The cases where, required documents have been submitted by Project Proponent but pending for processing / decision by the State Governments- as on 02.12.2016. State S. No . Name of the Applicant Mineral Area (Hect.) Village and Dist. Date of Approval under 5(1) , if scheduled mineral Letter of Intent issued, if non-scheduled mineral Action required and Timeline agreed. Andhra Pradesh 1 M/s. Chettinad Cement Corporation Limited Limestone 377.523 Kesanupalli & Pedagarlapadu Villages of Dachepalli & Karempudi Mandals, Guntur District - PL granted vide G.O.Ms.No.37, dt.07.05.2013. Letter of intent given vide memo No.19749/M.IV (2)/2013-1, dt.18.01.2014. Lease Executed on 24.08.2016. (A1) 2 M/s The KCP Ltd Limestone 20.046 Mandadi R.F. Block No.2, Polepalli Village, Durgi Mandal, Guntur District - Government Memo No.16354/M.IV(2)/2012-1, dt.06.12.2013 Lease Executed on 18.06.2016 (A1) 3 M/s The KCP Ltd Limestone 4.274 Mandadi Village, Guntur District - Government Memo No.14276/M.IV(2)/2012-1, dt.06.12.2013 Lease Executed on 18.06.2016 (A1) 4 Ultratech Cement Limestone 29.70 Petnikota, Kurnool 19.05.2007 All clearances complete. Only the 6(1)(b) general relaxation needs to be sought by the State Government by Sep, 2016 (A3) 5 Ultratech Cement Limestone 90.52 Bandarlapally, Kurnool, 20.7.2007 All clearances complete. Only the 6(1)(b) general relaxation needs to be sought by the State

Upload: others

Post on 18-Mar-2020

28 views

Category:

Documents


1 download

TRANSCRIPT

The cases where, required documents have been submitted by Project Proponent but pending for processing / decision by the State

Governments- as on 02.12.2016.

State S.

No

.

Name of the

Applicant

Mineral Area

(Hect.)

Village and Dist. Date of Approval under

5(1) , if scheduled

mineral

Letter of Intent issued, if

non-scheduled mineral

Action required and

Timeline agreed.

Andhra

Pradesh

1

M/s. Chettinad

Cement

Corporation

Limited

Limestone 377.523

Kesanupalli &

Pedagarlapadu

Villages of Dachepalli

& Karempudi

Mandals, Guntur

District

-

PL granted vide

G.O.Ms.No.37,

dt.07.05.2013. Letter of

intent given vide memo

No.19749/M.IV (2)/2013-1,

dt.18.01.2014.

Lease Executed on

24.08.2016.

(A1)

2 M/s The KCP Ltd Limestone 20.046

Mandadi R.F. Block

No.2, Polepalli

Village, Durgi

Mandal, Guntur

District

-

Government Memo

No.16354/M.IV(2)/2012-1,

dt.06.12.2013

Lease Executed on

18.06.2016

(A1)

3 M/s The KCP Ltd Limestone 4.274 Mandadi Village,

Guntur District -

Government Memo

No.14276/M.IV(2)/2012-1,

dt.06.12.2013

Lease Executed on

18.06.2016

(A1)

4 Ultratech Cement Limestone 29.70 Petnikota, Kurnool 19.05.2007

All clearances

complete. Only the

6(1)(b) general

relaxation needs to be

sought by the State

Government by Sep,

2016

(A3)

5 Ultratech Cement Limestone 90.52 Bandarlapally,

Kurnool, 20.7.2007

All clearances

complete. Only the

6(1)(b) general

relaxation needs to be

sought by the State

Government by Sep,

2016

(A3)

6 Ultratech Cement Limestone 114.37 Tummalapenta,

Kurnool 19.05.2007

All clearances

complete. Only the

6(1)(b) general

relaxation needs to be

sought by the State

Government by Sep,

2016

(A3)

7 M/s APMDC

Ltd. Beach Sand 3618

B/w Bendi to

Donkur, Srikakilam

Dist.

1.02.2010 -

TOR approved in

Jan, 2016 but now

MoEF insisting on

reduction of

protected forest

area. The state Govt.

need to expedite

decision, if required

in consultation with

the Central

Government. (B2)

8 M/s My Home

Industries Ltd Limestone 374.58

Gamalapadu

Village, Dachepalli

Mandal, Guntur

District

-

Govt. Memo

No.14722/M.III(2)/2012

-4, dt.16.04.2013.

EC has been

Granted. State

Government may

expedtie. (A2)

Proposal submitted

to the Government,

dated. 11.10.2016

for grant of Mining

Lease.

