RESUME Atif Hasan Jalali H#402, St#4,Sector G-9/3 Islamabad, Pakistan Cell: 0092-312-5200051,03315596662 E-mail: [email protected] OBJECTIVE: To join a dynamic and progressive organization offering ample opportunities for diversified experience. Seeking a position that will ensure continued professional growth, offered by an environment in which advancement is based on the strength of individual contribution to the realization of organization goals. EDUCATION BS Electrical (Telecommunication) Engineering 68% Feb 2005–Sep 2009 COMSATS Institute of Information & Technology, Islamabad Intermediate (F.S.C) 1 st Division 2002–2004 Model college for Boys F-10/3 Islamabad Matriculation 1 st Division 2000-2002 Bahria college E-8 Islamabad. Employment Netkom Technologies (FROM May 2012 to Present): 1) Installation of 3G (1+0, 1+1) MW links “Ufone optimization project” 3G Training on Microwave and achieved certification on first attempt for installation & commissioning by Huawei Links installation RTN 910,950A Installation of Dish, ODU, IDU Placing labels on sites according to link Commissioning of MW links Achieving required RSL according to the given link budget Perform traffic shifting of sites Configuring Ethernet services for 3G link Troubleshooting of MW links Dismantling of MW links 2) Installation of SDR (software defined radio) according to Telenor standards which includes following: Follow the Telenor HSSE standards PROFESSIONAL EXPERIENCE

Upload: atif-jalali

Post on 04-Dec-2015

5 views

Category:

Documents


2 download

DESCRIPTION

ati resume

TRANSCRIPT

Page 1: Atif Resume(1)We

RESUME

Atif Hasan Jalal iH#402, St#4,Sector G-9/3 Islamabad, PakistanCell: 0092-312-5200051,03315596662E-mail: [email protected]

OBJECTIVE: To join a dynamic and progressive organization offering ample opportunities for diversified experience. Seeking a position that will ensure continued professional growth, offered by an environment in which advancement is based on the strength of individual contribution to the realization of organization goals.

ED

UC

ATIO

N

BS Electrical (Telecommunication) Engineering 68%

Feb 2005–Sep 2009 COMSATS Institute of Information & Technology, Islamabad

Intermediate (F.S.C) 1st Division

2002–2004 Model college for Boys F-10/3 Islamabad

Matriculation 1st Division

2000-2002 Bahria college E-8 Islamabad.

Employment Netkom Technologies (FROM May 2012 to Present):

1) Installation of 3G (1+0, 1+1) MW links “Ufone optimization project”

3G Training on Microwave and achieved certification on first attempt for installation & commissioning by Huawei

Links installation RTN 910,950A Installation of Dish, ODU, IDU Placing labels on sites according to link Commissioning of MW links Achieving required RSL according to the given link budget Perform traffic shifting of sites Configuring Ethernet services for 3G link Troubleshooting of MW links Dismantling of MW links

2) Installation of SDR (software defined radio) according to Telenor standards which includes following:

Follow the Telenor HSSE standards Place RRU’s at the right place on tower Routing of power and fiber cables from RRU to BBU so that no crossing occurs

between both the cables Ties should be placed at proper interval and in crossed pattern so that power

and fiber remains firm in their position SDR and all equipment should be at the same level horizontally SDR channels should be tighten properly with lock nuts and washers Cables beneath the SDR should be coiled properly Fiber cable rings for extra fiber sector wise should be made on horizontal

ladder Power cable routing should be at the side near to door inside SDR complete Swap within the downtime provided

3)Installation of MW links “Telenor Vega project”

Links installation ipaso link 200,400,1000

PR

OFES

SIO

NA

L E

XP

ER

IEN

CE

Page 2: Atif Resume(1)We

Installation of Dish, ODU, IDU

Placing labels on sites near and far end Configuration of IDU using IP Address \\172.17.254.253 Entering site name, TX, RX frequency, modulation scheme, power and other

parameters etc Achieving required RSL according to the given link budget

4)Survey of MW links “Mobilink Mega project”

Carrying out LOS survey of sites Check tower loading ,were dish is to be installed on tower Check that there is no obstacle between two towers where dish is to be

installed Check free breakers ,idu space available Check exsisting idu’s and no of E1’s currently configured on site

5)Installation of MW & BSS on “Mobilink Mega project”

Links installation RTN 905(1A & 2A),950A,980 Installation of Dish, ODU, IDU Placing labels on sites according to link Commissoning of MW links Achieving required RSL according to the given link budget Performing sites cutover Dismantling of MW links Cut Over of microwave and BSS. BTS Commissioning and installation Installation of Huawei BTS3900, BTS3900A, DBS3900, Power Cube ICC 500, Power

Cube ICC200. Used site master for VSWR and power issues. Survey of transmission for shifting indoor to outdoor. Swapping indoor and outdoor BTS into Huawei 3900A LTE commission on site through UMPT card by using LMT software. Media testing from BSC to site through ping tool. Quality Check during the site installation according to client’s standard. Documentation of Sites as standards. PAT of Rollout sites and microwave links

6)installation of MW links “CMPAK project”

Links installation RTN 910,950,950A Installation of Dish, ODU, IDU Placing labels on sites according to link Commissoning of MW links Achieving required RSL according to the given link budget Performing sites cutover Dismantling of MW links

Employment (FROM September 2010 TO May 2012):

Network Operation Centre (NOC) O&M Department of Huawei. Providing LEVEL-I support to customer (PTML, PMCL, PTCL, WARID,

Witribe, Telenor, CMPAK, Roshan Telecom) related to all Productlines (NSS, BSS, Transmission, Microwave, etc)

Registration of all issues for warranty support and assigning it to concern Engineer and taking updates of issue and finding the Root Cause until its resolution

Keeping record for all issues and maintaining a summary for all Networks

Activity monitoring of activities carried out in customer network.

PR

OFES

SIO

NA

L E

XP

ER

IEN

CE

Page 3: Atif Resume(1)We

Pro

jects

BS FINAL YEAR PROJECT

Performance and Evaluation of Transport Protocols for Multimedia Applications over Heterogeneous Network (FYP)

SEMESTER PROJECTS

Water level indicator Signal amplifier using Micro-Controller’s Antenna designing and Analysis using HFSS/AWR AM receiver

COMPUTER SKILLS

Microsoft Office, MATLAB, Kiel Compiler, HFSS, Packet Tracer, AWR.

PER

SO

NA

L D

ATA

Date of Birth: 15TH July 1985

NIC # 61101-7285761-5

Domicile Punjab

Martial Status Single