Guido Staltari, Executive ChairmanRaleigh Finlayson, Chief Operating Officer
SARACEN MINERAL HOLDINGS LTD
Exploring for growth.
Saracen Mineral Holdings LimitedAustralian Gold ProducerASX:SAR
Guido StaltariExecutive Chairman
Denver Gold ForumDenver, CO12 September 2012
For
per
sona
l use
onl
y
![Page 2: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/2.jpg)
2
Qualification
This is a presentation about geology, geoscientific interpretation, geoscientific speculation, gold deposits, gold potential, engineering, infrastructure, potential values, costs, risks, and related matters pertinent to Saracen’s present and future activities as a publicly listed mineral exploration and production company. It includes forecasts, predictions, targets and estimates of future expenditures which may vary over time.
Exploration targets presented and discussed here are conceptual in nature and there has been insufficient exploration to define a Mineral Resource (“Resource”) or Ore Reserve (“Reserve”). It is uncertain if further exploration will result in the determination of a Resource or Reserve. Where exploration, evaluation, operational and feasibility study expenditure estimates and budgets amounts are presented herein, ongoing prioritisation and scaling of expenditures will be subject to results and, where applicable, scheduling changes. Targeted production and other outcomes are subject to change, and may not eventuate, depending on the results of ongoing performance and assessment of data. All Reserves and Resources as referred to herein are in accordance with JORC. Refer to Slide 30 for the relevant Competent Person statements. Resources are inclusive of Reserves.
Some of the comments, forecasts, targeted outcomes and predictions made, or that might be interpreted from the comments herein, are subjective and speculative, in part because such is the very nature of gold exploration and exploitation, and in part also because geoscientists and engineers can be very optimistic about the future of the exploration and other work programs they are involved in. Such optimism can lead to erroneous judgments as to future results and valuations, and in many cases external factors may change the outcome.
Take care to question and carefully evaluate any judgments you might make, on the basis of this presentation, as to the value of Saracen and its securities. This presentation is not intended to provide the sole or principal basis of any investment or credit decision or any other risk evaluation and may not be considered as a recommendation by Saracen or its officers. Any investor reading this presentation should determine its interest in acquiring securities in Saracen on the basis of independent investigations that it considers necessary, prudent or desirable.
Saracen and its officers do not accept any liability for any loss or damage suffered or incurred by any investor or any other person or entity however caused (including negligence) relating in any way to this presentation including, without limitation, the information contained in it, any errors or omissions however caused by any other person or entity placing any reliance on this presentation, its accuracy or reliability.
This presentation should not be construed as an offer or mooted offer in relation to Saracen securities.
United States
This document may not be released or distributed in the United States. This document does not constitute an offer to sell, or a solicitation of an offer to buy, securities in the United States. Any securities described in this document have not been, and will not be, registered under the US Securities Act of 1933 (as amended) and may not be offered or sold in the United States except in transactions exempt from, or not subject to, registration under the US Securities Act and applicable US state securities laws.
For
per
sona
l use
onl
y
![Page 3: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/3.jpg)
3
SARACEN…. who we are…
Profitable Australian ASX200 gold producer Experienced Board and Management with excellent
track record in discovery, delivering mining projects, and adding long-term shareholder value.
World class gold region in Australia 120,000-130,000ozpa (in FY13)
Resources: 3.6moz (inclusive of Reserves)…to be updated in Sep ‘12
Reserves: 825,000oz …to be updated in Sep ’12
Low-grade surface stockpiles 3.5Mt @ 0.9g/t - 89,000oz Open pit and u/g ore sources A$17m exploration budget FY13
FY2012 A$670/oz cash margin A$37.7M Operating Profit (before other income/expenses)
A$18.7m FY12 net profit (after tax and non-cash adjustments)
For
per
sona
l use
onl
y
![Page 4: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/4.jpg)
4
SARACEN – where we are…
110km NE of Kalgoorlie, WA
30Moz plus gold districtNeighbours are Barrick (Kanowna, Wallaby, Granny Smith) and Anglogold Ashanti (Sunrise Dam)
Saracen’s resource inventory over a number of gold deposits, with a central 2.4mtpa processing facility at Carosue Dam.
