PRE- M/s. Ind [PROJECT ISOLATED STO HUBERT ENV -FEASIBILITY REPORT (as per MoEF Guidelines) FOR dian Oil Corporation PVT LTD Storage and filling the LPG AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram Tamilnadu TERMED UNDER SCHEDULE 6 (b): CATEGORY B ORAGE & HANDLING OF HAZARDOUS CHEMICAL FEBRUARY, 2015 BY VIRO CARE SYSTEMS PVT LTD., CHENN D LS, NAI

Upload: others

Post on 23-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

PRE-FEASIBILITY REPORT(as per MoEF Guidelines)

FOR

M/s. Indian Oil Corporation PVT LTD

Storage and filling the LPGAT

VILLAGE:Madura Kolambakkam

TALUK: Maduranthagam

DIST: KanchipuramTamilnadu

[PROJECT TERMED UNDER SCHEDULE 6 (b): CATEGORY BISOLATED STORAGE & HANDLING OF HAZARDOUS CHEMICALS,

FEBRUARY, 2015

BY

HUBERT ENVIRO CARE SYSTEMS PVT LTD., CHENNAI

PRE-FEASIBILITY REPORT(as per MoEF Guidelines)

FOR

M/s. Indian Oil Corporation PVT LTD

Storage and filling the LPGAT

VILLAGE:Madura Kolambakkam

TALUK: Maduranthagam

DIST: KanchipuramTamilnadu

[PROJECT TERMED UNDER SCHEDULE 6 (b): CATEGORY BISOLATED STORAGE & HANDLING OF HAZARDOUS CHEMICALS,

FEBRUARY, 2015

BY

HUBERT ENVIRO CARE SYSTEMS PVT LTD., CHENNAI

PRE-FEASIBILITY REPORT(as per MoEF Guidelines)

FOR

M/s. Indian Oil Corporation PVT LTD

Storage and filling the LPGAT

VILLAGE:Madura Kolambakkam

TALUK: Maduranthagam

DIST: KanchipuramTamilnadu

[PROJECT TERMED UNDER SCHEDULE 6 (b): CATEGORY BISOLATED STORAGE & HANDLING OF HAZARDOUS CHEMICALS,

FEBRUARY, 2015

BY

HUBERT ENVIRO CARE SYSTEMS PVT LTD., CHENNAI

Page 2: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

i

TABLE OF CONTENTS

1. EXECUTIVE SUMMARY ........................................................................................................................1

2. INTRODUCTION...................................................................................................................................3

2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT ....................................... 3

2.2 BRIEF DESCRIPTION OF NATURE OF THE PROJECT .................................................. 3

2.3 NEEDFOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND REGIONError!Bookmark not defined.

2.4 EXPORT POSSIBILITY .................................................................................................. 4

2.5 DOMESTIC / EXPORT MARKETS .................................................................................. 4

2.6 EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT .......... 4

3. PROJECT DESCRIPTION ........................................................................................................................5

3.1 TYPE OF PROJECT ...................................................................................................... 5

3.2 LOCATION.................................................................................................................... 5

3.3 SALIENT FEATURES OF THE PROJECT SITE ............................................................... 7

3.4 SIZE OR MAGNITUDE OF OPERATION ....................................................................... 10

3.5 PROJECT DESCRIPTION WITH PROCESS DETAILS ................................................... 10

3.6 AVAILABILITY OF WATER ITS SOURCE, ENERGY/ POWER REQUIREMENT............... 11

3.7 LIST OF PRODCUT......................................................Error! Bookmark not defined.

4. SITE ANALYSIS ...................................................................................................................................12

4.1 CONNECTIVITY .......................................................................................................... 12

4.2 LAND FORM, LAND USE AND LAND OWNERSHIP ...................................................... 12

4.3 EXISTING LAND USE PATTERN ................................................................................. 13

4.4 EXISTING INFRASTRUCTURE .................................................................................... 15

4.5 CLIMATIC DATA FROM SECONDARY SOURCES ........................................................ 15

4.6 SOCIAL INFRASTRUCTURE ....................................................................................... 15

5. PLANNING BRIEF ...............................................................................................................................16

