asia pacific update - fieldbus foundation · · 2014-11-131. ap-eac/stecom organization and...
TRANSCRIPT
Asia Pacific Update
Automation 2014Mumbai, India
October 16th , 2014
Hisashi Sasajima
2
1. AP-EAC/SteCom organization and Migration
2. F-ROM Reports• Japan: F-ROM JEMIMA Demonstration/Site Test Plan
Agenda
October 16th , Automation 2014
3
Company EAC SteCom1. ABB Madhav Kalia Jack Vanderhorst2. Azbil Hisashi Sasajima Hisashi Sasajima 3. Emerson Vidya Ramnath Jonas Berge
Honeywell Lin, Yew Chai Yeo Hwee Khoen (Withdraw in 2013)4. GE Oil & Gas5. Invensys Mahajan, Amar (To be appointed)6. Leoni - Vincent Foo (New from 2012)7. Moore Hawk - Michael Carolan (New from 2012)8. MTL(Cooper Ind.) P T Lim Andreas Agostin9. Pepperl+Fuchs Shane Parr Arasu Thanigai10. Rockwell Automation Eugene Yeo Glen Chang11. R Stahl Alain Schellings Wilson Lim 12. Smar - Lesley Leong (New from 2012)13. Turck Frank Rohn14. Yokogawa Prasad CNN Jerry Shi Shuai / Kaoru Onodera
Softing - Alfred Quintero (Withdraw in 2013)15. Endress+Hauser Jonathan Soanes(Australia) (New from 2013)16. Phoenix Contact Johnny Low(Singapore) (New from 2013)
Asia Pacific Executive Advisory Council (AP-EAC) and
AP- Steering Committee (AP-SteCom)as of August, 2014
4
Fieldbus FoundationAsia Pacific Organization
Asia PacificExecutive Advisory Council
AP Steering Committee
India(FFIMC)
China(CFFC)
Japan(FF-J) Taiwan Thai
(FFTA)Korea
(FFKMC)Malaysia Indonesia Australia
AP-EAC Funding Regions
EUC-India EUC-J
FCTPUL
FCTPWaseda
FCTPKMITL
FCTPYanshan
FCTPPetronas
Independent Funding Regions
• ABB• Azbil• Cooper Ind. (MTL)• Emerson• Endress+Hauser• Invensys• Leoni• MooreHawk
• Pepperl+Fuchs• Phoenix Contact• Rockwell• Smar• Turck• R. STAHL• Yokogawa
5
Asia Pacific Organization
AP Steering CommitteeSecretary
Jonas Berge
AP Steering CommitteeVice ChairmanArasu Thanigai
IndiaMarketing Committee
Thampy Mathew
China Marketing Committee
Yuenian WU
MalaysiaMarketing Event Team
JapanMarketing Committee
Takashi Ikeda
KoreaMarketing Committee
Beom-Sik Lee
IndonesiaMarketing Event team
ThaiMarketing Committee
Srinakorn Nontanakorn
Taiwan Marketing Event Team
Australia Marketing Event Team
as of March, 2014
Asia Pacific Steering Committee
ChairmanHisashi Sasajima
Asia Pacific Executive Advisory Council
ChairmanShane Parr
Asia Pacific Executive Advisory Council
Vice ChairmanParasad CNN
AP Steering CommitteeAssist. SecretaryAndreas Agostin
6
AP Executive Advisory Council (AP-EAC) Membership
Promote the Foundation Technology more and encourage End User challenge in Asia with strategic allocation of event funding for developing new regions, sponsoring EUCs and marketing promotions
AP-EAC funded by 15 companies in 2013;– ABB– Azbil– Cooper Ind. (MTL)– Emerson Process Management– Endress+Hauser– Invensys– Leoni– MooreHawk– Pepperl+Fuchs– Phoenix Contact– Rockwell Automation– Smar– Turck– R. STAHL– Yokogawa Blue: New in 2013
FCG Boards•ABB•Azbil•Emerson Process Management•Endress + Hauser•Fuji Electric•Foxboro/Schneider Electric• Honeywell• Pepperl+Fuchs• Rockwell Automation•Siemens•Yokogawa
7
