August 17, 2016 Timmons Group 1001 Boulders Parkway Suite 300 Richmond, VA 23225 ATTN: Mr. John T. Russell, AIPG CPG Senior Environmental Project Manager RE: Asbestos Inspection Report City of Richmond Former Fulton Gas Works Building #1 Peebles Street Richmond, Virginia FEI Project Number: FEI-16AL243 View of Building #1 Dear Mr. Russell: France Environmental, Inc. (FEI) has completed the asbestos sampling for suspect asbestos- containing building materials (ACBM’s) that may be impacted as a result of the proposed demolition project in the building referenced above. The scope of work included inspecting the interior and exterior areas, including the roof. Mr. Jason L. Day (Virginia Asbestos Inspector License #3303003733) conducted the fieldwork on June 3, 2016. FEI collected a total of thirty-nine (39) bulk samples from suspect materials, which may or may not be impacted by the planned renovation/demolition work. The samples were hand delivered to AmeriSci Richmond, located in Midlothian, Virginia where they were analyzed for the presence of asbestos using Polarized Light Microscopy (PLM). A material is considered by the EPA and the Commonwealth of Virginia to be an asbestos- containing material (ACM) if at least one sample collected from a multi-sample group contains asbestos in an amount greater than one percent (>1%). The following building materials were determined to be ACMs: Gray Asbestos-Cement (Transite™) Wall/Roof Panels Black Motor Blower Gasket White/Orange Duct Gasket Black Valve Gasket Black Composite Electrical Spacers White 4" O.D. Thermal System Insulation (TSI) with White Cloth Gray Relief Tank Thermal System Insulation (TSI) with Silver Canvas Wrap White 6" O.D. Pipe Thermal System Insulation (TSI) White 8" O.D. Pipe Thermal System Insulation (TSI) White Valve Tank Insulation

Upload: others

Post on 04-Oct-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

August 17, 2016 Timmons Group 1001 Boulders Parkway Suite 300 Richmond, VA 23225 ATTN: Mr. John T. Russell, AIPG CPG Senior Environmental Project Manager RE: Asbestos Inspection Report City of Richmond Former Fulton Gas Works Building #1 Peebles Street Richmond, Virginia FEI Project Number: FEI-16AL243 View of Building #1 Dear Mr. Russell: France Environmental, Inc. (FEI) has completed the asbestos sampling for suspect asbestos-containing building materials (ACBM’s) that may be impacted as a result of the proposed demolition project in the building referenced above. The scope of work included inspecting the interior and exterior areas, including the roof. Mr. Jason L. Day (Virginia Asbestos Inspector License #3303003733) conducted the fieldwork on June 3, 2016. FEI collected a total of thirty-nine (39) bulk samples from suspect materials, which may or may not be impacted by the planned renovation/demolition work. The samples were hand delivered to AmeriSci Richmond, located in Midlothian, Virginia where they were analyzed for the presence of asbestos using Polarized Light Microscopy (PLM). A material is considered by the EPA and the Commonwealth of Virginia to be an asbestos-containing material (ACM) if at least one sample collected from a multi-sample group contains asbestos in an amount greater than one percent (>1%). The following building materials were determined to be ACMs:

• Gray Asbestos-Cement (Transite™) Wall/Roof Panels • Black Motor Blower Gasket • White/Orange Duct Gasket • Black Valve Gasket • Black Composite Electrical Spacers • White 4" O.D. Thermal System Insulation (TSI) with White Cloth • Gray Relief Tank Thermal System Insulation (TSI) with Silver Canvas Wrap • White 6" O.D. Pipe Thermal System Insulation (TSI) • White 8" O.D. Pipe Thermal System Insulation (TSI) • White Valve Tank Insulation

Page 2: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

Timmons - Former Fulton Gas Works, Building #1 (Asbestos Inspection) Page 2 FEI Project Number: FEI-16AL243 8/17/16

The Asbestos National Emission Standard for Hazardous Air Pollutants (NESHAP) regulation requires that each owner or operator of a demolition or renovation activity involving Regulated Asbestos Containing Material (RACM) remove all such material from a facility being demolished or renovated before any activity begins that would break up, dislodge, or similarly disturb the material or preclude access to the material for subsequent removal. ACM need not be removed before demolition if it: (i) Is a Category I non-friable ACM that is not friable. (ii) Is on a facility component that is encased in concrete or other similarly hard

material and is adequately wet whenever exposed during demolition. (iii) Was not accessible for testing and therefore was not discovered until after

demolition began and, as a result of the demolition, cannot be safely removed. If not removed for safety reasons, the exposed RACM and any asbestos-contaminated debris must be treated as asbestos-containing waste material and kept adequately wet at all times until disposed of.

(iv) Is a Category II non-friable ACM and the probability is low that the material will become crumbled, pulverized, or reduced to powder during demolition.

Please find enclosed the bulk sample summary sheets; sampled material summary charts; sample location drawings; laboratory analysis report; and a copy of the inspector’s license. If you have any questions concerning this report, please contact the undersigned at 804.716.0560. Respectfully submitted, FRANCE ENVIRONMENTAL, INC.

Jason L. Day Andrew S. Richmond Asbestos Inspector Project Manager Attachments

Page 3: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

ASBESTOS BULK SAMPLE SUMMARY SHEETS

Page 4: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

FEI Project Number: FEI-16AL243 8/17/2016

Bulk Sample Summary Sheet For

City of Richmond: Former Fulton Gas Works Building #1

Richmond, Virginia

MS Group

SampleNum.

Material Description

Sample Location

Analysis Result

A 1 White Interior Window Glazing Compound Mezzanine 1 - South Corner Window N.A.D.

A 2 White Interior Window Glazing Compound Open Room - West Corner Window N.A.D.

B 3 Brown/Gray Wall Plaster Large Conduit - Room 2 North Wall N.A.D.

B 4 Brown/Gray Wall Plaster Storage 1 - North Wall N.A.D.

B 5 Brown/Gray Wall Plaster Hallway to Switchgear Room N.A.D.

C 6 Gray Wall/Roof Transite™ Panels 2nd Floor - Storage 3 Wall 20%CHRY

C 7 Gray Wall/Roof Transite™ Panels Exterior Rack 1 Roof NA/PS D 8 White Motor/Gear Rope Gasket Mezzanine 1 N.A.D. D 9 White Motor/Gear Rope Gasket Mezzanine 1 N.A.D. E 10 Yellow Mechanical Gear Rope Mezzanine 1 N.A.D. E 11 Yellow Mechanical Gear Rope Mezzanine 1 N.A.D. F 12 Black Motor Blower Gasket Mezzanine 1 75%CHRY F 13 Black Motor Blower Gasket Mezzanine 1 NA/PS G 14 White/Orange Duct Gasket Mezzanine 1 90%CHRY G 15 White/Orange Duct Gasket Mezzanine 1 NA/PS H 16 Black Valve Gasket Mezzanine 1 90%CHRY H 17 Black Valve Gasket Mezzanine 1 NA/PS

I 18 Black Composite Electrical Spacer 2nd Floor - Switchgear Room 25%CHRY

I 19 Black Composite Electrical Spacer 2nd Floor - Open Room 2 NA/PS

J 20 White 4" Outer Diameter (O.D.)Thermal Systems Insulation (TSI) with White Cloth 2nd Floor - Storage 3 10%CROC

20%CHRY

J 21 White 4" Outer Diameter (O.D.)Thermal Systems Insulation (TSI) with White Cloth 2nd Floor - Storage 3 NA/PS

J 22 White 4" Outer Diameter (O.D.)Thermal Systems Insulation (TSI) with White Cloth 2nd Floor - Storage 3 NA/PS

K 23 Black Electrical Wire Cover 2nd Floor - Switchgear Room N.A.D.

