Page 1: ASAS GENERAL CONTRACTING CO. Visit us at

ASAS GENERAL CONTRACTING CO.ASAS GENERAL CONTRACTING CO.

Visit us at www.AsasContractingQ8.com

Page 2: ASAS GENERAL CONTRACTING CO. Visit us at

IndexIndex

1. General Brief1. General Brief

2. Team & Organization Chart2. Team & Organization Chart

3. Current Projects3. Current Projects

4. Company Projects4. Company Projects

Page 3: ASAS GENERAL CONTRACTING CO. Visit us at

General BriefGeneral Brief

• ASAS Was Established in1983 .

• ASAS is primarily involved in civil construction. Being an active participant in the construction market for more than 27 years, the company has obtained a reputation of a stable and reliable partner, having necessary technical knowledge, experience in fulfilling complex and crucial tasks and uniting a team of active and highly qualified employees

• ASAS consists of a team of highly skilled engineers and architects with the innovative and dynamic approach required to develop state-of-the-art projects in the construction field.

• ASAS has a highly qualified crew of Surveyors and Draftsman.

• The company’s economical and technical potential allows it to carry out several contracts in construction of civil objects simultaneously.

Page 4: ASAS GENERAL CONTRACTING CO. Visit us at

General BriefGeneral Brief

Our goals are to:

• Provide the client with a project that fulfills their requirements to the highest standard in a reasonable time frame and within their budget.

• Be a company where employees are proud to work.

• Be an internationally recognized executor of quality construction.

Goal fulfillment will be accomplished by:

• Recruiting highly qualified professionals that are able to perform their required tasks to the best standards.

• Providing our team with continuous training to increase their abilities to understand our clients’ needs.

Page 5: ASAS GENERAL CONTRACTING CO. Visit us at

General BriefGeneral Brief

ASAS Offices are located at:

Ahmed Al Jaber St., Kuwait City Salem Al Mubarak St., Salmyia

ASAS employs more than 100 employees.

General Manager:Engineer Gobran Saba

Page 6: ASAS GENERAL CONTRACTING CO. Visit us at

IndexIndex

2. Team & Organization Chart2. Team & Organization Chart

1. General Brief1. General Brief

3. Current Projects3. Current Projects

4. Company Projects4. Company Projects

Page 7: ASAS GENERAL CONTRACTING CO. Visit us at

Our Technical Team

Gergis AzizCivil Engineer (since 1987)Project Manager

Gobran SabaGeneral Manager

Mohsen AdeebCivil Engineer (since 1995)Project Manager

Mousa Fahmy Mena Architect (since 1986)Senior Site Engineer

Gamal BoshraCivil Engineer (since1989)Project Manager

Zelda Ziegelbaum Interior DesignerHead of Z.Design (Interior Design Dept.)

Page 8: ASAS GENERAL CONTRACTING CO. Visit us at

Gobran SabaGeneral Manager

Hany Helmy GadCivil Engineer (since 2002)

Mustafa Abdul Salam ,PMPCivil Engineer (since 2000)Planner & Quality Control

Our Technical Team

Mahmoud Abdul RahmanCivil Engineer (since 2002)Senior Projects Coordinator

Rasha SamyArchitect (since 1997)Senior Technical Office Engineer

Mahalakshmi Architect (since 1999)Technical Office Engineer

Page 9: ASAS GENERAL CONTRACTING CO. Visit us at

Gobran SabaGeneral Manager

Our Technical Team

Yousef MelkArchitect (since 2003)Site Engineer

Wafiq Melad RezkCivil Engineer (since 2003)

