Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p p p p p p n n The ASPERA Roadmap

Upload: jonah-clinton-sharp

Post on 05-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1.

pp

pp

pp

nn

The ASPERA Roadmap

Page 2: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 2.

• Prehistory:– PRC extensively examines field 2003-2005, 7 themes one by one

• Phase I: – Questionnaires from subfields, PRC discussions, community discussions– Roadmap Phase I– Recommendations correspond to reduction of original projects by factor 2.– But: required funding 2010-2015 still twice as high as present 5-year budget

• Phase II+III:– Questionnaires from subfields– Questionnaires from agencies– Amsterdam Meeting 20/21 Sept 2007 – Scrutinize information– Explore further sources of funding and obvious cost reductions in projects– Develop recommendations for 3 different funding scenarios (constant, moderate

increase, strong increase)– Approach Priorities – Recommendations for Infrastructures– Clear definition of milestones– Roadmap Phase II (30 page paper for politicians)

3 Phases

Page 3: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 3.

• Phase I: – Questionnaires from subfields, PRC discussions, community discussions– Roadmap Phase I– Recommendations correspond to reduction of original projects by factor 2.– But: required funding 2010-2015 still twice as high as present 5-year budget

• Phase II+III:– Questionnaires from subfields– Questionnaires from agencies– Amsterdam Meeting 20/21 Sept 2007

– Scrutinize information– Explore further sources of funding and obvious cost reductions in projects– Develop recommendations for 3 different funding scenarios (constant, moderate

increase, strong increase)– Priorities step 1 – Recommendations for Infrastructures– Clear definition of milestones– Roadmap Phase II (30 page paper for politicians) – August 2008– 2009/10: Explicit recommendations

3 Phases

Page 4: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 4.

Present information is last-minute information:• not always on the same footing

– PhD students included/not included– Private funding “ “ – Plans clear/less clear (sometimes just declare a claim)– Level of discussion within the community– ….

• not every experiment yet included in the Excel tables• Sometimes not clear wether total cost or only

European cost• No prioritization at all in the WGs !

Page 5: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 5.

• Phase I: – Questionnaires from subfields, PRC discussions, community discussions– Roadmap Phase I– Recommendations correspond to reduction of original projects by factor 2.– But: required funding 2010-2015 still twice as high as present 5-year budget

• Phase II+III:– Questionnaires from subfields– Questionnaires from agencies– Amsterdam Meeting 20/21 Sept 2007 – Scrutinize information (post workshop PRC)– Explore further sources of funding and obvious cost reductions in projects– Develop recommendations for 3 different funding scenarios (constant, moderate

increase, strong increase)

– Priorities step 1 – Recommendations for Infrastructures– Clear definition of milestones and

decisions points– Roadmap Phase II (30 page paper for politicians) – August 2008– 2009/10: Explicit recommendations

3 Phases

„calendar of decisions“

Page 6: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 6.

• Many positive reactions on Roadmap Phase I , but also critical questions

• Main points of critique:– „just a wish list“

– „cost estimate not realistic, will be more than factor 2“

– „factor 2 funding increase is an illusion“

– „an overall sum of 1.2-1.5 M€ for Astroparticle in Europe is too ambitious

Reactions to Phase I roadmap

Page 7: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 7.

• Many positive reactions on Roadmap Phase II , but also critical questions

• Main points of critique:– „just a wish list“

– „cost estimate not realistic, will be more than factor 2“

– „factor 2 funding increase is an illusion“

– „an overall sum of 1.2-1.5 M€ for Astroparticle in Europe is too ambitious

Reactions to Phase I roadmap

• YES and NO. It is a result of previous conver-gence (reduction factor ~2)

• YES – we see that from the phase-II questionnaires

• NO: Need factor 2 pressure! See positive examples next slides.

• NO: Compare ratio #scientists/cost for LHC, FAIR, XFEL – it is similar:

– APP 3000 scient./1.4 M€ 2011-15

– FAIR 2500 scientists/1.2 M€

– XFEL 2500 users/1.1 M€

Page 8: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 8.

Funding

Page 9: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 9.

• 2006 expenses in Aspera countries: – 70 M€ investment, about 150 M€ personnel

• Roadmap-I estimate: 135 M€ per year• Roadmap-I request: 1200-1400 M€ in 5 years,

2011-2015, mostly investment, some personnel• Now: WG requests including personnel sum up

to ~2000 M€ in 2011-2015• This seems to be a factor 2, but w.r.t.investment

3-3.5 (see later).• Prioritization mandatory:

Wherever possible. As early as possible.

