  • February 21, 2014

    ASTRODOME SITE STUDY

  • Project Goals - A plan that pays tribute to the Astrodomes history and acts as the outdoor fulcrum of Reliant Park

  • The Astrodome impedes circulation flow along two major axes of Reliant Park.

  • Removal of the Astrodome leaves an open green space thatwill be an amenity for the citizens of Harris County.

  • Case Study:Discovery Green Programmed urban park Regional Attraction Transformed Downtown Successful open spaces are a catalyst for

    development of surrounding properties

  • February 21, 2014

    ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    Discovery GreenCapacity: 52,300

    estimate 1 person/10 sf

  • February 21, 2014

    ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    Cynthia Woods Mitchell PavilionCapacity: 16,500

  • February 21, 2014

    ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    Sam Houston Race ParkCapacity: 15,000

  • February 21, 2014

    ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    International FestivalCapacity: 50,000

    Open Area: 385,000sf Open Area: 385,000sf

  • 30 0

    28 0

  • Astrodome History Walking Tour

  • ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

  • ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    Master PlanReliants Backyard

    Phase II

  • ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    Phase II

    LIGHT RAIL STATION

    CirculationVehicle and Pedestrian

  • ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    534,600 sf

    316,800 sf

    27,500 sf

    39,600 sf

    Current CarnivalTotal Area: 918,600 sf

  • February 21, 2014

    ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    Dome GreenArea: 385,000 sf

    8.8 acresCapacity: 38,500(estimate 1 person/10sf)

    AstrodomeHall of Fame

    Area: 25,00 sfContains service and

    storage area for the green

  • February 21, 2014

    ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    Carnival and RodeoHall of Fame Centered on Green

  • February 21, 2014

    ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    Outdoor ConcertHall of Fame Centered on Green

  • February 21, 2014

    ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    Outdoor ConcertHall of Fame Centered on Green

  • February 21, 2014

    ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    Game Day TailgateHall of Fame Centered on Green

    Parking Count: 456 cars

  • February 21, 2014

    ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    2017 Superbowl

  • 2017 Superbowl

  • February 21, 2014

    ASTRODOME

    NEWHOUSTON

    LIVESTOCK SHOW & RODEOFACILITY

    RELIANTSTADIUM

    RELIANT CENTER

    SOUTH LOOP WEST (I .H. 610)

    KIR

    BY

    DRI

    VE

    FAN

    NIN

    STR

    EET

    NAOMI

    HOLLY HALL

    OPTION 1

    ADD 2,100 PARKING

    Tensile Structure

  • Tensile Structure

  • May 30, 2014Astrodome Hall of Fame

  • February 21, 2014Astrodome Hall of Fame

    MEN'S

    VESTIBULE

    VESTIBULE

    ENTRY

    GIFT SHOP

    STORAGE

    WMN'S

    EXHIBITS

    (380 CHAIRS SHOWN / MAX CAPACITY 500)

    FLEXIBLE SPACE

    CAFE

    KITCHEN

    ENTRY

    10'-0" 40'-0"40'-0" 10'-0"10'-0" 100'-0" 10'-0"

    Overall sf: 25,000Schematic Plan

    Dinning sf: 7,850Seating Capacity: 300-500

  • February 21, 2014

    Page 1

    L I N B E C K Astrodome Hall of FameConcept Construction Budget Summary

    February 20, 2014

    Construction Cost Summary -Site Study

    Summary $/SF Total $

    1 Phase 1 - Demo / Backfill / Utilities 1,151,300 GSF $17.74/SF $20,426,211

    2 Phase 2 - Museum / Hardscape & Landscape 605,000 GSF $29.78/SF $18,018,884

    3 Phase 3 - Columns / Structural 385,000 GSF $45.35/SF $17,458,747

    Total Construction Costs 1,756,300 GSF $31.83/SF $55,903,841

    General Clarifications1. Budget pricing is based upon "Astrodome Site Study" dated January 22, 2014 & "Narratives and Exhibits" document prepared by Walter P Moore dated January 18, 2013.2. All pricing is based on February 2014 material and/or labor costs. Any future escalation costs are specifically excluded.3. This pricing assumes that all work will be performed concurrently.4. Demolition Costs include Implosion. Asbestos costs not included, assumed complete.5. An Allowance (2% of the Sitework cost) has been included for traffic signal timing, revisions to concrete and revisions to gate structures in order to accommodate the extra traffic.6. This pricing excludes stages and temporary exhibits.