K 24 Black Electrical Wire Cover 2nd Floor - Open Room 2 N.A.D.

L 25 Gray Relief Tank Thermal Systems Insulation (TSI) with Silver Canvas Wrap

Mechanical Room - Mezzanine 2

15%CHRY 10%AMOS

L 26 Gray Relief Tank Thermal Systems Insulation (TSI) with Silver Canvas Wrap

Mechanical Room - Mezzanine 2 NA/PS

L 27 Gray Relief Tank Thermal Systems Insulation (TSI) with Silver Canvas Wrap

Mechanical Room - Mezzanine 2 NA/PS

N.A.D. = No Asbestos Detected CHRY = Chrysotile Asbestos NA/PS = Sample Not Analyzed Due to First Positive Stop Instructions CROC = Crocidolite Asbestos AMOS = Amosite Asbestos

Page 5: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

FEI Project Number: FEI-16AL243 8/17/2016

Bulk Sample Summary Sheet For

City of Richmond: Former Fulton Gas Works Building #1

Richmond, Virginia

MS Group

SampleNum.

Material Description

Sample Location

Analysis Result

M 28 White 6" Outer Diameter (O.D.) Pipe Thermal Systems Insulation (TSI)

Mechanical Room - Mezzanine 2

15%CHRY 15%AMOS

M 29 White 6" Outer Diameter (O.D.) Pipe Thermal Systems Insulation (TSI)

Mechanical Room - Mezzanine 2 NA/PS

M 30 White 6" Outer Diameter (O.D.) Pipe Thermal Systems Insulation (TSI)

Mechanical Room - Mezzanine 2 NA/PS

N 31 White 8" Outer Diameter (O.D.) Pipe Thermal System Insulation (TSI)

Mechanical Room - Mezzanine 2

20%CHRY 20%AMOS

N 32 White 8" Outer Diameter (O.D.) Pipe Thermal System Insulation (TSI)

Mechanical Room - Mezzanine 2 NA/PS

N 33 White 8" Outer Diameter (O.D.) Pipe Thermal System Insulation (TSI)

Mechanical Room - Mezzanine 2 NA/PS

O 34 White Valve Tank Insulation Mechanical Room - Mezzanine 2

25%CHRY 20%AMOS

O 35 White Valve Tank Insulation Mechanical Room - Mezzanine 2 NA/PS

O 36 White Valve Tank Insulation Mechanical Room - Mezzanine 2 NA/PS

P 37 White/Gray Mudded Elbow Drainage Room N.A.D. P 38 White/Gray Mudded Elbow Drainage Room N.A.D. P 39 White/Gray Mudded Elbow Drainage Room N.A.D.

CHRY = Chrysotile Asbestos AMOS = Amosite Asbestos NA/PS = Sample Not Analyzed Due to First Positive Stop Instructions N.A.D. = No Asbestos Detected

Page 6: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

ASBESTOS SAMPLED MATERIAL DATA SUMMARY CHARTS

Page 7: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

FEI P

roje

ct N

umbe

r: F

EI-1

6AL2

43

8/17

/201

6

SAM

PLED

MAT

ERIA

L SU

MM

ARY

CH

ART

TEST

ED F

OR

: Ti

mm

ons

Gro

up

PR

OJE

CT:

For

mer

Ful

ton

Gas

Wor

ks -

Bui

ldin

g #1

, Ric

hmon

d, V

irgin

ia

11

7 So

uth

14th S

treet

FEI P

RO

JEC

T N

O.:

FEI

-16A

L243

Su

ite 3

03

IN

SPEC

TOR

(S):

Jas

on L

. Day

Ric

hmon

d, V

irgin

ia 2

3219

INSP

ECTI

ON

DAT

E: J

une

3, 2

016

MEC

HAN

ICAL

Al

l qua

ntiti

es a

re a

ppro

xim

ate

(See

Not

e Be

low

) M

S G

RO

UP

DES

CR

IPTI

ON

AS

BEST

OS

YES/

NO

LO

CAT

ION

TO

TAL

QU

ANTI

TY

NES

HAP

C

ATEG

OR

Y C

ON

DIT

ION

D

Whi

te M

otor

/Gea

r Rop

e G

aske

t N

O

Mez

zani

ne 1

and

Mez

zani

ne 2

N

/A

N/A

N

/A

E

Yel

low

Mec

hani

cal G

ear R

ope

NO

M

ezza

nine

1 a

nd M

ezza

nine

2

N/A

N

/A

N/A

F B

lack

Mot

or B

low

er G

aske

t YE

S M

ezza

nine

1 a

nd M

ezza

nine

2

600

ln. f

t. C

at. I

NF

Poor

G

Whi

te/O

rang

e D

uct G

aske

t YE

S M

ezza

nine

1 a

nd M

ezza

nine

2

800

ln. f

t. C

at. I

NF

Poor

H

Bla

ck V

alve

Gas

ket

YES

Mez

zani

ne 1

and

Mez

zani

ne 2

10

0 ln

. ft.

Cat

. I N

F Po

or

I B

lack

Com

posi

te E

lect

rical

Spa

cers

YE

S 2nd

Flo

or:

Switc

hgea

r Roo

m a

nd O

pen

Roo

m 2

50

sq.

ft.

Cat

. II N

F Po

or

J W

hite

(4")

Out

er D

iam

eter

(O.D

.) Th

erm

al

Syst

ems

Insu

latio

n (T

SI) w

ith W

hite

Clo

th

YES

2nd F

loor

: St

orag

e 3

1200

ln. f

t. R

ACM

Po

or

K

Bla

ck E

lect

rical

Wire

Cov

er

NO

Th

roug

hout

Bui

ldin

g #1

N

/A

N/A

N

/A

L G

ray

Rel

ief T

ank

Ther

mal

Sys

tem

s In

sula

tion

(TSI

) with

Silv

er C

anva

s W

rap

YES

Mez

zani

ne 2

10

0 sq

. ft.

RAC

M

Poor

M

Whi

te (6

") O

uter

Dia

met

er (O

.D.)

Pipe

The

rmal

Sy

stem

s In

sula

tion

(TSI

) YE

S M

ezza

nine

2

200

ln. f

t. R

ACM

Po

or

N

Whi

te (8

") O

uter

Dia

met

er (O

.D.)

Pipe

The

rmal

Sy

stem

s In

sula

tion

(TSI

) YE

S M

ezza

nine

2

50 ln

. ft.

RAC

M

Poor

O

Whi

te V

alve

Tan

k In

sula

tion

YES

Mez

zani

ne 2

50

sq.

ft.

RAC

M

Poor

P

Whi

te M

udde

d E

lbow

s N

O

Dra

inag

e R

oom

N

/A

N/A

N

/A

sq. f

t. =

Squa

re F

eet

ln. f

t. =

Line

ar F

eet

N/A

= N

ot A

pplic

able

Not

e: F

EI h

as in

tend

ed to

offe

r est

imat

es o

f asb

esto

s-co

ntai

ning

mat

eria

ls (A

CM

’s) i

dent

ified

dur

ing

this

Asb

esto

s Su

rvey

for b

udge

tary

est

imat

ing

purp

oses

. Th

e lo

catio

ns a

nd q

uant

ities

pr

esen

ted

are

only

incl

usiv

e of

the

area

s su

rvey

ed b

y th

e in

spec

tor.

