assets finance business solutions shaleen batra finance business solutions – user support &...
TRANSCRIPT
Assets
Finance Business Solutions
Shaleen BatraFinance Business Solutions – User Support & Training
Agenda
• What is an Asset?
• Tagging of UNSW Asset
• Buying an Asset
• Create a PO for Asset
• Receipt an Asset PO
• Scenarios
• Additions and BUILTIN Assets
• Search an Asset
What is an Asset?
Capitalised Item(s) ≥ $5000
To be capitalised over 3yr/ 5yr /8yr /10yr
Computers, Other Plant, Office Equipment, AV, Motor Vehicle
All the components should be added together
Additional procedures to be followed when creating/receipting a PO
Should be tagged
What is an Asset?
Acquisitions to be added to UNSW Asset
register
Lab, Plant, Office & other Equip / AV
EQ_CAP10YR
(A/C 5630)
EQ_CAP5YR
(A/C 5630)
Artwork < $5,000
Artwork ≥ $5,000
Contact
AMU
Motor Vehicles
MOTOR
(A/C 5300)
Computers
COMP_CAP
(A/C 5200)
Computer Equipment ≥5k
Computers Mainframes Monitors Base Units Modems Multi-controllers
Desktop printers Plotters Barcode Readers Image Device Scanners Digitisers Sensitisers Interface Cards
COMP_CAP (A/C 5200) Capitalised over 3 years
Other Plant & Equipment ≥5k
Microscopes Generators Pumps Surgical Equip Lab Items Binoculars Gym Equip
Tractors Farm Machinery Mowers Maintenance Machinery Forklifts Trailers Motor Bikes
EQ_CAP10YR (A/C 5630)Capitalised over 10 years
Airplanes
Office Equipment & AV ≥5k
Photocopiers Fax Machine Air Conditioning Unit
(Portable) Fridge**
Projectors TV Video Camcorders Editing equip Studio equip
EQ_CAP5YR (A/C 5630)Capitalised over 5 years
Office Equipment Audio Visual Photography
Camera Lenses Floodlights Processing equip
**only for office use not for research purposes
Artwork*
Paintings Prints Ceramics Photographs
Artwork <$5,000Non - Capitalised
Artwork ≥ $5,000Capitalised
ART_NONC (A/C 5400) ARTWORK (A/C 5400)
*Contact AMU before raising a PO
Motor Vehicles ≥5k
Cars Motor Bikes Quad Bikes Vans
Motor Vehicles Capitalised
MOTOR (A/C 5300)
Importantnot
e Software – Not an asset. Expense A/C 5620 is used
Furniture – No longer regarded as an asset. Expense A/C 5600 is used
Associated cost should be included in the value of an asset e.g. freight, installation, tax & levy.
Under $5000 – Not an asset (except artwork)
Additional insurance cost, annual fee, training & maintenance should not be included in Asset
Only the cost of acquiring the asset should be added not the cost of maintenance
Software included in a package – It is an Asset
Classes of non-Assets
Non-Assets (<$5k) Category Account
Furniture GOODS 5600
Computer Equip GOODS 5210
Computer Equip – Printers GOODS 5212
Computer Equip – Server Storage GOODS 5213
Computer Equip - Other GOODS 5214
Other Equipment GOODS 5211
Software GOODS 5260
Equip not owned by UNSW GOODS 5638
Use “GOODS” as category for the above non – assets items and select the relevant
Expense Account
Asset TagsTags are issued in advance of the purchase of an asset
Issued by Asset Management Unit (AMU)
Issued to Business Units (Faculties, Schools & Divisions)
Issued to one designated staff in each area
Apply the tag in the front of the equipment
Physical scanning of the equipment done annually by AMU
Tags should be affixed to assets at the time of receipt
Contact designated staff in your dept to get a tag
Assets should ONLY be bought using a Purchase Order.
Purchase Orders for assets can be created via eProcurement or Purchasing.
should not be
ASSETS Purchased
Unless they are bought using a Purchase Order, there is no way of entering the
Asset Management information e.g. owner, tag no, serial no, asset location,
dept etc. Contact Asset Management Unit for more information.