Company EAC SteCom1. ABB Madhav Kalia Jack Vanderhorst2. Azbil Hisashi Sasajima Hisashi Sasajima 3. Emerson Vidya Ramnath Jonas Berge4. Invensys Mahajan, Amar (To be appointed)5. Leoni - Vincent Foo (New from 2012)6. Moore Hawk - Michael Carolan (New from 2012)7. MTL(Cooper Ind.) P T Lim Andreas Agostin8. Pepperl+Fuchs Shane Parr Arasu Thanigai9. Rockwell Automation John Watts Glen Chang10. R Stahl Alain Schellings Wilson Lim 11. Smar - Lesley Leong (New from 2012)12. Turck (To be appointed) Andrew Lim13. Yokogawa Prasad CNN Jerry Shi Shuai / Kaoru Onodera14. Endress+Hauser - Jonathan Soanes (New from 2013)15. Phoenix Contact - Johnny Low (New from 2013)
Asia Pacific Executive Advisory Council (AP-EAC) and
AP- Steering Committee (AP-SteCom)as of September, 2013
8
Asia Pacific Organization
AP Steering CommitteeVice ChairmanArasu Thanigai
AP Steering CommitteeEvent Accounting(Andreas Agostin)
China Marketing Committee
Yuenian WU
KoreaMarketing Committee
Beom-Sik Lee
JapanMarketing Committee
Takashi Ikeda
SingaporeMarketing Committee
MalaysiaMarketing Committee(Bala Subramaniam?)
ThaiMarketing Committee
Srinakorn Nontanakorn
IndiaMarketing Committee
Thampy Mathew
IndonesiaMarketing Committee
(Djoni Lukman?)
Australia Marketing Committee
T.B.D.
Dissolved
as of March 2013
Asia Pacific Steering Committee
ChairmanHisashi Sasajima
Asia Pacific Executive Advisory Council
ChairmanShane Parr
Asia Pacific Executive Advisory Council
Vice ChairmanParasad CNN
AP Steering CommitteeSecretary
Jonas Berge
9
2014 Marketing Events in Asia Pacific East Asia China June 16 ChongQing End User Seminar
October 23 NingBo End User Seminar Japan March 12 Waseda U., Tokyo End User Seminar
November 19-21 Osaka JEMIMA 2014 Exhibition Taiwan - Korea November 21 Seoul End User Seminar
South East Asia Malaysia OGA 2015 Kuala Lumpur End User Seminar Vietnam - Thailand November 7 Pataya End User Seminar Indonesia May 7 Jakarta End User Seminar Singapore -
India India October 15-18 Mumbai Automation 2014 Exhibition
Oceania Australia -
(as of January 2014)
10
Fieldbus Foundation Certified Training Program
(FCTP)
Fieldbus CenterLee College, TX
STC Brielle, Netherlands
SINOPECBeijing Yanshan PetrochemicalSimulation Center
Waseda Univ.Open Network Lab.
Tokyo
Trine University, IN
Bandung Institute of Technology.
Indonesia
King Mongkuts’ Institute of Technology
LadkrabangBangkok, Thai
SAIT, Canada
as of December , 2013
IIT UL
MIT
University Of MiskolcHungary
• UL Group- Pune• Indian Institute of Technology • Madras Institute of Technology
India
Edith Cowan UniversityPerth, Australia
STC Sohar Oman
IDX JohannesburgSouth Africa
Petronas UniversityKL, Malaysia
PetrobrasRio de Janeiro
Fieldbus Foundation Asia pacific
Regional Situation
12
ROM End User Site Test 2015• Waseda University
ROM Demonstration • JEMIMA 2014 Osaka (Nov.19-21)
13
F-ROM Event in Japan(F-ROM Workshop at Waseda)
IONL (Industrial Open Network Laboratory), Waseda University (FCTP site) provides an event site and their test facilities for F-ROM event.
EUC-Japan members (including Mitsubishi Chemical) will participate F-ROM Workshop to study, evaluate F-ROM technology and its related technology including H1 itself.
