in Wake Co.North Carolina313NC020

303,750Construct segment of Raleigh Outer Loop, Wake Co.North Carolina804NC0201,266,000

2000Construct Raleigh Outer Loop (segment D) between NC 50 and SRNorth Carolina1647NC020

337,500and Carteret CountiesWiden North Carolina Route 24 from Swansboro to US-70 in OnslowNorth Carolina434NC021

2,925,000Upgrade I-85, Mecklenburg and Cabarrus CountiesNorth Carolina502NC022202,500Construct bridge over Chockoyotte Creek in Halifex Co.North Carolina562NC023532,500

US-221Widen US-421 from North Carolina Route 194 to two miles East ofNorth Carolina622NC024

506,250Edgecombe CountiesUpgrade US 13/NC11 (including Bethel bypass) in Pitt andNorth Carolina790NC025

337,500in Halifax and Warren CountiesUpgrade US 158 (including bypasses of Norlina, Macon and Littleton)North Carolina943NC026

337,500Upgrade US-158 in Warren and Halifax CountiesNorth Carolina1193NC0262,587,500

Durham CountiesUpgrade Highway 55 between US 64 and State Route 1121, Wake andNorth Carolina959NC027

Attachment 1 Page 26 of 41

Page 27: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

2,250,000Upgrade and improve US-19 from Maggie Valley to CherokeeNorth Carolina1303NC028

3,318,750Construct I-85 Greensboro Bypass in Greensboro, North Carolina.North Carolina1314NC029

112,500CountiesUpgrade US 13 (including Ahoskie bypass) in Bertie and HertfordNorth Carolina1361NC030

3,431,250Construct US-311(I-74) from NC-68 to US-29A-70ANorth Carolina1410NC031360,000Make improvements to I-95/SR-1162 interchange in Johnston Co.North Carolina1434NC032

821,250CountiesRelocate US 1from north of Lakeview to SR 1180, Moore and LeeNorth Carolina1466NC033

7,200,000Construct additional lanes on I-77 between I-85 and NC 73North Carolina1648NC03433,523,50025 ProjectsNorth Carolina

270,000Upgrade U.S. Route 52 between Donnybrook and US Route 2North Dakota334ND040

540,000Construct Jamestown bypassNorth Dakota1186ND041315,000Upgrade US Rt. 52, Kenmare to DonnybrookNorth Dakota1317ND042

1,970,700State Priority ProjectsNorth Dakota1649ND0433,095,7004 ProjectsNorth Dakota

2,587,500Upgrade and widen US-24 from I-469 to I-475Ohio1251OH005300,000Relocate Harrison/Belmont US 250Ohio703OH007

2,700,000Replace I-280 bridge over Maumee River, Toledo areaOhio344OH013562,500

Co.Upgrade SR 124 between Five Points and Ravenswood Bridge, MeigsOhio1183OH025

15,000SystemConduct feasibility study for inclusion of US-22 as part of the InterstateOhio14OH027

3,375,000Upgrade US-30 from Wooster to RicelandOhio762OH028300,000

Belmont CountyRelocate Washington Street/SR 149 within Bellaire city limits inOhio2OH030

180,000Co.Upgrade North Road between US 422 and East Market St., TrumbullOhio7OH031

225,000Washington County.Construct new bridge over Muskingum River and highway approaches,Ohio25OH032

562,500(Nelsonville Bypass)Upgrade US Rt. 33 between vicinity of Haydenville to FloodwoodOhio38OH033

562,500Richmond DaleUpgrade US Rt. 35 between vicinity of Chillicothe to Village ofOhio63OH034

50,625Restore Main and First Streets to two-way traffic, MiamisburgOhio71OH035

60,000Reconstruct Morgan County 37 in Morgan CountyOhio105OH036712,500Construct highway-rail grade separations on Snow Road in Brook ParkOhio110OH037

225,000Rehabilitate Martin Luther King, Jr. Bridge, ToledoOhio175OH038562,500Construct Chesapeake Bypass, Lawrence Co.Ohio186OH039787,500Upgrade Route 82, StrongsvilleOhio208OH040

1,687,500in Richland County.Upgrade US-30 from SR-235 in Hancock County to the Ontario bypassOhio257OH041

456,000Construct Intermodal Industrial Park in WellsvilleOhio301OH042562,500Construct Eastern US Rt. 23 bypass of PortsmouthOhio389OH043225,000

CountyRelocate State Route 60 from Zanesville to Dresden, MuskingumOhio422OH044

75,000Improve State Route 800 in Monroe CountyOhio442OH045150,000Upgrade I-77/US-250/SR-39 interchange in Tuscarawas CountyOhio452OH046

11,250Upgrade 1 warning device on the rail line from Marion to RidgewayOhio467OH047

930,750Hendricks Road and Jackson Street in MentorConstruct highway-rail grade separations on Heisley Road betweenOhio482OH048

360,000Upgrade Western Reserve Road, Mahoning Co.Ohio490OH049312,000Undertake improvements to open Federal Street to traffic, YoungstownOhio555OH050

330,000Guernsey County Industrial ParkConstruct State Route 209 from Cambridge and Byesville to theOhio557OH051

4,500Complete safety/bicycle path in Madison TownshipOhio626OH052600,000

CountyImprove Alum Creek Drive from I-270 to Frebis Avenue in FranklinOhio638OH053

300,000Replace Jacobs Road Bridge, Mahoning Co.Ohio644OH0541,050,000

line to I.R. 77.Widen and reconstruct State Route 82 from Lorain/Cuyahoga CountyOhio656OH055

6,000Upgrade SR 78 rest stop in Monroe CountyOhio661OH056300,000Improve and construct SR-44/Jackson Street Interchange in PainesvilleOhio700OH057

225,000Construct Licking-Thornwood Connector in Licking CountyOhio749OH05875,000Construct St. Clairsville Bike Path in Belmont CountyOhio757OH059

Attachment 1 Page 27 of 41

Page 28: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

150,000OhioRelocate SR-30 for final design of south alternative in Carroll County,Ohio839OH060

712,500Rail mitigation and improvement projects from Vermillion to ConneautOhio863OH061

345,000Construct greenway enhancements in MadisonOhio866OH062156,750

I-90 in Lake CountyConstruct Chagrin River/Gulley Brook corridor scenic greenway alongOhio882OH063

517,500Construct Black River intermodal transportation centerOhio934OH064123,750

DeshlerUpgrade 11 warning devices on the rail north/south line from Toledo toOhio985OH065

9,000Hebron in Licking CountyConstruct new traffic signal and intersection upgrade for Village ofOhio997OH066

3,750,000Mahoning Co.Construct SR 711 connector four-lane limited access highway inOhio1005OH067

562,500Construct Wilmington Bypass, WilmingtonOhio1021OH068925,500

Bend Road in Ashtabula County, OhioImprove and widen SR-45 from North of the I-90 interchange to NorthOhio1025OH069

1,350,000Widen Licking-SR-79-06.65 (PID 8314) in Licking CountyOhio1029OH0702,137,500Construct grade separations at Front Street and Bagley Road, BereaOhio1046OH071

525,000CountyConstruct SR-315 Ohio State University Ramp project in FranklinOhio1061OH072

525,000Construct interchange at I-480 in Independence, Ohio.Ohio1096OH073637,500

SolonImprove and widen SR-91 from SR-43 south to county line/city line inOhio1151OH074

232,500Upgrade State Route 18 between I-71 and I-77Ohio1187OH075708,000Upgrade U.S. Route 422 through GirardOhio1189OH076

1,065,000$100,000 to preserve or reconstruct the Tourism Information CenterConstruct a new interchange at County Road 80 and I-77 in Dover withOhio1234OH077

834,000Construct interchange at SR 11 and King Graves Rd. in Trumball Co.Ohio1280OH078

75,000South 93-22-40 connectorConduct feasibility study for the construction of Muskingum CountyOhio1333OH079

225,000Gallia Co.Upgrade SR 7 (Eastern Ave.) to improve traffic flow into Gallipolis,Ohio1377OH080

562,500Construct grade separations at Fitch Road in Olmsted FallsOhio1402OH081551,250

Area, DaytonConstruct access and related improvements to Downtown RiverfrontOhio1417OH082

22,500to ToledoUpgrade 2 warning devices on the rail north/south line from ColumbusOhio1463OH083

101,250Undertake improvements to Valley Street, DaytonOhio1470OH08490,000

Jefferson CountyWiden to 5 lanes existing SR 43/Sunset Boulevard in Steubenville,Ohio1472OH085

1,200,000ClevelandConstruct grade separation at Dille Road and London Road inOhio1474OH086

309,375improvements, DaytonReimburse costs associated with multimodal transportationOhio1487OH087

300,000Add lanes and improve intersections on Route 20 in Lake County, OhioOhio1489OH088