The factor 2

Page 10: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 10.

• Assume 3 scenarios:• 1) Constant funding• 2) Average increase 4% per year

– 50% after 10 years

• 3) Average increase 7% per year– 100% after 10 years

• Compare also P5 roadmap, USA (optimistic case factor 2 after 10 years)

• Increase will likely come in steps• There are examples of significant steps in funding

(see next page)

Funding scenarios

Is anything above that realistic ?

Page 11: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 11.

• German Verbundforschung (federal support for Universities): factor 2 increase end of the nineties (now 3.5 M€/y)

• NIKHEF strategic plan: factor 2 increase from 2007 to 2012

Some examples of significant funding steps

Page 12: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 12.

Dark Matter Searches

Page 13: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 13.1980 1985 1990 1995 2000 2005 2010 2015

10-4

10-10

10-8

10-6

Cro

ss s

ectio

n (p

b)

Stage 1:

Field in Infancy

Stage 2:

Prepare the instruments Stage 3:

Maturity.Rapid progress

Stage 4:

- Understand remaining background.100 kg scale - Determine best method for ton-scale detectors

Stage 5:

Build and operate ton-scale detectors

LHC

results of LHC may modify this picture !

Page 14: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 14.1980 1985 1990 1995 2000 2005 2010 2015

10-4

10-10

10-8

10-6

Cro

ss s

ectio

n (p

b)

- Background- Background- Funding / Infrastructure- Funding / Infrastructure

Page 15: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 15.

CRESST

Edelweiss

EURECA-100

EURECA @ ton scale

LXe

LAr

LAr

LXe

Ar-100

Xe-100Noble liquid@ ton scale

Now: 10 kg scale 2009/11: 100 kg scale 2011-17: constr. ton scale

a possible convergence scenario

Towards 2 ton-scale zero-background detectors

ELIXIR, ..XENON/LUX, WARP

modular expansion

Page 16: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 16.

0

5000

10000

15000

20000

25000

30000

35000

€k

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Investment - Total ASPERA

ArDM CYGNUS DAMA1ton ELIXIR EURECA SIMPLE Ulisse ULTIMA ZEPLIN

Page 17: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 17.

Properties of Neutrinos

Page 18: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 18.

Experiment k€ main source milestones

•KATRIN: 40.000 -Astrop.Phys. operation 2010

•MARE I: 5.450 Astrop.Phys. R&D<2011;

construction=2011; operation 2016

CUORE: 13.900 Astrop. Phys construction + commissioning<2012;

operation 2017•GERDA I+II: 5.250

Astrop. Phys contruction + commissioning<2009; operation 2009

•SuperNEMO: 104.000 Astrop. Phys R&D <2009

construction <2013 Operation 2011

Neutrino Properties

Page 19: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 19.

1-ton experiment not yet specified and included. Would it start – in parallel ?

– after ? Super-NEMO ?

– instead of ?

Neutrino Properties

Page 20: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 20.

Start within next 5 years:GERDA, Cuore, Super-NEMO, EXO-200, ..

Following generation:GERDA+Majorana, Cuore-enr., EXO-1ton,COBRA,. ..

20-50 meV range requires active mass of order one ton, good resolution, low BG. Price tag 50-200 M€. Gain experience within next 5 years.

Page 21: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 21.

Phases1. R&D2. Construction3. Commissioning4. Operation

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018Single beta decayKATRINMARE I

Double beta decayCUOREGERDA Phase I + IISuperNEMO Canfranc SuperNEMO Modane

InfrastructuresModane extension LSMICR

Neutrino Properties

Page 22: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 22.

Phases1. R&D2. Construction3. Commissioning4. Operation

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018Single beta decayKATRINMARE I

Double beta decayCUOREGERDA Phase I + IISuperNEMO Canfranc SuperNEMO Modane

InfrastructuresModane extension LSMICR

Neutrino Properties

Decision points: 2012/13: MARE-II ?2010-13: enr. CUORE vs. Gerda-Majorana vs. Super-NEMO ?

Inverted hierarchy test KKGH

Page 23: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 23.