Buying an Asset
Procurement Card
PR1 Form
Expense Claim
Buying an Asset -Prepayment
Payment in advance for goods or services
Create a PO – Standard process
Contact AP and provide details
Receipt when goods are physically received or commissioned*
Notify AP via email and write prepayment in the subject line
*Process by which equipment (installed or near completion) is tested to verify if it functions according to the requirement
Asset Purchasing Process
Is this asset
owned by UNSW?
*1
Code to relevant Expense accounts
*2
Y
N
Have all costs been identified?
Need to identify all
costs *3
N
Is the total cost
≥ $5k (excl GST)
Prepayment?
Code to relevant Expense accounts
*4
Submit PO for
approval
Contact AP
Check if the correct category code is used
Raise PO
Y
Examples:
*1 - Research Equipment, lab Equipment, computer equipment & etc
*2 - Consumable goods, Services related costs & etc
*3 - Inclusion of all parts/components costs of the asset, Freight cost, installation cost & etc
*4 - Furniture, equipment not owned by UNSW, equipment <$5k,& etc
Y
N
Y
N
Send PO to
supplier
Create a PO for Asset
Asset Category will default the Asset
Account.DO NOT CHANGE
Asset Category
Asset Account
Asset PO - Description
Description of the Asset
Asset PO - Comments
Description & Comments
• Description field is limited - only 30 characters will display to Assets Management. (incl. spaces, commas, etc)
• Ensure the name of the asset is entered in the description field first
• Attachments – scan and attach quotes, supporting documents, etc.
Asset PO - Category
ART_NONCARTWORK
COMP_CAP
EQ_CAP10YR
EQ_CAP5YR
MOTOR
Asset Category
When a Purchase Order for Asset is created, the buyer must select an Asset Category
This defaults the appropriate Asset expense account & VAT defaults
Purchase will only be receipted as an Asset if a proper Asset Category is selected
Most Important
Categories
When an Asset Purchase Order is raised,
buyer must select an Asset Category Code
Category & Account
Once the category is selected, account will be defaulted automatically. Please do not change it.
If the Asset category code is not selected then the item will not be considered as an Asset.
Asset Management Team will ask you to do a manual update
Description Category Account
Artwork <$5,000* ART_NONC 5400
Artwork ≥ $5,000* ARTWORK 5400
Computer Equip ≥ $5,000 COMP_CAP 5200
Other Plant and Equipment ≥ $5,000 EQ_CAP10YR 5630
Office Equipment ≥ $5,000 EQ_CAP5YR 5630
Motor Vehicles MOTOR 5300
* Before you raise a PO for Artwork please contact AMU
Asset PO - Distribution
Asset PO - Distribution
Asset Account Code has been defaulted according to the Asset Category. Please DO NOT change Account Code
Enter FUND, Program/Class & PROJECT and then click Asset Information Tab
AM Unit & Profile ID
Defaults from
Category Code
VCDIV – Vice Chancellor’s area, Internal Audit Academic
Ensure the correct AM Business Unit & Profile ID have defaulted at the Asset Information
tab
AM Unit & Profile ID
//
If you know the Employee ID of the Custodian you can enter it now otherwise this can be done at the time of
receipting
Asset Receipting Process
Has the asset been
physically received?
Has the asset been
installed and
commissioned*1?
No Action Required
Y
N
No Action required
N
Go to receipt
Menu to receipt
the PO *2
Y
Can you see
Pending link to enter Asset
details?
YEnter
Asset Tag & Serial no
in the system
Add Custodian, Dept and
Asset Location in the system
PO was not
raised correctly. Contact
AMU
N
Save Receipt
number in the system
Send a copy of invoice to AP
with PO no and receipt no for
payment
*1 Process by which equipment (installed or near
completion) is tested to verify if it functions
according to the requirement
*2 Asset PO cannot be receipted via Portal Menu
Was Prepayment
done?