9 Shree Jai Jyoti

Cement Limestone 149.39 Palkur village, 23.11.2012

EC has been

Granted. State

Government may

expedite. (A2)

10 M/s. Shree

Cement Ltd Limestone 283.59

Kachavaram &

Inuparajupalli

Villages of

Karempudi Mandal,

Guntur District

Govt. Memo

No.14499/M.II(2)/2009

-3, dt.19.05.2010.

Proposal submitted

to the Government,

dated. 26.11.2016 for

grant of Mining

Lease. (A2)

11 M/s. The Ramco

Cements Ltd Limestone

267.30

Acres

Sy.No.193,194/1,2

etc., and Sy.No.

171 of

Jayanthipuram (V)

Jaggayyapeta (M)

Krishna Dist

-

Recommended to

Government for

relaxation of

maximum area under

section 6(i)(b) of

MMDR Act, 1957.

(A3)

Chhattisgar

h

1 Kamlibai Kashyap

Limestone 4.09 Badhaji, Jagdalpur - 31.03.2011 03.05.2012 State Govt. has sorted

out the complaint in the

matter and given a

grant order on

22.08.2016. MDPA

model format is to be

given by the Central

Government. Lease

Execution to be

expedited by the State

Government. (A2)

2 M/s Pushp Steel &

Mining, Delhi

Iron ore 215

Hahaladi, Kanker - - High court has given

final order in July,

2016.The SG has

sought legal opinion

from Law Dept. The

lease may be executed

after the same, as rest

all clearances are

already obtained. (B2)

3 M/s J.K. Laksami

Cement Pvt Ltd.

Limestone 281-339 Semriya & Nandni

Khundani

Durg

- 07.02.2011 Regarding Govt. Grass

Land. State Govt. to

expedite decision by

16.08.2016. (A4)

4 M/s Ultratech

Cement Ltd. Raipur

Limestone 689.048 Mohrenga, Murra, Raipur - 19.04.12 EC granted on

09.08.2016. Not

pending on part of

MoEFCC.

NOC of Water

resources Department

of the State is to be

revised after resolution

of dam catchment

issue. Revised report

submitted by the

applicant. State

Government may be

asked to expedite

decision by15.09.2016.

EC has been

Granted. (A2)

5 M/s Ultratech

Cement Ltd. Raipur

Limestone 157.122 Guma, Balodabazar - 17.11.2009 EC has been

Granted. (A2)

6 CMDC/ NMDC Iron Ore 646.596

Deposit No. 4,

Dantewada

30.11.11

-

Goa 1

M/s Gomantak

Investment Pvt.

Ltd

FE 29.8700 Pissurlem, Sattari --- --- Matter is Subjudice

before Hon’ble

Supreme Court. (B2)

2

M/s A.H. Jaffar &

Sons

FE 100 Dharbandora, --- --- DGPS plan approved

and Regional control

of Mines informed

regarding

Environmental

clearance quantum,

which is required for

MP. (A2)

Gujarat 1 M/s Nirma Ltd Limestone 911.41.45 Patan Dist:- Jamnagar -- Dt.09.05.2007 All formalities

complete. The District

Administration may be

asked to expedite lease

execution. State has

also requested to give

model MDPA for non-

auction cases under

Rule 8(3) of MCR,

2016. (A2)

2 M/s Ambuja

Cement

Limestone 591.13 Lodhva, Girisomnath 20.09.2013

3 Indo Rama

Cement Ltd

(Heidelberg

Cement India

Ltd)

Limestone,

Marl

891.71.85 Rohina, Balana,

Vadhera Dist:-

Amreli

-- 08.02.2006 The decision in

regard to change of

name is to be taken

by SG for further

processing of EC.

The State may

expedite by31.08.2016.

(B2)

4 UltraTech

Cement Ltd

Limestone,

Marl

14.20.45 Babarkot Dist:-

Amreli

-- 04.02.2012 Pending for seeking

relaxation under

Section 6(1) (b) for

which a general

proposal needs to be

sent by the SG to the

CG by Aug 2016.

(A3)

5 UltraTech

Cement Ltd

Limestone,

Marl

49.84.54 Babarkot Dist:-

Amreli

-- 04.02.2012

6 M/s Nirma Ltd. Limestone 616.7254 Padhiyarka &

Doliya, Dist:

Bhavnagar

-- 15.02.2008 Proposal considered

by EAC in August,

2016. EAC deferred

the proposal due to

involvement of

Agriculture land.

