Assumptions in FIV: 1. Analysis shall be performed on design condition- Loadcase 2 where all 4 meter runs, Prover loop, headers will be in design condition a. Temperature : 75°C b. Pressure : 18.1 Barg 2. Crude Oil Bulk Modulus : 1551300 N/m2 3. Young's Modulus of main line material : 204000000000 N/m2 (API 5L Gr.B) ENERGY INSTITUTE GUIDELINES FOR AVOIDANCE OF VIBRATION INDUCED FATIGUE FAILURE IN PROCESS PIPEWORK

Upload: vijayakumar2015

Post on 14-Dec-2015

10 views

Category:

Documents


2 download

DESCRIPTION

FIV

TRANSCRIPT

Page 1: Assumptions in FIV

Assumptions in FIV:

1. Analysis shall be performed on design condition- Loadcase 2 where all 4 meter runs, Prover loop, headers will be in design condition

a. Temperature : 75°Cb. Pressure : 18.1 Barg

2. Crude Oil Bulk Modulus : 1551300 N/m23. Young's Modulus of main line material : 204000000000 N/m2

(API 5L Gr.B)

ENERGY INSTITUTE GUIDELINES FOR AVOIDANCE OF VIBRATION INDUCED FATIGUE FAILURE IN PROCESS PIPEWORK

Page 2: Assumptions in FIV

Clarification required from Client:

A. What is the Flow rate for this package?B.