athens, greeceapril 08-13, 2005 1 spring 2005 ccsds management council cnes report jean-marc soula...

10
April 08-13, 2005 1 Athens, Greece Spring 2005 CCSDS Management Council Spring 2005 CCSDS Management Council CNES report CNES report Jean-Marc SOULA (CNES) Jean-Marc SOULA (CNES)

Upload: vanessa-barker

Post on 28-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Athens, GreeceApril 08-13, 2005 1 Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

April 08-13, 2005 1Athens, Greece

Spring 2005 CCSDS Management Spring 2005 CCSDS Management CouncilCouncil

CNES reportCNES report

Jean-Marc SOULA (CNES)Jean-Marc SOULA (CNES)

Page 2: Athens, GreeceApril 08-13, 2005 1 Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

April 08-13, 2005 2Athens, Greece

• No change in CNES organization.

• Resource allocation between CCSDS and ECSS : CNES contributed to the discussions initiated between agencies and ECSS. Proposal formulated and to be presented to ECSS Executive and CMC…

• Some internal actions conducted to clarify applicability of Norms (CCSDS, ECSS, ISO) to CNES projects.

• France position on a Space TC in ISO (under BNAE responsibility) was made and is:

– No for a Space TC separated from TC-20– Yes for an optimization of SC13-SC14 organization within TC-20 .

1. CNES general information

Page 3: Athens, GreeceApril 08-13, 2005 1 Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

April 08-13, 2005 3Athens, Greece

• Potential involved– CNES manpower involved in the last 6 months was

around 3.5 EFT men effort

– Present participation covers all areas except Spacecraft On Board Interfaces Services (SOIS)

– This should be maintained for the next coming months• Likely with same distribution (question on SEA IA and SIS) • depending on operating plan presented by CESG and AD’s

2. CNES Resources on CCSDS

Page 4: Athens, GreeceApril 08-13, 2005 1 Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

April 08-13, 2005 4Athens, Greece

Spacecraft

– All CNES satellites under development are CCSDS compliant (at least partially)

– Just launched : Parasol and Essaim (Myriades, Dec 05)

– Summary of future satellites• Proteus family : Calipso (2005), Corot, Smos, Jason-2• Myriades family : Microscope, Picard• Dual satellites : Pleïades

– New project : ArgoµSat (Myriades phase A)

3. Implementations (1/2)

Page 5: Athens, GreeceApril 08-13, 2005 1 Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

April 08-13, 2005 5Athens, Greece

Operations• Remote Management System (qualification tests in progress)

Ground Stations• Project on a global harmonization of CNES ground segments, from

multi-mission thru product lines for a progressive implementation in the longer term (2007–2010).

• Implementation of RF&M, OPM, Packet TM/TC, etc… in progress• SLE gateway on Provider side for SLE transfer services with CNES

multi-mission facilities (end 2004).• SLE transfer services on the User side for Pleiades project

(development initiated : end 2005).• SLE transfer services at ground stations level under study for a

later phase (2006).• SLE Service Mngt anticipated as an external interface.

3. Implementations (2/2)

Page 6: Athens, GreeceApril 08-13, 2005 1 Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

April 08-13, 2005 6Athens, Greece

• What is the status of Procedures Manual and Operating Plan ? Which approved versions apply ?• Up-to-date versions are required before any change in

organization or working method.

• Agency reviews– Some agency reviews in Q1-2005 relate to F03 & S04

meetings; Reasons for such delays must be clarified– Poll Alerts messages should refer to CMC resolution number.– Could CESG verify beforehand if documents are ready for

Agency Review ?– Could we have a resolution that some Reviews are by-

passed when only minor changes are involved (editorial)?

4. Identified issues (1/5)

Page 7: Athens, GreeceApril 08-13, 2005 1 Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

April 08-13, 2005 7Athens, Greece

• What is the rule for new / revised charters ?• Changes in the Operating Plan only or other methods ?• SANA BOF in Operating plan <-> CSS Generic Services via poll

<-> NAV via poll (not announced in Toulouse F04 meeting)• Which processes for resource allocation in each case ?• How comments received during reviews are to be passed to

CESG and WG’s should be addressed in the procedures.

• Shall we change the order of the meetings from WG->CESG->CMC to CESG->CMC->WG?• How long will polls take if CESG resolutions and actions are

submitted when CMC meeting is over ?• How to improve the CMC efficiency in between the meetings?

4. Identified issues (2/5)

Page 8: Athens, GreeceApril 08-13, 2005 1 Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

April 08-13, 2005 8Athens, Greece

• SEA/IA position• CNES supports the IOAG idea that priority should be given to

Service Architecture• CNES considers that the Work Packages of the Information

Architecture WG could be distributed:– WP1 (language/model from Information point of view): to SEA/SA– WP2 (generic management and access to information): to MOIMS

in order to avoid discrepancies with OAIS– WP3 (best current practice): very low priority

• MOIMS/NAV • A 2-year extension of the NAV WG appears in the New

Charter• This is related to a request from ISO/SC-14 to analyze the

exchanges of vectors and errors for collision avoidance• Shouldn’t this be discussed first at CESG and CMC levels ?

4. Identified issues (3/5)

Page 9: Athens, GreeceApril 08-13, 2005 1 Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

April 08-13, 2005 9Athens, Greece

• SLS/RFM• CNES asks that agencies determine if they agree to

support the SFCG Draft recommendation 14-3R6 • If all agencies say « Yes », then the extension of

the WG has a meaning and CNES will change his vote.

• SLS / RFM and Coding• Those WG should have joint meetings and

discussions • The bandwidth / power / enveloppe efficiency

cannot be treated independently.

4. Identified issues (4/5)

Page 10: Athens, GreeceApril 08-13, 2005 1 Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

April 08-13, 2005 10Athens, Greece

• CSS/Generic Services • The WG takes into account Unframed TLM but not the CMD

counterpart.• The WG considers exchanges of TRK data while IOAG has

indicated a low priority requirement on this activity.• The CMC should discuss those aspects of the WG Charter.

• XML• CNES identifies a need for an harmonized approach across

the WG’s (MOIMS-NAV, CSS-SM, etc…)

• SIS• Only very long term objectives in the Strategic Plan and no

short term action in the Operating plan.

4. Identified issues (5/5)