Minutes of EAC

already put on

website. (B4)

7 M/s Nirma Ltd. Limestone 1225.855

3

Vangar& Madhiya,

Dist: Bhavnagar

-- 15.02.2008

8 M/s Nirma Ltd. Limestone 1489.470

1

Gujarda &

Dudheri, Dist:

Bhavnagar

-- 15.02.2008

9 Shree Digvijay

Cement Co. Ltd.

Limestone 6.64.89 Survey No. 51,

Mokhan Ta.

Bhanvad, Dist.

Jamnagar.

--- Included in the list

of saved cases

compiled by MoM

on the request of

State Government.

May please

expedite.. (A2) 10 Shree Digvijay

Cement Co. Ltd.

Limestone 18.03.88 Survey No.78,

Village:-

Pachhatardi, Ta.

Bhanvad, Dist.

Jamnagar.

11 Shree Digvijay

Cement Co. Ltd.

Limestone 67.17.37 Survey No. 166 and

138, Vill.:- Dheber

and Bhavaneshwar,

Ta. Bhanvad, Dist.

Jamnagar.

Jharkhand

1 M/s ACC Ltd Limestone 115.38 Ha. Ranjka, Kondwa &

Dakatta (W.

Singhbum)

19.02.2006(MMDR Act

1957), Sec 6(1)(b)

2204/M.Dated 14.10.2014 GR, EC, Not submitted

by Applicant. State

Govt. to expedite

decision by

16.08.2016. (B1)

2 Omiyo Ranjan

Jaiswal

Bauxite 111.63

Ha.

Kujam Dokapaat(

Gumla)

Nov,89 __ SG to verify mining

plan approval, FC

approval. Application

for EC is to be

expedited. (A4)

3 Omiyo Ranjan

Jaiswal

Bauxite 85.13 Ha. Bahagarah(Gumla) Nov,89 __ Queries of SG replied

by applicant on

16.03.2016. Pending

for decision by State

Government which

needs to be expedited

by 15 Sep, 2016. (A4)

Karnataka

1 M/s. Bellary Steel

and Alloys Ltd.

Iron Ore,

Manganese

Ore

121.41 Jaisingpur Approved

10/11/1997

Govt. conducted

meeting on 24.05.2016

to finalize draft orders.

Govt has passed

proceedings on

27.08.2016. Applicant

has to submit

complaince to the

Govt. DMG addressed

CEC on 07.10.2016 to

issue directions to

ICFRE to prepare

R&R plan of the

considered area.

Simultaneously ICFRE

has been informed vide

letter dated:

10.11.2016 that

expenses would be

borne by the respective

applicants. (A4)

2 Shri Vonti

Shivappa

Manganese

Ore 18.8 Acre Yeshwanthanagar

Approved

dt :3 /7 /2009

Pending with DC patta

land. Clarification

from DC with regard to

present status of land is

sought. Reply awaited.

Case is pending in DC

office Bellary

regarding the present

land status of the land.

State DMG office may

write to DC to expedite

the matter in 15 days.

(B2)

3 Shri D. Ramesh Iron Ore 14.59 Acre Ramgad Approved

dt :3 /6 /2008

Govt. is conducting

hearing on the proposal

sent to GoI as patta

land and now the status

of land has become

forest. Presently the

matter is pending with

the Hon'ble Minister,

GOK. The final

decision may be taken

within 15 days. State

Govt. recommended

for withdrawl of 5(1).

4 M/s. Mineral

Syndicate

Iron Ore,

Manganese

Ore

20.23 Hect. in NER Range

Approved

dt :25/7 /2005

MP & FC approved.

Overlaping found with

non FC area of M/s

MML area. Held up

for ascertaining the

same. Report is being

verified by Drawing

Branch. State DMG

has to forward its

comment to GOK as

applied area is

overlapping with the

non forest area of M/s

MML within 10 days.

(B1)

5 M/s. Kumar

Enterprises Iron Ore 7.69 Hect. Ramadurg Range

Approved

dt :18/7 /2006

Mines Tribunal

quashed the 5(1)

approval in favour of

this applicant.

Presently pedning with

law officer. WP

15700/2011/05.07.201

6 direction to conduct

hearing of all

applicants. State DMG

may process the matter

as per court orders and

take decision within 15

days. (B2)

6 Shri V.

Venkateshulu Iron Ore 40 Acre NEB Range Bavihalli

Approved

dt :14/6 /2006

GOK has requested to

revoke the grant

notification as no free

area is available and

nobody is present in

behalf of the lessee.

May be finalized

within 15 days. (B2)

7

Shri N.

