PROPOSED EXPANSION PROJECT FOR THE MANUFACTURING OF
PESTICIDES TECHNICAL - Category: 5(b)
at
NETMATRIX CROP CARE LIMITED
(Formerly known as NetMatrix Limited)
Located at: Plot No. C1-76/523,77/524,78/525, 65/551,66/550, 100 shed area,
GIDC Notified Industrial Area, Vapi, Dist- Valsad (Gujarat).
-
NetMatrix Crop Care Ltd. Page 2 of 14
APPENDIX I FORM 1
(I) BASIC INFORMATION
Sr. No.
Item Details
1. Name of the Project : NetMatrix Crop Care Limited
(Formerly known as NetMatrix Limited)
2. Sr. No. in the Schedule : Industrial Project, category -5(b) of EIA
notification
3. Proposed capacity / area /length /tonnage to
be handled/ command area /lease
area/number of wells to be drilled
: Existing Capacity: 93.3 TPM
Proposed expansion capacity: 746.7 TPM
Total after expansion: 840 TPM
Total plot area is 4225 m2 (Existing plot).
No wells to be drilled. Water requirement will
be met from GIDC Water supply.
4. New / Expansion/Modernization : Expansion project
5. Existing Capacity / Area etc. : 93.3 MT/Month
6. Category of Project i.e. ‘A’ or ‘B’ : Category of project “A”
7. Dose it attract the general condition? If yes,
please specify.
: No
8. Dose it attract the specific condition? If yes,
please specify.
: No.
9. Location : NetMatrix Crop Care Limited
Plot /Survey /khasra No. : Plot No. C1-76/523,77/524,78/525,
65/551,66/550
Village : GIDC, Vapi -396195
Taluka : Vapi
District : Valsad
State : Gujarat
10. Nearest railway station/airport along with
distance in kms.
: Railway Station Vapi – 4 km
11. Nearest Town, City, District Headquarters
along with distance in kms.
: Vapi- 4 kms
12. Village Panchayats, Zilla Parishad, Municipal
corporation, Local body (complete postal
addresses with telephone nos. to be given)
: Gujarat Iindustrial Development Corporation Ltd.
Notified Industrial Estate
Char Rasta, Vapi-396195
13. Name of the applicant : NetMatrix Crop Care Limited
14. Registered Address : NetMatrix Crop Care Limited
Flat No. 101, Madhavi Enclave, Motinagar ‘X’
Roads, Hyderabad- 500018
-
NetMatrix Crop Care Ltd. Page 3 of 14
15. Address for correspondence NetMatrix Crop Care Limited
Plot.No.C1-76/523,77/524,78/525,
65/551,66/550, 100 shed area, GIDC Vapi, Di:
Valsad, Gujarat 396195
Name : Mr. Subhash Chandra Das
Designation (Owner/Partner / CEO) : Assist. General Manager
Address : Plot.No.C1-76/523,77/524,78/525,
65/551,66/550, 100 shed area, GIDC Vapi, Di:
Valsad, Gujarat 396195
Pin Code : 396195
E-mail : [email protected]
Telephone No. : +91-260-2450790, Mobile No. +919974035831
Fax No. : +91-260-2450790
16. Details of Alternative Sites examined , if any
Location of these sits should be shown on a
toposheet
: As the proposed expansion activity will be carried
out in the GIDC notified area, there are no
alternative sites examined.
17. Interlined Projects. : –No-
18. Whether separate application of interlined
project has been submitted
: –No-
19. If yes, data of submission : –No-
20. If no. reason : Proposed expansion project is carried out within
the premises.
21. Whether the proposal involves approval/
clearance under:
(a) The Forest (Conservation) Act , 1980
(b) The Wildlife (protection) Act, 1972
(c) The C.R.Z. Notification 1991
: –No-
22. Whether there is any Government
Order/Policy relevant/relating to the site?
: –No-
23. Forest land involved (hectares) : –No-
24. Whether there is any litigation pending against
the project and / or land in which the project
is propose to be set up
(a) Name of the court
(b) Case No.
