atn 2001 18-19 september 2001

17
. . . . . . . . . . . ATN 2001 18-19 September 2001 American American Airlines Data Airlines Data Link Link . . . Frank Cheshire / Andy Fry

Upload: latona

Post on 11-Jan-2016

129 views

Category:

Documents


1 download

DESCRIPTION

American Airlines Data Link. ATN 2001 18-19 September 2001. Frank Cheshire / Andy Fry. The Path to PETAL. Certification & Operations Approval CDG Operations Not your basic routine flights Good support a key Non-revenue test profiles Data collection Response to problems - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ATN 2001 18-19 September 2001

1

.

.

..

. .

..

.

.

.

ATN 200118-19 September 2001

American American Airlines Data Airlines Data

LinkLink. .

.

Frank Cheshire / Andy Fry

Page 2: ATN 2001 18-19 September 2001

2

The Path to PETALThe Path to PETAL• Certification & Operations Approval• CDG Operations

– Not your basic routine flights– Good support a key

• Non-revenue test profiles– Data collection– Response to problems

• Operational sector operations• Results

Page 3: ATN 2001 18-19 September 2001

3

Certification & Ops ApprovalCertification & Ops Approval

• Supplemental Type Certificate (STC)– AAL was the applicant, issued 6/06/01– Applies to the B-767-300 with Pegasus FMC

and Rockwell Collins avionics package:• CMU - 900

• VHF - 920 VHF Digital Radio (VDR)

• APM

• Operations Approval– Issued mid-August– Triggered start of revenue flying

Page 4: ATN 2001 18-19 September 2001

4

Charles de Gaulle OperationsCharles de Gaulle Operations

• Airframe Scheduling

• Routing & Coordination– Non-standard routing and short flights– Lots of coordination

• Kudos to lots of people/organizations– Internal to AA– Eurocontrol– CFMU and CDG ATC personnel

Page 5: ATN 2001 18-19 September 2001

5

Non-Revenue Test ProfilesNon-Revenue Test Profiles

• Objectives outlined by Eurocontrol– Specific profiles to establish system performance

• Avionics performance with “operational” ground network• Ground network• The Controller’s end

– Troubleshooting• Profiles modified or repeated to check “fixes”• Aircraft variables• Lots of data collected

Page 6: ATN 2001 18-19 September 2001

6

Flight LogFlight Log• 07:25:59 (AVLC) INFO (P=0) N(s)=4 N(r)=6 A/G=1 • Source Addr: 0x5102b1a, Dest Addr: 0x1a4a445• Frame Data:• b2 48 12 a2 14 02 6a 59 c8 1b ff 66 82 1e 01 00 '.H....jY...f....'• 04 07 08 00 00 14 47 00 27 01 58 41 41 00 ee ee '......G.'.XAA...'• ee 00 2b 02 00 ac 14 2b c2 00 '..+....+........'• 07:25:59 (VDL) SQP.indication=0, Source Addr: 0x5102b1a• ROUTER MOBILE_ISH_IN 11/07/01 07:25:59 ARINC "584141EE002B" 1800

"4700270158414100EEEEEE002B0200AC142BC200"RIF ISH_IN 11/07/01 07:25:59 ARINC "4700270158414100EEEEEE002B0200AC142BC200" "584141EE002B"07:25:59 (AVLC) RR (F=0) N(r)=5 A/G=0

• Source Addr: 0x1a4a445, Dest Addr: 0x5102b1a• Frame Data:• 16 02 6a 58 b2 48 12 a3 a1 '..jX.H..........'• 07:26:44 (AVLC) INFO (P=0) N(s)=5 N(r)=6 A/G=1 • Source Addr: 0x5102b1a, Dest Addr: 0x1a4a445• Frame Data:• b2 48 12 a2 14 02 6a 59 ca 1b ff 68 82 1e 01 00 '.H....jY...h....'• 04 07 08 00 00 14 47 00 27 01 58 41 41 00 ee ee '......G.'.XAA...'• ee 00 2b 02 00 ac 14 2b c2 00 '..+....+........'• ROUTER MOBILE_ISH_IN 11/07/01 07:26:44 ARINC "584141EE002B" 1800

"4700270158414100EEEEEE002B0200AC142BC200"07:26:44 (VDL) SQP.indication=0, Source Addr: 0x5102b1a

Page 7: ATN 2001 18-19 September 2001

7

Operational Sector OpsOperational Sector Ops

• The Pay-off !– Controller-Pilot data link communications

Page 8: ATN 2001 18-19 September 2001

8

ResultsResults

• The “good” news - VDLM2 works !

• The “other” news - there is room forimprovement– Technical and operational suitability issues

• 21 Non-revenue test profiles flown

• Started data link with operational sectors on 17 August, it is continuing

• PETAL an excellent proving ground

• Next step - FAA Build I in Miami next year

Page 9: ATN 2001 18-19 September 2001

9

Upper E I C A SUpper E I C A S

Page 10: ATN 2001 18-19 September 2001

10

Logon Status PageLogon Status Page

Page 11: ATN 2001 18-19 September 2001

11

M C D U DisplayM C D U Display

Page 12: ATN 2001 18-19 September 2001

12

Uplink MessageUplink Message

Page 13: ATN 2001 18-19 September 2001

13

A T C LogA T C Log

Page 14: ATN 2001 18-19 September 2001

14

Brain TrustBrain Trust ? ?

Page 15: ATN 2001 18-19 September 2001

15

Questions ?Questions ?

Page 16: ATN 2001 18-19 September 2001

16

Page 17: ATN 2001 18-19 September 2001

17