    Based on ROM Estimate of $56M we suggest a $53M to $58M Budget.

    Page 1

    L I N B E C K Astrodome Hall of Fame Concept Construction Budget

    February 20, 2014

    Ground Level 385,000 SFBelow Ground 766,300 SF

    Hardscape/Landscape 605,000 SFLinbeck Category: New construction GB Area: 1,756,300 SF

    Estimator: DJ Story Height: 1 FL

    Description Quantity Unit $ Total Cost Cost/GSF % Total Comments

    A. Demolition1. Pre-Demolition Survey 1 LS $13,117.98 $13,118 $0.01 0.02%2. Asbestos Removal $0 $0.00 0.00% Not Required3. MEP Disconnect / Make Safe 1 LS $327,949.62 $327,950 $0.19 0.59%4. Implosion of Building 1,151,300 SF $3.94 $4,530,821 $2.58 8.10% Includes Protection to Extg5. Temporary Shoring 1 LS $196,769.77 $196,770 $0.11 0.35% Extg Conc Floor Framing

    Subtotal Demolition $5,068,658 $2.89 9.07%

    B. Foundation1. Excavation $0 $0.00 0.00% Not Required2. Backfill 397,500 CY $26.24 $10,428,798 $5.94 18.65% Place Select Fill3. Cathodic Protection $0 $0.00 0.00% Not Required4. Spread Footings 72 EA $13,385.18 $963,733 $0.55 1.72%5. Continuous Footings 2,100 LF $214.79 $451,054 $0.26 0.81%6. Tower Crane Foundation 4 EA $45,912.95 $183,652 $0.10 0.33%

    Subtotal Foundation $12,027,237 $6.85 21.51%

    C. Structure1. Columns 72 EA $191,442.53 $13,783,862 $7.85 24.66%2. Miscellaneous Steel 385,000 SF $1.31 $505,042 $0.29 0.90%3. Tower Crane - 4 Each $0 $0.00 0.01% Not Required4. Truck Crane - 3 Hyrdos 20 MO $29,515.47 $590,309 $0.34 0.01%5. Erect / Remove Tower Crane $0 $0.00 0.01% Not Required6. Tower Crane Operators $0 $0.00 0.01% Not Required7. Truck Crane Operators 277 WK $3,541.86 $981,094 $0.56 1.75%

    Subtotal Structure $15,860,308 $9.03 28.37%

    D. Enclosure Not RequiredSubtotal Enclosure $0 $0.00 0.00%

    E. Finishes / Specialties Not RequiredSubtotal Finishes $0 $0.00 0.00%

    F. MEP1. Plumbing, Drainage 385,000 SF $0.66 $252,521 $0.14 0.45%

    Subtotal MEP $252,521 $0.14 0.45%

    G. Conveying Systems & Equipment Not RequiredSubtotal Conveyors & Equipment $0 $0.00 0.00%

    H. Sitework 1. Utilities2. Sanitary Sewer Cut & Plugs 7 EA $3,279.50 $22,956 $0.01 0.04%3. Waterline Cut & Plugs 5 EA $3,279.50 $16,397 $0.01 0.03%4. Storm Sewer Cut & Plugs 27 EA $3,279.50 $88,546 $0.05 0.16%5. Grease Trap Abandonment 2 EA $6,558.99 $13,118 $0.01 0.02%6. Gas System 1 LS $65,589.92 $65,590 $0.04 0.12%7. Electrical8. Sub Station 385,000 SF $6.56 $2,525,212 $1.44 4.52%9. Re-Feed Reliant Arena 385,000 SF $3.28 $1,262,606 $0.72 2.26%