Mohammed Imam

Niazi

Iron Ore 16.19 Hect. Sankalapura Approved

dt :27/2 /2009

In process. Addressed

a letter to DC Bellary

and report awaited.

Case is pending in DC

office Bellary

regarding the present

land status of the land.

State DMG office may

write to DC to expedite

the matter in 15 days.

(B2)

8 Smt. B.L. Rani

Samyuktha Iron Ore 79 Acre Rajapur etc.

Approved

dt :4 /7 /2008

At present Pending

with drawing branch

of DMG for opinion

and status. The

matter for survey and

demarcation may

kindly be expedited to

be completed in 10

days. (B2)

9 Ms. Kumar

Enterprises Iron Ore 165 Acre Ramgad

Approved

dt :20/8 /2008

Matter is pending

before the court of law.

(B3)

10

M/s Upendra and

Company

Iron ore &

Manganese

ore

121.41 Ha Yarrekatte

Tumkur

Approved on 21-04-2006 Grantee has submitted

all clearances except

FC. Pending with

lessee.

But the considered area

is notified area for

Manganese and this

applicant company is a

sole applicant, without

conducting hearing

recommended this

application for grant.

The SG to take

decision within 15

days. (B1)

11

M/s Goa Minerals

Pvt.Ltd

Iron ore &

Manganese

ore

116.55Ha Yarrekatte

Tumkur

Approved on 09-03-

2006.

11 cases involved in the

overlapping issue.

WPs’ in High Court

Pending. Presently the

case is pending with

GOK to demarcate the

village/ lease boundary

after re-survey as per

the direction of Hon'ble

High Court. To resolve

the boundary dispute.

(B2)

12

M/s Dhruvdesh

Meta Steel

PVt.Ltd.,

Iron ore &

Manganese

ore

116.55 Ha Katarkihalli

Tumkur

Approved on 01-06-

2006.

Overlapping issue.

WPs’ in High Court

Pending.Presently the

case is pending with

GOK to demarcate the

village/ lease boundary

after re-survey as per

the direction of

Hon'ble High Court To

resolve the boundary

dispute. (B2)

13

Shri R.N.Ashok Iron ore &

Manganese

ore

178.3 acres Gollarahalli

Tumkur

Approved on 17-12-

2008.

Overlapping issue.

WPs’ in High Court

Pending.Presently the

case is pending with

GOK to demarcate the

village/ lease boundary

after re-survey as per

the direction of

Hon'ble High Court To

resolve the boundary

dispute.

14

Shri R.Praveen

Chandra

Iron ore &

Manganese

ore

178.3 acres Gollarahalli

Tumkur

Approved on 17-03-

2008.

Overlapping issue.

WPs’ in High Court

Pending.Presently the

case is pending with

GOK to demarcate the

village/ lease boundary

after re-survey as per

the direction of

Hon'ble High Court To

resolve the boundary

dispute. (B2)

15

M/s Milan

Minerals

Iron ore &

Manganese

ore

178.3 acres Gollarahalli

Tumkur

Approved on 04-03-

2008.

Advertised area.

No details are available

regrarding grant

notification. To be

checked at Govt.

At the time of

conducting S&D,

inherent defects found

in the adjacent original

village maps of

Hombalaghatta,

Kathrikehal &

Yarrekatte. To resolve

the boundary dispute, a

meeting was held on

16.10.2015 under the

Chairmanship of

Secretary, C&I.

Revenue Department

and the Department of

Survey Settlement &

Land Records have

been directed to

resurvey the village

boundaries and revise

the revenue documents

accordingly within

three months.Awaiting

for revised village

maps from the

Revenue Dept.

Presently the case is

pending with GOK to

demarcate the village/

lease boundary after

re-survey as per the

direction of Hon'ble

High Court. (B2)

16

M/s Mineral

Enterprises

Pvt.Ltd.,

Iron ore &

Manganese

ore

178.3 acres Gollarahalli

Tumkur

Approved on 17-03-

2008.

Overlapping issue.

WPs’ in High Court

Pending.Presently the

case is pending with

GOK to demarcate the

village/ lease boundary

after re-survey as per

the direction of

Hon'ble High Court To

resolve the boundary

dispute. (B2)

17

M/s Banashankari

Mining Corpn.

Iron ore &

Manganese

ore

178.3 acres Gollarahalli

Tumkur

Approved on 17-12-

2008.

Overlapping issue.

WPs’ in High Court

Pending.Presently the

case is pending with

GOK to demarcate the

village/ lease boundary

after re-survey as per

the direction of

Hon'ble High Court To

resolve the boundary

dispute. (B2)

18

Shri M.Babanna Iron ore &

Manganese

ore

383.5

Acres

Aravatti

Tumkur

Approved on 17-12-

2008.

