aspects of nepal's rural infrastructure project managment by bhim upadhyaya
TRANSCRIPT
Slide 1
Aspects of Rural Infras Project Management
Er. Bhim UpadhyayaDDG DoLIDAR
NASC class on Aspects of Rural Infras Project Managment 066.11.251
PDE/SDC Orientation1
Engineer & Engineering "Engineering is a great profession. There is the satisfaction of watching a figment of the imagination emerge through the aid of science to a plan on paper. then it moves to realization in stone or metal or energy. then it brings homes to men or women. then it elevates the standard of living and adds to the comforts of life. this is the engineer's high privilege." -Herbert Hoover (Er.) 31st President, USA2NASC class on Aspects of Rural Infras Project Managment 066.11.25
Engineer & Engineering"The great liability of the engineer compared to men of other professions is that his works are out in the open where all can see them. His acts, step by step, are in hard substance. He cannot bury his mistakes in the grave like the doctors. He cannot argue them into thin air or blame the judge like the lawyers. He cannot, like the architects, cover his failures with trees and vines. He cannot, like the politicians, screen his short-comings by blaming his opponents and hope the people will forget. The engineer simply cannot deny he did it. If his works do not work, he is damned."-Herbert Hoover, Engineer & 31st President, USA3NASC class on Aspects of Rural Infras Project Managment 066.11.25
Engineering"The story of civilization is, in a sense, the story of engineering- that long and arduous struggle to make the forces of nature work for man's good." --L Sprange DeCamp4NASC class on Aspects of Rural Infras Project Managment 066.11.25
NASC class on Aspects of Rural Infras Project Managment 066.11.255Lecture ContentProject: definition, cycle, party & phasesProject Stakeholders, Functions, Environment,Phases, ToolsProject Practice: Rural Infras.Responsibility Break-downSome relevant case-photographs
PDE/SDC Orientation5
What is a Project(Public Works)?A Project has the following attributes Objective or Goal Time Cost Location or space; and A Team-work of expertsNASC class on Aspects of Rural Infras Project Managment 066.11.256
PDE/SDC Orientation6
A Project has mainly 3+1 Stakeholders: 4C's1.Client (or Employer) 2.Consultant (or Engineer)3.Contractor (or Consumer Group)4.ConsumerNASC class on Aspects of Rural Infras Project Managment 066.11.257
PDE/SDC Orientation7
Project PhasesStudy (Data collection & Need)Design Phase (Detailing for Goal) Development Phase (Input-Output Mngt.) Operation Phase (Service Mngt.)NASC class on Aspects of Rural Infras Project Managment 066.11.258
PDE/SDC Orientation8
NASC class on Aspects of Rural Infras Project Managment 066.11.259
Project Life cycle
NASC class on Aspects of Rural Infras Project Managment 066.11.2510
Project Phases
NASC class on Aspects of Rural Infras Project Managment 066.11.2511
Work Break Down StructureNASC class on Aspects of Rural Infras Project Managment 066.11.2512
NASC class on Aspects of Rural Infras Project Managment 066.11.2513
Work Break Down Structure
NASC class on Aspects of Rural Infras Project Managment 066.11.2514
Gantt Chart
CPMNASC class on Aspects of Rural Infras Project Managment 066.11.2515
NASC class on Aspects of Rural Infras Project Managment 066.11.251616
Seven Sectors of Local Infrastructure
PDE/SDC Orientation16National Society of Agri Engineers16
17PROJECT MGMT(Input & Output) PROCUREMENTMGMT,Goods, works,servicesFINANCIALMGMT CONTRACTMGMT QLTY/LAB MGMT SITE MGMT
PROJECT Management Breakdown
TechnicalAudit QAP WORK PLAN
payment in timeDISBURSEMENT Reporting
MobilizationInsuranceClaim & RefundDetail Project ReportSelection, WalkoverEIRR,IEE, ResettlementLand AcquisitionDetail Survey, DesignEstimate Approval
ContractorsRBG, VIUGConsultantsCONSTRUCTION MGMTNASC class on Aspects of Rural Infras Project Managment 066.11.25
PDE/SDC Orientation17
Public Works PartiesNASC class on Aspects of Rural Infras Project Managment 066.11.2518Standard 3 party Int'l Practice for large Works2 Party Nepali(Local Body) Practice for small and medium sized Works
PDE/SDC Orientation18
Phases of Public Works NASC class on Aspects of Rural Infras Project Managment 066.11.2519
PDE/SDC Orientation19
NASC class on Aspects of Rural Infras Project Managment 066.11.2520
PDE/SDC Orientation20
NASC class on Aspects of Rural Infras Project Managment 066.11.2521
PDE/SDC Orientation21
NASC class on Aspects of Rural Infras Project Managment 066.11.2522
PDE/SDC Orientation22
3 Parties Mutual Check and BalanceNASC class on Aspects of Rural Infras Project Managment 066.11.2523
PDE/SDC Orientation23
Supervisory HierarchyNASC class on Aspects of Rural Infras Project Managment 066.11.2524
PDE/SDC Orientation24
NASC class on Aspects of Rural Infras Project Managment 066.11.2525AspectsScheduling, Gantt, CPM, PERT
Drawing, Specification, Lab Tests, Qualified Supervisors
PDE/SDC Orientation25
NASC class on Aspects of Rural Infras Project Managment 066.11.2526
PDE/SDC Orientation26
NASC class on Aspects of Rural Infras Project Managment 066.11.2527Road ill-designed and in Disrepair
27Poor-Maintenance and hardships12,000km un-operational road
PDE/SDC Orientation27PDE/SDC Orientation27
Good Quality works in progress
NASC class on Aspects of Rural Infras Project Managment 066.11.2528
PDE/SDC Orientation28
NASC class on Aspects of Rural Infras Project Managment 066.11.2529 29
PDE/SDC Orientation29National Society of Agri Engineers29
NASC class on Aspects of Rural Infras Project Managment 066.11.2530
Road Construction Technologies30
PDE/SDC Orientation3030
NASC class on Aspects of Rural Infras Project Managment 066.11.2531
Lab Facility
PDE/SDC Orientation31
NASC class on Aspects of Rural Infras Project Managment 066.11.253232
More than 12000 such TB Required
PDE/SDC Orientation32National Society of Agri Engineers32
NASC class on Aspects of Rural Infras Project Managment 066.11.253333
PDE/SDC Orientation33National Society of Agri Engineers33
NASC class on Aspects of Rural Infras Project Managment 066.11.2534
Project Stakeholders
NASC class on Aspects of Rural Infras Project Managment 066.11.2535
Project Environment
NASC class on Aspects of Rural Infras Project Managment 066.11.2536
Cost Control through Time, Cost Control
NASC class on Aspects of Rural Infras Project Managment 066.11.2537
Core Function of a Project
NASC class on Aspects of Rural Infras Project Managment 066.11.2538
Scope, Time and Cost management for Success of Project
NASC class on Aspects of Rural Infras Project Managment 066.11.2539
Thank YouAny [email protected]
PDE/SDC Orientation39