2011200920072005 2006 20162014201220102008 20152013

now

design study

construction

operation

operation

construction

operation

operation

NEMO-3

Super-NEMO

CUORICINO

CUORE

bolometric 41 kg 130Te

construction operation GERDA

bolometric 740 kg 130Te

tracking 8 kg 130Mo/82Se

tracking 100 kg 150Nd/82Se

15 35 kg 76Ge

construction operation EXO (USA) 200 kg 130Xedesign study

(Projects running, under construction or with substantial R&D funding)

Slide from

1 year ago

Page 24: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 24.

design study

construction

operation

operation

construction

operation

operation

NEMO-3

CUORICINO

CUORE

construction operation GERDA

construction operation EXO (USA) design study

Converge towards 2 largeEuropean Projects !Start construction2012-2015

2011200920072005 2006 20162014201220102008 20152013

nowSlide from

1 year ago

Page 25: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 25.

Investments k€

02 0004 0006 0008 000

10 00012 00014 00016 00018 000

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

ICR

MARE

SuperNEMO

GERDA I+II

CUORE

Neutrino Mass

Page 26: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 26.

Low Energy Neutrino

Astronomy and Proton

Decay pp

pppp

Page 27: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 27.

Indicative investment needs (without megaton-scale-physics)

0

2000

4000

6000

8000

10000

12000

14000

2008 2010 2012 2014 2016 2018

Year

k€

Project 7: LAGUNA

Project 6: DoubleChooz

+ Project5 :SNO

Project 4: ICARUS T600

Project 3: Borexino

Project 2: CTF

Project 1: LVD-Gd

Page 28: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 28.

LAGUNA

ModulAr(Gran Sasso)

30-1000 ktons

20 ktons

Page 29: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 29.

Indicative investment needs (total)

0

5000

10000

15000

20000

25000

30000

2008 2010 2012 2014 2016 2018

Year

k€

Project 8: MEMPHYS orGLACIER or LENAProject 7: LAGUNA

Project 6: DoubleChooz

+ Project5 :SNO

Project 4: ICARUS T600

Project 3: Borexino

Project 2: CTF

Project 1: LVD-Gd

LAGUNA:

Total cost 200-500 M€

30-80 M€over 6 years.

If in Europe,> 50% from Europe

Page 30: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 30.

The High Energy Universe

Page 31: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 31.

•Charged Cosmic Rays– Auger North

•Gammas– CTA

•Neutrinos– KM3NeT

European priorities, new projects next decade

Page 32: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 32.

Charged Cosmic Rays

Experiment k€ FTE (additional 2008-18) main source milestones

•Auger (south): 30.000 -Astrop.Phys. operation 2018++; construction<2011

•Auger (north): 91.400 1400Astrop.Phys. R&D<2012; construction<2015; operation 2018++

•JEM-EUSO: 90.000 150space agencies 2009 A+B report JAXA, launch 2013

•SUPER-EUSO: 155.000 335 space agencies R&D<2012, constr.<2016 commis.<2019

•LOFAR: 104.000 77 (only CR)astronomy R&D+construction CR-KSP <2012 (1M€)

•NUCLEON: 40.150 600space agencies operation >2014 construction<2011

•AMS-02: 20.000 4000 space agencies operation >2008 end 2015

cost worldwide

Page 33: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 33.

Charged Cosmic Rays

Experiment k€ FTE (additional 2008-2018)

•Auger (south): 15.000 -•Auger (north): 45.700 655•AMS-02: 8.500 335•JEM-EUSO: 2.600 50•SUPER-EUSO: 18.600 50 •LOFAR(CR): 1.000 77•NUCLEON: 3.212 151

Summary: ASPERA sum 2008-2018

Investments k€ FTE

cost Europe

Page 34: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 34.

Charged Cosmic Rays

Summary: ASPERA sum 2008-2018

Investments (ASPERA part)

0

2000

4000

6000

8000

10000

12000

14000

16000

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Year

k€

NUCLEON

Super-EUSO

JEM-EUSO

LOFAR

AMS-02

Auger North

Auger South

Page 35: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 35.

Experiment k€ FTE (additional 2008-18) main source milestones

•H.E.S.S.: 9.050 235Astrop.Phys. HESS II commissioning in 2009

•MAGIC: 9.700 260Astrop.Phys. MAGIC 2 commissioning in 2008

•VERITAS: 11.051 115Astrop.Phys. Started full operation spring 2007.