Overlapping issue.

WPs’ in High Court

Pending.Presently the

case is pending with

GOK to demarcate the

village/ lease boundary

after re-survey as per

the direction of

Hon'ble High Court To

resolve the boundary

dispute. (B2)

19

M/s Kudremukha

Iron ore Co.Ltd.,

Iron ore &

Manganese

ore

116.55 Ha Hombalagatta

Tumkur

Approved on 12-06-

2008.

Overlapping issue.

WPs’ in High Court

Pending.Presently the

case is pending with

GOK to demarcate the

village/ lease boundary

after re-survey as per

the direction of

Hon'ble High Court To

resolve the boundary

dispute. (B2)

20

Smt.Prema

Channappa

Iron ore &

Manganese

ore

60.00 Ha Hombalagatta

Tumkur

Approved on 02-06-

2008.

Overlapping issue.

WPs’ in High Court

Pending.Presently the

case is pending with

GOK to demarcate the

village/ lease boundary

after re-survey as per

the direction of

Hon'ble High Court To

resolve the boundary

dispute. (B2)

21

Mariam Md.

Siddique Patel

Iron ore &

Manganese

4.86 Ha Kenkeri

Chitradurga

Approved on

24-12-2008

Applicant has

produced statutory

clearances such as

technical report, NOC

from DC, CFE from

KSPCB, EC and

mining plan approved

by IBM. NA

conversion not

produced. Govt. yet to

issue grant notification.

Pending with Govt.

Matter is pending with

GOK for notification

of ML. May expedite

decision within 15

days. (A4)

Madhya

Pradesh

1 Lalaji Mineral Manganese 4.99 Negariya/ Jhabua 13.07.2011 All clearances

obtained. SG will issue

Grant orders by

September. (A2)

2 Khatri Mineral Iron ore,

Yellow Ocre

4.56 Silua, Jhasi/ Jabalpur 30.11.2015 All clearances

obtained. SG will issue

Grant orders by

September. (A2)

3 M/s Vandana

Energy and Steel

Ltd.

Manganese 9.915 Miragpur, Balaghat 26.07.2007 SG to examine the

matter in the light of

the recent decision of

the High Court. MP

approved. (B3)

4 Shri Harish

Khandelwal

Limestone 4.502 Sitapuri/ Dhar 22.12.2014 SG will issue Grant

orders by September.

(A2)

5 M/s Mescow

OMC Mining

Corporation

Limestone

and

Dolomite

522.436 Tedi,

Manehra,Shahpur/

Katni

7.05.2015 EC pending, but the

State Government has

intimated about

executing the lease.

(A2)

6. M/s Nirmala

Minerals

Iron,

Manganese

Ore, Bauxite

23.491 Ghughari Kalan/

Jabal Pur

26.10.2007 Pending in MoM for

reduction of area.

(A3)

7. M/s Anand

Mining

Corporation

Iron,

Manganese

Ore, Bauxite

30.756 Ghughari Kalan/

Jabalpur

02.01.2008

8. Shri Ajay

Knandelwal

Manganese

Ore

22.498 Lodhikheda

Chhindwara

29.09.2008

Maharashtra

1 M/s. Y &M

Cement (India)

Pvt. Ltd.

Limestone 252.00 Devalmari/

Katepalli, Dist.

Gadchiroli

------ 12/08/2008 Common boundary

dispute with Ambuja to

be resolved by the

State Govt. (B2)

2 M/s. Jagadamba

Power and

Alloys Ltd.

Manganese

Ore

90.95 Bhandarbodi, Dist.

Nagpur

14/12/2005 --- Area is being revised

to 14.65 , which needs

to be processed by the

State Government

(B1)

3 M/s. Nilesh Mines

Corporation

Bauxite 70.07 Karivane, Dist.

Raigad

23/05/2008 All approvals granted.

Lease to be executed.

Processing at state

govt. level. State Govt.

to expedite decision by

30.08.2016. (A2)

4 M/s. Prachi Mines Bauxite 73.22 Adi M Khadi, Dist.

Raigad

23/05/2008 All approvals granted.

Lease to be executed.

Processing at state

govt. level State Govt.

to expedite decision by

30.08.2016.. (A2)

5 M/s. Ex-

ServicemenWelfar

e Association

Bauxite 90.60 Girgaon Dist.

