  • FOR

    PROPOSED EXPANSION PROJECT FOR THE MANUFACTURING OF

    PESTICIDES TECHNICAL - Category: 5(b)

    at

    NETMATRIX CROP CARE LIMITED

    (Formerly known as NetMatrix Limited)

    Located at: Plot No. C1-76/523,77/524,78/525, 65/551,66/550, 100 shed area,

    GIDC Notified Industrial Area, Vapi, Dist- Valsad (Gujarat).

  • NetMatrix Crop Care Ltd. Page 2 of 14

    APPENDIX I FORM 1

    (I) BASIC INFORMATION

    Sr. No.

    Item Details

    1. Name of the Project : NetMatrix Crop Care Limited

    (Formerly known as NetMatrix Limited)

    2. Sr. No. in the Schedule : Industrial Project, category -5(b) of EIA

    notification

    3. Proposed capacity / area /length /tonnage to

    be handled/ command area /lease

    area/number of wells to be drilled

    : Existing Capacity: 93.3 TPM

    Proposed expansion capacity: 746.7 TPM

    Total after expansion: 840 TPM

    Total plot area is 4225 m2 (Existing plot).

    No wells to be drilled. Water requirement will

    be met from GIDC Water supply.

    4. New / Expansion/Modernization : Expansion project

    5. Existing Capacity / Area etc. : 93.3 MT/Month

    6. Category of Project i.e. ‘A’ or ‘B’ : Category of project “A”

    7. Dose it attract the general condition? If yes,

    please specify.

    : No

    8. Dose it attract the specific condition? If yes,

    please specify.

    : No.

    9. Location : NetMatrix Crop Care Limited

    Plot /Survey /khasra No. : Plot No. C1-76/523,77/524,78/525,

    65/551,66/550

    Village : GIDC, Vapi -396195

    Taluka : Vapi

    District : Valsad

    State : Gujarat

    10. Nearest railway station/airport along with

    distance in kms.

    : Railway Station Vapi – 4 km

    11. Nearest Town, City, District Headquarters

    along with distance in kms.

    : Vapi- 4 kms

    12. Village Panchayats, Zilla Parishad, Municipal

    corporation, Local body (complete postal

    addresses with telephone nos. to be given)

    : Gujarat Iindustrial Development Corporation Ltd.

    Notified Industrial Estate

    Char Rasta, Vapi-396195

    13. Name of the applicant : NetMatrix Crop Care Limited

    14. Registered Address : NetMatrix Crop Care Limited

    Flat No. 101, Madhavi Enclave, Motinagar ‘X’

    Roads, Hyderabad- 500018

  • NetMatrix Crop Care Ltd. Page 3 of 14

    15. Address for correspondence NetMatrix Crop Care Limited

    Plot.No.C1-76/523,77/524,78/525,

    65/551,66/550, 100 shed area, GIDC Vapi, Di:

    Valsad, Gujarat 396195

    Name : Mr. Subhash Chandra Das

    Designation (Owner/Partner / CEO) : Assist. General Manager

    Address : Plot.No.C1-76/523,77/524,78/525,

    65/551,66/550, 100 shed area, GIDC Vapi, Di:

    Valsad, Gujarat 396195

    Pin Code : 396195

    E-mail : [email protected]

    Telephone No. : +91-260-2450790, Mobile No. +919974035831

    Fax No. : +91-260-2450790

    16. Details of Alternative Sites examined , if any

    Location of these sits should be shown on a

    toposheet

    : As the proposed expansion activity will be carried

    out in the GIDC notified area, there are no

    alternative sites examined.

    17. Interlined Projects. : –No-

    18. Whether separate application of interlined

    project has been submitted

    : –No-

    19. If yes, data of submission : –No-

    20. If no. reason : Proposed expansion project is carried out within

    the premises.

    21. Whether the proposal involves approval/

    clearance under:

    (a) The Forest (Conservation) Act , 1980

    (b) The Wildlife (protection) Act, 1972

    (c) The C.R.Z. Notification 1991

    : –No-

    22. Whether there is any Government

    Order/Policy relevant/relating to the site?

    : –No-

    23. Forest land involved (hectares) : –No-

    24. Whether there is any litigation pending against

    the project and / or land in which the project

    is propose to be set up

    (a) Name of the court

    (b) Case No.

    (c) Orders / directions of the court, if any and

    its relevance with the proposed project.

