Brickyard Bubble with Insulation July 15, 2010
The Bubble was designed to Blend Well with Brickyard July 15, 2010
Crews Working Diligently July 15, 2010
The Bubble Seats 250 July 15, 2010
The Left Side Currently Undergoing Heavy Construction July 15, 2010
The Left Side will Feature the New Concepts July 15, 2010
Heavy Construction July 15, 2010
New Carpet in Temporary Serving Area July 15, 2010
New Serving Line for Faster Service July 15, 2010
Chick-fil-A and a Wrap Bar will be Served on the Line July 15, 2010
Li’l Dinos will be Served Here July 15, 2010
Students will Check Out Here July 15, 2010