1. ORACLE ASCP Coproducts FunctionalityTo fulfil Coproducts demand ORACLE creates one Planed Order for one of the coproducts and one Planned Orders co-products/by-product for the rest of the coproducts2. ScenarioWe have two formulas with CoproductsFormulaComponent TypeComponentQty
XXProdCoproductXXProd11
CoproductXXProd21
IngredientXXIngr11
IngredientXXIngr21
XXProd3CoproductXXProd31
CoproductXXProd41
IngredientXXIngr11
IngredientXXIngr21
We will create a forecast demand for the coproducts as followsItemDateQuantityComment
XXProd1Current Date + 7100Should be replenished for a single Planned Order
XXProd2Current Date + 14100
XXProd3Current Date + 8150Should be replenished for a single Planned Order
XXProd4Current Date + 8150
We want to launch a plan associated to the above forecast and analyse the resultsExpected ResultsWe expect ASCP to create 1. Two Planned Orders: for the first Coproducts of each Formula (XXProd1, XXProd3)2. Two Planned Orders co-products/by-product: for the second Coproducts of each Formula.
3. Setup3.1. Organization Items Planning AttributesAll coproducts MPS/MRP planning item attributes were defined as:
ItemItem
General Planning TabGeneral Planning Tab
Inventory Planning MethodNot PlannedInventory Planning MethodNot Planned
PlannerPlanner
Make or BuyMakeMake or BuyBuy
Safety StockNon-MRP PlannedSafety StockNon-MRP Planned
MPS/MRP Planning TabMPS/MRP Planning Tab
OrganizationOrganization
Exception SetException Set
Planning MethodMRP/MPP PlannedPlanning MethodMRP/MPP Planned
Forecast ControlConsume and DeriveForecast ControlConsume and Derive
PeggingEnd Assembly/Soft PeggingPeggingEnd Assembly/Soft Pegging
Round Order Quantities YesRound Order Quantities Yes
Create SupplyYesCreate SupplyYes
Planning Time Fence1 Planning Time Fence1
3.2. Formulas
FormulaVersionComponent TypeComponentQty
XXProd11CoproductXXProd11
CoproductXXProd21
IngredientXXIngr11
IngredientXXIngr21
FormulaVersionComponent TypeComponentQty
XXProd31CoproductXXProd31
CoproductXXProd41
IngredientXXIngr11
IngredientXXIngr21
3.3. RecipesRecipe XXProd1 has validity rules for XXProd1 and XXProd2Recipe Header
RecipeXXProd1
Version1
DescriptionXXProd1
ProductXXProd1
FormulaXXProd1
Version1
Validity Rules
VR1VR2
Organization
Recipe UseProductionProduction
ProductXXProd1XXProd2
Preference11
Quantities Data
Recipe XXProd3 has validity rules coproducts XXProd3 and XXProd4 Recipe Header
RecipeXXProd3
Version1
DescriptionXXProd3
ProductXXProd3
FormulaXXProd3
Version1
Validity Rules
VR1VR2
Organization
Recipe UseProductionProduction
ProductXXProd3XXProd4
Preference11
Quantities Data
3.4. Sourcing Rules Assignment Set
Sourcing RuleXXMakeAssigment Set
ItemInstance/Ord
From DateItem
TypeMake AtTypeSourcing Rule
OrgSourcing Rule/BODXXMake
Allocation100%
Rank1
Assigment Set
Sourcing RuleXXBuyInstance/Ord
ItemItem
From DateTypeSourcing Rule
TypeBuy FromSourcing Rule/BODXXBuy
Supplier
Site
Allocation100%
Rank1
3.5. Forecast
ItemDateQuantity
XXProd1Current Date + 7100
XXProd2Current Date + 14100
XXProd3Current Date + 8150
XXProd4Current Date + 8150
4. Plan ExecutionLaunch a Manufacturing plan associated to the above forecast
After the launching was completed, the Supply/Demand form should shows:
OrganizationItemOrder TypeDate
XXProd1Planned OrderCurrent Date + 7
XXProd2Planned Order Coproduct/By ProductCurrent Date + 7
XXProd3Planned OrderCurrent Date + 8
XXProd4Planned Order Coproduct/By ProductCurrent Date + 8
OrOrganizationItemOrder TypeDate
XXProd1Planned OrderCurrent Date + 7
XXProd2Planned Order Coproduct/By ProductCurrent Date + 7
XXProd3Planned Order Coproduct/By ProductCurrent Date + 8
XXProd4Planned OrderCurrent Date + 8
Scenario 2Item AItem BItem C
Supply Demand Form
Supplier CapacitySourcing Rule
SupplierCapacity/DayRank
Office Supplies7501
Staples15002
BigmartUnilimited3
Assignment Set
ASLs
Office Supplies: 500Staples: 1500Bigmart: Unlimited
Plan Horizon
ForecastDayQtyCapacitySupplierV1 Acct CapacityRemainig
10-Aug10000750V175006500
11-Aug0750V165007250
12-Aug2000750V180006000
13-Aug10000750V160000
14-Aug250750V1
15-Aug250750V1
16-Aug1000750V1
Plan