Email AP with details and
write Prepayment in the subject line
N
Y
Receipting AssetsReceipt when goods are installed / commissioned*
Receipt once all items related to the asset have been received, assembled/configured, tested and are ready to use
Asset information
via Pending
Link
Tag Number Serial ID
Dept Owner Asset Location
More Details
via Pending
Link
Employee ID
23
4
1
Go to Pending link
*Process by which equipment (installed or near completion) is tested to verify if it functions according to the requirement
Asset Receipting
Asset Receipting
If “Pending” link is not displayed, then you did not correctly select
an Asset Category when the PO was raised
Note: Contact Asset Management Office and details need to be entered manually
Employee ID
Employee ID
Employee ID Asset Custodian
Tag Number & Serial ID
Tag Number Serial ID
Asset Information
Tag Number & Serial ID
Serial ID Serial Id of the item
Tag NumberSix digit number provided by
AMU for tagging Asset
Asset ID
Asset IDPLEASE DO NOT CHANGE.
Should always be NEXT
Please DO NOT Click this icon.
Leave blank
Dept OwnerDept Owner Department who owns the
asset
Location of the Asset
LocationShould be the location of the Asset. By default it is Ship to location from your profile. If this is not changed then it will be blank when asset details are transferred to AM system
Format of the location should be Building / Level / Room///
Scenario 1
Single Asset1 line PO
Qty 1
Chartfield 1Qty 1
Scenario 1: One Line PO – Single Asset and one chartfield
TAG1 SN1
Scenario 2 - PO
Chartfield 1Qty 0.7
Chartfield 2Qty 0.3
Scenario 2: One Line PO – Single Asset with split chartfield
Single Asset1 line PO
Qty 1
Scenario 2 - Receipt
Chartfield 1Qty 0.7
Chartfield 2Qty 0.3
Scenario 2: One Line PO – Single Asset with split chartfield
TAG1
TAG1
SN1
SN1
Single Asset1 line PO
Qty 1
Tag no and Serial ID should be same for both the distribution lines at the time
of receipting
Scenario 2 - Receipt
Scenario 3 - PO
Chartfield 1Qty 3
Scenario 3: One Line PO – Single Asset multiple quantity and same chartfield
Single Asset1 line PO
Qty 3
Scenario 3 - Receipt
Chartfield 1Qty3
TAG1
TAG2
SN1
SN2Single Asset
1 line POQty 3
When you go to create a receipt and click Pending link, you will see 3
lines. All 3 are separate Assets not part of one asset. Each distribution line
Should have a separate Tag no and Serial ID.
Scenario 3: One Line PO – Single Asset multiple quantity and same chartfield
TAG3 SN3
If you use the same serial ID, receipt will be saved in open status which is incorrect and Asset will have problems transferring to Asset
register. Amend the serial ID and save. Receipt status will be changed to “Fully Received”
If you use the same tag number, receipt will be saved in “Fully Received” status. However, this will create issues at the time of
physical scanning of the equipments.
Scenario 3 – Receipt
Should always be NEXT. DO NOT ChangeDifferent Tag No &
Different Serial ID
Scenario 4 - PO
Chartfield 1Qty 1
Scenario 4: One Line PO – Single Asset multiple quantity and multiple chartfield
Single Asset1 line PO
Qty 3
Chartfield 2Qty 2
Chartfield 3Qty 3
Scenario 4 - Receipt
TAG1
TAG2
SN1
SN2
When you go to create a receipt and click Pending link, you will see 3
lines. All 3 are separate Assets not part of one asset. Each distribution line
Should have a separate Tag no and Serial ID.
Scenario 4: One Line PO – Single Asset multiple quantity and multiple chartfield
TAG3 SN3
Chartfield 1Qty 1
Single Asset1 line PO
Qty 3
Chartfield 2Qty 2
Chartfield 3Qty 3
If you use the same tag number, receipt will be saved in “Fully Received” status. However, this will create issues at the time of
physical scanning of the equipments.