•ARGO-YBJ 2.500 150Astrop.Phys. Completion with lead layer in 2008

•GAW: 985 103.5Astrop.Phys. First telescope by end 2007

•CTA: 177.500 990 Astrop.Phys. Design Study until 2011; Start construction 2011

•GLAST 198.200 150.5Space agencies Launch in 2008; 5 years warranted operation

High Energy Gamma Rays

Page 36: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 36.

design study

construction

construction + operation

operation

operation

construction

operation

operation

operation

MAGIC-I

MAGIC- II

H.E.S.S.

H.E.S.S.- II

CTA

four 11-m telescopes

+ one 25-m telescope

one 17-m telescope

2nd 17-m telescope

Coordination with

USA, Japan, Australia

2011200920072005 2006 20162014201220102008 20152013

nowGamma Rays: IACTs

Page 37: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 37.

High Energy Gamma Rays

Investments

0

10000

20000

30000

40000

50000

60000

70000

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Year

k€

Project 7: GLAST

Project 6: CTA

Project 5: GAW

Project 4: ARGO-YBJ

Project 3: VERITAS

Project 2: MAGIC

Project 1: HESS

Page 38: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 38.

FP6 Design Study

oonstruction + operation

construction + operation

operation

operation

construction

operation

operation

operat

NT200, NT200+

ANTARES

AMANDA

IceCube

KM3NeT

GVD

c + o

R&D KM3 NESTOR, NEMO

design study construction + operation

operat

?

2011200920072005 2006 20162014201220102008 20152013

now

Page 39: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 39.

FP6 Design Study

oonstruction + operation

construction + operation

operation

operation

construction

operation

operation

operatNT200, NT200+

ANTARES

AMANDA

IceCube

KM3NeT

GVD

c + o

R&D KM3 NESTOR, NEMO

design study construction + operation

operat

Recommendation: only ONE large detector on the Northern hemisphere. Expect consolidation of physics case from IceCube and H.E.S.S.

2011200920072005 2006 20162014201220102008 20152013

now

Page 40: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 40.

FP6 Design Study

oonstruction + operation

construction + operation

operation

operation

construction

operation

operation

operatNT200, NT200+

ANTARES

AMANDA

IceCube

KM3NeT

GVD

c + o

R&D KM3 NESTOR, NEMO

design study construction + operation

operat

Need detector with >1 km3, if IceCube doesnot discover sources until 2009 (IceCube has 1 km3 x year early 2009)Challenge to stay below 300 M€ !

2011200920072005 2006 20162014201220102008 20152013

now

Page 41: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 41.

1980 1985 1990 1995 2000 2005 2010 2015

10-4

10-10

10-8

10-6

10-1000 TeV

1 EeV

Dumand

Frejus Macro

Baikal/Amanda

IceCube/ Antares KM3NeT

Rice AGASA

Rice GLUE

Anita, Auger, other new methods

Flux * E² (GeV/ cm² sec sr)

Sensitivity to HE diffuse neutrino fluxes

Waxman-Bahcall limit

Page 42: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 42.

Gravitational Waves

Page 43: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 43.

Time Chart

Page 44: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 44.

Annual Costs

0

20000

40000

60000

80000

100000

120000

140000

160000

Year

An

nu

al c

ost

s [k

€] ET

DUAL

GEO HF

bars

ad. LIGO

enh. LIGO

Virgo +

Ad. Virgo

Gravitational Waves: Investment

Without LISA

Page 45: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 45.

Total cost

Page 46: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 46.

Investment

0

50000

100000

150000

200000

250000

300000

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

year

kE

ModulAr

MEMPHYS or GLACIER or LENA

LAGUNA

DoubleChooz

SNO+

ICARUS T600

Borexino

CTF

LVD-Gd

ET

DUAL

GEO HF

bars

ad. LIGO

enh. LIGO

Virgo +

Ad. Virgo

ZEPLIN

ULTIMA

Ulisse

SIMPLE

EURECA

ELIXIR

DAMA1ton

CYGNUS

ArDM

Acoustic R&D

ANITA

KM3NeT

2011-2015: ~1000-1200 M€

70 M€

Page 47: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 47.

FTE

0

200

400

600

800

1000

1200

1400

1600

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

year

FTE

ModulAr

MEMPHYS or GLACIER or LENA

LAGUNA

DoubleChooz

SNO+

ICARUS T600

Borexino

CTF

LVD-Gd

ET

DUAL

GEO HF

bars

ad. LIGO

enh. LIGO

Virgo +

Ad. Virgo

ZEPLIN

ULTIMA

Ulisse

SIMPLE

EURECA

ELIXIR

DAMA1ton

CYGNUS

ArDM

Acoustic R&D

ANITA

KM3NeT2011-2015: 1200 FTE + students another ~ 800 M€

Page 48: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 48.