5.1 PLANNING CONCEPT................................................................................................. 16

5.2 POPULATION PROJECTION ....................................................................................... 16

5.3 LAND USE PLANNING ................................................................................................ 17

5.4 ASSESSMENT OF INFRASTRUCTURE DEMAND ........................................................ 17

5.4.1 PHYSICAL INFRASTRUCTURE ............................................................................... 17

5.4.2 SOCIAL INFRASTRUCTURE.................................................................................... 17

5.5 AMENITIES/FACILITIES........................................................................................... 17

Page 3: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

ii

6. PROPOSED INFRASTRUCTURE ...........................................................................................................19

6.1 INDUSTRIAL AREA ..................................................................................................... 19

6.2 RESIDENTIAL AREA ................................................................................................... 19

6.3 GREENBELT .............................................................................................................. 19

6.4 SOCIAL INFRASTRUCTURE ....................................................................................... 19

6.5 CONNECTIVITY .......................................................................................................... 19

6.6 DRINKING WATER MANGEMENT ............................................................................... 19

6.7 SEWERAGE SYSTEM ................................................................................................. 20

6.8 INDUSTRIAL & SOLID WASTE MANAGEMENT ............................................................ 20

6.8.1 HAZARDOUS CHEMICAL STORAGE & HANDLING .................................................. 20

6.9 POWER REQUIREMENT............................................................................................. 20

7. REHABILITATION AND RESETTLEMENT (R & R) PLAN.........................................................................21

8. PROJECT SCHEDULE & COST ESTIMATES............................................................................................21

8.1 TIME SCHEDULE FOR THE PROJECT ........................................................................ 21

8.2 ESTIMATED PROJECT COST ..................................................................................... 21

9. CONCLUSION……………………………………………………………………….……22

LIST OF TABLES

Table 1-1 Summary of Proposed Project details...................................................................................... 2Table 2-1 Details of the proposed project ................................................................................................3Table 3-1 Financial Breakup for the project ............................................................................................. 5Table -3-2 Salient Features of the project site ......................................................................................... 7Table 3-3 Products Storage Capacity Details ........................................................................................ 10Table 3.4 source of energy…………………………………………………………………….11Table 3.5 list of product………………………………………………………………………11Table 4-1 Land Use Classification for the Project Site ...........................................................................12Table5.1 Demographic summary…………………………………………………………….16

Table 5.2 Land use planning…………………………………………………………………17Table 6.1 Plant Infrastructure ………………………………………………………………..19Table8-1 Project cost details …. .. .. …………………………...........................................21

Page 4: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

iii

LIST OF FIGURES

Figure 3-1 Satellite map of 10 km radius around the project....................................................................6Figure3-2 Satellite image of Project Site..................................................................................................6Figure 3-3 Location of the project Site ....................................................................................................8Figure 3-4 Recent Site Photographs ....................................................................................................9Figure 4-1 Land use map of Study Area ................................................................................................ 13

Page 5: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

1

1. EXECUTIVE SUMMARYThis is a project of Indian oil corporation limited, Kancheepuram District, for proposed expansion offilling the Liquid Petroleum Gas for domestic and non domestic purpose at Madura Kolambakkam

village of Maduranthagam Tehsil, Kanchipuram District,Tamil Nadu. This project falls under item no. 6(b): Isolated storage & handling of hazardous chemicals under the category “A” (general conditionsapply) as per the EIA notification 2006 area.

There are high demand within the state for 5 Kg Cylinder (Non domestic), 14.2 Kg Cylinder (domestic) and 19 Kg

Cylinder (non domestic). Therefore, to reduce their scarcity, the Indian Oil Corpration Limited, headed byThe Chief Plant Manager,decided on supplying these for domestic and non domestic purpose to public.The LPG will reach the site by trucks and then store. The cylinders are then filled with gas and sent forinspection followed by dispatch.Nearest facilities include Fire station at Maduranthakam, Police station at Padalam,

Government Civil Hospital Maduranthakam.

