atf2: summary of scheduling strategy session grahame blair feedback and feedforward systems fast...
DESCRIPTION
3-bunch extraction: 154ns spacing RMS y jitter w.r.t bunch 1: 5 um (bunch 2) 20 um (bunch 3) Train-train jitter: 8 um Banana: 220um Train-train jitter cannot be corrected by FB because intra-train jitter is comparable in size (larger) Banana effect >> jitter: requires large dynamic range of kicker amplifier to straighten trainTRANSCRIPT
![Page 1: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/1.jpg)
ATF2: Summary of Scheduling Strategy
SessionGrahame Blair
• Feedback and Feedforward systems• Fast Kicker for ILC bunch train structure• Laser-wire• Shintake system• IP-BPM and BSM with laser cavity
Second ATF2 Project Meeting,KEK,
1st June 2006
![Page 2: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/2.jpg)
2
• Feedforward ring -> extraction line Single or multibunch beam• Feedback/feedforward in extraction line
Multibunch beam
In either case probably want to correct y and y’• Few um stability: stripline BPM resolution probably ok
• Sub-um stability: probably need cavity BPM resolution
P. Burrows: Feedback and FeedforwardHow to achieve required stability?
![Page 3: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/3.jpg)
3-bunch extraction: 154ns spacingRMS y jitter w.r.t bunch 1:
5 um (bunch 2)
20 um (bunch 3)
Train-train jitter:8 um
Banana: 220um
• Train-train jitter cannot be corrected by FB because intra-train jitter is comparable in size (larger)• Banana effect >> jitter: requires large dynamic range of kicker amplifier to straighten train
![Page 4: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/4.jpg)
Where to put hardware? FB mode +FF modes Decide locations and either install or leave space
What type of BPM and where?Dedicated stripline, cavity BPM
Beam feedback requires multi-bunch beam
Need to think about how to handle multi-bunch operation in IP BPMs at ATF2
Questions + Issues
![Page 5: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/5.jpg)
Beam extraction by using strip-line kicker (T. Naito)
![Page 6: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/6.jpg)
LLNL Inductive Adder Pulser
Uses stacked FET boards
to achieve:
Rise time ~ 5.7ns
Pulse voltage ~ +- 8kV
![Page 7: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/7.jpg)
Plans exist to modify laser to produce arbitrary bunch spacing
![Page 8: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/8.jpg)
ATF2 LW Plans (G.Blair)
A 3-stage approach is foreseen
•Start with installation of laser hut
•First stage of light transport system
•Single 2-D LW-IP system
• Add IP’s as project progresses
• Highly desirable to include a micron-size IP,
possibly in the upstream S-bend area.
![Page 9: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/9.jpg)
Laser hut
2-d LW IPDetector Collimation
Possible Stage 1-3
Final number of IPs will depend on level of funding
Micron IP ?
![Page 10: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/10.jpg)
Shintake System (T. Suehara)• Vertical
– 20 ~ 360 nm (30°,174° setup, 10%~90% modulation)• Horizontal
– 380 ~ 1800 nm (6°setup,10%~90%)• For commissioning,
Beam size larger than 360nm (V) 1800nm (H)should be covered by another monitor– Solid wire
(before or with Shintake-monitor, IP or non-IP)– “Laser wire” mode:
"Laser wire" mode
![Page 11: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/11.jpg)
Commissioning schedule:ATF2 plan
• R&D finished : Aug. 07• Transportation to KEK : Sep.07• Unpacking & component check : Oct.07• Wait until rough beam tuning finished (?)• Installing & system check : ~Dec.07 (if no wait)• Tuning with beam : Feb.08 ~
– Tuning to reduce background– Beam tuning with “Laser wire” mode ?– Measurement using interferometer mode
![Page 12: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/12.jpg)
Y.Honda
![Page 13: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/13.jpg)
![Page 14: ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake](https://reader035.vdocuments.mx/reader035/viewer/2022062413/5a4d1b7a7f8b9ab0599b8e0d/html5/thumbnails/14.jpg)
Summary
•All projects have some good idea of their schedule
• New funding is being sought for some; outcome expected at the end of 2006
• General schedules will be drafted and gathered in time for the next ATF2 meeting.