(c) Orders / directions of the court, if any and
its relevance with the proposed project.
:
:
:
:
–No-
mailto:[email protected]
-
NetMatrix Crop Care Ltd. Page 4 of 14
(II) ACTIVITY
1. Construction, operation or decommissioning of the Project involving actions, which will cause
physical changes in the locality (topography, land use, changes in water bodies, etc.)
Sr.
No.
Information/Checklist confirmation Yes /
No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
1.1 Permanent or temporary change in land use,
land cover or topography including increase
in intensity of land use (with respect to local
land use plan)
No The company has existing plots for the
proposed expansion project. Project site
location and plant layout is attached as
Annexure – 1 & 2 of PFR.
1.2 Clearance of existing land, vegetation and
buildings?
No --
1.3 Creation of new land uses? No --
1.4 Pre-construction investigations e.g. bore
houses, soil testing?
No --
1.5 Construction works? yes Construction activity will be undertaken
for the proposed project.
1.6 Demolition works? No There will be no demolition,
underground, reclamation or dredging
work for proposed project.
1.7 Temporary sites used for construction works
or housing of construction workers?
No Local workers will be hired during
construction as well as operation phase.
1.8 Above ground buildings, structures or
earthworks including linear structures, cut
and fill or excavations
No Construction of plant building, storage
area, utility area etc. shall be carried out
as per detailed design. Plan for
construction is attached as Annexure: 2
of Project Feasibility Report.
1.9 Underground works including mining or
tunneling?
No Not Applicable
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes List of Products and manufacturing
process attached as Annexure: 3 of
Project Feasibility Report.
1.14 Facilities for storage of goods or materials? Yes The raw materials will be stored in a raw
material storage area and hazardous
chemicals will be stored separately.
1.15 Facilities for treatment or disposal of solid
waste or liquid effluents?
Yes Domestic Effluent will be treated
through septic tank/soak pit .
-
NetMatrix Crop Care Ltd. Page 5 of 14
The effluent from industrial activity
will be treated in ETP, solvent
stripper & spray dryer to achieve zero
liquid discharge.
Hazardous / non Hazardous solid
waste will be disposed as per
hazardous waste rules 2008. Organic
residue & methyl chloride gas will be
treated in proposed incineration
system.
1.16 Facilities for long term housing of operational
workers?
No Workers from the local/nearby areas will
be employed.
1.17 New road, rail or sea traffic during
construction or operation?
No Not Applicable
1.18 New road, rail, air waterborne or other
transport infrastructure including new or
altered routes and stations, ports, airports
etc?
No The proposed project will be located in Vapi GIDC area, which has a well-developed infrastructure, including road network & connected with railway.
1.19 Closure or diversion of existing transport
routes or infrastructure leading to changes in
traffic movements?
No
Not Applicable
1.20 New or diverted transmission lines or
pipelines?
No Not Applicable
1.21 Impoundment, damming, culverting,
realignment or other changes to the
hydrology of watercourses or aquifers?
No Not Applicable
1.22 Stream crossings? No Not Applicable
1.23 Abstraction or transfers of water form ground
or surface waters?
No Water requirement will be met from
GIDC Water supply.
1.24 Changes in water bodies or the land surface
affecting drainage or run-off?
No Not Applicable
1.25 Transport of personnel or materials for
construction, operation or decommissioning?
Yes We shall hire personnel from local /
nearby area only and the construction
material will be obtained preferably from
local traders and will be transported via
roads. The sources of raw materials and
machinery for operation will vary based
on market driven forces, which will be
transported via roads.
1.26 Long-term dismantling or decommissioning
or restoration works?
No Not Applicable
1.27 Ongoing activity during decommissioning
which could have an impact on the
No Not Applicable
-
NetMatrix Crop Care Ltd. Page 6 of 14
environment?
1.28 Influx of people to an area in either
temporarily or permanently?
No This is a well-developed Industrial Area and due to project, 80 people shall be employed for operation.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No Not Applicable
2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
Sr.
No.