Page 6: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

2

Table 1-1 Summary of Proposed Project details

S.NO PROJECT DETAILS PROPOSED PROJECT DETAILS

1. LAND AREA 42 acres

2. PROJECT COST INR 520 LACS

3. PROPOSED PRODUCT STORAGECAPACITY DETAILS

PRODUCTS

CLASSOFPETROLEUMPRODUCT

CAPACITY INTPM

TYPE OFTANK REMARKS

LPG STORAGE 2WE 3125M3 MOUNDEDBULLET

4. POWER REQUIREMENT TOTAL POWER REQUIREMENT WILL BE, 500 KVA AND160KVA(EXISTING ITSELF)THERE ARE ALSO 5 NOS. OF DIESEL DRIVEN FIRE WATER PUMPS (3WORKING + 2 STANDBY). LOCATED IN THE FW (FIRE WATER) PUMPHOUSE.

5. WATER CONSUMPTION (KLD) 8KLDFRESH WATER DEMAND WILL BE MET FROM CHENGALPETMUNICIPALITY WATER SUPPLY AND GROUND WATER.

Page 7: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

3

2. INTRODUCTION

2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT

IndianOil is the highest ranked Indian company in the latest Fortune ‘Global 500’ listings, ranked at the 96th position.

Initially the plant was commissioned with single carousal bottling operation as the demand was less and the marketwas small. The existing Bottling facilities was not sufficient to meet the market requirements due to the increase indemand of LPG Cylinders over the period of time and widespread distribution of Markets overChennai,Trichy,Villupuram,Kancheepuram,Vellore,Thiruvannamalai,Thiruvallur, and Cuddalore area. Hence a secondcarousal was installed after obtaining CTE from TNPCB, which is waiting for CTO from TNPCB for commissioning.

This project will supply LPG to which comes in Kanchipuram all the part of the district and to some part of chennaidistrict. The plant was commissioned on NOV 2003 and due to market demand now the plant needs expansion tofulfill the market demand.

2.2 BRIEF DESCRIPTION OF NATURE OF THE PROJECT

Table 2-1 Details of the proposed projectName of theProject

M/s. Indian Oil Corporation LimitedExpansion of LPG bottling plant facility at Madura Kolambakkam

ProposedCapacity PRODUCTS

CLASS OFPETROLEUMPRODUCT

CAPACITYIN TPM

TYPE OFTANK REMARKS

LPG(EXISITING) 2WE 3125M3 MOUNDEDBULLET

Project Proponent The Chief Plant Manager

Location Madura Kolambakkam, Maduranthagam.

Total Land Area 42 acres

Project Cost 520 LACS

EIA Consultant Hubert Enviro Care Systems Pvt. Ltd.( NABET : NABET EIN 1013/ 041)

PROJECT TERMED UNDER SCHEDULE 6 (b): CATEGORY A PROJECT, Isolated storage & handling ofhazardous chemicals located under Non Planned Area

2.3 NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND REGIONDue to drastic increase in the demand for supply of LPG Cylinders, we are not able to meet the Market

requirement with the Bottling capacity of a single carousal. Hence an additional carousal has been installed and iswaiting for commissioning for obtaining CTO approval from Pollution Control Board.

Page 8: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

4

Proposed facilities for expansion1. Carousal with associated facilities such as Valve Leak Detector, O-Ring Leak Detector.2. Associated Conveyor system for movement of cylinders.3. Cylinder Washing & Drying Unit.4. Sealing unit for sealing Cylinders5. Additional LPG Pipelines & Air lines for New Carousal.

In addition following facilities are also going to be installed soon:1. 47.5 Kg Filling machine.2. Valve Change Without evacuation machine

2.4 EXPORT POSSIBILITYM/S Indian Oil Corporation Limited has no export possibility to foreign nation. They already supplyingcompletely to the local Kanchipuram district and some part of Chennai.