750,000Upgrade intersection of US 20 and SR 420, WoodvilleOhio1681OH089450,000Improve intersection at SR 327 and US 32, WellstonOhio1682OH090450,000Upgrade US 20 in Painesville, Perry, and MadisonOhio1683OH091600,000Upgrade US 30 and Hill-Diley Road, LancasterOhio1684OH092300,000Upgrade Caves Road, Geauga CountyOhio1685OH093750,000Upgrade SR 2 between Oregon and Camp PerryOhio1686OH094

1,200,000Construct intermodal transit center in CinncinnatiOhio1687OH0955,148,750High priority highway and bridge projectsOhio1688OH096

600,000Upgrade intersection of US35 and Fairfield RoadOhio1689OH09750,381,25074 ProjectsOhio

705,000Reconstruct US-99/SH377 from Prague to Stroud in Lincoln CountyOklahoma424OK015

28,125Wildlife RefugeReconstruct County Road 237 from Indiahoma to Wichita MountainsOklahoma503OK016

240,000McCurtain CountyImprove Battiest-Pickens Road between Battiest and Pickens inOklahoma646OK017

589,500McCurtain CountyReconstruct US-70 from Broken Bow to Arkansas State line inOklahoma1031OK018

10,918,125

supporting structures between I-35 and I-44.vehicle approach roads, interchanges, intersections, signalization anddowntown Oklahoma City, including demolition of the existing bridge,Reconstruct and widen I-40 Crosstown Bridge and Realignment inOklahoma1211OK019

Attachment 1 Page 28 of 41

Page 29: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

4,636,800CityReconstruct/widen I-40 Crosstown Bridge and Realignment, OklahomaOklahoma1690OK019

16,500Reconstruct US-70 in Marshall and Bryan CountiesOklahoma1218OK02024,000

Counties.Conduct study of Highway 3 in McCurtain, Pushmataha and AtokaOklahoma1359OK021

750,000High priority highway and bridge projectsOklahoma1828OK02217,908,0509 ProjectsOklahoma

450,000Upgrade I-5, SalemOregon270OR004300,000

restoration of the Tanner Creek and Moffett Creek bridgesa pedestrian and bicycle path under I-84 at Tanner Creek andRestore the Historic Columbia River Highway including construction ofOregon451OR008

90,000path, SpringfieldConstruct bike path paralleling 42nd Street to link with existing bikeOregon32OR009

56,250Design and engineering for Newberg-Dundee BypassOregon37OR0102,343,750

corridor solutions project.Construct phase I: highway 99 to Biddle Road of the highway 62Oregon52OR011

600,000Restore funding for Medford Highway 62/99 ProjectOregon1697OR011450,000Study and design I-5/Beltline Road interchange reconstructionOregon171OR012

1,500,000Repair bridge over Rogue River, Gold BeachOregon184OR013150,000

access to MAX light rail, GreshamConstruct right-of-way improvements to provide improved pedestrianOregon323OR014

750,000Reconstruct Lovejoy ramp, PortlandOregon325OR015562,500Upgrade Murray Blvd. inlcuding overpass bridge, Millikan to TermanOregon353OR016

180,000Clatsop Co.Relocate and rebuild intersection of Highway 101 and Highway 105,Oregon489OR017

675,000and Mile Post 47, Lane Co.Construct passing lanes on Highway 58 between Kitson Ridge RoadOregon526OR018

45,000Clatsop Co.Construct roundabout at intersection of Highway 101 and Highway 202,Oregon543OR019

825,000Repair Coos Bay rail bridge, Port of Coos BayOregon589OR020120,000Construct bike path along Willamette River, CorvallisOregon648OR021787,500Upgrade I-5/Highway 217 interchange, PortlandOregon756OR022262,500Restore funding for I-5/217 Kruse Way ProjectOregon1694OR022

1,650,000Construct South Rivergate rail overcrossing in PortlandOregon782OR023300,000Restore funding for South Rivergate Overcrossing ProjectOregon1696OR023225,000Upgrade access road and related facilities to Port of Port OrfordOregon807OR024

33,750Design and engineering for intermodal transportation center, AstoriaOregon878OR025

168,750Repair Port of Hood River Bridge Lift Span projectOregon911OR02656,250Design and engineering for Tualatin-Sherwood BypassOregon914OR027

1,125,000Rehabilitate Broadway Bridge in PortlandOregon950OR028375,000Restore funding for Broadway Bridge ProjectOregon1693OR028

2,580,000extrension road, Clackamas Co.Construct I-205/Sunnyside/Sunnybrook interchange and relatedOregon968OR029

270,000Restore funding for I-205 Sunnybrooke Interchange ProjectOregon1698OR029175,500Construct bike path between Terry Street and Greenhill Road, EugeneOregon1091OR030

34,500to Row River Trail, Cottage GroveConstruct bike path between Main Street/Highway 99 in Cottage GroveOregon1203OR031

300,000center, EugeneAcquire and rennovate facility to serve as multimodal transportationOregon1346OR032

675,000

intersections, Portlandmovement of emergency and transit vehicles at key arterialPurchase and install emitters and receiving equipment to facilitateOregon1418OR033

1,500,000Construct regional multimodal transportation center in AlbanyOregon1421OR034

78,750AstoriaRestore transportation connection between Wauna, Astoria and Port ofOregon1460OR035

600,000Relocate Highway 126 through RedmondOregon1691OR0361,170,000Widen U.S. 30 from two lanes to four lanes in PendletonOregon1692OR037

26,250Restore funding for Astoria Hazard Recovery Railroad SlideOregon1695OR0384,500,000Repair and preserve high priority highwaysOregon1844OR039

25,991,25038 ProjectsOregon3,000,000

BrownsvilleConstruct Mon-Fayette Expressway between Union Town andPennsylvania80PA011

750,000Construct Mon Fayette Expressway between WV and FairchancePennsylvania1733PA011

750,000Construct new lane on Rte 15, Tioga CountyPennsylvania1732PA014270,000Construct US-6 Tunkhannock Bypass in Wyoming CountyPennsylvania788PA023

Attachment 1 Page 29 of 41

Page 30: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

3,717,000

Commission to carry out this subsection]available on October 1, 1998, to the Pennsylvania Turnpikethe IRS Reform Act, provides that the $3,000,000 shall be madeSection 1217(j), as amended by the TEA-21 technical corrections in1999 shall be made available to carry out section 1217(j) [TEA-21Pennsylvania, and $3,000,000 for the period of fiscal years 1998 andFulton and Clearfield, and Huntingdon as selected by the State ofprojects in the counties of Bedford, Blair, Centre, Franklin, Mifflin,Relocate U.S. 22 around the Borough of Holidaysburg, PA, or otherPennsylvania164PA026

675,000Gwynedd and Lower GwyneddConstruct US-202 Section 600 Phase I Early Action project in UpperPennsylvania795PA034

810,000Upgrade PA 228 (Crows Run Corridor)Pennsylvania43PA040731,250Resurface current 219 bypass at BradfordPennsylvania375PA044112,500

BradfordConduct preliminary engineering and design for the US-219 bypass ofPennsylvania1123PA044

3,300,000

Clearfield, and Huntingdon, as selected by the State of Pennsylvaniacounties of Bedford, Blair, Fulton, Franklin, Mifflin, Fulton andparking facility to be associatied therewith or other projects in thefacilitate movement of traffic within the site and construction of aU.S. 220 to the Springs Project and to construct other facilities toConstruct an access road in Bedford Springs, Pennsylvania, along OldPennsylvania1278PA046

450,000Relocate Rte 222 in/around Trexlertown, Lehigh CountyPennsylvania1728PA0522,850,000

Warren Street extenstion in ReadingLancaster/Berks County line and Grings Mill Rd. and construction ofReconstruct and widen US Rt. 222 to four-lane expressway betweenPennsylvania927PA054

450,000Construct Warren Street Extension, ReadingPennsylvania1731PA054112,500Improve Route 219 in Clearfield CountyPennsylvania1134PA056303,750Construct Robinson Town Centre intermodal facilityPennsylvania529PA057675,000

ExpresswayExtend Martin Luther King, Jr. East Busway to link with Mon-FayettePennsylvania495PA063

247,500Extend Martin Luther King Busway, Alleghany Co.Pennsylvania1399PA0632,430,000Construct Erie Eastside ConnectorPennsylvania565PA066

300,000Construction of Erie Bayside Connector, Erie CountyPennsylvania1708PA066450,000Construct Erie Eastside ConnectorPennsylvania1725PA066

1,125,000US-209 Marshall’s Creek Traffic Relief project in Monroe CountyPennsylvania20PA075

67,500Construct Ardmore Streetscape projectPennsylvania34PA076300,000

in the vicinity of the Falling Spring, ChambersburgWiden Montgomery Alley and improve pedestrian and parking facilitesPennsylvania45PA077