If you use the same serial ID, receipt will be saved in open status which is incorrect and Asset will have problems transferring to Asset
register. Amend the serial ID and save. Receipt status will be changed to “Fully Received”
Scenario 4 - Receipt
Should always be NEXT. DO NOT ChangeDifferent Tag No &
Different Serial ID
Scenario 5 - PO
Chartfield 1Qty 1
Scenario 5: Multiple Line PO – Asset with several components
Asset 1Component A
Qty 1
Asset 1Component B
Qty 1
Asset 1CoreQty 1
Chartfield 1Qty 1
Chartfield 1Qty 1
Asset Category should be used for all the lines including freight and installation
Scenario 5Scenario 5: Multiple Line PO – Asset with several components
Chartfield 1Qty 1
Asset 1Component A
Qty 1
Asset 1Component B
Qty 1
Asset 1CoreQty 1
Chartfield 1Qty 1
Chartfield 1Qty 1
TAG1
TAG1
SN1
Component A
TAG1 Component B
TAG number for all three lines should be same. You can write Serial ID of the Core component and Use Component A and
Component B for associated items
Scenario 5 - ReceiptScenario 5: Multiple Line PO – Asset with several components
Line 1
Line 2
Line 3
Additions – Existing Asset
Additions
Enhance Functionality of an
existing Asset
Add to the life of an existing
Asset
OR
Part of an existing Asset
Individual Asset
OR
Scenario: If you are buying a new microscope • Will that be used as a part of other Asset?• Will that be used as a part of more than one Asset?• Will that be used as an individual?
Scenario 6 - PO
Chartfield 1Qty 1
Scenario 6: Multiple Asset PO – Addition to an Existing Asset on UNSW Asset Register
Asset 2Qty 1
Asset 1Qty 1
Chartfield 1Qty 0.5
Chartfield 2Qty 0.5
Line 1 – Asset 1 – EEG Recording H/W – Individual Asset
Line 2 – Asset 2 – EEG Enhancement – BUILT IN to an existing Asset previously purchased
Scenario 6 – PO DistributionScenario 6: Multiple Asset PO – Addition to an Existing Asset on UNSW Asset Register
Line 2 – Asset 2 – EEG Enhancement – BUILT IN to an existing Asset previously purchased
Line 1 – Asset 1 – EEG Recording H/W – Individual Asset
Scenario 6 - Receipt
Scenario 6: Multiple Asset PO – Addition to an Existing Asset on UNSW Asset Register
Chartfield 1Qty 1
Asset 2Qty 1
TAG1 SN1
BUILTIN - A
Asset 1Qty 1
Chartfield 1Qty 0.5
Chartfield 2Qty 0.5
BUILTIN - A
TAG #Existing Asset
TAG #Existing Asset
Scenario 6 - Receipt Scenario 6: Multiple Line PO – Addition to an Existing Asset on UNSW Asset Register
Line 1 – Asset 1 – EEG Recording H/W
Tag number of the existing Asset
New Tag Number
Line 2 – Asset 2 – EEG Enhancement – BUILT IN to an existing Asset previously purchased
//
Search for Receipted Asset
Search either with the PO number
or
Receipt number
//
Search for Receipted Asset
//
Asset Information link can only be accessed for the selected line.
Troubleshooting
1. When I go to receipt the PO, there is no Pending link.
Asset Category Code was not selected at the time of
creating the PO. Contact AMU.
2. I receipted all the lines of the PO but the receipt is still in Open Status.
• Check if the Tag number and Serial ID is entered correctly• Make sure that the Asset ID is “NEXT”
3. I am buying an Artwork for my Dept. What should I do before raising a PO
Contact Asset Management Unit
Knowledgebase
Support & Guidance
• Buying NetworkExt. 53330, Email - [email protected] My Buying Network -http://www.fin.unsw.edu.au/OurServices/FinancialOperations_Purchasing_FindBuyingNetwork.html
• Accounts PayableAP Help - Ext. 53356, Email - [email protected] of Invoices, Email- [email protected]
• Finance Website – Purchasinghttp://www.fin.unsw.edu.au/OurServices/FinancialOperations_Purchasing.html
• Purchasing Guidelines & Procedureshttp://www.fin.unsw.edu.au/OurServices/FinancialOperations_Purchasing_Guidelines.htmlhttp://www.fin.unsw.edu.au/files/PP/Purchase_Order_Procedure.pdf
• Asset Management UnitFrancine Porto Gomes- Ext. 53865, Email – [email protected]://www.fin.unsw.edu.au/OurServices/FinancialControl_AssetManagement.html
User Support & Training
• Finance Website – Traininghttps://www.fin.unsw.edu.au/NSF_KnowledgeBase/FKB_Training.html
• Training EnquiriesExt. 53550 / 57665, Email [email protected]
Questions