Commanding infrastructure position
For
per
sona
l use
onl
y
![Page 5: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/5.jpg)
5
Executive Summary
ASX Code: SAR
Shares on Issue: 594.8mMarket Cap: ~$210m Cash: ~$31m (as at 30 June 12)Debt: Nil (excluding leasing)Hedging: Nil
Shareholding:Institutional: 60%Management: 3%Other: 37%
Major Shareholders:Sprott: 5.0%Van Eck: 6.1%Old Mutal: 5.1%Kinetic: 3.6%Black Rock: 3.1%Management: 3.0%F
or p
erso
nal u
se o
nly
![Page 6: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/6.jpg)
6
Saracen – Share Price Performance
ASX: SAR
17 Apr 2009$20m debt facility
with RMB
22 June 2009$28m Placement
Development fully funded
18 Dec 2009Mining Commences
at Porphyry
29 Jan 20101st Gold
Pour
9 Apr 2010Commercial Production
23 Jun 2010$35m Placement to fund Red October UG
3 Sept 2010ASX300
21 Dec 2010Red October Dewatering
1 Oct 2011Red October UG Mining
2 Dec 2011ASX200
13 Jun 2012Red October Milling starts
29 Sept 2008Development & Production
Board Approval
For
per
sona
l use
onl
y
![Page 7: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/7.jpg)
7
Results and Expansion
FY11 – Great StartProduction: 111kozCash Costs: A$738/oz (ex royalties)Net Profit: A$47.6mGross Margin: A$590/oz (before hedging adjustments)
FY12 – ConsolidationProduction: 116kozYTD Cash Costs: A898/oz (ex royalties)Net Profit: A$18.7m (impacted by hedge adjustments, inventory write-down, higher D&A)Gross Margin: A$666/oz (before hedging adjustments)
FY13 – Ramp-Up and Pre-expansionForecast Production: 120-130kozBulk Pit Feed: KarariHigh Grade Pit Feed: Deep SouthHigh Grade UG Feed: Red October
FY14 – Expansion & GrowthBulk Pit Feed: Whirling Dervish, WallbrookMultiple UG Sources: Red October, Deep South, Whirling Dervish (subject to positive feasibility results)Expansion Study: Increase production from 2.4mtpa -> 3.2mtpa -> 4.0mtpa (subject to positive feasibility results)
For
per
sona
l use
onl
y
![Page 8: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/8.jpg)
8
Karari OPMargarets OP
Wallbrook OP
Red October UG
Whirling Dervish UG
Twin Peaks UG
Deep South UG
Karari UG Porphyry UG
Stage 4
Active Mines
Development Phase
Feasibility & Pre‐Development
Greenfields Exploration
Million $ OP
Scoping Study & Resource Definition
Lake Carey (Red October – Sunrise Dam gap) Porphyry North Regional
Tin Dog
Elliots OP
Butcher Well OP
Pinnacles UGCrimson Belle OP
Whirling Dervish Luvi trendButcher Well‐Red October South Regional Stage 1
Stage 5
Stage 3
Stage 2
Underground Project
Open Pit Projects
Greenfields Exploration
Summary – Project Pipeline
Whirling Dervish OP
Deep South OP
Porphyry OP
For
per
sona
l use
onl
y
![Page 9: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/9.jpg)
9
Carosue Dam District – Key Projects
KarariResources: 12.9mt @ 1.3g/t = 557koz.Reserves: 4.8mt @ 1.3g/t = 205koz.Planning: Base load open pit feed near mill for FY13.Exploration: Target high grade shoots amenable to bulk Underground Mining from base of open pit.
Whirling DervishResources: 12.1mt @ 1.3g/t = 503koz.Reserves: 3.2mt @ 1.4g/t = 146koz (Open Pit only and excludes expansion).Planning: Bulk open pit source for FY14-16, Underground Feasibility Studies ongoing.Exploration: Extensions to high grade HW & FW Underground targets.