56,250Construct SR 3019 over Great Trough Creek in Huntingdon CountyPennsylvania47PA078

112,500Improve PA 56 from I-99 to Somerset County Line in Bedford CountyPennsylvania48PA079

281,250Renovate Harrisburg Transportation Center in Dauphin CountyPennsylvania51PA080

3,217,500improvements to Girard Ave./I-95 interchange, PhiladelphiaUpgrade I-95 between Lehigh Ave. and Columbia Ave. andPennsylvania66PA081

225,000Construct I-95/Route 332 interchangePennsylvania68PA082315,000

CorridorState Park within the Delaware and Lehigh Canal National HeritageImprove walking and biking trails between Easton and Lehigh GorgePennsylvania94PA083

457,500Upgrade US Rt. 119 between Homer City and BlairsvillePennsylvania99PA084225,000Construct highway-transit transfer facility in LemoynePennsylvania117PA085225,000

Base, PhiladelphiaConstruct access to site of former Philadelphia Naval Shipyard andPennsylvania122PA086

300,000BaseConstruct access to site of former Philadelphia Naval Shipyard andPennsylvania1723PA086

191,250LackawannaConstruct access improvements between exits 56 and 57 off I-81 inPennsylvania134PA087

450,000Historic Park-VFHS Center, Valley ForgeConstruct access road and parking facilities, Valley Forge NationalPennsylvania140PA088

1,050,000between Rt. 183 in Cressona and SR 0215 in Mount CarbonMake safety improvements on PA Rt. 61 (Dusselfink Safety Project)Pennsylvania147PA089

112,500Replace Dellville Bridge in WheatfieldPennsylvania212PA0901,350,000Widen US-30 from US-222 to PA-340 and from PA-283 to PA-741Pennsylvania218PA091

375,000Widening and reconstruction of US 30, Lancaster CountyPennsylvania1707PA091360,000Upgrade Route 219 between Meyersdale and SomersetPennsylvania219PA092112,500Upgrade Route 219 between Meyersdale and SomersetPennsylvania1395PA092

750,000Upgrade US 219 between Meyersdale and SomersetPennsylvania1727PA092

Attachment 1 Page 30 of 41

Page 31: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

1,012,500Reconstruct State Route 2001 in Pike CountyPennsylvania235PA093300,000

(design and right-of-way acquisition phases), Allegheny Co.Reconstruct structures and adjacent roadway, Etna and AspenwallPennsylvania239PA094

727,500Upgrade US Rt. 22, Chickory Mountain sectionPennsylvania245PA0951,575,000

interchange on S.R. 0029Street and the Luzerne County Community College, including a newwest of Center Street through S.R. 2008 in the vicinity of ProspectCommunity College Road between S.R. 2002 and S.R. 3004 one-mileDesign, engineer, ROW acquisition and construct the Luzerne CountyPennsylvania259PA096

45,000McKeesportConstruct Steel Heritage Trail between Glenwood Bridge to Clairton viaPennsylvania274PA097

922,500

KidsPeace National Hospital to Rt. 309Packhouse Road including widening of Old Packhouse Road betweenConstruct safety and capacity improvements to Rt. 309 and OldPennsylvania284PA098

150,000

KidsPeace National Hospital and Rte 309, Lehigh CountyPackhouse Road, including widening of Old Packhouse Road betweenConstruct safety and capacity improvements to Rte 309 and OldPennsylvania1717PA098

112,500Improve South Central Business Park in Fulton CountyPennsylvania298PA09990,000PA 26 over Piney Creek 2-bridges in Bedford CountyPennsylvania306PA100

225,000I-83 in York CountyConduct preliminary engineering on the relocation of exits 4 and 5 onPennsylvania312PA101

150,000

the Intelligent Infrastructure Institute at Drexel University]5118(b), these funds shall be available for funding the establishment ofConduct highway research, Drexel University [Under TEA-21 SectionPennsylvania315PA102

900,000Construct Philadelphia Intermodal Gateway Project at 30th St. StationPennsylvania318PA103

270,000Replace Grant Street Bridge, New CastlePennsylvania333PA104275,625Construct PA-283 North Union Street ramps in Dauhpin CountyPennsylvania337PA105

2,910,000Eliminate 16 at-grade rail crossings through EriePennsylvania345PA106180,000Realign Route 501 in Lebanon CountyPennsylvania358PA107

6,000,000Improve Lewistown Narrows US 322 in Mifflin and Juniata CountyPennsylvania362PA108

168,750Upgrade 2 sections of US-6 in Tioga CountyPennsylvania379PA109191,250Rehabilitate Jefferson Heights Bridge, Penn HillsPennsylvania388PA110180,000

CamdenConstruct access to Tioga Marine Terminal, Ports of Philadelphia andPennsylvania395PA111

750,000Upgrade PA Route 21, Fayette and Greene CountiesPennsylvania406PA11210,800

County, PAConstruct streetscape project in the Borough of Ambler, MontgomeryPennsylvania415PA113

300,000222 and U.S. 422, Spring TownshipConstruct improvements to the Park Road extension connecting U.S.Pennsylvania416PA114

675,000Construct US-30 at PA-772 and PA-41Pennsylvania466PA1152,812,500Construct US-322 Conchester Highway between US-1 and PA-452Pennsylvania486PA116

1,035,000ScottdaleConstruct Rt. 819/Rt. 119 interchange between Mt. Pleasant andPennsylvania487PA117

580,500Montgomery County, Pennsylvania.Widen and signalize Sumneytown Pike and Forty Foot Road inPennsylvania505PA118

67,500Improve Park Avenue/PA 36 in Blair CountyPennsylvania511PA119225,000

CountyConstruct Newton Hamilton SR 3021 over Juniata River in MifflinPennsylvania532PA120

2,338,200abatementReconstruct PA-309 in Eastern Montgomery with $4,000,000 for noisePennsylvania533PA121

300,000Reconstruct SR 309 in Eastern Montgomery CountyPennsylvania1715PA121750,000Improve PA-41 between Delaware State line and PA-926Pennsylvania551PA122150,000Improve PA 16 including intersection with Antrim Church RoadPennsylvania556PA123

843,750Widen PA-413 in Bucks CountyPennsylvania563PA12455,350West Philadelphia congestion mitigation initiativePennsylvania573PA125

1,125,000Construct Lawrenceville Industrial Access RoadPennsylvania585PA126750,000

New Jersey LineConstruct rail mitigation and improvement projects from Philadelphia toPennsylvania591PA127

135,000Widen PA-228 from Criders Corners to State Route 3015Pennsylvania593PA128375,000

County line and MorgantownImprove PA-23 Corridor from US-30 Bypass between LancasterPennsylvania594PA129

1,226,250Industrial Highway for the Moosic Mountain Business ParkWiden SR-247 and SR-2008 between 84 and Lackawanna ValleyPennsylvania595PA130

562,500Kensington with Allegheny Valley ExpresswayConstruct road connector and bridge over Allegheny River to link NewPennsylvania602PA131

Attachment 1 Page 31 of 41

Page 32: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

56,250Construct Lackawanna River Heritage Trail in LackawannaPennsylvania605PA13222,500St. Thomas Signals Hade and Jack Rds US 30 in Franklin CountyPennsylvania631PA133

720,000Improve PA-8 between Cherry Tree and Rynd FarmPennsylvania641PA134810,000

CountyRealign West 38th Street from Shunpike Road to Myrtle Street in EriePennsylvania643PA135

225,000Improve US 22/Canoe Creek Blair CountyPennsylvania653PA136337,500Construct Frazier Township interchange on SR-28 in AlleghanyPennsylvania672PA137

225,000

Route 315 and Commerce Blvd.Wilkes-Barre/Scranton International Airport Access Road betweenDesign, engineer, ROW acquisition and construct thePennsylvania679PA138

225,000Improve US 22/PA 866 Intersection in Blair CountyPennsylvania688PA139450,000Gettysburg comprehensive road improvement studyPennsylvania696PA140168,750Improve access to Raystown in Huntingdon CountyPennsylvania711PA14178,750Reconfigure I-81 Exit 2 Ramp in Franklin CountyPennsylvania720PA14267,500

improvements, Upper Dublin, PA.Conduct study and construct Ft. Washington transportationPennsylvania725PA143

750,000Upgrade PA 61 between PA 895 and SR 2014, Schuylkill Co.Pennsylvania729PA144

56,250Improve Sidling Hill Curve and Truck Escape in Fulton CountyPennsylvania734PA145

450,000Construct US-30 Bypass from Exton Bypass to PA-10Pennsylvania739PA146843,750Improve I-95/PA-413 Interchange in Bucks CountyPennsylvania767PA147225,000Improve Oxford Valley Road/US-1 interchange in Bucks CountyPennsylvania787PA148