2.5 DOMESTIC MARKETSM/S Indian Oil Corporation Limited will supply the product LPG to whole kanchipuram district and most partof the Chennai.

2.6 EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT

This project already developed the employment for 136 employee and expansion which will create moreemployment opportunity. This include Engineers, Operators, and general service categories for canteen,garden and Security. Additionally IOCL use bulk no of truck for collection of raw material and dispatch of theproduct to supply will create the employment opportunity for the truck drivers.

Page 9: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

5

3. PROJECT DESCRIPTION

3.1 TYPE OF PROJECTThe proposed project involves in the storage of Liquid Petroleum Gas and filling the gas in bottle.then afterthrough surveillance the cylindrical bottle will dispatch from the station.

Table 3-1 Financial Breakup for the project

Sr. No. ParticularsTotal Cost (Rs. InLACS)

1. Survey & engineering consultancy charges 5.00

2. Filling system 396

3. Equipments & pipe lines 96

4. Electrical & instrumentation 35

5. Contingency 24.77 (5%)

TOTAL 520.17

3.2 LOCATIONThe project is located at Village: Madura Kolambakkam Tehsil: Maduranthagam , Dist: Kancheepuram, Tamil

Nadu State. The Satellite image of project site with 10 Km radius is given in Figure 3-1.

Page 10: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

6

Figure 3-1Satellite map of 10 km radius around the project

Figure3-2 Satellite image of Project Site

The plant present is well connectivity to the National Highway 45, and easy for the transportion.

Page 11: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

7

3.3 SALIENT FEATURES OF THE PROJECT SITEThe salient features of the project site are given in the following table.

Table -3-2 Salient Features of the project siteFeatures Description

Name of the project Expansion of LPG bottling plant facility at Madura Kolambakkam

Purpose of the report To meet the market demand

Land Area 42 acres

Nearest Village Madura Kolambakkam

Nearest Railway station Padalam Railway station -2.89 Km

Highway NH-45

Airport Chennai International Airport is around 31.8km.

Sea port Chennai Port is at around 67.42km

Forest/Wildlife Sanctuary Nil .

Historical/ Archaeological Place Nil

Project siteThe project of LPG storage and filling station of IOCL present near the NationalHighway 45.

The Satellite Image indicating salient features within 10 km radius of the proposed project is as attached as Annexure-5.

Page 12: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

8

Figure 3-3 Location of the project Site

Page 13: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

9

Figure 3-4 RECENT PHOTOGRAPHS OF THE SITE

12/2014 @ 12:42 PM)

Page 14: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

10

3.4 SIZE OR MAGNITUDE OF OPERATIONThere is no production or Manufacturing of products, Indian Oil Corpration Limited project is just Storage ofproduct Liquid petroleum Gas. The Capacity of storage of products is as shown in the below table.

Table 3-3Products Storage Capacity Details

PRODUCTCLASS OFPETROLEUMPRODUCT

CAPACITYIN M3 TYPE OF TANK REMARKS

LPG (EXISTING) 2WE 3125 MOUNTEDBULLET

3.5 PROJECT DESCRIPTION WITH PROCESS DETAILS

The Proposed Expansion of LPG bottling plant facility at Madura Kolambakkam a storage and filling the LPG

bottle existing project which located at National Highway 45 Madura kolambakkam.

The proposed project is a expansion for Storage and filling cylinder of products like Liquid Petroleum Gas.There process carried out is to store the LPG and filling cylinders. The Liquid Petroleum Gas reach the plantby trucks and store in storage tank.The filled cylinder will undergoes for inspection and acceptable cylinderare send to dispatch through trucks. A pump will provide to pump the Liquid petroleum Gas from storagetank to filling.MSDS of the Product Liquid Petroleum Gas (5 Kg Cylinder (Non domestic) – 100 TPM, 14.2 Kg Cylinder

(domestic) -11400 TPM, 19 Kg Cylinder (non domestic) -1000 TPM) attached as Annexure-8.