Kolhapur

14/10/2014 --- 5 (1) approval obtained

but Revised LOI not

issued by the State

Govt. (Applied area is

reduce excluding forest

area) State Govt. to

expedite decision by

30.08.2016. (B2)

6 Shri. Haroon

Ahamed Fazlani

Bauxite 139.05 Mandivali, Dist.

Ratnagiri

18/06/2007 --- Issue regarding Legal

Heir. SG may take

appropriate action by

30.08.2016. EC

approved , but put on

hold due to Eco

sensitive notification

but now cleared. EC

final order to be issued.

(B4)

8 M/s. Deccan

Minerals

Bauxite 369.96 Gargoti block, Dist.

Kolhapur

10/07/2009 --- Applicant has been

asked by MoEF to

reduce the area for

which the applicant is

seeking the State

Government approval

9 Smt. Nila V.

Dempo

&Shrivinas V.

Dempo

Iron Ore 263.82 Zolambe, Dist.

Sindhudurg

01/08/2008 --- Pending with MoEF

for EC and FC.

MoEF may take

final decision by

Aug. 2016. Public

hearing has deferred

by SPCB on account

of moratorium

imposed in the

region by MoEF for

grant of EC for

Project falling in

Western Ghat.

(Ratnagiri and

Sindhudug). MoEF

to expedite

by16.08.2016. Decided

not give EC in the

wake of Moratorium.

(B4)

10 Shri. Shrivinas

V. Dempo

Iron Ore 437.93 Asaniye, Dist.

Sindhudurg

29/03/2007 --- Pending with MoEF

for EC and FC.

MoEf may take final

decision. Public

hearing has been

conducted on

22.04.2010 but

deffered by SPCB

on account of

moratorium

imposed in the

region by MoEF on

16.08.2010 for grant

of EC for Project

falling in Western

Ghat. (Ratnagiri and

Sindhudug) MoEF to

expedite by16.08.2016.

Decided not give EC in

the wake of

Moratorium. (B4)

11 M/s. Ex-

ServicemenWelfar

e Association

Bauxite 90.60 Girgaon Dist.

Kolhapur

14/10/2014 --- The proposal was

recommended by

EAC in meeting of

EAC held during

June 22,23, 2016.

File is under

submission. EC

rejected. (B4)

Odisha

1 J. N.Pattnaik Iron 4.916 Bhanjapali,

Sundergarh

19.12.2001 - Pending for

disposal at Govt.

level. State Govt.

to expedite

decision by Sep

.2016 taking the

implications of

Rule 12(5) of

minimum area of

5 ha for grant of a

mining lease

under the new

rules. (A3)

2 M/s. OMC Ltd. Iron &

Manganes

e

5091.84 Malangtoli,

Keonjhar &

Sundergarh

20.12.2000 - MP approved on

08.03.1996 over

5226.03 hects. of

the applied area.

EC & FC not

applied. LoI not

issued by Govt.

The prior approval

mandates

tripartite

agreement of

OMC, NMDC &

Rio Tinto. Which is

notmade

operational by the

State Govt.

Matter in court

also. FC under

section 2(iii) is

being applied by

OMC. (B3)

3 M/s. OMC Ltd. Iron &

Manganes

e

1011.5 SGBK, Keonjhar 13.12.1993 - MP & EC

approved. FC not

applied. LoI not

issued by Govt.

The issue of state

mining agent to

be converted to

mining lease is

pending for

decision of policy

section of the

Ministry of Mines

which needs to be

expedited by Sep,

2016. (A3)

4 M/s. Orissa

Sponge Iron

Ltd.

Iron 459 Garjantoli &

Kadamdihi,

Keonjhar

17.07.2002 - The diversion

proposal has been

accorded stage-I

(In Principle)

approval for

173.02 hect.

Against originally

proposed

269.1698 hect.

Further an extent

34.00 hect. Of non

forest land has

been considered

as forest land by

the Ministry

during their site

inspection for

which GOI, MOEF

has sought for

separate diversion

proposal and then

modification of

Stage-I approval

order. The user

agency has filed

the D.P. for 34.00

hect. which is

under scrutinity at

the field level.

Issue of captive

use condition is

also bein

contemplated by

the State Govt, in

line with the

guidelines of the

Ministry dt.

19.09.2012.

State Govt. to

expedite decision

by 16.08.2016.

(B2)

5 M/s. OMC Ltd. Bauxite 721.323 Lanjigarh

(Niyamgiri R.F)

Kalahandi &

Rayagada

13.09.2004 - Stage-I approval

has been

accorded for

660.449 hect.

Stage-I

compliance

awaited. Not

being processed.

FC withdrawn by

Supreme Court.