450,000Fairview TownshipImprove ramp junctions at intersection of S.R. 114 and Interstate 83,Pennsylvania800PA149

900,000Allegheny Trail from Pittsburgh, Pennsylvania to Cumberland, MarylandPennsylvania808PA150

405,000Construct Western Innerloop from PA-26 to State Route 3014Pennsylvania825PA151

562,500along Osterhout StreetRelocate US-219 Ridgeway, Pennsylvania, truck bypass connectorPennsylvania827PA152

78,750Improve T-344 Bridge over Mahantango Creek in Snyder CountyPennsylvania833PA153

56,250Reconfigure Pennsylvania Turnpike/Route 13 interchangePennsylvania845PA154112,500Widen and improve Route 449 in Potter CountyPennsylvania846PA155250,875Complete Broad Street ramps at Route 611 bypass in Bucks CountyPennsylvania860PA156

450,000

of 52nd and Lancaster Ave., Philadelphiavans for reverse commutes, to intermodal facility located at intersectionConstruct enhancements and related measures, including purchase ofPennsylvania880PA157

405,000Relocate PA-113 at Creamery Village in SkippackPennsylvania889PA15872,900Construct 25.5 miles of the Perkiomen TrailPennsylvania896PA15954,000

west in Cumberland CountyConstruct noise abatement barriers along US-581 from I-83 2.) milesPennsylvania912PA160

450,000at Philadelphia International AirportImprove access and interchange from I-95 to the international terminalPennsylvania922PA161

750,000Construct I-95 access ramps at and around Philadelphia Int'l AirportPennsylvania1714PA161

750,000Philadelphia Int'l AirportImprove access and interchange from I-95 to int'l terminal atPennsylvania1721PA161

168,750Construct park and ride facilities in Lower Bucks CountyPennsylvania936PA162562,500

CountyWiden US-11/15 between Mt. Patrick and McKees Half Falls in PerryPennsylvania937PA163

450,000Construct American Parkway Bridge project in AllentownPennsylvania965PA164150,000Construct American Parkway Bridge project, AllentownPennsylvania1702PA164

1,181,250Construct exit ramp on I-180 at State Route 2049 in Lycoming CountyPennsylvania983PA165

60,000Landing and Millvale Borough, Allegheny Co.Construct bicycle and pedestrian facility between Washington'sPennsylvania999PA166

112,500Replace bridge over Shermans Creek in CarrollPennsylvania1044PA167787,500

I-180 to the airportConstruct Williamsport-Lycoming County Airport Access road fromPennsylvania1063PA168

150,000AirportConstruct Williams-Lycoming Cty Airport access road from I-180 to thePennsylvania1703PA168

112,500Construct PA 36 Convention Center Connector in Blair CountyPennsylvania1068PA169

991,125Construct Route 72 overpass at Conrail in LebanonPennsylvania1087PA170630,000

PhiladelphiaExtend North Delaware Ave. between Lewis St. and Orthodox St.,Pennsylvania1094PA171

Attachment 1 Page 32 of 41

Page 33: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

157,500Relocate PA 18 between 9th Ave. and 32nd St., Beaver FallsPennsylvania1097PA172

900,000Improve safety on PA-41 from US-30 to PA-926Pennsylvania1107PA173112,500Improve PA 26 in Huntingdon CountyPennsylvania1116PA174457,500Construct access road to Hastings Industrial Park, Cambria Co.Pennsylvania1144PA175

72,000Construct I-81 noise abatement program in Dauphin CountyPennsylvania1147PA176112,500Install citywide signalization (SAMI) project in LebanonPennsylvania1156PA177900,000Improve Route 94 Corridor through Hanover to Maryland State Line.Pennsylvania1164PA178

322,500Improve access to McKeesport-Duquesne BridgePennsylvania1174PA179150,000Construct California University of Pennsylvania intermodal facilityPennsylvania1219PA180

112,500Improve PA 17 from PA 274 to PA 850 in Perry CountyPennsylvania1222PA18156,250Install traffic signal upgrade in Clearfield Borough in Clearfield CountyPennsylvania1241PA182

1,650,000city of PittsburghConstruct improvements to North Shore Roadway and access in thePennsylvania1243PA183

18,750McKee Point Park, Allegheny Co.Construct bicycle and pedestrian facility between Boston Bridge andPennsylvania1250PA184

225,000Construct PA 16 Truck climbing lane in Franklin CountyPennsylvania1256PA185787,500

CorridorLanding Area of the Delaware and Lehigh Canal National HeritageUndertake transportation enhancement activities within the LehighPennsylvania1268PA186

450,000

Philadelphiafacilities including purchase of vans for reverse commutes,and Market, and enhance access and related measures to areaFacilitate coordination of transportation systems at intersection of 46thPennsylvania1276PA187

525,000North Fayette TownshipImprove intersection of U.S. 30, S.R. 3066, and West Allegheny Road,Pennsylvania1288PA188

825,000PhiladelphiaConstruct Independence Gateway Transportation Center project,Pennsylvania1290PA189

150,000PhiladelphiaConstruct Independence Gateway Transportation Ctr project,Pennsylvania1709PA189

300,000St. Francis College, Cambria CountyConstruct improvements to roadway and parking facility in the vicinity ofPennsylvania1293PA190

67,500Construct Abbey Trails in Abington TownshipPennsylvania1301PA191225,000Widen US 30 from Walker Rd to Fayetteville in Franklin CountyPennsylvania1308PA192

112,500Construct Walnut Street pedestrian bridge in Dauphin CountyPennsylvania1324PA193

225,000Improve Bedford County Business Park Rd in Bedford CountyPennsylvania1330PA194

199,125Reconstruct I-95/Street Road interchange in Bucks CountyPennsylvania1343PA195112,500Improve PA 453 from Water Street to Tyrone in Huntingdon CountyPennsylvania1345PA196

120,000Construction of noise barriers along State Route 28, AspinwallPennsylvania1349PA197

2,272,500related improvements, PhiladelphiaUpgrade roadway in the Princeton/Cottman I-95 interchange andPennsylvania1370PA198

74,250PennsylvaniaRealign PA29 in the Borough of Collegeville, Montgomery County,Pennsylvania1391PA199

391,500Construct Towamencin Township multimodal centerPennsylvania1392PA200Construct Johnstown-Cambria County Airport Relocation RoadPennsylvania1395PA201

900,000Reconstruct the I-81 Davis Street interchange in LackawannaPennsylvania1396PA202

150,000Reconstruct I-81/Davis Street Interchange, Lackawanna CountyPennsylvania1701PA202

123,750Construct Wexford I-79/SR 910 Interchange, Allegheny Co.Pennsylvania1398PA203300,000

Interstate 81 and S.R. 0944, Hampden TownshipConstruct transportation improvements around the interchange ofPennsylvania1436PA204

750,000Replace Masontown bridge, Fayette and Greene CountiesPennsylvania1446PA205594,000Construct PA-309 Sumneytown Pike ConnectorPennsylvania1448PA20667,500Rehabilitate Kenmawr Bridge, SwissvalePennsylvania1490PA207

150,000Reconstruction of I-79 from Pa 285 to US 6, Crawford CountyPennsylvania1699PA208

150,000Northumberland CountiesRelocation of US 15 from US 522 to PA 147 in Snyder, Union, andPennsylvania1700PA209

75,000Rehabilitate Streets Run Road, Pittsburgh, for emergency accessPennsylvania1704PA210150,000

and 16th StreetsConstruct pedestrian bridge, Vine Street Expressway between 15thPennsylvania1705PA211

375,750North Shore roadway and pedestrian improvements, PittsburghPennsylvania1706PA212

Attachment 1 Page 33 of 41

Page 34: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

450,000BethlehemRoad construction in and around former Bethlehem Steel plant site,Pennsylvania1710PA213

375,000Business District Corridor Transportation Project, PittsburghRoadway and pedestrian improvements for North Shore CentralPennsylvania1711PA214

300,000Construction at Williamsport Airport, Lycoming CountyPennsylvania1712PA215450,000Construct US 322 Conchester Hwy between US 1 and SR 452Pennsylvania1713PA216

150,000Lancaster County airport runway extensionPennsylvania1716PA217150,000

Allegheny CountyConstruct grade separated interchange on Old Rte 60 at Pgh. Airport,Pennsylvania1718PA218

300,000improvements for rail intermodal facility, BethlehemImprovements to SR 412 from I-78 to Bethlehem Steel site and roadPennsylvania1719PA219

150,000Construct new interchange at Settler's Cabin, Allegheny CountyPennsylvania1720PA220

150,000Relocate Rte 15 at Selinsgrove and Shamokin Dam, Snyder CountyPennsylvania1722PA221