FEI

doe

s no

t gua

rant

ee a

nd/o

r war

rant

y th

e es

timat

es a

nd d

isco

urag

es th

e us

e of

thes

e es

timat

es a

s th

e on

ly s

ourc

e fo

r su

bmitt

ing

cons

truct

ion

bids

. In

stea

d, th

e lo

catio

ns a

nd e

stim

ated

qua

ntiti

es o

f mat

eria

ls p

rese

nted

abo

ve s

houl

d be

fiel

d ve

rifie

d by

the

one

prep

arin

g ea

ch b

id.

NE

SH

AP

Cat

egor

ies:

C

at. I

NF

= C

ateg

ory

I Non

-fria

ble

AC

M (i

nclu

des

pack

ing’

s, g

aske

ts, a

spha

lt ro

ofin

g an

d re

silie

nt fl

oorin

g)

Cat

. II N

F =

Cat

egor

y II

Non

-fria

ble

AC

M (i

nclu

des

any

non-

friab

le m

ater

ial t

hat i

s no

t Cat

egor

y I)

RA

CM

= R

egul

ated

Asb

esto

s-C

onta

inin

g M

ater

ial (

incl

udes

mat

eria

ls th

at a

re fr

iabl

e A

CM

; Cat

egor

y I N

on-fr

iabl

e A

CM

that

has

or w

ill b

e su

bjec

ted

to s

andi

ng, g

rindi

ng, c

uttin

g or

abr

adin

g; a

nd

Cat

egor

y II

Non

-fria

ble

AC

M th

at h

as a

hig

h pr

obab

ility

of b

ecom

ing

or h

as b

ecom

e cr

umbl

ed, p

ulve

rized

or r

educ

ed to

a p

owde

r)

Page 8: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

FEI P

roje

ct N

umbe

r: F

EI-1

6AL2

43

8/17

/201

6

SAM

PLED

MAT

ERIA

L SU

MM

ARY

CH

ART

TEST

ED F

OR

: Ti

mm

ons

Gro

up

PR

OJE

CT:

For

mer

Ful

ton

Gas

Wor

ks -

Bui

ldin

g #1

, Ric

hmon

d, V

irgin

ia

11

7 So

uth

14th S

treet

FEI P

RO

JEC

T N

O.:

FEI

-16A

L243

Su

ite 3

03

IN

SPEC

TOR

(S):

Jas

on L

. Day

Ric

hmon

d, V

irgin

ia 2

3219

INSP

ECTI

ON

DAT

E: J

une

3, 2

016

FI

NIS

HES

Al

l qua

ntiti

es a

re a

ppro

xim

ate

(See

Not

e Be

low

) M

S G

RO

UP

DES

CR

IPTI

ON

AS

BEST

OS

YES/

NO

LO

CAT

ION

TO

TAL

QU

ANTI

TY

NES

HAP

C

ATEG

OR

Y C

ON

DIT

ION

A

Whi

te In

terio

r Win

dow

Gla

zing

Com

poun

d N

O

Thro

ugho

ut In

terio

r Win

dow

s N

/A

N/A

N

/A

B

Gra

y W

all P

last

er

NO

2nd

Flo

or:

Hal

lway

to S

witc

hgea

r Roo

m a

nd S

witc

hgea

r R

oom

Gro

und

Floo

r: L

arge

Con

duit

Roo

ms

1, 2

and

Sto

rage

1

N/A

N

/A

N/A

C

Gra

y W

all/R

oof T

rans

ite™

Pan

els

YES

Hal

lway

to S

witc

hgea

r Roo

m, S

witc

hgea

r Roo

m, O

pen

Roo

m 2

, Sto

rage

3 a

nd L

arge

Con

duit

Roo

m 1

65

0 sq

. ft.

Cat

. II N

F Po

or

RO

OFI

NG

Al

l qua

ntiti

es a

re a

ppro

xim

ate

(See

Not

e Be

low

) M

S G

RO

UP

DES

CR

IPTI

ON

AS

BEST

OS

YES/

NO

LO

CAT

ION

TO

TAL

QU

ANTI

TY

NES

HAP

C

ATEG

OR

Y C

ON

DIT

ION

C

Gra

y W

all/R

oof T

rans

ite™

Pan

els

YES

Thro

ugho

ut R

oof,

Exte

rior R

ack

1 &

2

11,7

50 s

q. ft

. C

at. I

I NF

Poor

sq

. ft.

= Sq

uare

Fee

t ln

. ft.

= Li

near

Fee

t N

/A =

Not

App

licab

le

Not

e: F

EI h

as in

tend

ed to

offe

r est

imat

es o

f asb

esto

s-co

ntai

ning

mat

eria

ls (A

CM

’s) i

dent

ified

dur

ing

this

Asb

esto

s Su

rvey

for b

udge

tary

est

imat

ing

purp

oses

. Th

e lo

catio

ns a

nd q

uant

ities

pr

esen

ted

are

only

incl

usiv

e of

the

area

s su

rvey

ed b

y th

e in

spec

tor.

FEI

doe

s no

t gua

rant

ee a

nd/o

r war

rant

y th

e es

timat

es a

nd d

isco

urag

es th

e us

e of

thes

e es

timat

es a

s th

e on

ly s

ourc

e fo

r su

bmitt

ing

cons

truct

ion

bids

. In

stea

d, th

e lo

catio

ns a

nd e

stim

ated

qua

ntiti

es o

f mat

eria

ls p

rese

nted

abo

ve s

houl

d be

fiel

d ve

rifie

d by

the

one

prep

arin

g ea

ch b

id.

NE

SH

AP

Cat

egor

ies:

C

at. I

NF

= C

ateg

ory

I Non

-fria

ble

AC

M (i

nclu

des

pack

ing’

s, g

aske

ts, a

spha

lt ro

ofin

g an

d re

silie

nt fl

oorin

g)

Cat

. II N

F =

Cat

egor

y II

Non

-fria

ble

AC

M (i

nclu

des

any

non-

friab

le m

ater

ial t

hat i

s no

t Cat

egor

y I)

RA

CM

= R

egul

ated

Asb

esto

s-C

onta

inin

g M

ater

ial (

incl

udes

mat

eria

ls th

at a

re fr

iabl

e A

CM

; Cat

egor

y I N

on-fr

iabl

e A

CM

that

has

or

will

be

subj

ecte

d to

san

ding

, grin

ding

, cut

ting

or a

brad

ing;

and

C

ateg

ory

II N

on-fr

iabl

e A

CM

that

has

a h

igh

prob

abili

ty o

f bec

omin

g or

has

bec

ome

crum

bled

, pul

veriz

ed o

r red

uced

to a

pow

der)

Page 9: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

LABORATORY ANALYSIS REPORT

Page 10: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 11: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 12: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 13: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 14: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 15: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 16: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 17: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

SAMPLE LOCATION DRAWINGS

Page 18: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 19: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 20: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

INSPECTOR’S LICENSE

Page 21: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 22: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

