asa(alt)/aae perspective
DESCRIPTION
ASA(ALT)/AAE Perspective. FORCE PROJECTION SYMPOSIUM IV “Deploying the Objective Force”. The Honorable Claude M. Bolton, Jr. Assistant Secretary of the Army (Acquisition, Logistics and Technology) and Army Acquisition Executive May 6, 2003. Trivia Question. What Was the Name of the - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/1.jpg)
ASA(ALT)/AAE PerspectiveASA(ALT)/AAE Perspective
The Honorable Claude M. Bolton, Jr.Assistant Secretary of the Army
(Acquisition, Logistics and Technology) andArmy Acquisition Executive
May 6, 2003
The Honorable Claude M. Bolton, Jr.Assistant Secretary of the Army
(Acquisition, Logistics and Technology) andArmy Acquisition Executive
May 6, 2003
FORCE PROJECTION SYMPOSIUM IV
“Deploying the Objective Force”
FORCE PROJECTION SYMPOSIUM IV
“Deploying the Objective Force”
![Page 2: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/2.jpg)
Trivia QuestionTrivia Question
What Was the Name of the
First Army Vessel?
What Was the Name of the
First Army Vessel?
![Page 3: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/3.jpg)
The AnswerThe Answer
The HannahThe Hannah
![Page 4: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/4.jpg)
Transforming the Way Soldiers FightTransforming the Way Soldiers Fight
![Page 5: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/5.jpg)
The Stryker Success StoryThe Stryker Success Story
![Page 6: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/6.jpg)
TUAVTube-launchedSmall UAV
Unmanned Aerial System
Class I (54)
MULE (54)
Unmanned Ground Vehicles
Class IVb***Class III/IVa (56)
Unmanned Payloads
Unattended Ground Sensors(157)
Unattended Munitions-NLOS LS (24)
-Intelligent MunitionsSystem*
NLOS Cannon(18)NLOS Cannon(18)
Infantry Carrier Veh.(84) Cmd & Control Veh.(49)Infantry Carrier Veh.(84) Cmd & Control Veh.(49)
Mounted Combat System(60)Mounted Combat System(60)
NLOS Mortar(24)NLOS Mortar(24)
Reconnaissance and Surveillance(30)Reconnaissance and Surveillance(30)
Medical Treatment, Evacuation(29)
Medical Treatment, Evacuation(29)
Small UGV (81)
FCS Maintenance and Recovery Veh.**FCS Maintenance and Recovery Veh.**
Total UA WT: <10 K STONSTotal UA WT: <10 K STONS Total UA Platforms: 294 Manned+453 Unmanned =747Total UA Platforms: 294 Manned+453 Unmanned =747
Total Personnel: 2,540Total Personnel: 2,540
Manned Systems Manned Systems
Derived From: FCS ORD, 14 Apr 03 (Change 3)Derived From: FCS ORD, 14 Apr 03 (Change 3)
Future Combat Systems (FCS) Development Future Combat Systems (FCS) Development
ARV-Assault*
ARV-Recon*ARV-A (Light) (18)
* Spiral Forward ** Increment II*** UE
* Spiral Forward ** Increment II*** UE
Class II*
![Page 7: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/7.jpg)
FCS Schedule and FundingFCS Schedule and Funding
System Development
& Demo
Production & Deployment
B
System Integr
System Demo
LeadSystems Integrator
(LSI)Award
LeadSystems Integrator
(LSI)Award
InterimProgressReview
InterimProgressReview
Full Rate ProductionDecisionReview
Full Rate ProductionDecisionReview
6.4/6.5
6.4/6.5/6.7/Procurement
Operational Requirements DocumentOperational Requirements Document
6.2/6.3/6.4
Initial ProductionConcept&
TechDev
Research, Development & Acquisition
$20.5B
PB04 Program Funding FY05-09
Enabling Technologies
$3.1B
Achieves IOC FY10 and FOC FY12Achieves IOC FY10 and FOC FY12Operations & OrganizationOperations & Organization
CriticalDesignReview
CriticalDesignReview
Preliminary DesignReview
Preliminary DesignReview
FY00-03FY00-03 FY04FY04 FY05FY05 FY06FY06 FY07FY07 FY08FY08 FY09FY09 FY10FY10 FY11FY11 FY12FY12 FY13FY13 FY14FY14 FY15-18FY15-18
InitialProductionDecision
InitialProductionDecision
InitialOperationalCapability
InitialOperationalCapability
FullOperationalCapability
FullOperationalCapability
Deployment
Mission Needs StatementMission Needs Statement
![Page 8: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/8.jpg)
1. Joint Interoperability2. Networked Battle Command3. Networked Lethality4. Transportability5. Sustainability/Reliability6. Training7. Survivability
1. Joint Interoperability2. Networked Battle Command3. Networked Lethality4. Transportability5. Sustainability/Reliability6. Training7. Survivability
FCS Key Performance ParametersFCS Key Performance Parameters
![Page 9: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/9.jpg)
TransportabilityTransportabilityThreshold: The FCS Family of Systems (FoS) must be transportable
worldwide by air, sea, highway and rail modes to support inter-theater strategic deployment and intra-theater
operational maneuver.
Threshold: The FCS Family of Systems (FoS) must be transportable worldwide by air, sea, highway and rail modes to support
inter-theater strategic deployment and intra-theater operational maneuver.
FCS Key Performance ParametersFCS Key Performance Parameters
![Page 10: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/10.jpg)
![Page 11: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/11.jpg)
![Page 12: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/12.jpg)
![Page 13: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/13.jpg)
Enhance strategic mobility/deployability
Optimize the logistics footprint
Reduce cost of support while maintaining warfighting capability and readiness
Enhance strategic mobility/deployability
Optimize the logistics footprint
Reduce cost of support while maintaining warfighting capability and readiness
Logistics Transformation Logistics Transformation
![Page 14: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/14.jpg)
Strategic Mobility/DeployabilityStrategic Mobility/Deployability
Joint/CoalitionArea Of
Operations
Joint/CoalitionArea Of
Operations
Ports of Debarkation
Ports of Debarkation
96Hours
120Hours
Ports of Embarkation
30Days
1 Division
1 Brigade
5 Divisions
Reduced Logistics Footprint, especially
Fuel and Water, is Key to Achieving Goal
Reduced Logistics Footprint, especially
Fuel and Water, is Key to Achieving Goal
![Page 15: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/15.jpg)
![Page 16: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/16.jpg)
Precision Extended Glide Aerial Delivery System
(PEGASYS)
Precision Extended Glide Aerial Delivery System
(PEGASYS)
Theater Support Vessel (TSV)Theater Support Vessel (TSV)
Operational Distribution VisionOperational Distribution Vision
![Page 17: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/17.jpg)
Future Tactical Truck System (FTTS)Future Tactical Truck System (FTTS)
Sustainment ModulesSustainment Modules
Tactical Distribution VisionTactical Distribution Vision
![Page 18: ASA(ALT)/AAE Perspective](https://reader033.vdocuments.mx/reader033/viewer/2022061616/56814865550346895db57444/html5/thumbnails/18.jpg)