150,000Reconstruct I-80, Mercer and Venango CountiesPennsylvania1724PA222150,000Reconstruct main line I-79Pennsylvania1726PA223300,000Widen Broad Street and related improvements, HazeltonPennsylvania1729PA224300,000

CountyConstruct Cranberry Connector, I-79/Rte 19/PA Turnpike, ButlerPennsylvania1730PA225

2,850,000Reconstruct Ft. Pitt Bridge and Tunnel, PittsburghPennsylvania1734PA226750,000

improvementsConstruct new interchange at I-95 and PA Turnpike and relatedPennsylvania1735PA227

7,500,000Counties, PennsylvaniaReconstruct and improve I-95 in Delaware, Philadelphia and BucksPennsylvania1847PA228

7,500,000Counties, PennsylvaniaReconstruct and improve US-22 in Westmoreland and IndianaPennsylvania1848PA229

120,156,750186 ProjectsPennsylvania900,000Upgrade PR 3 between Rio Grande and FajardoPuerto Rico847PR002900,000Upgrade PR 30 between PR 203 in Gurabo to PR 31 in JuncosPuerto Rico921PR003

1,800,0002 ProjectsPuerto Rico50,063

Viaduct, LincolnReconstruct interchanges on Rt. 116 between Rt. 146 and AshtonRhode Island191RI015

877,500

and $1,575,000 for the South County Bikepath Phase 2amount provided $4,275,000 for the Washington Secondary Bikepath,Construct Rhode Island Greenways and Bikeways projects with theRhode Island506RI016

22,500WoonsocketImplement transportation alternative relating to Court Street Bridge,Rhode Island671RI017

168,750Reconstruct Pawtucket Ave. and Wilcott St., PawtucketRhode Island784RI01833,750Install directional signs in Newport and surrounding communitiesRhode Island1026RI019

225,000Reconstruct Harris Ave., WoonsocketRhode Island1202RI02011,250Upgrade pedestrian traffic facilities, BristolRhode Island1456RI021

388,687Construct Blackstone River BikewayRhode Island1491RI0221,326,450Construct Blackstone River bikewayRhode Island1736RI022

465,000Construct Woonasquatucket bikewayRhode Island1737RI023750,000Construct pedestrian and Bicycle FacilitiesRhode Island1827RI024

4,318,95011 ProjectsRhode Island2,896,650Replace Cooper River Bridges, CharlestonSouth Carolina1738SC0043,000,000Cooper River BridgesSouth Carolina1849SC004

562,500Three River Greenway Project to and from Gervals Street in ColumbiaSouth Carolina86SC007

825,000Federal-aid highway funds.Construct high priority surface transportation projects eligible forSouth Carolina515SC008

900,000Widen and relocate SC-6 in Lexington CountySouth Carolina606SC009450,000Construct North Charleston Regional Intermodal CenterSouth Carolina624SC010120,000

Richland Co.Construct pedestrian walkway and safety improvements along SC 277,South Carolina718SC011

1,350,000Widen North Main Street, ColumbiaSouth Carolina758SC012787,500Construct I-77/SC #S-20-30 interchange, Fairfield Co.South Carolina771SC013

1,275,000Construct I-95/I-26 interchange, Orangeburg Co.South Carolina1077SC0141,012,500Construct improvements to I-95/SC 38 interchangeSouth Carolina1318SC015

480,000Upgrade US Highway 301 within BambergSouth Carolina1334SC016975,000Construct Calhoun/Clarendon CausewaySouth Carolina1389SC017

1,350,000Construct I-26/US-1 connector in ColumbiaSouth Carolina1458SC01815,984,15014 ProjectsSouth Carolina

975,750Construct Heartland Expressway Phase ISouth Dakota1230SD00666,150Construct US-16 Hell Canyon Bridge and approaches in Custer CountySouth Dakota115SD008

487,500Replace Meridan BridgeSouth Dakota207SD009

Attachment 1 Page 34 of 41

Page 35: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

5,220,600

12 between Aberdeen and I-29.Mitchell; U.S. Highway 83 between Pierre and I-90; and U.S. Highwaylane highways for South Dakota Highway 37 between Huron andConstruct Eastern Dakota expressways, to include construction of fourSouth Dakota697SD010

1,924,800Construct Eastern Dakota Expressway between Aberdeen at I-29South Dakota1739SD011

3,565,200Construct Eastern Dakota Expressway from Aberdeen to I-29South Dakota1845SD011

75,000Preserve Skyline Drive Scenic Ridgetop in Rapid CitySouth Dakota1740SD012150,000

ElderConstruct new interchange and access road on Interstate 90 at BoxSouth Dakota1741SD013

12,465,0008 ProjectsSouth Dakota765,000Alternative transportation systems, RutherfordTennessee8TN018562,500

should be US-412]Reconstruction of US-414 In Henderson County [Typo - US-414Tennessee18TN019

630,000

Opreyland should be Opryland]Upgrade Briley Parkway between I-40 and Opreyland [Typo -Tennessee50TN020

1,230,000Construct Stones River Greenway, DavidsonTennessee56TN021551,250

Anderson CountiesImprove State Road 95 from Westover Drive to SR-62 in Roane andTennessee59TN022

450,000Reconstruct US 79 between Milan and McKenzieTennessee97TN023950,625

US-321][Typos - Elizabethon should be Elizabethton, US-312 should beImprove the Elizabethon Connector from US-312 to US-19 East Tennessee145TN024

511,875Improve State Route 92 from I-40 to South of Jefferson CityTennessee148TN025189,000Reconstruct Old Walland Highway bridge over Little River in TownsendTennessee153TN026

63,000Reconstruction of Old Walland Hwy Bridge over Little River, TownsendTennessee1742TN026

270,000Construct State Route 131 from Gill Road to Bishop RoadTennessee180TN0271,200,000

Tennessee Commuter RailConstruct park and ride intermodal centers for Nashville/MiddleTennessee227TN028

1,293,750Weans should be Wear]Construct Foothills Parkway from Walland to Weans Valley [Typo -Tennessee352TN029

630,000Construct I-40/SR 155 interchange, DavidsonTennessee365TN030480,000Construct Crosstown Greenway/Bikeway, SpringfieldTennessee366TN031618,750Construct US-27 from State Road 61 to Morgan County lineTennessee458TN032225,000Construct U.S. 45 bypass, Madison Co.Tennessee579TN033

1,425,000the Stones River in MurfreesboroImplement middle Tennessee alternative transportation system alongTennessee705TN034

1,125,000Construct SR22 Bypass, Obion Co.Tennessee730TN035159,000Upgrade SR 386 between US 31 to the Gallatin Bypass, Sumner Co.Tennessee813TN036

1,023,750

Wean should be Wear]Widen US-321 from Kinzel Springs to Wean Valley Road [Typo -

Tennessee818TN037

180,000Improve State Road 60 from Waterville to US-64 in Bradley CountyTennessee840TN038

630,000Upgrade Briley Parkway between McGavock Pike and I-65Tennessee850TN039337,500Reconstruct US-27 in Morgan CountyTennessee867TN040562,500

should be McNairy]Improve US-64 in Hardeman and McNariy Counties [Typo - McNariyTennessee873TN041

1,161,000Construct State Route 30 from Athens to Etowah in McMinn CountyTennessee917TN042

225,000Construct Kingsport Highway in Washington CountyTennessee975TN043337,500

riverfront, MemphisMississippi River Trail, and restore adjacent historic cobblestones onConstruct pedestrian and bicycle pathway to connect with theTennessee977TN044

105,000Trail & restore historic cobblestones on the Riverfront, MemphisConstruct pedestrian & bicycle pathway to connect with Miss. RiverTennessee1743TN044

420,000Implement ITS technologies, NashvilleTennessee992TN045562,500

should be State]Improve County Road 374 in Montgomery County [Typo - CountyTennessee1032TN046

1,485,000Tennessee River (Henley Street Bridge)Construct bridge and approaches on State Route 33 over theTennessee1060TN047

480,000Construct greenway and bicycle path corridor, City of White HouseTennessee1154TN048

276,000State Highway 109 upgrade planning and engineering, Sumner Co.Tennessee1180TN049

300,000Construct Franklin Road interchange and bypassTennessee1356TN0501,200,000Construct Landport regional transportation hub, NashvilleTennessee1369TN051

Attachment 1 Page 35 of 41

Page 36: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

1,687,500CountyReconstruct road and causeway in Shiloh Military Park in HardinTennessee1419TN052

1,327,500

Blount County [Typo - State Route 321 should be US-321]Extend Pellissippi Parkway from State Route 33 to State Route 321 inTennessee1462TN053

6,607,200High priority highway and bridge projectsTennessee1744TN05432,237,70039 ProjectsTennessee

675,000

infrastructure safely and efficiently, Brownsvillethe Port and the construction of new connecting roads to access newrehabilitation of secondary roads providing access to various parts ofRelocate railroad tracks to eliminate road crossings, and provide for theTexas1030TX001