Fady GamilCivil Engineer (since 2008)Junior Site Engineer

Page 10: ASAS GENERAL CONTRACTING CO. Visit us at

Gobran SabaGeneral Manager

Aziz FrejGeneral Foreman

Ra’afat BelalExecutive Secretary

Kamel AttiaGeneral Foreman

Our Technical Team

MoneerGeneral Foreman

Magdy Wasfy MakenSenior Surveyor

Page 11: ASAS GENERAL CONTRACTING CO. Visit us at

Reporting DiagramReporting Diagram

General Manager

BMT Hospital

AdasaniVilla

KIB Bank CopticChurch

Page 12: ASAS GENERAL CONTRACTING CO. Visit us at

Organizational ChartOrganizational ChartGeneral Manager

Eng: Gobran

Interior Design Dept.Architect: Zelda

Junior Site Eng.Eng: Yousef

BMT Hospital PMEng: Girgis

Church PMEng: Mohsen

Adsani Villa PMEng: Mohsen

KIB PMEng: Gamal

Management Depart.Eng: Mustafa

Senior Site Eng.Eng: Mousa

Senior Site Eng.Eng: Wafiq

Site Eng.Eng : Hany

Junior Site Eng.Eng: Fady

Technical Depart.Eng: Rasha

ForemanKamel

ForemanMonir

Page 13: ASAS GENERAL CONTRACTING CO. Visit us at

IndexIndex

1. General Brief1. General Brief

2. Team & Organization Chart2. Team & Organization Chart

4. Company Projects4. Company Projects

3. Current Projects3. Current Projects

Page 14: ASAS GENERAL CONTRACTING CO. Visit us at

Current ProjectsCurrent Projects

ASAS currently has four construction projects with a total value of KD7,500,000 equipped with specialized construction facilities, staffed with highly qualified personnel, capable of building, reconstructing, trimming and equipping new objects independently.

The Current Projects are:

1. Yacoub Behbehani Hospital.2. Kuwait International Bank.3. Adsani Villa.4. Egyptian Church.

Page 15: ASAS GENERAL CONTRACTING CO. Visit us at

IndexIndex

1. General Brief1. General Brief

2. Team & Organization Chart2. Team & Organization Chart

3. Current Projects3. Current Projects

4. Company Projects4. Company Projects

Page 16: ASAS GENERAL CONTRACTING CO. Visit us at

Company Projects Company Projects

Adsani Villa

BMTHospital Coptic

Church

PrivateChalet

KIBBank

CompanyProjects

CompanyProjects West End

Tower

Page 17: ASAS GENERAL CONTRACTING CO. Visit us at

Yacoub Behbehani Bone Marrow Transplantation

BMT is Located at Shuwaikh Medical Area on Al Jahra road (Road 80)

Shuwaikh Medical

Jahra Road (80)

Jamal Abd elnasser (85)

Jahez ST.

Shuwaikh Educational

Page 18: ASAS GENERAL CONTRACTING CO. Visit us at

Yacoub Behbehani Bone Marrow Transplantation

Page 19: ASAS GENERAL CONTRACTING CO. Visit us at

Yacoub Behbehani for BMTYacoub Behbehani for BMT

Owner: Mr. Aqeel Behbehani on behalf of “THIRD OF THE LATE YACOUB YOUSUF BEHBEHANI”

Consultant: Option One International

Owner: Ministry of Public Health

Page 20: ASAS GENERAL CONTRACTING CO. Visit us at

Yacoub Behbehani for BMTYacoub Behbehani for BMTProject Information:

SCHEMATIC DESCRIPTION OF ZONES

Floor Area m2 No. of Floor

Basement Floor 586.31 1

Ground Floor 2655.63 1

First Floor 3570.07 1

Second Floor 3024.07 1

Roof 1076.28 1

Total Area 10913.13

Contract Start Date : 27-10-2009.Contract End Date : 27-06-2011.Contract Period : 610 DaysContract Value : 4,728,419 KD.Variation Order : None

Page 21: ASAS GENERAL CONTRACTING CO. Visit us at

Yacoub Behbehani for BMTYacoub Behbehani for BMT

BMT

Page 22: ASAS GENERAL CONTRACTING CO. Visit us at

Yacoub Behbehani for BMTYacoub Behbehani for BMT

South Perspective North East Perspective

North West Perspective

Page 23: ASAS GENERAL CONTRACTING CO. Visit us at

Yacoub Behbehani for BMTYacoub Behbehani for BMT

Page 24: ASAS GENERAL CONTRACTING CO. Visit us at

Yacoub Behbehani for BMTYacoub Behbehani for BMT

Page 25: ASAS GENERAL CONTRACTING CO. Visit us at

Yacoub Behbehani for BMTYacoub Behbehani for BMT

Page 26: ASAS GENERAL CONTRACTING CO. Visit us at

Yacoub Behbehani for BMTYacoub Behbehani for BMT

Project Facilities:

The Medical Center is a three storey building, covering a gross area of 8000 m2 and comprises the following facilities:-

Outpatient:- Outpatient Department of 6 Clinics.- Medical Records.- Pharmacy.

Inpatient Wards:- One Day Ward (Three Bedded Patient Rooms).- BMT Isolation Ward (9 Single Bed Patient Rooms).- Normal Inpatient Wards (6 single bed rooms for female &

pediatrics patients, 5 single bed rooms for male patients).