August 18, 2016 Timmons Group 1001 Boulders Parkway Suite 300 Richmond, VA 23225 : ATTN: Mr. John T. Russell, AIPG CPG Senior Environmental Project Manager RE: Asbestos Inspection Report City of Richmond Former Fulton Gas Works Building #2 Peebles Street Richmond, Virginia FEI Project Number: FEI-16AL243 View of Building #2 Dear Mr. Russell: France Environmental, Inc. (FEI) has completed the asbestos sampling for suspect asbestos-containing materials (ACMs) that may be impacted as a result of the proposed demolition/renovation project in the building referenced above. The scope of work included inspecting the interior and exterior areas including the roof. Mr. Jason L. Day (Virginia Asbestos Inspector License #3303003733) conducted the fieldwork on June 3, 2016. FEI collected a total of twenty-one (21) bulk samples of suspect materials, which may or may not be impacted by the renovation/demolition work. The samples were hand delivered to AmeriSci Richmond, located in Midlothian, Virginia where they were analyzed for the presence of asbestos using Polarized Light Microscopy (PLM). A material is considered by the EPA and the Commonwealth of Virginia to be an ACM if at least one sample collected from a multi-sample group contains asbestos in an amount greater than one percent (>1%). The following building materials were determined to be ACMs:

• Gray/Black Mud On Boiler Brick Wall with White Base Coating • Black/White Valve Mud Packing • White (2") O.D. Pipe Insulation with Silver Coating • White (10") O.D. Pipe Insulation with Silver Coating • Yellow/Gray Boiler Rope Gasket • Brown/Gray Asbestos-Cement (Transite™) Wall/Door/Roof Panels • Silver /White Packing Tank Insulation

Note: Suspect damaged ACM debris in poor condition was observed throughout the floor

of Building #2 that should be treated as ACM.

Page 23: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

Timmons - Former Fulton Gas Works: Building #2 (Asbestos Inspection) Page 2 FEI Project Number: FEI-16AL243 8/18/16

The following building materials were unsafe to collect a bulk sample and are presumed to be asbestos-containing:

• White/Gray Air Cell Pipe Insulation

The Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation requires that each owner or operator of a demolition or renovation activity involving Regulated Asbestos Containing Material (RACM) remove all such material from a facility being demolished or renovated before any activity begins that would break up, dislodge, or similarly disturb the material or preclude access to the material for subsequent removal. ACM need not be removed before demolition if it: (i) Is a Category I non-friable ACM that is not friable. (ii) Is on a facility component that is encased in concrete or other similarly hard

material and is adequately wet whenever exposed during demolition. (iii) Was not accessible for testing and therefore was not discovered until after

demolition began and, as a result of the demolition, cannot be safely removed. If not removed for safety reasons, the exposed RACM and any asbestos-contaminated debris must be treated as asbestos-containing waste material and kept adequately wet at all times until disposed of.

(iv) Is a Category II non-friable ACM and the probability is low that the material will become crumbled, pulverized, or reduced to powder during demolition.

Please find enclosed the bulk sample summary sheet; sampled material summary charts; sample location drawing; laboratory analysis report; and a copy of the inspector’s license. If you have any questions concerning this report, please contact the undersigned at 804.716.0560. Respectfully submitted, FRANCE ENVIRONMENTAL, INC.

Jason L. Day Andrew S. Richmond Asbestos Inspector Project Manager Attachments

Page 24: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

ASBESTOS BULK SAMPLE SUMMARY SHEET

Page 25: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

FEI Project Number: FEI-16AL243 8/18/2016

Bulk Sample Summary Sheet For

City of Richmond: Former Fulton Gas Works Building #2

Richmond, Virginia

MS Group

SampleNum.

Material Description

Sample Location

Analysis Result

A 1 Pink Interior Window Glazing Compound West Wall Window N.A.D. A 2 Pink Interior Window Glazing Compound East Wall Window N.A.D.

B 3 Black Mud On Boiler Brick Wall with White Base Coating Boiler 1 5%CHRY

B 4 Black Mud On Boiler Brick Wall with White Base Coating Boiler 1 NA/PS

B 5 Black Mud On Boiler Brick Wall with White Base Coating Boiler 2 NA/PS

C 6 Black/White Valve Mud Packing Boiler 1 20%CHRY C 7 Black/White Valve Mud Packing Boiler 1 NA/PS C 8 Black/White Valve Mud Packing Boiler 2 NA/PS

D 9 White (2") Outer Diameter (O.D.) Pipe Insulation with Silver Coating Boiler 2 10%CHRY

D 10 White (2") Outer Diameter (O.D.) Pipe Insulation with Silver Coating Boiler 2 NA/PS

D 11 White (2") Outer Diameter (O.D.) Pipe Insulation with Silver Coating Boiler 2 NA/PS

E 12 White (10)" Outer Diameter (O.D.) Pipe Insulation with Silver Coating Boiler 2 10%CHRY

E 13 White (10)" Outer Diameter (O.D.) Pipe Insulation with Silver Coating Boiler 2 NA/PS

E 14 White (10)" Outer Diameter (O.D.) Pipe Insulation with Silver Coating Boiler 2 NA/PS

F 15 Gray Boiler Rope Gasket Boiler 1 80%CHRY F 16 Gray Boiler Rope Gasket Boiler 2 NA/PS G 17 Gray Wall/Door/Roof Transite™ Panels Under Building Wall 20%CHRY

G 18 Gray Wall/Door/Roof Transite™ Panels Southwest Wall Next to Window NA/PS

H 19 Silver/White Packing Tank Insulation Boiler 1 15%CHRY H 20 Silver/White Packing Tank Insulation Boiler1 NA/PS H 21 Silver/White Packing Tank Insulation Boiler 1 NA/PS H 21 Silver/White Packing Tank Insulation Boiler 1 NA/PS

N.A.D. = No Asbestos Detected CHRY = Chrysotile Asbestos NA/PS = Sample Not Analyzed Due to First Positive Stop Instructions

Page 26: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

ASBESTOS SAMPLED MATERIAL DATA SUMMARY CHARTS

Page 27: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

FEI P

roje

ct N

umbe

r: F

EI-1

6AL2

43

8/18

/201

6

SAM

PLED

MAT

ERIA

L SU

MM

ARY

CH

ART

TEST

ED F

OR

: Ti

mm

ons

Gro

up

PRO

JEC

T: F

orm

er F

ulto

n G

as W

orks

- B

uild

ing

#2, R

ichm

ond,

Virg

inia

117

Sout

h 14

th S

treet

FE

I PR

OJE

CT

NO

.: F

EI-1

6AL2

43

Suite

303

IN

SPEC

TOR

(S):

Jas

on L

. Day

Ric

hmon

d, V

irgin

ia 2

3219

INSP

ECTI

ON

DAT

E: J

une

3, 2

016

MEC

HAN

ICAL

Al

l qua

ntiti

es a

re a

ppro

xim

ate

(See

Not

e Be

low

) M

S G

RO

UP

DES

CR

IPTI

ON

AS

BEST

OS

YES/

NO

LO

CAT

ION

TO

TAL

QU

ANTI

TY

CAT

EGO

RY

CO

ND

ITIO

N

B

Bla

ck M

ud O

n B

oile

r Bric

k W

all w

ith W

hite

B

ase

Coa

ting

YES

Boi

ler 1

and

Boi

ler 2

5,

000

ln. f

t. R

ACM

Po

or

C

Bla

ck/W

hite

Val

ve M

ud P

acki

ng

YES

Boi

ler 1

and

Boi

ler 2

10

ln. f

t. R

ACM

Po

or

D

Whi

te 2

" O

uter

Dia

met

er (O

.D.)

Pipe

Insu

latio

n w

ith S

ilver

Coa

ting

YES

Boi

ler 2

10

0 ln

. ft.