(B3)

6 Sri M.R. Dash Iron 68.63 Bhulbera

(Khuntapani)

Keonjhar

27.03.1986 - MP, EC & FC not

applied. The

applicant

requested for

deletion of Forest

area and retaining

the balance area

of 65.299 hects.

which is pending

with Govt. since

01.05.2008.

Complinace of

Rule 8 submitted

on 25.5.2016.

State Govt. to

expedite decision

by 30.09.2016 and

to be considered

in the Screening

committee

meeting of

24.09.2016. (B2)

7 Sri J.N.

Pattanaik

Iron &

Manganes

e

57.5 Unchabali

&Nayagarh,

Keonjhar

24.10.03 Granted GP No.

18/SM dt.04.01.2005

MP approved over

the entire area

over 57.50 hects.

EC & FC not

obtained. The

applicant

preferred

reduction of the

area to 30.642

hects. delating the

forest area but

Govt. decision in

this regard is

awaited. To be

considered in the

HLC meeting of

the State. Entire

area is DLC for

which FC would

be required. (B2)

8 M/s. Balasore

Alloys Ltd.

Chromite 35.6 Kaliapani, Jajpur 16.04.99 - Prior approval

was for 100 ha.

Part of it has been

executed as lease.

but left over area

is beinf processed.

MP & EC

approved, FC

approved for

35.285 hects. out

of total fores area

of 35.60 hects.

Applicant has

moved application

for clearation U/s-

2(iii) of FC Act,

1980 which is

pending with

MoEF, Govt. of

India. The

requirement of

prior approval for

bifurcation of the

area may be

borne in mind as

per letter dated

31.5.2012. for

expediting the

csase. (A4)

9 M/s. Koustuv

Mining &

Smelting (P)

Ltd.

Tin 19.0 Kamarpalli No.1

Malkangiri

- 9767/SM dt.

22.11.2004

MP approved, EC

is not a condition

of LoI, hence not

applied for the

same. FC not

required. The case

is Pending for

disposal at Govt

level. Compliance

of Rule 8(1)

submitted. The SG

may expedite the

case by 15 Oct,

2016 (A2)

10 Shri. Bijay Ku

Bansal

Garnet 33.532 Ghatapada,

Kalahandi

- 7543/SM

dt.13.06.2001

MP approved, EC

is not a condition

of LoI, hence not

applied for the

same. FC not

required. The

execution of the

ML has not

materialised since

the matter is sub-

judice before

Hon'ble High

Court, Odisha.

(B3)

11 Shri Om

Prakash Jain

Garnet 33.532 Ghatapada,

Kalahandi

- 7546/SM

dt.13.06.2001

MP approved, EC

is not a condition

of LoI, hence not

applied for the

same. FC not

required. The

execution of the

ML has not

materialised since

the matter is sub-

judice before

Hon'ble High

Court, Odisha.

(B3)

12 Shri. Bijay Ku

Bansal

Gemstone 41.485 Paikadakulguda,

Rayagada

- LoI 11915/SM dt.

15.10.2001 & GP No-

9246/SM

dt.12.11.2007

This case not

subjudice. Only

order to be issued

by State Govt. The

applicant was

asked to submit

the compliance of

Rule 8(1) within 3

days time to the

SG and SG to

expedite lease

execution by 15

Oct, 2016. (A2)

13 Shri. Bajrang

Lal Gupta

Semi-

precious

stone

41.485 Paikadakulguda

&

Kandhadakulgud

a

- LoI 11910/SM

dt.15.10.2001 &

Granted vide GP No.

9366/SM

dt.17.11.2007

Grant order

already issued.

Report from

collector received.

The SG to

expedite lease

execution by 15

Oct, 2016. (A2)

14 M/s.

Manikeswari

Minerals

Quartz &

Gemstone

21.092 Bankia,

Subarnapur

- LoI 9701/SM

dt.18.09.03 &

Granted vide GP No.

18239/SM

dt.22.07.2006

The applicant was

asked to submit

the compliance of

Rule 8(1) within 3

days time to the

SG and SG to

expedite lease

execution by 15

Oct, 2016 (A2)

15 M/s.

Manikeswari

Minerals

Quartz &

Gemstone

19.692 Manikpur,

Subarnapur

- LoI 9656/SM

dt.17.09.03 &

Granted vide GP No.

17692/SM

dt.07.12.2006

The applicant was

asked to submit

the compliance of

Rule 8(1) within 3

days time to the

SG and SG to

expedite lease

execution by 15

Oct, 2016 (A2)

16 M/s.

Manikeswari

Minerals

Quartz &

Gemstone

25.504 Bahalpadar,

Subarnapur

- LoI 4102/SM

dt.07.06.2004 &

Granted vide GP No.