Information/Checklist
confirmation
Yes /
No
Details thereof (with approximate quantities
/rates, wherever possible) with source of
information data
2.1 Land especially undeveloped or
agricultural land (ha)
No The proposed expansion project will be accommodated in the existing plot belongs to notified industrial estate.
2.2 Water (expected source &
competing users) unit: KL/D
Yes Water requirement will meet through the GIDC Water Supply line, Vapi. Construction Phase : 5 – 10 KLD Operation Phase : 145.21 KLD (total
after proposed expansion) For water balance refer section 3(viii) and
water permission, refer Annexure – 4 of Project
Feasibility Report.
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone,
aggregates, sand / soil (expected
source – MT)
Yes Company shall purchase Sand, stone, Cement
and Structural Steel from local traders as per
expansion project required.
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and
fuels (source, competing users)
Unit: fuel (MT), energy (MW)
Yes Power : Dakshin Gujarat Vij Co. Ltd./ Captive generation from Steam & gas
Power required : 1000 KVA (total after proposed expansion)
Fuel : (total after proposed expansion) Imported Coal for steam boiler-I, Hot
air generator, Thermic fluid heater : 1478 kgs/hr
Natural gas for steam boiler – II : 400 SCM/Hr
FO/LDO for incinerator: 200 kgs/hr HSD for D G set: 180 lits/hr
2.7 Any other natural resources (use
appropriate standard units)
No Not Applicable
-
NetMatrix Crop Care Ltd. Page 7 of 14
3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.
Sr.
No.
Information/Checklist confirmation Yes /
No
Details thereof (with approximate
quantities / rates, wherever possible) with
source of information data
3.1 Use of substances or materials, which are
hazardous (as per MSIHC rules) to human
health or the environment (flora, fauna, and
water supplies)
Yes Due care shall take during handling of
materials which may be harmful and
covered under MSIHC rules. Please
Refer Project Pre-Feasibility Report
3.2 Changes in occurrence of disease or affect
disease vectors (e.g. insect or water borne
diseases)
No Not applicable as site is located in Vapi
Industrial Area.
3.3 Affect the welfare of people e.g. by changing
living conditions?
No The project site is located in a notified
industrial zone which is surrounded by
cluster of industries, thus there will be no
change in the living conditions of the
people in the nearby vicinity.
3.4 Vulnerable groups of people who could be
affected by the project e.g. hospital patients,
children, the elderly etc.,
No Not applicable as site is located in Vapi
Industrial Area.
3.5 Any other causes No --
4. Production of solid wastes during construction or operation or decommissioning (MT/month)
Sr.
No.
Information/Checklist confirmation Yes /
No
Details thereof (with approximate
quantities / rates, wherever possible) with
source of information data
4.1 Spoil, overburden or mine wastes No --
4.2 Municipal waste (domestic and or
commercial wastes)
Yes The domestic waste will be disposed as per prevalent practice in GIDC.
The commercial waste generated from administration building will be sold to scrap vendors.
4.3 Hazardous wastes (as per Hazardous Waste
Management Rules)
Yes Please refer section 6(vii) for haz, waste
detail and TSDF membership refer
Annexure: 6 of Project Feasibility Report.
4.4 Other industrial process wastes Yes Please refer section 6(vii) of Project
Feasibility Report for haz. waste detail.
4.5 Surplus product Yes Hydro Chloric Acid (30%) - 288.59 TPM
(total after proposed expansion)
-
NetMatrix Crop Care Ltd. Page 8 of 14
4.6 Sewage sludge or other sludge from effluent
treatment
Yes Please refer section 6(vii) of Project
Feasibility Report for haz. waste detail.
4.7 Construction or demolition wastes Yes Construction waste shall be utilized for
leveling in the premises.
4.8 Redundant machinery or equipment No Not applicable
4.9 Contaminated soils or other materials No Not applicable
4.10 Agricultural wastes No Not applicable
4.11 Other solid wastes No Please refer section 6(vii) of Project
Feasibility Report for haz. waste detail.
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
Sr.
No.