RAC

M

Poor

E W

hite

10"

Out

er D

iam

eter

(O.D

.) Pi

pe

Insu

latio

n w

ith S

ilver

Coa

ting

YES

Boi

ler 2

60

ln. f

t. R

ACM

Po

or

F G

ray

Boi

ler R

ope

Gas

ket

YES

Boi

ler 1

and

Boi

ler 2

2,

000

sq. f

t. R

ACM

Po

or

H

Silv

er/W

hite

Pac

king

Tan

k In

sula

tion

YES

Boi

ler 1

15

0 sq

. ft.

RAC

M

Poor

N/A

W

hite

/Gra

y Ai

r Cel

l Pip

e In

sula

tion

PRES

UM

ED

Boi

ler 2

30

ln. f

t. R

ACM

Po

or

FIN

ISH

ES

All q

uant

ities

are

app

roxi

mat

e (S

ee N

ote

Belo

w)

MS

GR

OU

P D

ESC

RIP

TIO

N

ASBE

STO

S YE

S/N

O

LOC

ATIO

N

TOTA

L Q

UAN

TITY

C

ATEG

OR

Y C

ON

DIT

ION

A

Pin

k In

terio

r Win

dow

Gla

zing

N

O

Thro

ugho

ut W

indo

ws

N/A

N

/A

N/A

G

Gra

y W

all/D

oor/R

oof T

rans

ite™

Pan

els

YES

Doo

r, Se

lect

Wal

l Are

as, A

roun

d W

indo

ws

and

Und

er

Bui

ldin

g W

alls

1,

110

sq. f

t. C

at. I

I NF

Poor

sq. f

t. =

Squa

re F

eet

ln. f

t. =

Line

ar F

eet

N/A

= N

ot A

pplic

able

Not

e: F

EI h

as in

tend

ed to

offe

r est

imat

es o

f asb

esto

s-co

ntai

ning

mat

eria

ls (A

CM

’s) i

dent

ified

dur

ing

this

Asb

esto

s Su

rvey

for b

udge

tary

est

imat

ing

purp

oses

. Th

e lo

catio

ns a

nd q

uant

ities

pr

esen

ted

are

only

incl

usiv

e of

the

area

s su

rvey

ed b

y th

e in

spec

tor.

FEI

doe

s no

t gua

rant

ee a

nd/o

r war

rant

y th

e es

timat

es a

nd d

isco

urag

es th

e us

e of

thes

e es

timat

es a

s th

e on

ly s

ourc

e fo

r su

bmitt

ing

cons

truct

ion

bids

. In

stea

d, th

e lo

catio

ns a

nd e

stim

ated

qua

ntiti

es o

f mat

eria

ls p

rese

nted

abo

ve s

houl

d be

fiel

d ve

rifie

d by

the

one

prep

arin

g ea

ch b

id.

NE

SH

AP

Cat

egor

ies:

C

at. I

NF

= C

ateg

ory

I Non

-fria

ble

AC

M (i

nclu

des

pack

ing’

s, g

aske

ts, a

spha

lt ro

ofin

g an

d re

silie

nt fl

oorin

g)

Cat

. II N

F =

Cat

egor

y II

Non

-fria

ble

AC

M (i

nclu

des

any

non-

friab

le m

ater

ial t

hat i

s no

t Cat

egor

y I)

RA

CM

= R

egul

ated

Asb

esto

s-C

onta

inin

g M

ater

ial (

incl

udes

mat

eria

ls th

at a

re fr

iabl

e A

CM

; Cat

egor

y I N

on-fr

iabl

e A

CM

that

has

or w

ill b

e su

bjec

ted

to s

andi

ng, g

rindi

ng, c

uttin

g or

abr

adin

g; a

nd

Cat

egor

y II

Non

-fria

ble

AC

M th

at h

as a

hig

h pr

obab

ility

of b

ecom

ing

or h

as b

ecom

e cr

umbl

ed, p

ulve

rized

or r

educ

ed to

a p

owde

r)

Page 28: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

FEI P

roje

ct N

umbe

r: F

EI-1

6AL2

43

8/18

/201

6

SAM

PLED

MAT

ERIA

L SU

MM

ARY

CH

ART

TEST

ED F

OR

: Ti

mm

ons

Gro

up

PRO

JEC

T: F

orm

er F

ulto

n G

as W

orks

- B

uild

ing

#2, R

ichm

ond,

Virg

inia

117

Sout

h 14

th S

treet

FE

I PR

OJE

CT

NO

.: F

EI-1

6AL2

43

Suite

303

IN

SPEC

TOR

(S):

Jas

on L

. Day

Ric

hmon

d, V

irgin

ia 2

3219

INSP

ECTI

ON

DAT

E: J

une

3, 2

016

RO

OFI

NG

Al

l qua

ntiti

es a

re a

ppro

xim

ate

(See

Not

e Be

low

) M

S G

RO

UP

DES

CR

IPTI

ON

AS

BEST

OS

YES/

NO

LO

CAT

ION

TO

TAL

QU

ANTI

TY

CAT

EGO

RY

CO

ND

ITIO

N

G

Gra

y W

all/D

oor/R

oof T

rans

ite™

Pan

els

YES

Doo

rs, S

elec

t Wal

l Are

as, A

roun

d W

indo

ws

and

Und

er

Bui

ldin

g W

alls

5,

785

sq. f

t. C

at. I

I NF

Poor

sq. f

t. =

Squa

re F

eet

ln. f

t. =

Line

ar F

eet

N/A

= N

ot A

pplic

able

Not

e: F

EI h

as in

tend

ed to

offe

r est

imat

es o

f asb

esto

s-co

ntai

ning

mat

eria

ls (A

CM

’s) i

dent

ified

dur

ing

this

Asb

esto

s Su

rvey

for b

udge

tary

est

imat

ing

purp

oses

. Th

e lo

catio

ns a

nd q

uant

ities

pr

esen

ted

are

only

incl

usiv

e of

the

area

s su

rvey

ed b

y th

e in

spec

tor.

FEI

doe

s no

t gua

rant

ee a

nd/o

r war

rant

y th

e es

timat

es a

nd d

isco

urag

es th

e us

e of

thes

e es

timat

es a

s th

e on

ly s

ourc

e fo

r su

bmitt

ing

cons

truct

ion

bids

. In

stea

d, th

e lo

catio

ns a

nd e

stim

ated

qua

ntiti

es o

f mat

eria

ls p

rese

nted

abo

ve s

houl

d be

fiel

d ve

rifie

d by

the

one

prep

arin

g ea

ch b

id.

NE

SH

AP

Cat

egor

ies:

C

at. I

NF

= C

ateg

ory

I Non

-fria

ble

AC

M (i

nclu

des

pack

ing’

s, g

aske

ts, a

spha

lt ro

ofin

g an

d re

silie

nt fl

oorin

g)

Cat

. II N

F =

Cat

egor

y II

Non

-fria

ble

AC

M (i

nclu

des

any

non-

friab

le m

ater

ial t

hat i

s no

t Cat

egor

y I)

RA

CM

= R

egul

ated

Asb

esto

s-C

onta

inin

g M

ater

ial (

incl

udes

mat

eria

ls th

at a

re fr

iabl

e A

CM

; Cat

egor

y I N

on-fr

iabl

e A

CM

that

has

or w

ill b

e su

bjec

ted

to s

andi

ng, g

rindi

ng, c

uttin

g or

abr

adin

g; a

nd

Cat

egor

y II

Non

-fria

ble

AC

M th

at h

as a

hig

h pr

obab

ility

of b

ecom

ing

or h

as b

ecom

e cr

umbl

ed, p

ulve

rized

or r

educ

ed to

a p

owde

r)