Note: Resources and Reserves Statement last updated 6 Sept 2011. Upgrade expected Sept-12.
For
per
sona
l use
onl
y
![Page 10: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/10.jpg)
10
Carosue Dam District – Whirling Dervish
April 2011
Whirling Dervish
Karari2.4mtpa CIL Plant
For
per
sona
l use
onl
y
![Page 11: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/11.jpg)
11
Carosue Dam District – Karari
K3 K2 K1
For
per
sona
l use
onl
y
![Page 12: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/12.jpg)
12
Carosue Dam District – Karari 7750mN
K1 360m
For
per
sona
l use
onl
y
![Page 13: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/13.jpg)
13
KARARI – WHIRLING DERVISH POTENTIAL
Karari U/G
Drilling targets from U/GWhirling Dervish U/GBottom‐up mining extraction
K1
For
per
sona
l use
onl
y
![Page 14: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/14.jpg)
14
Carosue Dam District - Whirling Dervish
Footwall Lode System
Hangingwall Lode System
330m
For
per
sona
l use
onl
y
![Page 15: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/15.jpg)
15
Carosue Dam District - Whirling Dervish
Pit Exploration Target*10mt @ 1.3g/t410,000oz
Underground Exploration Target*2.8mt @ 3.5g/t300,000oz
Total Exploration Target*12.8mt @ 1.8g/t710,000oz
* The term “Exploration Target” is used in accordance with JORC.* Refer to Exploration Target qualification on Slide 2.
Current Block Model +3g/t
Existing Open Pit
Planned Cutback
Proposed Underground
Karari
350m
For
per
sona
l use
onl
y
![Page 16: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/16.jpg)
16
Porphyry District – Key Projects
WallbrookResources: 8.8mt @ 1.2g/t = 331koz.Reserves: 1.4mt @ 1.4g/t = 66koz.Planning: Bulk open pit source for +FY16 follow Whirling Dervish.Exploration: Extensions to resource below bottom of pit design to increase open pit reserves.
Note: Resources and Reserves Statement last updated 6 Sept 2011. Update expected Sept-12.
For
per
sona
l use
onl
y
![Page 17: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/17.jpg)
17
Porphyry District – Wallbrook
SouthExisting Eleven Bells Pit
Existing Redbrook Pit
Optimisation Shell – to limit of drilling
Deeper drilling recently completed, results include: -87m @ 0.9g/t81m @ 1.7g/tF
or p
erso
nal u
se o
nly
![Page 18: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/18.jpg)
18
Porphyry District – Wallbrook (Eleven Bells)
160m
For
per
sona
l use
onl
y
![Page 19: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/19.jpg)
19
Carosue Dam District - CIL Plant
Current 2.4MtpaStage 1 Expansion to 3.2mtpaStage 2 Expansion to +4.0mtpa
For
per
sona
l use
onl
y
![Page 20: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/20.jpg)
20
Safari Bore District – Key Projects
Deep SouthResources: 1.6mt @ 3.9g/t = 203koz.Reserves: 253kt @ 3.6g/t = 29koz (Open Pit only).Planning: High grade open pit source during FY13, Underground feasibility study ongoing.Exploration: Target HG shoots open at depth and along strike.
Note: Resources and Reserves Statement last updated 6 Sept 2011. Upgrade expected Sept-12.
Deep South trend
For
per
sona
l use
onl
y
![Page 21: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/21.jpg)
21
Resources:Total: 1.6mt @ 3.9g/t = 203koz
Reserves:Open pit: 253kt @ 3.6g/t = 29kozUnderground: Underground reserves TBD. Drilling & Feasibility study underway
Targets: Down-dip extensions of high grade mineralisation. No drilling below 400m
Planning:Open pit planned – FY13UG Feasibility – FY13Development – FY14 1HProduction – FY14 2H
Note: Resources and Reserves Statement last updated 6 Sept 2011. Upgrade expected Sept-12.
