assignment 4: prototype and test

10
PROBLEM of STAKEHOLDER A female graduated student who just start her 1st internship, which the area she will work on is not fit her major in

Upload: eggplant-technologies

Post on 15-Apr-2017

301 views

Category:

Business


2 download

TRANSCRIPT

Page 1: Assignment 4: Prototype and Test

PROBLEM of STAKEHOLDER

A female graduated student who just start her 1st internship, which the area she will work on is not fit her major in school.

Page 2: Assignment 4: Prototype and Test

ONE of the IDEAS

Learning by workingBecause I think the best way to find out if the internship she has chosen is fit to her and is the job she love to do, even though it's not fit for her major before.

Page 3: Assignment 4: Prototype and Test

TWO PROTOTYPES

1.UNDERSTAND

( WORKING PROCESS !!! )

Page 4: Assignment 4: Prototype and Test

UNDERSTAND: Experience the Working Process

Page 5: Assignment 4: Prototype and Test

• IDENTIFY:to identify the routine and working process

and what she’s good at and where she has difficulty.

• IMMERSEImmerse herself totally in her work and

experience the whole working style and process

• REFRAMERestructure her own style and fit to the real

working style, mix and match.

Page 6: Assignment 4: Prototype and Test

The Stakeholder has quickly adapted to the real-world business.

Every work assigned to her are simple ones that she could not tell that if she is really good at those work.

Because the ‘IMMERSE’ ,the girl was enjoying the working process very much.

Base on different work and projects. Shall her start overThis process again and again to experience and understand ?

Ask for more opportunitiesTo experience different project to know the work in different aspects.

TESTFEEDBACK

Page 7: Assignment 4: Prototype and Test

TWO PROTOTYPES

2. CREATE

( WORKING PROCESS !!! )

Page 8: Assignment 4: Prototype and Test
Page 9: Assignment 4: Prototype and Test

• IDEATE• BUILD• TEST

• Just like the process to draw and take ideas from the ideas pool and then work on some specific ideas and test during the process. But this process need the stakeholder to do it by herself.

Page 10: Assignment 4: Prototype and Test

FEEDBACKTime is not enough to have this whole process to be work out by the stakeholder. And because only one week for her, she just got used to the working environment.