Total Power Requirement for the project is 400KVA supplied by TANGEDCO and the power back up is500kva and 160 Kva DG.

RAW MATERIALS REQUIRED/MODE OF TRANSPORT OF RAW MATERIALS AND FINISHEDPRODUCT

Raw materials are required as the proposed expansion project is a development of Indian Oil Corprationlimted of products like Liquid Petroleum Gas will reach the site through trucks . The product will dispatchthrough truck from the site.

\

Page 15: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

11

3.6 AVAILABILITY OF WATER ITS SOURCE, ENERGY/ POWER REQUIREMENT

Table 3.4 – source of energyS.NO SOURCE REQUIREMENT

1 TANGEDCO 400 KVA

2 DG 160 KVA & 5OOKVA

3 ChengalpathuMunicipality & ground water

8KLD

3.7 LIST OF PRODUCTTable 3.5 – list of product

S.NO PRODUCT CAPACITY1 LPG 5KG CYLINDER 100T/M

2 LPG 14.2KG CYLINDER 11400T/M

3 LPG 19KG CYLINDER 1000T/M

Page 16: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

12

4. SITE ANALYSIS

4.1 CONNECTIVITYThe project site is located on road side of the National Highway 45 . The location of the site is given inFigure-3.3 above.

4.2 LAND FORM, LAND USE AND LAND OWNERSHIP

The proposed project site is in Kolambakkam located near National Highway 45 . The land use classificationfor the study area is given in table below

Table 4-1 Land Use classification for the Project Site

SR. NO. LAND USE/LAND COVER CLASSES AREA HEC AREA IN (%)

1. USED AREA (INC ROADS AND TRUCK LOADING &METERING SKIDS ETC)

11.87 72.73

2. GREEN AREA 4.45 27.26

TOTAL 16.32 100%

Page 17: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

13

4.3 EXISTING LAND USE PATTERN

Figure 4-1 Land use map of Study Area

13

4.3 EXISTING LAND USE PATTERN

Figure 4-1 Land use map of Study Area

13

4.3 EXISTING LAND USE PATTERN

Figure 4-1 Land use map of Study Area

Page 18: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

14

Page 19: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

15

4.4 EXISTING INFRASTRUCTURE

At present, existing plant is with good infrastructure like road, green belt, etc…and there is no expansionactivity at the site. Indian Oil Corporation limited will start the construction work after the issue ofEnvironmental Clearance.

4.5 CLIMATIC DATA FROM SECONDARY SOURCES OF KANCHIPURAM

MATE[hide]Climate data for Chennai

Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year

Averagehigh °C

(°F)

28.9(84)

30.6(87.1)

32.7(90.9)

34.7(94.5)

37.5(99.5)

37.3(99.1)

35.4(95.7)

34.5(94.1)

33.9(93)

31.9(89.4)

29.5(85.1)

28.5(83.3)

37.5(99.5)

Averagelow °C

(°F)

20.4(68.7)

21.2(70.2)

23.1(73.6)

25.8(78.4)

27.6(81.7)

27.4(81.3)

26.2(79.2)

25.6(78.1)

25.3(77.5)

24.3(75.7)

22.7(72.9)

21.2(70.2)

20.4(68.7)

Averagerainfall

mm(inches)

34.5(1.358)

12.5(0.492)

15.3(0.602)

17.7(0.697)

42.9(1.689)

53.7(2.114)

100.8(3.969)

129.2(5.087)

125.3(4.933)

290.9(11.453)

348.9(13.736)

145.6(5.732)

1,317.3(51.862)

Avg.rainydays

2.7 0.9 0.7 1.1 2.4 7.5 12.8 14.2 10.2 13.5 12.9 8.4 87.3

Meandaily

sunshinehours

8.7 9.6 9.5 9.7 9.0 6.8 6.0 6.2 6.6 6.3 6.1 6.6 7.59

Source #1: WMO [3]

Source #2: HKO (sun only, 1971–1990) [4]

4.6 SOCIAL INFRASTRUCTURE

The project will provide employment to local youth and products supply to various Domestic and NonDomestic use which are in need of these products thus increasing their standard of living and thus helpingstrengthen the social infrastructures of the region.