    10. Re-Route Conduit 385,000 SF $1.05 $404,034 $0.23 0.72%11. Lighting w/ Poles 385,000 SF $0.52 $202,017 $0.12 0.36%12. Temporary Power 385,000 SF $0.20 $75,756 $0.04 0.14%13. Telephone Service - AT&T $0 $0.00 0.00% By Others14. Plaza - Renovate / Rework / Landscape15. Museum & Visitor Center 210,000 SF $10.49 $2,203,821 $1.25 3.94%16. Carruth Plaza 150,000 SF $10.49 $1,574,158 $0.90 2.82%17. Retail Promenade 220,000 SF $10.49 $2,308,765 $1.31 4.13%18. Dome Museum 25,000 SF $459.13 $11,478,237 $6.54 20.53%19. Traffic Signal/Concrete/Gate Revisions 1 LS $453,902.35 $453,902 $0.26 0.81% Allowance

    Subtotal Sitework $22,695,117 $12.92 40.60%

    Total $55,903,841 $31.83 100.00%

  • February 21, 2014

    5

    L I N B E C K Astrodome Hall of FameProject Schedule Summary

    February 20, 2014

    Start Finish

    Owner release team to proceed 6/2/14 6/2/14

    Center Point Substation

    Center Point agreement 6/2/14 6/27/14

    Relocate Substation (12 months) 6/30/14 6/26/15

    Design Work (8 months)

    Schematic Design Phase 6/2/14 8/1/14

    Design Development Phase 8/4/14 10/3/14

    Construction Document Phase 10/6/14 2/6/15

    Develop GMP 2/9/15 3/6/15

    Owner Approval 3/9/15 3/20/15

    Construction (32 months)

    Notice to Proceed w/ Construction 6/2/14

    Mobilize 6/2/14 6/20/14

    Phase 1 - Underground Utilities 6/23/14 1/2/15

    Phase 1 - Demolition and Backfill of Astrodome 4/17/15 4/14/16

    Phase 2 - Plaza and Astrodome Hall of Fame 4/15/16 2/2/17

    Phase 3 - Commemorative Columns 4/1/16 10/4/16

    Sitework & Completion 6/15/16 11/1/16

    Substantial Completion 2/3/17

    Super Bowl 2/5/17

    1

    L I N B E C K Astrodome Hall of FameConcept Project Budget

    February 20, 2014

    Construction $55,903,841

    Hazardous Material & Abatement (not included)

    FF&E items - Allowance $500,000

    Security Cameras - Allowance $200,000

    A/E team Consultant Fees $3,000,000ArchitectStructural EngineerMEP EngineerCivil EngineerLandscapeLightingGraphicsCodeIT/AVSpecifiationsTraffic

    3D Renderings $7,500

    Survey $75,000

    Geotechnical Report $50,000

    Permit Fees (not included)