Safari Bore District - Deep South
360m
For
per
sona
l use
onl
y
![Page 22: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/22.jpg)
22
Red October District – Key Projects
Red OctoberResources: 1.5mt @ 4.2g/t = 208koz.Reserves: TBA - Trial mining & milling underway. Planning: High grade underground mill feed for FY13 and beyond.Exploration: Target extensions of high grade mineralisation (+10g/t) at depth and along strike from underground exploration drill drives.
Note: Resources and Reserves Statement last updated 6 Sept 2011. Upgrade expected Sept-12.
Red October Shear
For
per
sona
l use
onl
y
![Page 23: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/23.jpg)
23
Red October District – Red October
425m
For
per
sona
l use
onl
y
![Page 24: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/24.jpg)
24
Red October District – Red October
For
per
sona
l use
onl
y
![Page 25: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/25.jpg)
25
Red October District – Red October
For
per
sona
l use
onl
y
![Page 26: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/26.jpg)
26
Red October District – Red October
For
per
sona
l use
onl
y
![Page 27: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/27.jpg)
27
Carosue Dam Expansion - Funding
April 2011
WHIRLING DERVISHPre-strip…. A$30M
Karari
PLANT2.4mtpa > 4.2Mtpa …. A$35M+
Our preference is to fund the expansion work out of internal cash flow, supplemented by debt financing. The Saracen Board expects to complete its finance deliberations by October 2012, upon completion of the expansion feasibility study.
For
per
sona
l use
onl
y
![Page 28: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/28.jpg)
28
Karari OPMargarets OP
Wallbrook OP
Red October UG
Whirling Dervish UG
Twin Peaks UG
Deep South UG
Karari UG Porphyry UG
Stage 4
Active Mines
Development Phase
Feasibility & Pre‐Development
Greenfields Exploration
Million $ OP
Scoping Study & Resource Definition
Lake Carey (Red October – Sunrise Dam gap) Porphyry North Regional
Tin Dog
Elliots OP
Butcher Well OP
Pinnacles UGCrimson Belle OP
Whirling Dervish Luvi trendButcher Well‐Red October South Regional Stage 1
Stage 5
Stage 3
Stage 2
Underground Project
Open Pit Projects
Greenfields Exploration
Summary – Project Pipeline
Whirling Dervish OP
Deep South OP
Porphyry OP
For
per
sona
l use
onl
y
![Page 29: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/29.jpg)
29
Saracen – Contact us
For
per
sona
l use
onl
y
![Page 30: ASX:SAR For personal use only · 9/12/2012 · (“Resource”) or Ore Re serve (“Reserve”). It is uncer tain if further exploration will result in the determination of a Resource](https://reader031.vdocuments.mx/reader031/viewer/2022011900/5f057d8e7e708231d41338c6/html5/thumbnails/30.jpg)
30
Resources* 76.2mt @ 1.5g/t = 3.6Moz Reserves* 16.9mt @ 1.5g/t = 825Koz
Rounding errors will occur.
Competent Person Statements: The information in this report that relates to mineral resources and open pit ore reserves has been compiled by Mr Lynn Widenbar BSc MSc DIC MAusIMM. Mr Widenbar, who is a member of the Australasian Institute of Mining and Metallurgy, is a consultant to Saracen Gold Mines Pty Ltd. Mr Widenbar has sufficient experience that is relevant to the styles of mineralisation and types of deposit under consideration and to the activity that he is undertaking to qualify as a Competent person as defined in the 2004 edition of the Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves. Mr Widenbar consents to the inclusion in this report of the matters based on his information in the form and context that the information appears.
Competent Person Statement:The information in this report relating to ore reserves for Porphyry underground has been compiled by Chris Burton. Mr Burton, who is a Member of the Australasian Institute of Mining and Metallurgy, is a full time employee of Saracen Gold Mines Pty Ltd and has sufficient experience that is relevant to the styles of mineralisation and types of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves. Mr Burton consents to the inclusion in this report of the matters based on his information in the form and context that the information appears.