Bone Marrow Bank

Page 27: ASAS GENERAL CONTRACTING CO. Visit us at

Egyptian Coptic Orthodox Cathedral

Beirut ST.

Tunisia ST.

The Church is located behind the Hawally fire station

Page 28: ASAS GENERAL CONTRACTING CO. Visit us at

Egyptian Coptic Orthodox Cathedral

Page 29: ASAS GENERAL CONTRACTING CO. Visit us at

Egyptian Coptic Orthodox CathedralEgyptian Coptic Orthodox Cathedral

Owner: Egyptian Coptic Orthodox Cathedral

Architect Design: Wagdy El Meri

Consultant: Fadel Tefony

Page 30: ASAS GENERAL CONTRACTING CO. Visit us at

Egyptian Coptic Orthodox CathedralEgyptian Coptic Orthodox Cathedral

SCHEMATIC DESCRIPTION OF ZONES

Floor Area m2

Basement Floor 6500

Ground Floor 5200

First Floor 4160

Second Floor 174

Third Floor 3328

Roof 6450

Total Area 25812

Project Information:

Contract Start Date : 30-11-2007.Contract End Date : 31-11-2009.Contract Period : 730 DaysContract Value : KD 2,650,000Variation Order : KD 300,000

Page 31: ASAS GENERAL CONTRACTING CO. Visit us at

Egyptian Coptic Orthodox Cathedral Perspective Egyptian Coptic Orthodox Cathedral Perspective

Page 32: ASAS GENERAL CONTRACTING CO. Visit us at

Egyptian Coptic Orthodox CathedralEgyptian Coptic Orthodox Cathedral

Page 33: ASAS GENERAL CONTRACTING CO. Visit us at

Egyptian Coptic Orthodox CathedralEgyptian Coptic Orthodox Cathedral

Page 34: ASAS GENERAL CONTRACTING CO. Visit us at

Egyptian Coptic Orthodox CathedralEgyptian Coptic Orthodox Cathedral

Page 35: ASAS GENERAL CONTRACTING CO. Visit us at

Egyptian Coptic Orthodox CathedralEgyptian Coptic Orthodox Cathedral

Page 36: ASAS GENERAL CONTRACTING CO. Visit us at

Egyptian Coptic Orthodox Cathedral Egyptian Coptic Orthodox Cathedral

The total built-up area of the Project exceeds 25,000 square meters, which includes a 6,500 square meters basement covering the whole plot area.

The complex is a multi-purpose building housing a diversified range of activities among them; a Banquet Hall with all related services. The Project includes a housing building, libraries, computer halls, a gymnasium, a kindergarten, a cafeteria, a central kitchen, administration offices and exterior car parks.The Cathedral is furnished to accommodate around 9,000 worshipers

Page 37: ASAS GENERAL CONTRACTING CO. Visit us at

Kuwait International Bank

KIB is located in Fintas beside The Fintas Co-operative Society

Fintas Co-operative Society

Costal R

oad

KIB

Page 38: ASAS GENERAL CONTRACTING CO. Visit us at

Kuwait International Bank (Funtas)Kuwait International Bank (Funtas)

Owner: Kuwait International Bank

Consultant: Dar Osama Bukhamseen Design

Project Manager: Gulf Consultant

Page 39: ASAS GENERAL CONTRACTING CO. Visit us at

Kuwait International BankKuwait International Bank

Page 40: ASAS GENERAL CONTRACTING CO. Visit us at

Kuwait International BankKuwait International Bank

Page 41: ASAS GENERAL CONTRACTING CO. Visit us at

Kuwait International BankKuwait International Bank

Page 42: ASAS GENERAL CONTRACTING CO. Visit us at

Kuwait International BankKuwait International Bank

Page 43: ASAS GENERAL CONTRACTING CO. Visit us at

Kuwait International Bank (Fintas)Kuwait International Bank (Fintas)

SCHEMATIC DESCRIPTION OF ZONES

Floor Area m2

Basement Floor 300

Ground Floor 300

First Floor 300

Roof 300

Upper Roof 100

Total Area 1300

Project Information:

Contract Start Date : 30-05-2010.Contract End Date : 28-02-2011.Contract Period : 272 DaysContract Value : KD 449,459Variation Order : None

Page 44: ASAS GENERAL CONTRACTING CO. Visit us at

Adsani Villa (Salwa)

Adsani Villa is located at Salwa Sea SideTa’aw

an Road (25)