Information/Checklist confirmation Yes /
No
Details thereof (with approximate
quantities / rates, wherever possible) with
source of information data
5.1 Emissions from combustion of fossil fuels
from stationary or mobile sources
Yes Please Refer Project Pre-Feasibility Report
Annexure- 10
5.2 Emissions from production processes Yes Please Refer Project Pre-Feasibility Report
Annexure- 10.
5.3 Emissions from materials handling including
storage or transport
No All liquid raw materials shall be procured in bulk tankers and shall be transferred through a closed circuit pipe lines by pumps. Thus no generation of emissions from material handling including storage or transport.
5.4 Emissions from construction activities
including plant and equipment
No Utmost care will be taken during
construction activity and water sprinklers
shall be utilized whenever necessary.
5.5 Dust or odors from handling of materials
including construction materials, sewage and
waste
Yes All the waste shall be stored in designated places and shall be transported to TSDF in their own approved closed vehicles.
5.6 Emissions from incineration of waste Yes Incineration system shall be provided as per CPCB guidelines
5.7 Emissions from burning of waste in open air
(e.g. slash materials, construction debris)
No No open burning of waste is carried out.
5.8 Emissions from any other sources No --
-
NetMatrix Crop Care Ltd. Page 9 of 14
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
Sr.
No.
Information/Checklist
confirmation
Yes /
No
Details thereof (with approximate quantities / rates,
wherever possible) with source of information data
6.1 From operation of
equipment e.g. engines,
ventilation plant, crushers
Yes There are few activities due to which noise would be generated. The equipments resulting in noise generation are machinery of plant and Diesel generator. Adequate noise control measures will be provided whenever required. Proper and timely oiling, lubrication and preventive maintenance will be carried out for the machineries & equipments to reduce noise generation. Use of PPE like ear plugs and ear muffs will be made compulsory near the high noise generating machines. Noise monitoring shall be done regularly in plant area. The D.G. Set will be installed in a closed room and provided with acoustic enclosure.
6.2 From industrial or similar
processes
Yes All machinery / equipment shall be well maintained, shall be proper foundation with anti-vibrating pads wherever applicable and noise levels within permissible limits. Acoustic enclosures shall be provided for DG set.
6.3 From construction or
demolition
No Not applicable
6.4 From blasting or piling No Not applicable
6.5 From construction or
operational traffic No
Not applicable
6.6 From lighting or cooling
systems No
Not applicable
6.7 From any other sources No Acoustic enclosures shall be provided for DG set.
-
NetMatrix Crop Care Ltd. Page 10 of 14
7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
Sr.
No.
Information/Checklist confirmation Yes /
No
Details thereof (with approximate quantities /
rates, wherever possible) with source of
information data
7.1 From handling, storage, use or
spillage of hazardous materials
Yes Hazardous materials will be stored in an isolated
area and all proper steps will be followed to
prevent accidents.
7.2 From discharge of sewage or other
effluents to water or the land
(expected mode and place of
discharge)
Yes Domestic Effluent will be treated through
septic tank/soak pit .
The effluent from industrial activity will be
treated in ETP, solvent stripper & spray dryer
to achieve zero liquid discharge.
There will be no discharge of effluent on land.
7.3 By deposition of pollutants emitted to
air into the land or into water
Yes However, the emissions from utility section will
be controlled with help of adequate chimney
height. Moreover, the process emissions will be
controlled with help of scrubber.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of
pollutants in the environment from
these sources?
No Full- fledged Environmental Management System
(EMS) has been installed at existing plant.
Proposed EMS in line with existing shall be
installed to eliminates the possibility of building
up of pollution.
-
NetMatrix Crop Care Ltd. Page 11 of 14
8. Risk of accidents during construction or operation of the Project, which could affect human
health or the environment
Sr.
No.
Information/Checklist confirmation Yes /
No
Details thereof (with approximate quantities /
rates, wherever possible) with source of
information data
8.1 From explosions, spillages, fires etc from
storage, handling, use or production of
hazardous substances
Yes Hazardous materials will be stored in an
isolated area and all proper steps will be
followed to prevent accidents.
The risk assessment will be carried out and
all mitigative measures shall be taken to
avoid accidents.