District Mine Type Category Tonnes Au grade OuncesMeasured 5,639,000 1.3 236,000Indicated 16,478,000 1.3 697,000Inferred 4,574,000 1.2 180,000Total 26,691,000 1.3 1,113,000Measured 0 0.0 0Indicated 497,000 3.7 58,000Inferred 755,000 3.0 73,000Total 1,252,000 3.3 132,000
27,943,000 1.4 1,245,000Measured 1,603,000 1.3 65,000Indicated 22,894,000 1.2 859,000Inferred 5,911,000 1.0 197,000Total 30,407,000 1.1 1,121,000Measured 0 0.0 0Indicated 982,000 4.3 137,000Inferred 316,000 3.4 34,000Total 1,298,000 4.1 171,000
31,706,000 1.3 1,293,000Measured 780,000 2.0 51,000Indicated 2,023,000 2.4 157,000Inferred 804,000 2.2 57,000Total 3,607,000 2.3 266,000Measured 0 0.0 0Indicated 294,000 4.4 42,000Inferred 782,000 4.6 116,000Total 1,076,000 4.5 157,000
4,683,000 2.8 423,000Measured 0 0.0 0Indicated 4,474,000 1.8 255,000Inferred 5,309,000 1.3 215,000Total 9,784,000 1.5 470,000Measured 0 0.0 0Indicated 618,000 6.8 134,000Inferred 32,000 2.9 3,000Total 651,000 6.6 137,000
10,434,000 1.8 608,000Stockpiles Measured 1,442,000 0.8 36,000
Measured 9,463,000 1.3 389,000Indicated 45,869,000 1.3 1,969,000Inferred 16,599,000 1.2 649,000Total 71,931,000 1.3 3,006,000Measured 0 0.0 0Indicated 2,390,000 4.8 372,000Inferred 1,886,000 3.7 226,000Total 4,276,000 4.3 598,000Measured 9,463,000 1.3 389,000Indicated 48,259,000 1.5 2,340,000Inferred 18,485,000 1.5 875,000
76,207,000 1.5 3,604,000
MINERAL RESOURCES
Open Pit & Stockpiles
UndergroundMINERAL RESOURCES
Total
GRAND TOTAL
Red October
Open Pit
Underground
Red October Total
Open Pit
Underground
Carosue Dam Total
Open Pit
Underground
Porphyry Total
Open Pit
Underground
Safari Bore Total
Carosue Dam
Porphyry
Safari Bore
District Mine Type Category Tonnes Au grade OuncesProven 4,267,000 1.2 170,000Probable 4,084,000 1.5 193,000Total 8,351,000 1.4 363,000Proven 0 0.0 0Probable 0 0.0 0Total 0 0.0 0
Carosue Dam Total 8,351,000 1.4 363,000Proven 579,000 1.6 30,000Probable 6,108,000 1.4 282,000Total 6,688,000 1.5 312,000Proven 0 0.0 0Probable 643,000 3.4 70,000Total 643,000 3.4 70,000
Porphyry Total 7,331,000 1.6 382,000Proven 362,000 2.0 23,000Probable 485,000 2.9 45,000Total 847,000 2.5 68,000Proven 0 0.0 0Probable 0 0.0 0Total 0 0.0 0
Safari Bore Total 847,000 2.5 68,000Proven 0 0.0 0Probable 0 0.0 0Total 0 0.0 0Proven 0 0.0 0Probable 0 0.0 0Total 0 0.0 0
Red October Total 0 0.0 0Stockpiles Proven 344,000 1.1 12,000
Proven 5,552,000 1.3 235,000Probable 10,677,000 1.5 520,000Total 16,230,000 1.4 755,000Proven 0 0.0 0Probable 643,000 3.4 70,000Total 643,000 3.4 70,000Proven 5,552,000 1.3 235,000Probable 11,320,000 1.6 590,000
16,873,000 1.5 825,000
Underground
Open pit
Underground
ORE RESERVES
Carosue Dam
Porphyry
Safari Bore
Open pit
Underground
Open pit
Underground
Open pit
ORE RESERVES
Open Pit & Stockpiles
Underground
Total
GRAND TOTAL
Red October
Appendix – Resources & Reserves