28,125Construct relief route around AliceTexas941TX0121,036,500

CountiesUpgrade State Highway 35 Yoakum District in Matagorda and BuazoviaTexas632TX014

776,250dedicate $630,000 to the acquisition of right-of-way in Brazoria CountyWiden State Highway 35 from SH288 in Angleton to FM521 andTexas989TX014

1,038,000Upgrade State Highway 35 Houston District Brazoria CountyTexas1078TX014813,000Complete State Highway 35 in Aransas CountyTexas1479TX014540,000Reconstruct FM 364 between Humble Road and I-10, BeaumontTexas12TX016

450,000Construct rail-grade separations (Rosenberg Bypass) at U.S. 59(S)Texas1271TX019

112,500Upgrade SH 130 in Caldwell amd Williamson CountiesTexas128TX0252,025,000

to determining a final alignment for the project.of the affected local communities, and provide for public comment priorof Texas shall consult with all appropriate local officials, representativesConstruct segment lof a bypass to I-35 known as SH-130. The StateTexas1196TX025

1,113,750Construct circumferential freeway loop around TexarkanaTexas735TX02656,250Construct 6th and 7th Street overpass over railroad yard, BrownsvilleTexas1108TX029

1,845,000University AvenueImprove US 82, East-West Freeway between Memphis Avenue andTexas55TX032

450,000Upgrade FM225, NacogdochesTexas62TX033562,500

Kelly AFB, San AntonioConstruct transportation improvements as part of redevelopment ofTexas91TX034

168,750(A&M University)Conduct pipeline express study through Texas Transportation InstituteTexas92TX035

864,000Jefferson Co.Construct improvments along US 69 including frontage roads,Texas103TX036

843,750Construct Austin to San Antonio CorridorTexas146TX037112,500Construct East Loop, BrownsvilleTexas196TX03856,250

international border crossing in RomaInvestigate strategies to reduce congestion and facilitate access at theTexas222TX039

701,25043SExtend Texas State Highway 154 between US 80W and State HighwayTexas243TX040

3,262,500Upgrade IH-30 between Dallas and Ft. WorthTexas266TX041825,000

WylieReconstruct intermodal connectors on Highway 78 and Highway 544 inTexas287TX042

337,500Upgrade FM 1764 between FM 646 to State Highway 6Texas300TX043843,750Construct US Expressway 77/83 interchange, HarlingenTexas302TX044337,500Upgrade JFK Causeway, Corpus ChristiTexas317TX045900,000

to US Rt. 190Reconstruct and widen I-35 between North of Georgetown at Loop 418Texas341TX046

562,500of CooperUpgrade State Highway 24 from Commerce to State Highway 19 northTexas399TX047

900,000to provide access to I-10 in El PasoConstruct ramp connection between Hammet St. to Highway 54 rampTexas421TX048

1,080,000and Quaker Avenue intersectionRelocation of Indiana Avenue between 19th street to North Loop 289Texas428TX049

1,800,000Construct Manchester grade separations in HoustonTexas430TX050281,250Construct Titus County West Loop, Mount PleasantTexas431TX051

1,106,250Construct Concord Road Widening project, BeaumontTexas450TX0521,237,500Construct highway-rail-marine intermodal project, Corpus ChristiTexas485TX053

1,372,500construct railroad overpassWiden State Highway 6 from FM521 to Brazoria County line andTexas498TX054

1,125,000east to I-45Construct the George H.W. Bush Presidential Corridor from Bryan toTexas512TX055

720,000BoulevardConstruct FM2234(McHard Road) from SH-35 to Beltway 8 at MonroeTexas546TX056

337,500Construct US 77/83 Expressway extension, BrownsvilleTexas571TX057600,000Reconstruct bridges across the channel for the Port of Corpus ChristiTexas597TX058

Attachment 1 Page 36 of 41

Page 37: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

28,125Conduct feasability study on upgrading SH 16 in South Texas.Texas694TX059

3,750,000Construct State Highway 121 from I-30 to US-67 in CleburneTexas699TX060112,500

AntonioConduct MIS for Multimodal Downtown Improvement Project, SanTexas753TX061

450,000Improve I-35 West from Spur 280 to I-820 in Fort WorthTexas809TX062720,000

Co. lineConstruct Texas State Highway 49 between FM 1735 to Titus/MorrisTexas835TX063

145,575Penninsula, McFadden BeachReconstruct State Highway 87 between Sabine Pass and BolivarTexas884TX064

768,750Widen Highway 287 from Creek Bend Drive to Waxahacie bypassTexas913TX065

900,000Implement ‘Hike and Bike’ trail program, HoustonTexas915TX06682,125Construct Galveston Island Causeway Expansion project, GalvestonTexas993TX067

768,750Construct Houston Street Viaduck project in DallasTexas1022TX0681,260,000

Section 366]Expand Winters Freeway (US83/84) in Abilene [See PL 105-277Texas1083TX069

393,750Construct US Highway 59 railroad crossing overpass in TexarkanaTexas1127TX070

1,800,000Upgrade US Rt. 59 between US 281 to I-37Texas1152TX0711,518,750Construct Cleveland BypassTexas1169TX072

300,000Meacham Boulevard from west of FM-156 to North Main StreetWiden Meacham Boulevard from I-35W to FM-146 and extendTexas1212TX073

281,250Road improvements along historic mission trails in San Antonio.Texas1232TX074

433,800Upgrade FM517 between Owens and FM 3346, GalvestonTexas1252TX075482,625Construct Loop 197, GalvestonTexas1258TX076787,500Construct US Rt. 67 Corridor through San AngeloTexas1292TX077281,250Upgrade SH 30, HuntsvilleTexas1306TX078225,000Upgrade Highway 271 between Paris and PattonvilleTexas1311TX079112,500Construct extension of Bay Area Blvd.Texas1337TX080545,625

vicinity of Dickinson BayouConstruct two-lane parallel bridge, State Highway 146, FM 517 toTexas1422TX081

1,361,250Widen State Highway 6 from from Senior Road to FM521Texas1431TX082202,500

Tyler Road and Loop 224, NacogdochesConstruct extension of West Austin Street (FM 2609) between OldTexas1467TX083

1,500,000priorityRelocate railroad Bryan/College Station at Texas A&M or any other highTexas1812TX084

2,250,000UniversityRelocate railroad line in Bryan and College Station, Texas A&MTexas1820TX084

20,079,450High priority highway and bridge projectsTexas1813TX085750,000

375 in El PasoConstruct a 4-lane divided highway on Artcraft Road from I-10 to RouteTexas1065TX086

74,188,20068 ProjectsTexas787,500Reconstruct US-89 and interchange at 200 North in KaysvilleUtah6UT003

562,500Valley CityImprove 5600 West Highway from 2100 South to 4100 South in WestUtah604UT004

150,000Valley CityImprove 5600 West Hwy from 2100 South to 4100 South in WestUtah1757UT004

1,125,000Construct Phase II of the University Avenue Interchange in ProvoUtah574UT007

225,000Construct Phase 2 of the Univ Ave Interchange, ProvoUtah1745UT007150,000Construct Phase 2 of the Univ Ave Interchange, ProvoUtah1754UT007787,500Construct Cache Valley Highway in LoganUtah276UT011150,000Construct Cache Valley Hwy in LoganUtah1747UT011300,000Construct Cache Valley Hwy in LoganUtah1750UT011900,000Construct I-15 interchange at AtkinvilleUtah360UT012300,000Construct I-15 interchange at AtkinvilleUtah1756UT012675,000Widen 106th South from I-15 to Bangerter Highway in South JordanUtah634UT013

877,500JordanConstruct 7800 South from 1300 West to Bangerter Highway in WestUtah944UT014

675,000Highway in RivertonWiden and improve 123rd/126th South from Jordan River to BangerterUtah945UT015

75,000in RivertonWiden/improve 123rd/126th South from Jordan River to Bangerter HwyUtah1751UT015

526,500Construct underpass at 100th South in SandyUtah971UT016150,000Construct underpass at 100 South, in SandyUtah1752UT016148,500Widen 7200 South in MidvaleUtah1071UT01752,500Widen 7200 West, MidvaleUtah1755UT017

Attachment 1 Page 37 of 41

Page 38: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

945,000in DraperWiden and improve 123rd/126th South from 700 East to Jordan RiverUtah1124UT018

75,000DraperWiden/improve 123rd/126th South from 700 East to Jordan River,Utah1749UT018

1,552,500Extend Main Street from 5600 South to Vine Street in MurrayUtah1143UT019

300,000Extend Main St from 5600 South to Vine St, MurrayUtah1753UT019337,500Widen SR-36 from I-80 to Mills JunctionUtah1170UT020127,500Engineer/reconstruct at Brown's Park Rd, Daggett CtyUtah1746UT021150,000Gateway Redevelopment Area road reconstruction, Salt Lake CityUtah1748UT022