    :

    :

    :

    :

    –No-

    mailto:[email protected]

  • NetMatrix Crop Care Ltd. Page 4 of 14

    (II) ACTIVITY

    1. Construction, operation or decommissioning of the Project involving actions, which will cause

    physical changes in the locality (topography, land use, changes in water bodies, etc.)

    Sr.

    No.

    Information/Checklist confirmation Yes /

    No

    Details thereof (with approximate

    quantities /rates, wherever possible)

    with source of information data

    1.1 Permanent or temporary change in land use,

    land cover or topography including increase

    in intensity of land use (with respect to local

    land use plan)

    No The company has existing plots for the

    proposed expansion project. Project site

    location and plant layout is attached as

    Annexure – 1 & 2 of PFR.

    1.2 Clearance of existing land, vegetation and

    buildings?

    No --

    1.3 Creation of new land uses? No --

    1.4 Pre-construction investigations e.g. bore

    houses, soil testing?

    No --

    1.5 Construction works? yes Construction activity will be undertaken

    for the proposed project.

    1.6 Demolition works? No There will be no demolition,

    underground, reclamation or dredging

    work for proposed project.

    1.7 Temporary sites used for construction works

    or housing of construction workers?

    No Local workers will be hired during

    construction as well as operation phase.

    1.8 Above ground buildings, structures or

    earthworks including linear structures, cut

    and fill or excavations

    No Construction of plant building, storage

    area, utility area etc. shall be carried out

    as per detailed design. Plan for

    construction is attached as Annexure: 2

    of Project Feasibility Report.

    1.9 Underground works including mining or

    tunneling?

    No Not Applicable

    1.10 Reclamation works? No Not Applicable

    1.11 Dredging? No Not Applicable

    1.12 Offshore structures? No Not Applicable

    1.13 Production and manufacturing processes? Yes List of Products and manufacturing

    process attached as Annexure: 3 of

    Project Feasibility Report.

    1.14 Facilities for storage of goods or materials? Yes The raw materials will be stored in a raw

    material storage area and hazardous

    chemicals will be stored separately.

    1.15 Facilities for treatment or disposal of solid

    waste or liquid effluents?

    Yes Domestic Effluent will be treated

    through septic tank/soak pit .

  • NetMatrix Crop Care Ltd. Page 5 of 14

    The effluent from industrial activity

    will be treated in ETP, solvent

    stripper & spray dryer to achieve zero

    liquid discharge.

    Hazardous / non Hazardous solid

    waste will be disposed as per

    hazardous waste rules 2008. Organic

    residue & methyl chloride gas will be

    treated in proposed incineration

    system.

    1.16 Facilities for long term housing of operational

    workers?

    No Workers from the local/nearby areas will

    be employed.

    1.17 New road, rail or sea traffic during

    construction or operation?

    No Not Applicable

    1.18 New road, rail, air waterborne or other

    transport infrastructure including new or

    altered routes and stations, ports, airports

    etc?

    No The proposed project will be located in Vapi GIDC area, which has a well-developed infrastructure, including road network & connected with railway.

    1.19 Closure or diversion of existing transport

    routes or infrastructure leading to changes in

    traffic movements?

    No

    Not Applicable

    1.20 New or diverted transmission lines or

    pipelines?

    No Not Applicable

    1.21 Impoundment, damming, culverting,

    realignment or other changes to the

    hydrology of watercourses or aquifers?

    No Not Applicable

    1.22 Stream crossings? No Not Applicable

    1.23 Abstraction or transfers of water form ground

    or surface waters?

    No Water requirement will be met from

    GIDC Water supply.

    1.24 Changes in water bodies or the land surface

    affecting drainage or run-off?

    No Not Applicable

    1.25 Transport of personnel or materials for

    construction, operation or decommissioning?

    Yes We shall hire personnel from local /

    nearby area only and the construction

    material will be obtained preferably from

    local traders and will be transported via

    roads. The sources of raw materials and

    machinery for operation will vary based

    on market driven forces, which will be

    transported via roads.

    1.26 Long-term dismantling or decommissioning

    or restoration works?

    No Not Applicable

    1.27 Ongoing activity during decommissioning

    which could have an impact on the

    No Not Applicable

  • NetMatrix Crop Care Ltd. Page 6 of 14

    environment?

    1.28 Influx of people to an area in either

    temporarily or permanently?

    No This is a well-developed Industrial Area and due to project, 80 people shall be employed for operation.

    1.29 Introduction of alien species? No Not Applicable

    1.30 Loss of native species or genetic diversity? No Not Applicable

    1.31 Any other actions? No Not Applicable

    2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

    Sr.