8.2 From any other causes No --
8.3 Could the project be affected by natural
disasters causing environmental damage
(e.g. floods, earthquakes, landslides,
cloudburst etc)?
No --
9. Factors which should be considered (such as consequential development) which could lead to
environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
Sr.
No.
Information/Checklist confirmation Yes /
No
Details thereof (with approximate
quantities / rates, wherever possible) with
source of information data
9.1 Lead to development of supporting, cities,
ancillary development or development
stimulated by the project which could have
impact on the environment e.g.:
• Supporting infrastructure (roads, power
supply, waste or wastewater treatment, etc.)
• Housing development
• Extractive industries
• Supply industries
• Other
No Site is located in Vapi Industrial Area, has all infrastructure facility like road, water, power, CETP & underground effluent drainage line etc.
Local people will be employed and no housing is required.
9.2 Lead to after-use of the site, which could
have an impact on the environment
No Not applicable
9.3 Set a precedent for later developments No Not applicable
9.4 Have cumulative effects due to proximity to
other existing or planned projects with
similar effects.
Yes The unit belongs to an area where other
pesticides, pharmaceutical and chemical
industries are in operation in close proximity.
Pollution load of this industrial cluster may
lead to cumulative negative impacts on the
surrounding. However, the unit belongs to a
notified GIDC area.
-
NetMatrix Crop Care Ltd. Page 12 of 14
(III) ENVIRONMENTAL SENSITIVITY
Sr. No.
Areas Name/ Identity
Aerial distance (within 15 km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value
None
Site is located in Vapi Industrial Area.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests
None
Site is located in Vapi Industrial Area.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration
None
Site is located in Vapi Industrial Area.
4 Inland, coastal, marine or underground waters
None
Site is located in Vapi Industrial Area
5 State, National boundaries State boundary between Daman &
D&NH-Vapi.
4 to 5 km
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas
Daman and Silvassa tourist
places
20 to 25 km
7 Defense installations None --
8 Densely populated or built-up area Vapi 5 km
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities)
hospitals, schools, places of worship, community facilities
Within 5 km radius
10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)
Surface water resources
River Daman Ganga
5 km
11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded)
None The unit belongs to Vapi GIDC notified industrial area.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)
None Site is located in Vapi Industrial Area
-
NetMatrix Crop Care Ltd. Page 13 of 14
(IV) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES
As the proposed project will be established considering all the aspects of Environment Protection and
there is no major impact on environment due to proposed project in presence of proper EMP. However,
as per the requirements, the Draft TOR for proposed EIA study is given below:
Parameters Sampling Location & Frequency
Project description Project location map with project layout will be submitted
Product and their quantity will be delineated.
Process description, Flow chart, Reaction, material balance, etc will be provided.
Resource requirements (Raw materials, water, Power and fuel etc.)
Anticipated pollution potential (waste water, air emissions, waste generation etc.)
Proposed mitigation measures including details of effluent treatment and disposal, air pollution control, waste storage and disposal.
Air Environment
A) Micro Meteorological Wind speed, wind direction, ambient temperature and relative humidity.
1 near project site for hourly Continuous for three months.
B) Ambient Air Quality PM
10, PM
2.5, NOx, SO
2
6 locations including project site (4 stations in each direction & 1 station in downwind direction) in study area of 10 km radial distance from the project site 24 hourly twice a week for one month.
Water Environment
6 locations including project site in study area of 5 km radial distance from the project site.
Soil & Land Environment
6 locations including project site in study area of 5 km radial distance from the project site.
Parameters Sampling Location & Frequency
Noise Environment 6 locations including project site within the study area Once during the study period during daytime and nighttime. Monitoring of various locations within the existing premises once during study period.
Ecological Environment There is no any ecological sensitive area within 15 km
Socio-Economic Environment Socio-economic base line data will be collected from District Census Handbook (2001) of Surat district.
Risk assessment and disaster management plan
Will be prepared for the involved raw materials and processes.
Identification and anticipation of impacts Identification of impacting activities.
Anticipation of the significance of the impacts from the proposed project during construction and operational phase.