Page 29: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

LABORATORY ANALYSIS REPORT

Page 30: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 31: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 32: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 33: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 34: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

SAMPLE LOCATION DRAWING

Page 35: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 36: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

INSPECTOR’S LICENSE

Page 37: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 38: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

August 17, 2016 Timmons Group 1001 Boulders Parkway Suite 300 Richmond, VA 23225 ATTN: Mr. John T. Russell, AIPG CPG Senior Environmental Project Manager RE: Asbestos Inspection Report City of Richmond Former Fulton Gas Works Building #3 Peebles Street Richmond, Virginia FEI Project Number: FEI-16AL243 View of Building #3 Dear Mr. Russell: France Environmental, Inc. (FEI) has completed the asbestos sampling for suspect asbestos-containing building materials (ACBM’s) that may be impacted as a result of the proposed demolition project in the building referenced above. The scope of work included inspecting the interior and exterior areas including the roof. Mr. Jason L. Day (Virginia Asbestos Inspector License #3303003733) conducted the fieldwork on June 3, 2016. FEI collected a total of twenty-seven (27) bulk samples of suspect materials, which may or may not be impacted by the planned renovation/demolition work. The samples were hand delivered to AmeriSci Richmond, located in Midlothian, Virginia where they were analyzed for the presence of asbestos by Polarized Light Microscopy (PLM). A material is considered by the EPA and the Commonwealth of Virginia to be an asbestos-containing material if at least one sample collected from a multi-sample group contains asbestos in an amount greater than one percent (>1%). The following building materials were determined to be ACMs:

• White Rope Gasket • Gray Asbestos-Cement (Transite™) Roof/Walls Panels • White (4") Outer Diameter (O.D.) Thermal System Insulation (TSI) • Off-White Gray (6") O.D. Thermal System Insulation (TSI) • White/Gray (12)" O.D. Thermal System Insulation (TSI) • White/Light Gray Tank Insulation • Gray/White (3") O.D. Thermal System Insulation (TSI)

Note: Suspect damaged ACM debris in poor condition was observed throughout the floor of the Pump Room that should be disposed of as ACM.

Building #3

Page 39: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

Timmons - Former Fulton Gas Works, Building #3 (Asbestos Inspection) Page 2 FEI Project Number: FEI-16AL243 8/17/16

The Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation requires that each owner or operator of a demolition or renovation activity involving Regulated Asbestos Containing Material (RACM) remove all such material from a facility being demolished or renovated before any activity begins that would break up, dislodge, or similarly disturb the material or preclude access to the material for subsequent removal. ACM need not be removed before demolition if it: (i) Is a Category I non-friable ACM that is not friable. (ii) Is on a facility component that is encased in concrete or other similarly hard

material and is adequately wet whenever exposed during demolition. (iii) Was not accessible for testing and therefore was not discovered until after

demolition began and, as a result of the demolition, cannot be safely removed. If not removed for safety reasons, the exposed RACM and any asbestos-contaminated debris must be treated as asbestos-containing waste material and kept adequately wet at all times until disposed of.

(iv) Is a Category II non-friable ACM and the probability is low that the material will become crumbled, pulverized, or reduced to powder during demolition.

Please find enclosed the bulk sample summary sheet; sampled material summary chart; sample location drawing; laboratory analysis report; and a copy of the inspector’s license. If you have any questions concerning this report, please contact the undersigned at 804.716.0560. Respectfully submitted, FRANCE ENVIRONMENTAL, INC.

Jason L. Day Andrew S. Richmond Asbestos Inspector Project Manager Attachments

Page 40: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

ASBESTOS BULK SAMPLE SUMMARY SHEET

Page 41: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

FEI Project Number: FEI-16AL243 8/17/2016

Bulk Sample Summary Sheet For

City of Richmond: Former Fulton Gas Works Building #3

Richmond, Virginia

MS Group

SampleNum.

Material Description

Sample Location

Analysis Result

A 1 Black/Brown Gasket Material Motor Room - West Corner N.A.D.

A 2 Black/Brown Gasket Material Motor Room - West Corner N.A.D.

B 3 White Friable Rope Gasket Material Motor Room - North Wall 45%CHRY

B 4 White Friable Rope Gasket Material Motor Room - North Wall NA/PS

B 5 White Friable Rope Gasket Material Motor Room - North Wall NA/PS

C 6 Gray Roof/Walls Transite™ Panels Motor Room - Southwest Wall 15%CHRY

C 7 Gray Roof/Walls Transite™ Panels Pump Room Roof NA/PS D 8 Light Gray Wall Mud Pump Room - North Wall N.A.D. D 9 Light Gray Wall Mud Motor Room - South Wall N.A.D. D 10 Light Gray Wall Mud Pump Room - South Wall N.A.D.

E 11 White (4") Outer Diameter (O.D.) Thermal Systems Insulation (TSI) (Yellow)

Pump Room - Main Area

2%CHRY 15%AMOS

E 12 White (4") Outer Diameter (O.D.) Thermal Systems Insulation (TSI) (Yellow)

Pump Room - Main Area NA/PS

E 13 White (4") Outer Diameter (O.D.) Thermal Systems Insulation (TSI) (Yellow)

Pump Room - Main Area NA/PS

F 14 Off-White Gray (6") Outer Diameter (O.D.) Thermal Systems Insulation (TSI) (Orange)

Pump Room - Main Area 85%CHRY

F 15 Off-White Gray (6") Outer Diameter (O.D.) Thermal Systems Insulation (TSI) (Orange)

Pump Room - Main Area NA/PS

F 16 Off-White Gray (6") Outer Diameter (O.D.) Thermal Systems Insulation (TSI) (Orange)

Pump Room - Main Area NA/PS

G 17 White/Gray (12") Outer Diameter (O.D.) Thermal Systems Insulation (TSI) (Orange)

Pump Room - Main Area

35%CHRY 20%AMOS

G 18 White/Gray (12") Outer Diameter (O.D.) Thermal Systems Insulation (TSI) (Orange)

Pump Room - Main Area NA/PS

G 19 White/Gray (12") Outer Diameter (O.D.) Thermal Systems Insulation (TSI) (Orange)

Pump Room - Main Area NA/PS

H 20 Light Gray/White Tank Insulation (Orange) Pump Room Center 85%CHRY

H 21 Light Gray/White Tank Insulation (Orange) Pump Room Center NA/PS H 22 Light Gray/White Tank Insulation (Orange) Pump Room Center NA/PS

I 23 Gray/White (3") Outer Diameter (O.D.) Thermal Systems Insulation (TSI) (Silver)

Pump Room - Main Area

5%CHRY 20%AMOS

I 24 Gray/White (3") Outer Diameter (O.D.) Thermal Systems Insulation (TSI) (Silver)

Pump Room - Main Area NA/PS

I 25 Gray/White (3") Outer Diameter (O.D.) Thermal Systems Insulation (TSI) (Silver)

Pump Room - Main Area NA/PS

N.A.D. = No Asbestos Detected CHRY = Chrysotile Asbestos NA/PS = Sample Not Analyzed Due to First Positive Stop Instructions AMOS = Amosite Asbestos

Page 42: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

ASBESTOS SAMPLED MATERIAL DATA SUMMARY CHART

Page 43: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

FEI P

roje

ct N

umbe

r: F

EI-1

6AL2

43

8/17

/201

6

SAM

PLED

MAT

ERIA

L SU

MM

ARY

CH

ART

TEST

ED F

OR

: Ti

mm

ons

Gro

up

PR

OJE

CT:

For

mer

Ful

ton

Gas

Wor

ks -

Bui

ldin

g #3

, Ric

hmon

d, V

irgin

ia

11

7 So

uth

14th S

treet

FEI P

RO

JEC

T N

O.:

FEI

-16A

L243

Su

ite 3

03

IN

SPEC

TOR

(S):

Jas

on L

. Day

Ric

hmon

d, V

irgin

ia 2

3219

INSP

ECTI

ON

DAT

E: J

une

3, 2

016

MEC

HAN

ICAL

Al

l qua

ntiti

es a

re a

ppro

xim

ate

(See

Not

e Be

low

) M

S G

RO

UP

DES

CR

IPTI

ON

AS

BEST

OS

YES/

NO

LO

CAT

ION

TO

TAL

QU

ANTI

TY

CAT

EGO

RY

CO

ND

ITIO

N

A

Bla

ck/B

row

n G

aske

t Mat

eria

l N

O

Mot

or R

oom

- W

est C

orne

r N

/A

N/A

N

/A

B

Whi

te F

riabl

e R

ope

Gas

ket M

ater

ial

YES

Mot

or R

oom

- N

orth

Wal

l 10

ln. f

t. R

ACM

Po

or

E W

hite

(4")

Out

er D

iam

eter

(O.D

.) Th

erm

al

Syst

ems

Insu

latio

n (T

SI) (

Yello

w)

YES

Pum

p R

oom

- M

ain

Area

20

ln. f

t. R

ACM

Po

or

F O

ff-W

hite

Gra

y (6

") O

uter

Dia

met

er (O

.D.)

Ther

mal

Sys

tem

s In

sula

tion

(TSI

) (O

rang

e)

YES

Pum

p R

oom

- M

ain

Area

50

ln. f

t. R

ACM

Po

or

G

Whi

te/G

ray

(12)

" O

uter

Dia

met

er (O

.D.)

Ther

mal

Sys

tem

s In

sula

tion

(TSI

) (O

rang

e)

YES

Pum

p R

oom

- M

ain

Area

30

ln. f

t. R

ACM

Po

or

H

Ligh

t Gra

y/W

hite

Tan

k In

sula

tion

(Ora

nge)

YE

S Pu

mp

Roo

m -

Cen

ter

3 Ta

nks

75 s

q. ft

. R

ACM

Po

or

I G

ray/

Whi

te (3

") O

uter

Dia

met

er (O

.D.)

Ther

mal

Sy

stem

s In

sula

tion

(TSI

) (Si

lver

) YE

S Pu

mp

Roo

m -

Mai

n Ar

ea

50 ln

. ft.

RAC

M

Poor

FIN

ISH

ES

All q

uant

ities

are

app

roxi

mat

e (S

ee N

ote

Belo

w)

MS

GR

OU

P D

ESC

RIP

TIO

N

ASBE

STO

S YE

S/N

O

LOC

ATIO

N

TOTA

L Q

UAN

TITY

C

ATEG

OR

Y C

ON

DIT

ION

C

Gra

y R

oof/W

alls

Tra

nsite

™ P

anel

s YE

S Pe

rimet

er W

alls

& R

oof

1,72

5 sq

. ft.

Cat

. II N

F Po

or

D

Whi

te/G

ray

Wal

l Mud

N

O

Pum

p R

oom

& M

otor

Roo

m

N/A

N

/A

N/A

sq. f

t. =

Squa

re F

eet

ln. f

t. =

Line

ar F

eet

N/A

= N

ot A

pplic

able

Not

e: F

EI h

as in

tend

ed to

offe

r est

imat

es o

f asb

esto

s-co

ntai

ning

mat

eria

ls (A

CM

’s) i

dent

ified

dur

ing

this

Asb

esto

s Su

rvey

for b

udge

tary

est

imat

ing

purp

oses

. Th

e lo

catio

ns a

nd q

uant

ities

pr

esen

ted

are

only

incl

usiv

e of

the

area

s su

rvey

ed b

y th

e in

spec

tor.

FEI

doe

s no

t gua

rant

ee a

nd/o

r war

rant

y th

e es

timat

es a

nd d

isco

urag

es th

e us

e of

thes

e es

timat

es a

s th

e on

ly s

ourc

e fo

r su

bmitt

ing

cons

truct

ion

bids

. In

stea

d, th

e lo

catio

ns a

nd e

stim

ated

qua

ntiti

es o

f mat

eria

ls p

rese

nted

abo

ve s

houl

d be

fiel

d ve

rifie

d by

the

one

prep

arin

g ea

ch b

id.

NE

SH

AP

Cat

egor

ies:

C

at. I

NF

= C

ateg

ory

I Non

-fria

ble

AC

M (i

nclu

des

pack

ing’

s, g

aske

ts, a

spha

lt ro

ofin

g an

d re

silie

nt fl

oorin

g)

Cat

. II N

F =

Cat

egor

y II

Non

-fria

ble

AC

M (i

nclu

des

any

non-

friab

le m

ater

ial t

hat i

s no

t Cat

egor

y I)

RA

CM

= R

egul

ated

Asb

esto

s-C

onta

inin

g M

ater

ial (

incl

udes

mat

eria

ls th

at a

re fr

iabl

e A

CM

; Cat

egor

y I N

on-fr

iabl

e A

CM

that

has

or w

ill b

e su

bjec

ted

to s

andi

ng, g

rindi

ng, c

uttin

g or

abr

adin

g; a

nd

Cat

egor

y II

Non

-fria

ble

AC

M th

at h

as a

hig

h pr

obab

ility

of b

ecom

ing

or h

as b

ecom

e cr

umbl

ed, p

ulve

rized

or r

educ

ed to

a p

owde

r)

Page 44: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

LABORATORY ANALYSIS REPORT

Page 45: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 46: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 47: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 48: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 49: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 50: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

SAMPLE LOCATION DRAWING

Page 51: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 52: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

INSPECTOR’S LICENSE

Page 53: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 54: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

August 17, 2016 Timmons Group 1001 Boulders Parkway Suite 300 Richmond, VA 23225 ATTN: Mr. John T. Russell, AIPG CPG Senior Environmental Project Manager RE: Asbestos Inspection Report City of Richmond Former Fulton Gas Works Sheds #2 and #3 Peebles Street Richmond, Virginia FEI Project Number: FEI-16AL243 View of Shed # 2 and Shed #3 Dear Mr. Russell: France Environmental, Inc. (FEI) has completed the asbestos sampling for suspect asbestos-containing building materials (ACBM’s) that may be impacted as a result of the proposed demolition project in the building referenced above. The scope of work included inspecting the interior/exterior areas, which included the roof. Mr. Jason L. Day (Virginia Asbestos Inspector License #3303003733) conducted the fieldwork on June 3, 2016. FEI collected a total of four (4) bulk samples of suspect materials, which may or may not be impacted by the renovation/demolition work. The samples were hand delivered to AmeriSci Richmond, located in Midlothian, Virginia where they were analyzed for the presence of asbestos by Polarized Light Microscopy (PLM). A material is considered by the EPA and the Commonwealth of Virginia to be an asbestos-containing material (ACM) if at least one sample collected from a multi-sample group contains asbestos in an amount greater than one percent (>1%). The following building materials were determined to be ACMs:

• Gray Asbestos-Cement (Transite™) Roof/Wall Panels • Off-White/Gray Exterior Door Caulk

The Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation requires that each owner or operator of a demolition or renovation activity involving Regulated Asbestos Containing Material (RACM) remove all such material from a facility being demolished or renovated before any activity begins that would break up, dislodge, or similarly disturb the material or preclude access to the material for subsequent removal.