•Convergence•Priority Definition•Increased funding

Our field is highly dynamic.Keep room for new developments !

Page 49: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 49.

Visions

pp

pp pp

nn

2013

Page 50: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 50.

• Dark Matter: – LHC has discovered SUSY. – First direct searches with sensitivity <10-9 pb discover DM. dramatically accelerated speed with other nuclei and

methods for confirmation. Push directional methods. – If DM not yet discovered: move on with 2 experiments to 10-10 pb or below

• Neutrino Properties– Double-CHOOZ, T2K and others have measured finite 13

– KATRIN measures neutrino mass > 0.2 eV – and/or: Gerda/Cuore measure mass > 0.1 eV– If no sign for mass: move further on towards 1-2 DBD experiments with

sensitivity 0.03 eV , see what MARE could do

Visions 2013

Sensational: cosmology !

Page 51: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 51.

• Megaton-Detector– Technology ready, worldwide consensus, construction started

• High Energy Universe– >200 gamma sources from HESS-II and MAGIC-II– CTA under construction, first results from prototypes– Rich sky-map from Auger-South, also chemical composition– Auger-North under construction, first results– IceCube has discovered neutrino sources– KM3NeT is well under construction

• If no neutrino sources in IceCube until 2011: consequent re-design towards > 5 cubic kilometers for affordable price

– Exciting multimessenger astronomy, including satellites (GLAST)

Visions 2013

Page 52: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 52.

• Gravitational Waves– LIGO+, VIRGO+ and GEO have seen their very first event

– Adv LIGO, adv VIRGO, GEO-HF have started operation

– E.T. in preparatory phase

– Lisa-Pathfinder successful, clear way towards LISA

• New Methods– Variety of methods called „new methods“ today (radio,

acoustics, COUPP-like detectors, ..) are established or are being implemented.

– Still, we have kept funding reserves for new „new methods“.

Visions 2013

We have to keep reserves for

new methods and approaches!

Page 53: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 53.

Visions

pp

pp pp

nn

2018

Page 54: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 54.

• Dark Matter:– Several experiments are below 10-10 pb and have seen

DM– Move from DM searches to DM studies

• Neutrino mass:– DBD measures neutrino mass 30-70 meV and proves

inverted hierarchy– If not: hm …. There is no idea how to reach < 20 meV

• Megaton detectors:– First subdetectors operate– >10000 neutrinos from SN2018A (Feb 22, 2018)

(IceCube measure precise early time profile)

– New precision results on solar physics

Visions 2018

Page 55: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 55.

• High Energy Universe:– CTA full operation, > 500 sources, full astronomy

mode– Auger South/North, IceCube/KM3NeT + gammas:

florishing multi-messenger astronomy– GZK neutrino physics with reasonable statistics

has started

• Gravitational Waves:– Advanced LIGO/VIRGO, GeoHF, Dual have

recorded a dozen GW events– LISA launched, E.T. under construction. GW close

to full astronomy mode

Visions 2018

Page 56: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 56.

•Something totally different

Visions 2018

Page 57: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 57.

pp

pp

pp nn

Alice disclosing the Astroparticle Universe

Page 58: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 58.

Page 59: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 59.

Page 60: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 60.

•Backups

Visions 2018

Page 61: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 61.

2013201120092007 2008 20182016201420122010 20172015

30 M€ (from 85)

KM3NeT

Megaton

Auger North

CTA

Grav Wave 3rd generation

> 2/3 from 100 + 50 M€

250 M€

400-800 M€

300 M€

60-100 M€

60-100 M€

Double Beta 1 ton

DM search 1 ton

50-200 M€

50-200 M€

Page 62: Astroparticle Physics for Europe C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 1. p     p p n The ASPERA Roadmap

Astroparticle Physics for Europe

C. Spiering: The ASPERA Roadmap, Sept. 21, 2006 62.

2013201120092007 2008 20182016201420122010 20172015

30 M€ (from 85)

KM3NeT

Megaton

Auger North

CTA

Grav Wave 3rd generation

> 2/3 from 100 + 50 M€

250 M€

400-800 M€

300 M€

60-100 M€

60-100 M€

Double Beta 1 ton

DM search 1 ton

50-200 M€

50-200 M€30+100+250+200+100+100+50+100 ~ 950 M€

add 300 M€ for runningexperiments, upgrades,new methods