    No.

    Information/Checklist

    confirmation

    Yes /

    No

    Details thereof (with approximate quantities

    /rates, wherever possible) with source of

    information data

    2.1 Land especially undeveloped or

    agricultural land (ha)

    No The proposed expansion project will be accommodated in the existing plot belongs to notified industrial estate.

    2.2 Water (expected source &

    competing users) unit: KL/D

    Yes Water requirement will meet through the GIDC Water Supply line, Vapi. Construction Phase : 5 – 10 KLD Operation Phase : 145.21 KLD (total

    after proposed expansion) For water balance refer section 3(viii) and

    water permission, refer Annexure – 4 of Project

    Feasibility Report.

    2.3 Minerals (MT) No Not Applicable

    2.4 Construction material – stone,

    aggregates, sand / soil (expected

    source – MT)

    Yes Company shall purchase Sand, stone, Cement

    and Structural Steel from local traders as per

    expansion project required.

    2.5 Forests and timber (source – MT) No Not Applicable

    2.6 Energy including electricity and

    fuels (source, competing users)

    Unit: fuel (MT), energy (MW)

    Yes Power : Dakshin Gujarat Vij Co. Ltd./ Captive generation from Steam & gas

    Power required : 1000 KVA (total after proposed expansion)

    Fuel : (total after proposed expansion) Imported Coal for steam boiler-I, Hot

    air generator, Thermic fluid heater : 1478 kgs/hr

    Natural gas for steam boiler – II : 400 SCM/Hr

    FO/LDO for incinerator: 200 kgs/hr HSD for D G set: 180 lits/hr

    2.7 Any other natural resources (use

    appropriate standard units)

    No Not Applicable

  • NetMatrix Crop Care Ltd. Page 7 of 14

    3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

    Sr.

    No.

    Information/Checklist confirmation Yes /

    No

    Details thereof (with approximate

    quantities / rates, wherever possible) with

    source of information data

    3.1 Use of substances or materials, which are

    hazardous (as per MSIHC rules) to human

    health or the environment (flora, fauna, and

    water supplies)

    Yes Due care shall take during handling of

    materials which may be harmful and

    covered under MSIHC rules. Please

    Refer Project Pre-Feasibility Report

    3.2 Changes in occurrence of disease or affect

    disease vectors (e.g. insect or water borne

    diseases)

    No Not applicable as site is located in Vapi

    Industrial Area.

    3.3 Affect the welfare of people e.g. by changing

    living conditions?

    No The project site is located in a notified

    industrial zone which is surrounded by

    cluster of industries, thus there will be no

    change in the living conditions of the

    people in the nearby vicinity.

    3.4 Vulnerable groups of people who could be

    affected by the project e.g. hospital patients,

    children, the elderly etc.,

    No Not applicable as site is located in Vapi

    Industrial Area.

    3.5 Any other causes No --

    4. Production of solid wastes during construction or operation or decommissioning (MT/month)

    Sr.

    No.

    Information/Checklist confirmation Yes /

    No

    Details thereof (with approximate

    quantities / rates, wherever possible) with

    source of information data

    4.1 Spoil, overburden or mine wastes No --

    4.2 Municipal waste (domestic and or

    commercial wastes)

    Yes The domestic waste will be disposed as per prevalent practice in GIDC.

    The commercial waste generated from administration building will be sold to scrap vendors.

    4.3 Hazardous wastes (as per Hazardous Waste

    Management Rules)

    Yes Please refer section 6(vii) for haz, waste

    detail and TSDF membership refer

    Annexure: 6 of Project Feasibility Report.

    4.4 Other industrial process wastes Yes Please refer section 6(vii) of Project

    Feasibility Report for haz. waste detail.

    4.5 Surplus product Yes Hydro Chloric Acid (30%) - 288.59 TPM

    (total after proposed expansion)

  • NetMatrix Crop Care Ltd. Page 8 of 14

    4.6 Sewage sludge or other sludge from effluent

    treatment

    Yes Please refer section 6(vii) of Project

    Feasibility Report for haz. waste detail.

    4.7 Construction or demolition wastes Yes Construction waste shall be utilized for

    leveling in the premises.

    4.8 Redundant machinery or equipment No Not applicable

    4.9 Contaminated soils or other materials No Not applicable

    4.10 Agricultural wastes No Not applicable

    4.11 Other solid wastes No Please refer section 6(vii) of Project

    Feasibility Report for haz. waste detail.

    5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

    Sr.

    No.