Workshop plan Venue: Kikuicho campus in Waseda Univ. (Tokyo) Period: May 2014 to June 2015 Facilities: Residential fuel cell cogeneration system test facility,
gas fired absorption pump test facility and seminar demo room Press day: June 2015
Preliminary Version
14
System Overview
Temp. (2)
Temperature
Host SystemH1LD
Gas flowmeter (addition)Mag flowmeter (exchange)
(Pressure transmitter (addition))
ISA100GW
WiHARTGW
RIO
FW
Gas fired absorption pump
ISA100Wireless
WirelessHART
AzbilF-ROM
Host
JB
RIO
Pressure
HUBHUB
HUB
Rack
(Rack)
FW
LabView
Pipe mountingLocal Control Panel
H1LD
Test devices
Campus LANHSE
MOD
HSE
HSE
MOD
H1
HSE/MODBUS
H1
Waseda’s facility
Donation
HSE
Residential Fuel Cell Cogeneration SystemTest Facility (basement)
Lab Building Rooftop
SeminarDemo RoomOutside
Wired or Wireless LAN
CV (2)AC/DC
Sunshine
: AdopterFBPS
Sensor (2)
H1 Display (1)
Rack/Panel Equipment
Demo area
RIO
Wireless device demo areaPractical use area #2
Practical use area #1
15
Call equipment criteria
Equipment for Practical use are #1 and #2 ( Class 1) Specification and Date of deliver are tightly decided. These must be donation. All Gateways (including RIO) must be donation for permanent use.
Wireless demo area (Class 2) A few devices are requested by Waseda. But unlisted devices are
welcome to donate or lend for the event period.Demo area (Class 3)
All kinds of equipment are welcome for demonstration. Good opportunity appealing your products to Japanese end user (EUC-J members).
If you want to participate JEMIMA show 2014 Osaka (Nov. 19 to 21) using the same devices in the demo area, it is acceptable. Please ask Hiroyuki Tsugane for details.
16
Field Device List (Required)
Since this site has small demonstration area as off-line use, if you want to provide other field devices excluding above, please contact Hiroyuki Tsugane ([email protected]).
Location No. Device Process Min Max Nor. Unit Pipe size Processconnection
Deliverydate
Remarks
F1 Fuel cell unit fuel city gas flow City gas 13A 0.01 1.6 0.17 m3/h 20A Screw 18-Jul-14 Analog (4-20mA)
F2 Heat pump city gas flow City gas 13A 0.07 10 5 m3/h 32A Screw 18-Jul-14 Analog (4-20mA)
F3 Fuel cell unit circulation water flow(Electromagnetic Flowmeter)
Hot water 0.05 1 0.42 L/h R1/4 18-Jul-14 HART
F4 Pressure Transmitter Chilled water 0.14 0.23 0.16 MPa 3-Oct-14 HART
F5 Gas heat pump city gas flow City gas 13A 2 m3/h RC1/2 18-Jul-14 Analog (4-20mA)
F6Hot water cooling line temperaturetransmitter Hot water ºC - 18-Jul-14
Waseda provides a sonsor(Pt100)Fieldbus
F7 Hot water cooling line control valve Hot water 2800 8000 6340 L/h 25A 18-Jul-14 CV in: Mpa, out: MPaFieldbus
F8 Brine heating line temperature transmitter Chilled water ºC - 18-Jul-14Waseda provides a sonsor(Pt100)Fieldbus
F9 Brine heating line control valve Chilled water 2000 4000 3020 L/h 25A 18-Jul-14CV in: Mpa, out: MPaFieldbus
F10 Temperature transmitter (Wireless) Atmosphere -10 50 10-30 ºC 2B pipe 3-Oct-14 Wireless
F11 Temperature transmitter (Wireless) Atmosphere -10 50 10-30 ºC 2B pipe 3-Oct-14 Wireless
F12 Pressure transmitter (Wireless) Atmosphere 90 150 101.3 kPa 2B pipe 3-Oct-14 Wireless
F13 Pressure transmitter (Wireless) Atmosphere 90 150 101.3 kPa 2B pipe 3-Oct-14 Wireless
F14 Wireless adaptor for sunshine transmitter Atmosphere 4 20 mA 2B pipe 3-Oct-14 Analog sunshine transmitterprovided by Waseda Univ.
