assembly instructions hum. minds at work. · hum. minds at work. ® 4 proper product installation,...
TRANSCRIPT
![Page 1: Assembly Instructions Hum. Minds at Work. · Hum. Minds at Work. ® 4 Proper product installation, in accordance with these instructions, is the responsibility of the installing agent](https://reader036.vdocuments.mx/reader036/viewer/2022062508/6045b79d75ca1b091248b1bc/html5/thumbnails/1.jpg)
Hum. Minds at Work.® 1
Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Care.
2230949, Revision B
Assembly Instructions
Four Circuit Power Tools Required
Mallet
Flathead Screwdriver
The installation of the four circuit floor/wall power in-feed,
modular starter plate, or ceiling power in-feed must be per-
formed by a licensed electrician in accordance with the Na-
tional Electrical Code and local codes. Reference labels on
conduit for wiring diagrams.
Warning: Hum electrical components are manufactured to meet UL1286
Requirements. Do not use Cetra, Xsite, or Interworks EQ
electrical components with Hum.
Figure A
Figure B
Note: Installation must be in accordance with
the National Electrical Code and local codes.
Electrically interconnected tables need
to be mechanically connected.
![Page 2: Assembly Instructions Hum. Minds at Work. · Hum. Minds at Work. ® 4 Proper product installation, in accordance with these instructions, is the responsibility of the installing agent](https://reader036.vdocuments.mx/reader036/viewer/2022062508/6045b79d75ca1b091248b1bc/html5/thumbnails/2.jpg)
Hum. Minds at Work.® 2
Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Care.
2230949, Revision B
Assembly Instructions
Four Circuit Floor/Wall Power In-Feed Tools Required
None
Note:The installation of the four circuit floor/wall power in-feed must be performed by a licensed electrician in accordance with the
National Electrical Code and local codes. Reference labels on conduit for wiring diagrams. Electrically interconnected tables need
to be mechanically connected.
Figure C
Warning: Hum electrical components are manufactured to meet UL1286 Requirements. Do not use Cetra, Xsite, or Interworks EQ
electrical components with Hum.
Note: Take care to ensure that the
electrical power supply cord is pro-
tected from being damaged or pinched
after installation.
![Page 3: Assembly Instructions Hum. Minds at Work. · Hum. Minds at Work. ® 4 Proper product installation, in accordance with these instructions, is the responsibility of the installing agent](https://reader036.vdocuments.mx/reader036/viewer/2022062508/6045b79d75ca1b091248b1bc/html5/thumbnails/3.jpg)
Hum. Minds at Work.® 3
Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Care.
2230949, Revision B
Assembly Instructions
Four Circuit Modular Power In-Feed Tools Required
None
Figure D
Note: Take care to ensure that the electrical
power supply cord is protected from being
damaged or pinched after installation.
Note: The installation of the four circuit modular in-feed must be performed by a licensed electrician in accordance with the
National Electrical Code and local codes. Reference labels on conduit for wiring diagrams. Electrically interconnected tables need
to be mechanically connected.
Warning: Hum electrical components are manufactured to meet UL1286 Requirements. Do not use Cetra, Xsite, or Interworks EQ
electrical components with Hum.
Important Warning Information
![Page 4: Assembly Instructions Hum. Minds at Work. · Hum. Minds at Work. ® 4 Proper product installation, in accordance with these instructions, is the responsibility of the installing agent](https://reader036.vdocuments.mx/reader036/viewer/2022062508/6045b79d75ca1b091248b1bc/html5/thumbnails/4.jpg)
Hum. Minds at Work.® 4
Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Care.
2230949, Revision B
Assembly Instructions
Four Circuit Ceiling Power In-Feed Tools Required
Philips Screwdriver
Hacksaw (if necessary) Figure E
Figure F
Warning: Hum electrical components are manufactured to meet UL1286 Requirements. Do not use Cetra, Xsite, or Interworks EQ
electrical components with Hum.
Note: The installation of the four circuit ceiling power in-feed must be performed by a licensed electrician in accordance with the
National Electrical Code and local codes. Reference labels on conduit for wiring diagrams.
![Page 5: Assembly Instructions Hum. Minds at Work. · Hum. Minds at Work. ® 4 Proper product installation, in accordance with these instructions, is the responsibility of the installing agent](https://reader036.vdocuments.mx/reader036/viewer/2022062508/6045b79d75ca1b091248b1bc/html5/thumbnails/5.jpg)
Hum. Minds at Work.® 5
Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Care.
2230949, Revision B
Assembly Instructions
New York Electrical Tools Required
None
Note: Installation must be in
accordance with the National
Electrical Code and local codes.
Electrically interconnected tables
need to be mechanically con-
nected.
Figure G
Hardwire Box Electrical Tools Required
Flathead Screwdriver
Mallet
Cordless Drill
Note: Installation must be in accordance with
the National Electrical Code and local codes.
Electrically interconnected tables need
to be mechanically connected.
Warning: Connection to building power must be completed by a licensed electri-
cian. Installation must be in accordance with National Electrical Code and local
codes.
Note: Decora style receptacles, wires, EMT listed con-
duit, and fittings to be supplied by contractor.
Warning: Connection to building power must be completed
by a licensed electrician. Installation must be in accordance
with National Electrical Code and local codes.
Note: Decora style receptacles, wires, EMT listed conduit, and fittings to be sup-
plied by contractor.