Page 45: ASAS GENERAL CONTRACTING CO. Visit us at

Adsani Villa

Page 46: ASAS GENERAL CONTRACTING CO. Visit us at

Adsani VillaAdsani Villa

Owner: Marzok Al Adsani

Consultant: OPTION ONE INTERNATIONAL

Page 47: ASAS GENERAL CONTRACTING CO. Visit us at

Adsani VillaAdsani Villa

Page 48: ASAS GENERAL CONTRACTING CO. Visit us at

Adsani VillaAdsani Villa

Page 49: ASAS GENERAL CONTRACTING CO. Visit us at

Adsani VillaAdsani Villa

Page 50: ASAS GENERAL CONTRACTING CO. Visit us at

Adsani VillaAdsani Villa

SCHEMATIC DESCRIPTION OF ZONES

Floor Area m2

Lower Basement 2123

Upper Basement 3372

Ground Floor 1848

First Floor 1511

Second Floor 1368

Total Area 10222

Project Information:

Contract Start Date : 01-09-2009.Contract End Date : 01-07-2011.Contract Period : 660 DaysContract Value : KD 473,000 Variation Order : None

Page 51: ASAS GENERAL CONTRACTING CO. Visit us at

Adsani VillaAdsani Villa

Project Facilities:

• The Villa built up area is about 10,222 m2.

• The villa contains a formal diwan, a daily diwaniyah, reception, dining hall, master bed room and 6 bedroom quarters.

• The basement contains a car parking, a central kitchen and a servant quarters.

Page 52: ASAS GENERAL CONTRACTING CO. Visit us at

West End Tower, Al Nugra Hawally

West End Tower is Located at Al Nugra Hawally

Third

Ring R

oad

Cairo ST..

Page 53: ASAS GENERAL CONTRACTING CO. Visit us at

West End Tower

Page 54: ASAS GENERAL CONTRACTING CO. Visit us at

West End TowerWest End Tower

Owner: Mr. Aqeel Behbehani

Consultant: OPTION ONE INTERNATIONAL

Page 55: ASAS GENERAL CONTRACTING CO. Visit us at

West End TowerWest End Tower

Page 56: ASAS GENERAL CONTRACTING CO. Visit us at

West End TowerWest End Tower

Page 57: ASAS GENERAL CONTRACTING CO. Visit us at

West End TowerWest End Tower

Page 58: ASAS GENERAL CONTRACTING CO. Visit us at

West End TowerWest End Tower

Project Information:

Contract Start Date : 03-05-2007.Contract End Date : 31-06-2009.Contract Period : 789 DaysContract Value : KD 1,288,000Variation Order : KD 70,000

SCHEMATIC DESCRIPTION OF ZONES

Floor Area No. of Floor Total Area(m2)

Basement Floor 798 1 798

Ground Floor 95 1 95

Typical Floor 242X13 13 3146

Level 14 174 1 174

Roof 78 1 78

Total Area 4291

Page 59: ASAS GENERAL CONTRACTING CO. Visit us at

West End TowerWest End Tower

Project Facilities:

• A 14-floor residential tower. Each floor is a single luxurious apartment. The apartment has a fully furnished kitchen, a master bed room and two bedrooms with an en-suite bathroom for each, a large reception and dining area and a living room.

• Each apartment has a main entrance and service entrance to the kitchen

and the maids quarter. The tower entrance is equipped with a counter and a luxurious reception.

• The vast parking areas in the basement and ground floor, secure two parking lots for every apartment. The Tower is furnished with a modern camera surveillance system.

Page 60: ASAS GENERAL CONTRACTING CO. Visit us at

Bnaider ChaletBnaider Chalet

Page 61: ASAS GENERAL CONTRACTING CO. Visit us at

Bnaider ChaletBnaider Chalet

Page 62: ASAS GENERAL CONTRACTING CO. Visit us at

Bnaider ChaletBnaider Chalet

Page 63: ASAS GENERAL CONTRACTING CO. Visit us at

Bnaider ChaletBnaider Chalet

Project Information:

Contract Start Date : 01-10-2004.Contract End Date : 01-04-2006.Contract Period : 547 DaysContract Value : KD 115,000Variation Order : KD 85,000

Page 64: ASAS GENERAL CONTRACTING CO. Visit us at

Bnaider ChaletBnaider Chalet

Project Facilities:

• The chalet consists of a ground floor and a first floor, both with full sea view.

• The chalet has two swimming pools; one on the sea side with waterfalls and the other in the chalet inner court.

• The garden surrounding the chalet was designed and organized under the supervision of a company specialized in landscaping and includes special plants, green areas, walking ways, water falls, a pergola and covered car parks.