F15 Wireless adaptor for sunshine transmitter Atmosphere 4 20 mA 2B pipe 3-Oct-14 Analog sunshine transmitterprovided by Waseda Univ.
Lab BuildingRooftop
ResidentialFuel Cell
CogenerationSystem Test
Facility(Basement)
Gas FiredAbsorptionHeat Pump(Outside)
Delivery date: July 18th, 2014
17
F-ROM Device List (Required)No. Device Specification Q'ty Delivery date RemarksR1 Remote I/O HART AIx8, DIx16, DOx16 2 18-Jul-14 Modbus acceptableR2 Remote I/O HART AIx8, DIx16 1 3-Oct-14 HSER3 H1 Linking Device HSE/H1 1 18-Jul-14 HSER4 H1 Linking Device HSE/H1 1 3-Oct-14 Modbus acceptableR5 Device Coupler (JB) 8-12 spurs 1 18-Jul-14 For H1R6 Device Coupler (JB) 8-12 spurs 1 3-Oct-14 For H1R7 Fieldbus Power supply 8-12 spurs 1 18-Jul-14 For H1R8 Fieldbus Power supply 1 3-Oct-14 For H1R9 Fieldbus cable 100m 18-Jul-14 For H1R10 ISA100 Wireless Gateway 1 3-Oct-14 HSER11 WirelessHART Gateway 1 3-Oct-14 Modbus acceptableR12 Ethernet HUB 4-8 ports 1 18-Jul-14R13 Ethernet HUB 4-8 ports 2 3-Oct-14R14 Wireless LAN router 1 pair 3-Oct-14 Meets Japanese Radio lawR15 F-ROM Host system Azbil provides 3-Oct-14
Delivery date: July 18th, 2014
18
Schedule (tentative)
FF-J approved F-ROM event plan at Waseda
Explained the plan at EUC-J meeting
Call EUC-J members for participations
April, 2014
JuneJulyAug.Sept.Oct.Nov.Dec.Jan.Feb.Mar.AprilMayJune
Make a test plan
Study each technology before testing;(1) H1(2) HART(3) ISA100 Wireless(4) WirelessHART(5) F-ROM
2015
Invite media and sponsors
Make a test report
Date EUC-J IONL FF-J Sponsors Description
FF-J meeting
EUC-J
Test plan (1 day)
Report (1 day)
Press Day (1 day: preparation + the press day)
StudyH1, HART,
ISA100Wireless, WirelessHART
F-ROM(2 days)
System staging and configuration (1-2 days)Test (1-2 days)
Support
Support
Note: Number of days above shows minimum days
Call for devices
Providedevices
May
Call F-ROM Sponsors for test devices
19
After F-ROM event
Waseda will continue use these facilities for their study and is planning another class, demo and/or training for digital integration using these facilities. ( not as a part of F-ROM demo, so far)
20
Measurement and Control Show 2014 OSAKA
20
Date: 19th - 21st, November, 2014Location: Osaka International Convention Center
(Nakanoshima, Kita-ku, Osaka City, Japan)
”Measurement and Control, lead to the future earth”"Turning the key to the future"
21
21
Measurement and Control Show 2014 OSAKA
“Sustainable Growth”
while “Protecting
Global Environment
s”
SmartManufacturing
EnergyEfficiency
Safetyand
Security
Interface between
Smart Gridand
FEMS
Supply Chain and
Logistics
CloudApplication
andSolution
Key Messages
Technical Forum and Seminars- IEC TC65 Forum: Measurement, Control and Automation: Industrie 4.0 and Energy
Efficiency- Round Table Discussion
22
JEMIMA 2014 OSAKA F-ROM Demo Plan
(November 19 – November 21)
H1 Intrinsic Safety InstallationWired and Wireless ROM Installation
23
JEMIMA 2014 OSAKA F-ROM Demo Plan
(November 19 – November 21)
24
Host DCS
BackhaulWireless
25
JEMIMA 2014 OSAKA F-ROM Demo Plan
(November 19 – November 21)BackhaulWireless
Host DCS
WirelessAccess Point
26
IEC TC65 Participating Countries
P-member:26 countriesO-member:15 countries
27
Thank You