Sheds #2 and #3

Page 55: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

Timmons - Former Fulton Gas Works, Sheds #2 and #3 (Asbestos Inspection) Page 2 FEI Project Number: FEI-16AL243 8/17/16

ACM need not be removed before demolition if it: (i) Is a Category I non-friable ACM that is not friable. (ii) Is on a facility component that is encased in concrete or other similarly hard

material and is adequately wet whenever exposed during demolition. (iii) Was not accessible for testing and therefore was not discovered until after

demolition began and, as a result of the demolition, cannot be safely removed. If not removed for safety reasons, the exposed RACM and any asbestos-contaminated debris must be treated as asbestos-containing waste material and kept adequately wet at all times until disposed of.

(iv) Is a Category II non-friable ACM and the probability is low that the material will become crumbled, pulverized, or reduced to powder during demolition.

Please find enclosed the bulk sample summary sheet; sampled material summary chart; sample location drawing; laboratory analysis report; and a copy of the inspector’s license. If you have any questions concerning this report, please contact the undersigned at 804.716.0560. Respectfully submitted, FRANCE ENVIRONMENTAL, INC.

Jason L. Day Andrew S. Richmond Asbestos Inspector Project Manager Attachments

Page 56: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

ASBESTOS BULK SAMPLE SUMMARY SHEET

Page 57: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

FEI Project Number: FEI-16AL243 8/17/2016

Bulk Sample Summary Sheet For

City of Richmond: Former Fulton Gas Works Sheds #2 and #3

Richmond, Virginia

MS Group

SampleNum.

Material Description

Sample Location

Analysis Result

C 6 Gray Roof/Walls Transite™ Panels Building 3 Motor Room - SW Wall 15%CHRY

C 7 Gray Roof/Walls Transite™ Panels Pump Room Roof NA/PS J 26 Off-White/Gray Exterior Door Caulk Shed #2 Entry 15%CHRY J 27 Off-White/Gray Exterior Door Caulk Shed #2 Entry NA/PS

CHRY = Chrysotile Asbestos NA/PS = Sample Not Analyzed Due to First Positive Stop Instructions

Note: Samples representing the suspect materials identified within Shed #2 and Shed #3 was included in the group of samples collected from Building #3. The Transite™ panels present on Sheds #2 and #3 are the same as the panels identified on Building #3. Therefore, the sample of this material collected from Building #3 was considered to be representative of the panels in all three (3) structures.

Page 58: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

ASBESTOS SAMPLED MATERIAL DATA SUMMARY CHART

Page 59: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

FEI P

roje

ct N

umbe

r: F

EI-1

6AL2

43

8/17

/201

6

SAM

PLED

MAT

ERIA

L SU

MM

ARY

CH

ART

TEST

ED F

OR

: Ti

mm

ons

Gro

up

PR

OJE

CT:

For

mer

Ful

ton

Gas

Wor

ks -

Shed

s #2

and

#3,

Ric

hmon

d, V

irgin

ia

11

7 So

uth

14th S

treet

FEI P

RO

JEC

T N

O.:

FEI

-16A

L243

Su

ite 3

03

IN

SPEC

TOR

(S):

Jas

on L

. Day

Ric

hmon

d, V

irgin

ia 2

3219

INSP

ECTI

ON

DAT

E: J

une

3, 2

016

FIN

ISH

ES

All q

uant

ities

are

app

roxi

mat

e (S

ee N

ote

Belo

w)

MS

GR

OU

P D

ESC

RIP

TIO

N

ASBE

STO

S YE

S/N

O

LOC

ATIO

N

TOTA

L Q

UAN

TITY

C

ATEG

OR

Y C

ON

DIT

ION

C

Gra

y R

oof/W

alls

Tra

nsite

™ P

anel

s YE

S W

alls

and

Roo

f 95

0 sq

. ft.

Cat

. II N

F Po

or

J O

ff-W

hite

/Gra

y Ex

terio

r Doo

r Cau

lk

YES

Shed

#2

Mai

n En

try

20 ln

. ft.

Cat

. II N

F Po

or

RO

OFI

NG

Al

l qua

ntiti

es a

re a

ppro

xim

ate

(See

Not

e Be

low

) M

S G

RO

UP

DES

CR

IPTI

ON

AS

BEST

OS

YES/

NO

LO

CAT

ION

TO

TAL

QU

ANTI

TY

CAT

EGO

RY

CO

ND

ITIO

N

C

Gra

y R

oof/W

alls

Tra

nsite

™ P

anel

s YE

S W

alls

and

Roo

f 50

0 sq

. ft.

Cat

. II N

F Po

or

sq. f

t. =

Squa

re F

eet

ln. f

t. =

Line

ar F

eet

N/A

= N

ot A

pplic

able

Not

e: F

EI h

as in

tend

ed to

offe

r est

imat

es o

f asb

esto

s-co

ntai

ning

mat

eria

ls (A

CM

’s) i

dent

ified

dur

ing

this

Asb

esto

s Su

rvey

for b

udge

tary

est

imat

ing

purp

oses

. Th

e lo

catio

ns a

nd q

uant

ities

pr

esen

ted

are

only

incl

usiv

e of

the

area

s su

rvey

ed b

y th

e in

spec

tor.

FEI

doe

s no

t gua

rant

ee a

nd/o

r war

rant

y th

e es

timat

es a

nd d

isco

urag

es th

e us

e of

thes

e es

timat

es a

s th

e on

ly s

ourc

e fo

r su

bmitt

ing

cons

truct

ion

bids

. In

stea

d, th

e lo

catio

ns a

nd e

stim

ated

qua

ntiti

es o

f mat

eria

ls p

rese

nted

abo

ve s

houl

d be

fiel

d ve

rifie

d by

the

one

prep

arin

g ea

ch b

id.

NE

SH

AP

Cat

egor

ies:

C

at. I

NF

= C

ateg

ory

I Non

-fria

ble

AC

M (i

nclu

des

pack

ing’

s, g

aske

ts, a

spha

lt ro

ofin

g an

d re

silie

nt fl

oorin

g)

Cat

. II N

F =

Cat

egor

y II

Non

-fria

ble

AC

M (i

nclu

des

any

non-

friab

le m

ater

ial t

hat i

s no

t Cat

egor

y I)

RA

CM

= R

egul

ated

Asb

esto

s-C

onta

inin

g M

ater

ial (

incl

udes

mat

eria

ls th

at a

re fr

iabl

e A

CM

; Cat

egor

y I N

on-fr

iabl

e A

CM

that

has

or

will

be

subj

ecte

d to

san

ding

, grin

ding

, cut

ting

or a

brad

ing;

and

C

ateg

ory

II N

on-fr

iabl

e A

CM

that

has

a h

igh

prob

abili

ty o

f bec

omin

g or

has

bec

ome

crum

bled

, pul

veriz

ed o

r red

uced

to a

pow

der)

Page 60: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

LABORATORY ANALYSIS REPORT

Page 61: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 62: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 63: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 64: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 65: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 66: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

SAMPLE LOCATION DRAWING

Page 67: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical
Page 68: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical

INSPECTOR’S LICENSE

Page 69: ASBESTOS BULK SAMPLE SUMMARY SHEETS...H 17 Black Valve Gasket Mezzanine 1 NA/PS I 18 Black Composite Electrical Spacer 2 nd Floor - Switchgear Room 25%CHRY I 19 Black Composite Electrical