12,105,00026 ProjectsUtah1,800,000Replace Missisquoi Bay BridgeVermont169VT0061,375,200

Bennington to BurlingtonUpgrade and Improve Publicly-Owned Vermont Rail Infrastructure fromVermont1772VT007

3,175,2002 ProjectsVermont900,000Construct bypass around ChristianstedVirgin Islands1117VI001900,000Upgrade West-East corridor through Charlotte AmalieVirgin Islands660VI003

1,800,0002 ProjectsVirgin IslandsSmart Road connecting Blacksburg, VA, to I-81Virginia525VA008

903,750Operate and conduct research on the "Smart Road" in BlacksburgVirginia1770VA008450,000Construct Third Bridge/Tunnel Crossing of Hampton RdVirginia1768VA009450,000Upgrade Danville Bypass in PittsylvaniaVirginia618VA014

1,125,000Virginia.Complete North Section of Fairfax County Parkway in Fairfax County,Virginia830VA018

300,000Complete no. section of Fairfax Cty Pkwy, Fairfax CountyVirginia1761VA01875,000

the West Virginia borderConduct feasibility study for the construction I-66 from Lynchburg toVirginia535VA020

1,125,000Quantico CreekCommuter and freight rail congestion and mitigation project overVirginia3VA023

300,000CreekCommuter/freight rail congestion/mitigation project over QuanticoVirginia1764VA023

1,125,000in Fairfax County, Virginia.Widen Route 123 from Prince William County line to State Route 645Virginia26VA024

900,000Reconstruct SR 168 (Battlefield Blvd.) in ChesapeakeVirginia42VA025450,000Reconstruct SR 168 (Battlefield Blvd), ChesapeakeVirginia1762VA025

3,875,625Widen I-64 Bland Boulevard interchangeVirginia72VA026450,000Widen I-64 Bland Blvd interchangeVirginia1769VA026225,000

Initiative, NorfolkUndertake access improvements for Freemason Harbor DevelopmentVirginia98VA027

600,000Augusta and Rockingham CountiesWiden I-81 in Roanoke and Botetourt Counties and in Rockbridge,Virginia131VA028

112,500Upgrade Virginia Route 10, Surrey Co.Virginia182VA02975,000Improve Harrisonburg East Side roadways in HarrisonburgVirginia262VA030

112,500maintained by Town of AbingdonRepair historic wooden bridges along portion of Virginia Creeper TrailVirginia324VA031

37,500

between Haysi and Garden Hole area of Breaks Interstate Parkfacilities for Haysi to Breaks Interstate Bicycle and Pedestrain TrailConstruct road improvement, trailhead development and relatedVirginia332VA032

48,750Conduct Williamsburg 2007 transportation studyVirginia350VA033575,625Construct I-95/State Route 627 interchange in Stafford CountyVirginia351VA034

750,000National Recreation AreaUpgrade Rt. 600 to facilitate access between I-81 and Mount RogersVirginia372VA035

450,000Replace Shore Drive Bridge over Petty Lake, NorfolkVirginia382VA03675,000Downtown Staunton Streetscape Plan - Phase I in StauntonVirginia396VA03730,000Phase 1 Downtown Staunton Streetscape PlanVirginia1763VA037

112,500Upgrade Route 501 in the counties of Bedford, Halifax, and CampbellVirginia528VA038

225,000Construct the Kemper Street Station connector road in LynchburgVirginia615VA039

562,500Rennovate Greater Richmond Transit transportation facility, RichmondVirginia693VA040

150,000and Wise CountiesPlanning and design for Coalfields Expressway, Buchanan, DickensonVirginia721VA041

225,000Construct the Lynchburg/Madison Heights bypass in LynchburgVirginia722VA042

75,000

the Block House in Scott County, Virginia(Kane Gap section), Jefferson National Forest, and for the purchase ofAquire land and construct segment of Daniel Boone Heritage TrailVirginia746VA043

2,812,500Construct Route 288 in the Richmond Metropolitan AreaVirginia747VA044300,000Construct Main St Sta (Rte 288), RichmondVirginia1759VA044900,000Construct I-73 from Roanoke to the North Carolina borderVirginia792VA045

Attachment 1 Page 38 of 41

Page 39: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

450,000Virginia/North Carolina State lineConduct preliminary engineering on I-73 between Roanoke andVirginia1178VA045

150,000state lineConduct preliminary engineering on I-73 between Roanoke and VA/NCVirginia1765VA045

75,000Conduct historic restoration of Roanoke Passanger Station in RoanokeVirginia821VA046

405,000

Mountain Music Interpretive Center on Blue Ridge ParkwayTo the National Park Service for construction of the Fisher PeakVirginia836VA047

303,750Enhance Maple Avenue streetscape in Vienna, VirginiaVirginia1033VA048787,500

to Route 652.Route 8 South beginning at the intersection of Johnson Street in StuartConstruct connector road from the proposed U.S. 58 Stuart bypass toVirginia1043VA049

56,250Improve East Eldon Street in HerndonVirginia1168VA0501,687,500

William County, Virginia.Improve Route 123 from Route 1 to Fairfax County line in PrinceVirginia1266VA051

33,750Nicholsville Center, Scott Co.Construct access road, walking trail and related facilities for theVirginia1287VA052

900,000Construct Main Street Station in RichmondVirginia1299VA053450,000Construct Southeastern Parkway and Greenbelt in Virginia BeachVirginia1309VA054

600,000Construct Southeastern Pkwy and Greenbelt, Virginia BeachVirginia1758VA054

37,500Knob Trail on Cumberland MountainConstruct road improvements, trailhead and related facilities for BirchVirginia1335VA055

202,500Improve Lee Highway Corridor in Fairfax, Virginia.Virginia1374VA056150,000Improve Lee Hwy Corridor in FairfaxVirginia1767VA05645,000

National Recreation AreaStation at terminus of Virginia Creeper Trail adjacent to Mount RogersConstruct trailhead and related facilities and restore old Whitetop TrainVirginia1426VA057

750,000CtesPlanning/design for Coalfields Expwy, Buchanan, Dickinson, and WiseVirginia1760VA058

150,000Construct I-95/State Rte 627 interchange, Stafford CtyVirginia1766VA0592,250,000Reconstruct I-66/Rte 29 interchange, GainesvilleVirginia1771VA060

750,000High priority highway and bridge projectsVirginia1821VA06130,217,50054 ProjectsVirginia

2,643,750WAConstruct Interstate 405/NE 8th Street interchange project in Bellevue,Washington991WA010

881,250Construct I-405/NE 8th Street Interchange, BellevueWashington1797WA010825,000Widen US-395 in the vicinity of mile post 170 north of SpokaneWashington1380WA012

116,250Safety Improvements to SR 14 Columbia GorgeWashington1778WA012472,500

National Scenic AreaSafety improvements to State Route 14 in Columbia River GorgeWashington1475WA018

285,000Widen US 395 north of SpokaneWashington1780WA018150,000

Deception Pass State Park, WashingtonConstruct pedestrian access and safety on Deception Pass Bridge,Washington13WA020

38,550in Sultan, Washington.Construct traffic signals on US-2 at Olds Owens Road and 5th StreetWashington53WA021

465,000Widen Cook Road in Skagit County, Washington.Washington73WA022101,250Construct Port of Kalama River BridgeWashington181WA02325,350Port of Kalama River BridgeWashington1774WA023

748,125Construct I-5 interchanges in Lewis CountyWashington199WA024190,500I-5 interchange, Lewis CtyWashington1777WA024135,000

HighwayConstruct Washington Pass visitor facilities on North CascadesWashington249WA025

34,650Construct Washington Pass Visitors CenterWashington1782WA025405,000Widen SR-99 between 148th Street and King County Line in LynnwoodWashington326WA026

86,550Widen SR 99 between 148th Street and King County Line, LynnwoodWashington1786WA026

67,500Pierce County, WA.Construct State Route 7 - Elbe rest area and interpretive facility inWashington390WA027

22,500Construct SR 7 Elbe rest area and interpretive facilityWashington1795WA027399,375Improve Hillsboro Street/Highway 395 intersection in PascoWashington420WA028102,300Improve Hillsboro Street/Hwy 395 intersection, PascoWashington1783WA028607,500

Washington.Improve I-5/196th Street, Southwest Freeway interchange in Lynnwood,Washington455WA029

129,900Improve I-5/196th Street Interchange, LynnwoodWashington1787WA029562,500Construct passenger ferry facility to serve Southworth, SeattleWashington642WA030

144,300Southworth Seattle FerryWashington1793WA030731,250Undertake SR 166 slide repairWashington682WA031187,500Undertake SR 166 Slide RepairWashington1794WA031525,000Improve Clinton Ferry TerminalWashington737WA032