    Information/Checklist confirmation Yes /

    No

    Details thereof (with approximate

    quantities / rates, wherever possible) with

    source of information data

    5.1 Emissions from combustion of fossil fuels

    from stationary or mobile sources

    Yes Please Refer Project Pre-Feasibility Report

    Annexure- 10

    5.2 Emissions from production processes Yes Please Refer Project Pre-Feasibility Report

    Annexure- 10.

    5.3 Emissions from materials handling including

    storage or transport

    No All liquid raw materials shall be procured in bulk tankers and shall be transferred through a closed circuit pipe lines by pumps. Thus no generation of emissions from material handling including storage or transport.

    5.4 Emissions from construction activities

    including plant and equipment

    No Utmost care will be taken during

    construction activity and water sprinklers

    shall be utilized whenever necessary.

    5.5 Dust or odors from handling of materials

    including construction materials, sewage and

    waste

    Yes All the waste shall be stored in designated places and shall be transported to TSDF in their own approved closed vehicles.

    5.6 Emissions from incineration of waste Yes Incineration system shall be provided as per CPCB guidelines

    5.7 Emissions from burning of waste in open air

    (e.g. slash materials, construction debris)

    No No open burning of waste is carried out.

    5.8 Emissions from any other sources No --

  • NetMatrix Crop Care Ltd. Page 9 of 14

    6. Generation of Noise and Vibration, and Emissions of Light and Heat:

    Sr.

    No.

    Information/Checklist

    confirmation

    Yes /

    No

    Details thereof (with approximate quantities / rates,

    wherever possible) with source of information data

    6.1 From operation of

    equipment e.g. engines,

    ventilation plant, crushers

    Yes There are few activities due to which noise would be generated. The equipments resulting in noise generation are machinery of plant and Diesel generator. Adequate noise control measures will be provided whenever required. Proper and timely oiling, lubrication and preventive maintenance will be carried out for the machineries & equipments to reduce noise generation. Use of PPE like ear plugs and ear muffs will be made compulsory near the high noise generating machines. Noise monitoring shall be done regularly in plant area. The D.G. Set will be installed in a closed room and provided with acoustic enclosure.

    6.2 From industrial or similar

    processes

    Yes All machinery / equipment shall be well maintained, shall be proper foundation with anti-vibrating pads wherever applicable and noise levels within permissible limits. Acoustic enclosures shall be provided for DG set.

    6.3 From construction or

    demolition

    No Not applicable

    6.4 From blasting or piling No Not applicable

    6.5 From construction or

    operational traffic No

    Not applicable

    6.6 From lighting or cooling

    systems No

    Not applicable

    6.7 From any other sources No Acoustic enclosures shall be provided for DG set.

  • NetMatrix Crop Care Ltd. Page 10 of 14

    7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

    Sr.

    No.

    Information/Checklist confirmation Yes /

    No

    Details thereof (with approximate quantities /

    rates, wherever possible) with source of

    information data

    7.1 From handling, storage, use or

    spillage of hazardous materials

    Yes Hazardous materials will be stored in an isolated

    area and all proper steps will be followed to

    prevent accidents.

    7.2 From discharge of sewage or other

    effluents to water or the land

    (expected mode and place of

    discharge)

    Yes Domestic Effluent will be treated through

    septic tank/soak pit .

    The effluent from industrial activity will be

    treated in ETP, solvent stripper & spray dryer

    to achieve zero liquid discharge.

    There will be no discharge of effluent on land.

    7.3 By deposition of pollutants emitted to

    air into the land or into water

    Yes However, the emissions from utility section will

    be controlled with help of adequate chimney

    height. Moreover, the process emissions will be

    controlled with help of scrubber.

    7.4 From any other sources No Not applicable

    7.5 Is there a risk of long term build up of

    pollutants in the environment from

    these sources?

    No Full- fledged Environmental Management System

    (EMS) has been installed at existing plant.

    Proposed EMS in line with existing shall be

    installed to eliminates the possibility of building

    up of pollution.

  • NetMatrix Crop Care Ltd. Page 11 of 14

    8. Risk of accidents during construction or operation of the Project, which could affect human

    health or the environment

    Sr.

    No.

    Information/Checklist confirmation Yes /

    No

    Details thereof (with approximate quantities /

    rates, wherever possible) with source of

    information data

    8.1 From explosions, spillages, fires etc from

    storage, handling, use or production of

    hazardous substances

    Yes Hazardous materials will be stored in an

    isolated area and all proper steps will be

    followed to prevent accidents.