    CenterPoint Fees - Allowance $100,000

    Materials Testing $200,000

    Reimbursables $75,000

    Subtotal $60,036,341

    Owner Contingency (10%) $6,003,634

    TOTAL PROJECT COSTS $66,039,975

  • ID Name Duration Start Finish

    1 ST00110 Commissioner's Court Decision 0 Days 5/15/2014 (*)

    2 ST00087 Release Design Team to Proceed 0 Days 6/2/2014 (*)

    3 ST00065 CenterPoint Agreement 20d 6/2/2014 6/27/2014

    4 ST00020 Design Work 220d 6/2/2014 4/3/2015

    5 ST00220 Prepare SD Drawings 45d 6/2/2014 8/1/2014

    6 ST00100 SD Drawing Budget 10d 8/4/2014 8/15/2014

    7 ST00180 Prepare DD Drawings 45d 8/4/2014 10/3/2014

    8 ST00230 DD Drawing Budget 15d 10/6/2014 10/24/2014

    9 ST00211 Submit for Demo Permit 20d 10/6/2014 10/31/2014

    10 ST00192 Prepare CDs 90d 10/6/2014 2/6/2015

    11 ST00155 Submit for Permit 40d 2/9/2015 4/3/2015

    12 ST00136 Develop GMP 20d 2/9/2015 3/6/2015

    13 ST00117 Approvals 10d 3/9/2015 3/20/2015

    14 ST00076 Contracts & Expediting 195d 10/27/2014 7/24/2015

    15 ST00073 Demo Contract & Submittal 45d 10/27/2014 12/26/2014

    16 ST00067 Steel Contract & Submittals 80d 3/9/2015 6/26/2015

    17 ST00055 Rebar Contract & Submittals 25d 3/9/2015 4/10/2015

    18 ST00053 Museum Contracts & Expediting 100d 3/9/2015 7/24/2015

    19 ST00030 Phase 1-Demo/Backfill/Centerpoint 489d 6/2/2014 4/14/2016

    20 ST00040 Secure Site 15d 6/2/2014 6/20/2014

    21 ST00050 Relocate CenterPoint Substation 260d 6/30/2014 6/26/2015

    22 ST00070 Trace, Cut & Cap Utilities 140d 6/23/2014 1/2/2015

    23 ST00090 Demolition 160d 4/17/2015 11/26/2015

    24 ST00075 Backfill 160d 9/4/2015 4/14/2016

    25 Phase 2-Plaza & Dome Museum 210d 4/15/2016 2/2/2017

    26 ST00376 Foundation 30d 4/15/2016 5/26/2016

    27 ST00386 Structure 40d 5/27/2016 7/21/2016

    28 ST00396 Enclosure 60d 7/22/2016 10/13/2016

    29 ST00406 Interiors 40d 10/14/2016 12/8/2016

    30 ST00416 Completion Activities 40d 12/9/2016 2/2/2017

    31 ST00120 Phase 3-Columns 133d 4/1/2016 10/4/2016

    32 ST00130 Drilled Pier (4 per column/288 ea) 25d 4/1/2016 5/5/2016

    33 ST00140 Pier Cap (72 ea) 60d 4/6/2016 6/28/2016

    34 ST00150 Erect Columns 20d 6/15/2016 7/12/2016

    35 ST00160 Detail Columns 40d 6/22/2016 8/16/2016

    36 ST00170 Cladding 75d 6/22/2016 10/4/2016

    37 ST00320 Sitework 75d 6/15/2016 9/27/2016

    38 ST00330 Completion Activities 20d 10/5/2016 11/1/2016

    39 ST00340 Substantial Completion 0 Days 2/3/2017

    40 ST00350 Super Bowl 0 Days 2/5/2017 (*)

    Jan 2014

    wk -5Aprwk 9

    Julwk 22

    Octwk 35

    Jan 2015

    wk 48Aprwk 61

    Julwk 74

    Octwk 87

    Jan 2016

    wk 100Aprwk 113

    Julwk 126

    Octwk 139

    Jan 2017

    wk 153Aprwk 165

    Julwk 178

    Octwk 192

    Jan 2018

    wk 205Aprwk 218

    Julwk 231

    Octwk 244

    Jan 2019

    wk 257

    Nov 2013

    wk -13

    Commissioner's Court Decision Release Design Team to Proceed

    CenterPoint Agreement Design Work

    Prepare SD Drawings SD Drawing Budget

    Prepare DD Drawings DD Drawing Budget Submit for Demo Permit

    Prepare CDs Submit for Permit

    Develop GMP Approvals

    Contracts & Expediting Demo Contract & Submittal

    Steel Contract & Submittals Rebar Contract & Submittals

    Museum Contracts & Expediting Phase 1-Demo/Backfill/Centerpoint

    Secure Site Relocate CenterPoint Substation

    Trace, Cut & Cap Utilities Demolition

    Backfill Phase 2-Plaza & Dome Museum

    Foundation Structure

    Enclosure Interiors

    Completion Activities Phase 3-Columns

    Drilled Pier (4 per column/288 ea) Pier Cap (72 ea) Erect Columns

    Detail Columns Cladding Sitework

    Completion Activities Substantial Completion Super Bowl

    Projecttitle Astrodome Hall of FameProgrammetitle

    Client Texans/Houston Rodeo

    Dated 2/19/2014 Drawn by Mark Gore Programme NoRev No Rev comments

    NotesPrinted: 2/19/2014

    , Page 1 of 1