    System Process DocumentAssociating Overheads with Resources

    Department

    Responsibility/Role

    File Name 27759806.docRevision

    Document Generation Date 18/01/2010 09:35:00

    Date Modified 1/18/2010 09:35:00 AM

    Last Changed by

    Status

    Associating Overheads with Resources

    Trigger:

    Concept

    The Resource Overhead Associations page enables you to associate overheads with resources.

    You can assign resource cost as dollars per hour. If you enter a new resource, you can directly

    enter a frozen unit cost. However, you cannot directly update the frozen unit cost for a previously

    entered resource.

    In this topic, you will associate overheads with resources.

    Required Field(s) Comments

    Output - Result(s) Comments

    Additional Information

    Last changed on: 1/18/2010 09:35:00 AM Page 1

  • 8/14/2019 Associating Overheads With Resources_SPD

    2/17

    System Process DocumentAssociating Overheads with Resources

    Procedure

    Step Action

    1. Begin by navigating to the Resources page.

    Click the vertical scrollbar.

    Page 2 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Associating Overheads With Resources_SPD

    3/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    2. Click the Manufacturing and Distribution Manager link.

    Last changed on: 1/18/2010 09:35:00 AM Page 3

  • 8/14/2019 Associating Overheads With Resources_SPD

    4/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    3. Click the vertical scrollbar.

    Step Action

    4. Click the Resources link.

    Page 4 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Associating Overheads With Resources_SPD

    5/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    5. Use the Organizations page to select your organization.

    Last changed on: 1/18/2010 09:35:00 AM Page 5

  • 8/14/2019 Associating Overheads With Resources_SPD

    6/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    6. Click the M1 Seattle Manufacturing list item.

    Step Action

    7. Click the OKbutton.

    orPress [Alt+O].

    Page 6 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Associating Overheads With Resources_SPD

    7/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    8. Use the Resources page to enter a resource name unique to the organization to

    describe the resource.

    Last changed on: 1/18/2010 09:35:00 AM Page 7

  • 8/14/2019 Associating Overheads With Resources_SPD

    8/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    9. Click in the Resource field.

    Step Action

    10. Press [F11].

    Page 8 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Associating Overheads With Resources_SPD

    9/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    11. Enter the desired information into the Resource field. Enter "HG_TST_MCH".

    Last changed on: 1/18/2010 09:35:00 AM Page 9

  • 8/14/2019 Associating Overheads With Resources_SPD

    10/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    12. Press [Ctrl+F11].

    Step Action

    13. Click the Overheads button.

    orPress [Alt+a].

    Page 10 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Associating Overheads With Resources_SPD

    11/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    14. Use the Resources Cost page to associate overheads with resources.

    Last changed on: 1/18/2010 09:35:00 AM Page 11

  • 8/14/2019 Associating Overheads With Resources_SPD

    12/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    15. Click in the Cost Type field.

    Step Action

    16. Enter the desired information into the Cost Type field. Enter "Engineer".

    Page 12 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Associating Overheads With Resources_SPD

    13/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    17. Click in the Description field.

    Last changed on: 1/18/2010 09:35:00 AM Page 13

  • 8/14/2019 Associating Overheads With Resources_SPD

    14/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    18. The Allow Updates check box indicates whether the cost type is defined as

    updatable.

    Step Action

    19. Click in the Overhead field.

    Page 14 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Associating Overheads With Resources_SPD

    15/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    20. Enter the desired information into the Overhead field. Enter "MfgEng".

    Last changed on: 1/18/2010 09:35:00 AM Page 15

  • 8/14/2019 Associating Overheads With Resources_SPD

    16/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    21. Click in the Description field.

    Step Action

    22. Click the Save button.

    Page 16 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Associating Overheads With Resources_SPD

    17/17

    System Process DocumentAssociating Overheads with Resources

    Step Action

    23. You have completed the Associating Overheads with Resources procedure.

    End of Procedure.