Page 20: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

16

5. PLANNING BRIEF

5.1 PLANNING CONCEPT

This is the existing project for the likely market demand of Liquid Petroleum Gas providing in Kanchipuramdistrict and Chennai. Indian Oil Corpration Planned to expand the plant to increase the capacity from44,000MTS/Annum to 1,50,000 MTS/Annum. The products from the plant after expansion 5 Kg Cylinder (Non

domestic) – 100 TPM ,14.2 Kg Cylinder (domestic) -11400 TPM,19 Kg Cylinder (non domestic) -1000 TPM.

5.2 POPULATION PROJECTION

The demographic details of the study area are given in subsequent sections while the summarizedinformation is presented below which highlights information on household, population, employment, literacyand community structure. The salient features of the study area are given in table below.

Table 5-1Demographic Summary

DEMOGRAPHIC PARAMETERS DETAILSNO. OF TALUKAS 1

NO. OF VILLAGES 97

NO. OF URBAN AREAS 4

TOTAL NO. OF HOUSEHOLDS 69772

TOTAL POPULATION 275953

POPULATION DENSITY 991

SEX RATIO (N0. OF FEMALE\ 1000 MALES 10001

SCHEDULED CASTES (%) 115832(41.9%)

SCHEDULED TRIBES (%) 5428

LITERATE (%) 77.56

MAIN WORKERS (%) 82917

MARGINAL WORKERS (%) 44685

NON- WORKERS (%) 141072

Page 21: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

17

5.3 LAND USE PLANNINGTable -5.2 Land use planning

S.NO PROJECT DETAILS PROPOSED

1. LAND AREA 42 ACRES

2. PROJECT COST INR 520 LACS

3. PROPOSED CAPACITYPRODUCTS

CLASS OFPETROLEUMPRODUCT

CAPACITY INTPM

TYPE OFTANK REMARKS

LPG STORAGE 2WE 3125M3 MOUNDEDBULLET

4. POWERREQUIREMENT

160 KVA , 360KVA.

5. WATERCONSUMPTION (KLD)

8010LTRS/DAY

6. GREEN BELT AREA 44500M2(27.26%)

5.4 ASSESSMENT OF INFRASTRUCTURE DEMAND

5.4.1 PHYSICAL INFRASTRUCTUREThe project with an investment of more than 520LACS of Indian rupees will bring in improvement inphysical infrastructure like roads, electricity, water infrastructure along with various other developmentalactivities as per its Corporate Social Benefit strategies by special budgetry by management.

5.4.2 SOCIAL INFRASTRUCTUREThe project wills provide employment to local youth and good supply of products to public, thusincreasing their standard of living and thus helping strengthen the social infrastructures of the region.

5.5 AMENITIES/FACILITIES

The major facilities provided are

Proper First Aid centre and medical facilities will be provided

Indian Oil Corpration Limited is providing the entire required infrastructure like roadconnectivity, water infrastructure, green belt development etc.

Preliminary facilities envisaged are

Emergency shutdown procedure

Page 22: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

18

A dedicated and pressurized fire fighting ring-main.

Dedicated fire alarm networks with adequate number of fire alarm call points and emergencytelephone handsets throughout the site.

A two-way Public Address (PA) system installed independently in all production units and alsoin important service areas.

Adequate supply protective clothing & breathing apparatus will be made available to allpersonnel of emergency team.

On-site first aid and treatment centre with round the clock medical attendance.

Page 23: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

19

6. PROPOSED INFRASTRUCTURE

6.1 INDUSTRIAL AREA

Table 6.1 plant infrastructureS.NO PROJECT DETAILS PROPOSED

1. LAND AREA 42 ACRES

2. PROJECT COST 520 LACS

3. PROPOSEDPRODUCTS STORAGECAPACITY

PRODUCTSCLASS OFPETROLEUMPRODUCT

CAPACITYIN M3

TYPE OFTANK REMARKS

LPG (EXISITING) 2WE 3125 MOUNDEDBULLET

4. POWERREQUIREMENT

160KVA & 500KVA.