Attachment 1 Page 39 of 41

Page 40: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

180,000Clinton Ferry TerminalWashington1799WA032168,750Reconstruct I-5 interchange, City of LacyWashington773WA03343,200Reconstruct I-5 Interchange, City of LaceyWashington1791WA033

735,000corridor in Washington.Improve primary truck access route on East Marine View Drive, FASTWashington814WA034

3,600,000

Co., and $1,125,000 for the Shaw Rd. extension Puyallupproject in Tukwila, $750,000 for the 8th St. E/BSNF project in PierceSt./UP project in Auburn Kent, $1,500,000 for the S. 180th St. E/BSNFS.277th St./BNSF project in Auburn/Kent, $1,500,000 for the S.277thfor the SW Third St./BSNF project in Auburn, $1,500,000 for theProject, $3,375,000 for the Port of Tacoma Road project, $2,250,000follows: $12,000,000 to construct the North Duwamish IntermodalUndertake FAST Corridor improvements with the amounts provided asWashington1279WA034

883,950

planthe Riverside Industrial Access Road as identified in the FAST CorridorConstruct overcrossing at 38th Street in Everett, WA., and constructWashington1480WA034

37,5008th Street East Pierce CountyWashington1800WA03456,250Shaw Road Puyallup extensionWashington1801WA03475,000180th, TukwilaWashington1802WA03475,000South 277th, Auburn (UP)Washington1803WA03475,000South 277th, Auburn (BNSF)Washington1804WA034

112,500Construct Southwest Third StreetWashington1805WA034168,750Construct Port of Tacoma RoadWashington1806WA034600,000Construct North Duwamish Intermodal ProjectWashington1807WA034472,500

Washington.Construct State Route 305 corridor improvements in Poulsbo,Washington817WA035

562,500Construct 192nd Street from Sr-14 to SE 15thWashington841WA036144,300Construct 192nd Street from SR 14 to SE 15th, VancouverWashington1779WA036675,000

Edmonds, Washington.Construct Edmonds Crossing Multi-modal transportation project in Washington881WA037

144,300Edmonds Crossing multi-modal transportation projectWashington1789WA037181,125Widen Columbia Center Boulevard in KennewickWashington900WA03846,350Columbia Center Blvd, KennewickWashington1781WA038

780,000

Lake Road to Snohomish River BridgeSR-9 to Lake Road; $1,550,000 to construct segment from ParadiseWiden SR-522 in Snohomish County: $3,650,000 for phase 1 fromWashington905WA039

540,000Widen SR522 from SR-9 to Paradise Lake RoadWashington929WA039281,250

Overpass in LongviewConstruct Port of Longview Industrial Rail Corridor and Fibre WayWashington952WA040

71,550Port of Longview Industrial Rail CorridorWashington1776WA0402,227,500Improve I-90/Sunset Way interchange in Issaquah, WAWashington955WA041

742,500Improve I-90/Sunset Way Interchange, IssaquahWashington1798WA04184,375Improve Huntington Avenue South in Castle RockWashington1074WA04220,700Huntington Avenue South Castle RockWashington1775WA042

735,000Construct Peace Arch Crossing of Entry (PACE) lane in BlaineWashington1148WA043

1,530,000Widen SR-543 from I-5 to International Boundary, Washington.Washington1157WA044

7,500Redevelop Port of Anacortes waterfrontWashington1197WA045972,000

RoadReconstruct I-82/SR-24 intersection and add lanes on SR- 24 to KeysWashington1248WA046

249,450Reconstruct I-82/Keys Road Intersection, YakimaWashington1784WA04656,250Construct Cross Base Corridor, Fort Lewis-McChord AFBWashington1328WA04717,250Construct Cross Base Corridor Ft. Lewis/McChord AFBWashington1790WA047

112,500SalmonConduct feasibility study of State Route 35 Hood River bridge in WhiteWashington1368WA048

28,800Hood River Bridge SR 35Washington1773WA048112,500Construct Sequim/Dungeness Valley trail projectWashington1371WA04928,800Construct Sequim/Dungeness Valley Trail ProjectWashington1785WA049

168,750Construct SR 167 Corridor, TacomaWashington1379WA05043,200Construct SR 167 CorridorWashington1792WA050

150,000corridor in Everett, WashingtonDesign and implement report and environmental study of the I-5Washington1433WA051

450,000Extend Mill Plain Boulevard in VancouverWashington1485WA052150,000Extend Mill Plain Blvd, VancouverWashington1796WA052100,950Construct SR 305 corridor improvement, PoulsboroWashington1788WA053

29,781,15074 ProjectsWashington4,650,000Upgrade US Rt. 35 between I-64 and South Buffalo BridgeWest Virginia868WV0081,500,000

provide for a connection to I-64 (Merrick Creek Connector)Upgrade Route 2 in Cabell Co., including the relocation of Route 2 toWest Virginia1246WV012

Attachment 1 Page 40 of 41

Page 41: Attachment 1 Page 1 of 41 - Federal Highway AdministrationTEA-21 DEMO ID PROJECT STATE TOTALS 1,500,000 Florence AL002 957 Alabama Construct bridge over Tennessee River connecting

in State allocations above:**FLH PROJECTS** - Funds for the following projects are provided to Federal Lands Highway Office, as requested by the involved States, and are not included

CA093 (Project 320 - Improve and widen Forest Hill Road in Placer County)

30,000signalization, Berkely Co.Construct improvements on WV 9 including turning lane andWest Virginia1244WV014

4,050,000Construct Riverside Expressway, FairmontWest Virginia865WV0153,403,500Construct Coalfields ExpresswayWest Virginia1808WV017

562,500and I-77Construct Shawnee Parkway between junction with the I-73/74 CorridorWest Virginia698WV018

1,357,500Co. Rt. 13 (Gilbert Creek), Mingo CountyConstruct I-73/74 Corridor, including connectors with WV Rt. 44 andWest Virginia954WV019

2,250,000CountyConstruct I-73/74 Corridor, including interchange with US- 460, MercerWest Virginia1023WV019

150,000Fayette CountyConstruct safety improvements on Route 82 (Fayette Station Road),West Virginia655WV023

600,000Relocate segment of Route 33 (Scott Miller Bypass), Roane Co.West Virginia981WV024

7,500,000Upgrade Route 10 between Logan and ManWest Virginia1159WV025300,000

Chelayn Road, Boone Co.Preliminary engineering, design and construction of the Orgas toWest Virginia1238WV026

757,500Construct I-81 interchange, MartinsburgWest Virginia1264WV027300,000

Charles Town BypassUpgrade US 340 between West Virginia/Virginia State line and theWest Virginia1488WV028

27,411,00014 ProjectsWest Virginia337,500Construct STH-26/US-41 Interchange in OshkoshWisconsin319WI003

2,400,000Kaukauna and Brown County Highway FConstruct freeway conversion project on Highway 41 betweenWisconsin1385WI003

675,000Construct Abbotsford BypassWisconsin224WI004675,000Upgrade STH 29 between IH 94 and Chippewa FallsWisconsin252WI004675,000Construct Chippewa Falls BypassWisconsin347WI004

1,350,000Upgrade State Highway 29 between Green Bay and WausauWisconsin909WI0042,925,000Reconstruct U.S. Highway 151, Waupun to Fond du LacWisconsin210WI0073,375,000Construct U.S. Highway 151 Fond du Lac BypassWisconsin651WI007

562,500Upgrade Marshfield Blvd., MarshfieldWisconsin223WI008900,000Upgrade US Rt. 10 between Waupaca to US Rt. 41Wisconsin272WI009

1,350,000Reconstruct U.S. Highway 10, Waupaca CountyWisconsin842WI009450,000Construct U.S. Highway 10, Freemont to AppletonWisconsin853WI009450,000Improve Janesville transportationWisconsin380WI010562,500Upgrade U.S. 51 Tomahawk BypassWisconsin803WI011900,000Construct Eau Claire Bypass projectWisconsin1403WI012900,000Upgrade Highway 151 between Platteville and DubuqueWisconsin1437WI013

5,988,900High priority highway and bridge projectsWisconsin1817WI01424,476,40017 ProjectsWisconsin

225,000Construct Jackson-Teton Pathway in Teton CountyWyoming165WY004525,000Reconstruct Cheyenne Area Norris ViaductWyoming629WY005750,000

Yellowstone National Park to CodyWiden and improve Cody - Yellowstone Highway from the entrance toWyoming1430WY006

2,090,100State Priority ProjectsWyoming1809WY007750,000High priority highway and bridge projectsWyoming1826WY007

4,340,1005 ProjectsWyoming1,403,572,5001,403,572,500TOTALS

Attachment 1 Page 41 of 41