    The risk assessment will be carried out and

    all mitigative measures shall be taken to

    avoid accidents.

    8.2 From any other causes No --

    8.3 Could the project be affected by natural

    disasters causing environmental damage

    (e.g. floods, earthquakes, landslides,

    cloudburst etc)?

    No --

    9. Factors which should be considered (such as consequential development) which could lead to

    environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

    Sr.

    No.

    Information/Checklist confirmation Yes /

    No

    Details thereof (with approximate

    quantities / rates, wherever possible) with

    source of information data

    9.1 Lead to development of supporting, cities,

    ancillary development or development

    stimulated by the project which could have

    impact on the environment e.g.:

    • Supporting infrastructure (roads, power

    supply, waste or wastewater treatment, etc.)

    • Housing development

    • Extractive industries

    • Supply industries

    • Other

    No Site is located in Vapi Industrial Area, has all infrastructure facility like road, water, power, CETP & underground effluent drainage line etc.

    Local people will be employed and no housing is required.

    9.2 Lead to after-use of the site, which could

    have an impact on the environment

    No Not applicable

    9.3 Set a precedent for later developments No Not applicable

    9.4 Have cumulative effects due to proximity to

    other existing or planned projects with

    similar effects.

    Yes The unit belongs to an area where other

    pesticides, pharmaceutical and chemical

    industries are in operation in close proximity.

    Pollution load of this industrial cluster may

    lead to cumulative negative impacts on the

    surrounding. However, the unit belongs to a

    notified GIDC area.

  • NetMatrix Crop Care Ltd. Page 12 of 14

    (III) ENVIRONMENTAL SENSITIVITY

    Sr. No.

    Areas Name/ Identity

    Aerial distance (within 15 km.) Proposed project location boundary

    1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value

    None

    Site is located in Vapi Industrial Area.

    2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

    None

    Site is located in Vapi Industrial Area.

    3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

    None

    Site is located in Vapi Industrial Area.

    4 Inland, coastal, marine or underground waters

    None

    Site is located in Vapi Industrial Area

    5 State, National boundaries State boundary between Daman &

    D&NH-Vapi.

    4 to 5 km

    6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas

    Daman and Silvassa tourist

    places

    20 to 25 km

    7 Defense installations None --

    8 Densely populated or built-up area Vapi 5 km

    9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities)

    hospitals, schools, places of worship, community facilities

    Within 5 km radius

    10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

    Surface water resources

    River Daman Ganga

    5 km

    11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded)

    None The unit belongs to Vapi GIDC notified industrial area.

    12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

    None Site is located in Vapi Industrial Area

  • NetMatrix Crop Care Ltd. Page 13 of 14

    (IV) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

    As the proposed project will be established considering all the aspects of Environment Protection and

    there is no major impact on environment due to proposed project in presence of proper EMP. However,

    as per the requirements, the Draft TOR for proposed EIA study is given below:

    Parameters Sampling Location & Frequency

    Project description Project location map with project layout will be submitted

    Product and their quantity will be delineated.

    Process description, Flow chart, Reaction, material balance, etc will be provided.

    Resource requirements (Raw materials, water, Power and fuel etc.)

    Anticipated pollution potential (waste water, air emissions, waste generation etc.)

    Proposed mitigation measures including details of effluent treatment and disposal, air pollution control, waste storage and disposal.

    Air Environment

    A) Micro Meteorological Wind speed, wind direction, ambient temperature and relative humidity.

    1 near project site for hourly Continuous for three months.

    B) Ambient Air Quality PM

    10, PM

    2.5, NOx, SO

    2

    6 locations including project site (4 stations in each direction & 1 station in downwind direction) in study area of 10 km radial distance from the project site 24 hourly twice a week for one month.

    Water Environment

    6 locations including project site in study area of 5 km radial distance from the project site.

    Soil & Land Environment

    6 locations including project site in study area of 5 km radial distance from the project site.

    Parameters Sampling Location & Frequency

    Noise Environment 6 locations including project site within the study area Once during the study period during daytime and nighttime. Monitoring of various locations within the existing premises once during study period.

    Ecological Environment There is no any ecological sensitive area within 15 km

    Socio-Economic Environment Socio-economic base line data will be collected from District Census Handbook (2001) of Surat district.

    Risk assessment and disaster management plan

    Will be prepared for the involved raw materials and processes.

    Identification and anticipation of impacts Identification of impacting activities.

    Anticipation of the significance of the impacts from the proposed project during construction and operational phase.