6.2 RESIDENTIAL AREA

No Residential area development as the proposed project is just storage and filling of LPG in bottel.

6.3 GREENBELTThe proposed project site is providing 27.26% area for greenbelt development proposing avenue plantationsalong its boundary and other unused areas. The layout plan showing Used area and greenbelt area isenclosed as Annexure-1.

6.4 SOCIAL INFRASTRUCTUREThe project wills provide employment to local youth and good supply of products to Public, thus increasingtheir standard of living and thus helping strengthen the social infrastructures of the region.

6.5 CONNECTIVITYIOCL is located on the National Highway 45 which connect to Chennai and various part of Tamilnadu state.

6.6 DRINKING WATER MANGEMENTWater for the proposed Project will be supplied by Chengelpet municipality.

Page 24: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

20

6.7 SEWERAGE SYSTEMSewage generated of approx. 8KLD will be collected in the septic tank with soakpit and collected by concernperson by mean of truck .The authorised letter from the sewage collecting transporter is attached in theannexure-11. Total 4 number of septic tank is present in plant.

6.8 INDUSTRIAL & SOLID WASTE MANAGEMENT

6.8.1 HAZARDOUS CHEMICAL STORAGE & HANDLING

The details pertaining to the hazardous chemicals in terms of health, explosion and fire hazards andmeasures for storage, handling & transportation will be considered complying with statutory regulationsunder the various acts & rules. All measures shall be taken to minimize the environmental impact duringthe process.

Table 6-2 Details of Hazardous Chemicals and its storage

Hazardous chemical Storage facilityMode ofTransport

Liquid Petroleum Gas 3125m3 Truck

6.9 POWER REQUIREMENTTotal Power requirement is 400KVA is supplied by TANGEDCO and backup is 500Kva and 160Kva.

Page 25: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

21

7. REHABILITATION AND RESETTLEMENT (R & R) PLAN

There will not be any Rehabilitation and Resettlement issues as the site is already existing with good infrasturctre.

8. PROJECT SCHEDULE & COST ESTIMATES

8.1 TIME SCHEDULE FOR THE PROJECT

The project will commence after being accorded with Environmental Clearance from Tamilnadu SEIAA,MoEF and Consent to operation (CTO) from Tamilnadu State Pollution Control Board(TNPCB).

8.2 ESTIMATED PROJECT COSTTable 8-1 Project Cost Details

SR. NO. PARTICULARS TOTAL COST (RS. INLACS)

1. CIVIL WORK (STEEL STRUCTURE) 6.802. EQUIPMENT & PIPELINE 92.603. FILLING SYSTEM 3564. ELECTRIFICATION 355. MISSLIENOUS INCLUDE CONSULTANCY,

CONSTRUCTION CONSTRUCTION PREDIODEXPANSION PA..,

5

6. CONTIGENCY 24.77 (5%)TOTAL 520.17

Page 26: AT VILLAGE:Madura Kolambakkam Maduranthagam BY HUBERT ...environmentclearance.nic.in/writereaddata/Online/... · AT VILLAGE:Madura Kolambakkam TALUK: Maduranthagam DIST: Kanchipuram

22

Conclusion : As the plant has market potential increase widely throughout the Tamilnadu state, hence Indian

oil corporation planned to expand the capacity of plant. The expansion wiil be carried out in the existing land without the procurement of additional land. There will be positive impact on the project by reducing the scarcity of LPG throughout the state. This expansion will developes the socio-economic environment. The management had planned to develop the green belt area upto 33% of total plot area. The oil spillage may takes place and some mitigative measures are proposed to reduce the oil

spillage. There is no discharge of water from plant which avoid the damage of ground water and surface

water of the sorrundings.