3471/SM

dt.16.02.2006

The applicant was

asked to submit

the compliance of

Rule 8(1) within 3

days time to the

SG and SG to

expedite lease

execution by 15

Oct, 2016 (A2)

17 M/s. Sanjukta

Gems

Cat's eye 17.122 Pipal Padar &

Sarigipali Dist-

Kalahandi

- Granted vide GP

7496/SM Dt.

02.07.05

The applicant was

asked to submit

the compliance of

Rule 8(1) within 3

days time to the

SG and SG to

expedite lease

execution by 15

Oct, 2016 (A2)

18 Sri M.R. Dash Graphite 49.96 Dudukamal,

Bolangir

- LoI 11866/MG dt.

01.11.85 & Granted

vide

G.P No.4605/MG

dt.04.04.86

The applicant was

asked to submit

the compliance of

Rule 8(1) within 3

days time to the

SG and SG to

expedite lease

execution by 15

Oct, 2016

19 M/s. Mesco

Ltd.

Iron 1519.98 Kadakala,

Luhakala,

Pidapokhari and

Sundra Keonjhar

07.01.1999 Granted GP No.

2327/SM

dt.17.03.1999

Moved to HC for

execution of the

Lease. Counter

filed by the SG.

The SG has replied

to MESCO query

of the Central

Govt whch needs

to be finalised by

the Central Govt

by Sep, 2016 (B3)

20 M/s. Shiva

Cement Ltd.

Limestone

& Dolomite

63.956 Kutra,

Sundergarh

- Granted vide

G.P. No. 5919/MG

dt.22.05.92

MP appvd in

1989. FC

Application

pending with the

Collector for DLC

land of 4.09 ha.

The district

administration

may be asked to

expedite the same

by Sep, 2016 (B4)

21 M/s.

Sulakshani

Mines &

minearls (P)

Ltd.

Ruby 15.666 Karanga,

Kalahandi

- LoI 7920/SM dt.

27.06.01

Granted vide

G.P No.3435/SM

dt.28.03.03

FC (stage-II

approved only

14.836 hects.

Balance forest

area not

approved) Issue of

Stanp duty with

District

Administration

which may be

asked to expedite

by Sep, 2016. (A2)

22 M/s. Bharat

Precious Stone

& Minerals

(P) Ltd.

Semi-

precious

stone

70.553 Karlaghati,

Litakabaoli,

Pidilpodga,

Rayagada

- LoI 9085/SM dt.

23.08.2003 Granted

vide GP No. 3423/SM

dt.03.04.2007

The grant order

issued. Pending

for execution of

Lease for want of

approval of survey

maps. May be

done by Sep, 2016

(A2)

23 M/s. Deepak

Steel & Power

Ltd.

Iron &

Manganes

e

38.687 Khandabandh &

Baitarni R.F.

Keonjhar

NA

However LoI issued

on 20.08.2007

- Grant order was

revoked due to

illegal mining

issues. The same

was quashed by

RA but State has

escalated the

matter to HC. So

cant be decided

till the decision is

given by the HC.

MP & EC

approved. FC not

obtained but

compliance of

Stage-I clearance

submitted and

NPV paid over

total forest land.

(B3)

Rajasthan

1

M/s. Grasim

Industries Ltd.

Limestone 532.8585 Sundo ki

dadi/Jhunjhunu

Not required 02-04-03 Matter is pending at

Govt. level regarding

demerger of Grasim

Industries Ltd. in M/s.

Samridhi Cement Ltd.

and further

amalgamation of M/s.

Samridhi Cement Ltd.

in M/s. Ultratech

Cement Ltd. State

Govt. to expedite

decision for S. No. 4 to

5. Applicantion will be

required to submit

revised mining plan

because company has

reduced the area from

34.612 sq. km. to

532.8585 ha (A4)

2

M/s. Grasim

Industries Ltd.

Limestone 1153.4 Bsawa/ Jhunjhunu Not required 16-03-02 State Govt. to expedite

decision at the earliest..

(A2)

3

M/s. Grasim

Industries Ltd.

Limestone 318.78 Mohanpura

jodhpura/Kotputali

Not required 10-10-07 State Govt. to expedite

decision at the earliest.

(A2)

4 M/s Rashtgriya

Ispat Nigam Ltd.

Iron ore 945.8575 Baneda, Sultangarh,

Baran/ Bhilwara

19.03.2013 31.05.2013 Pending with State for

final sanction order.

State Govt. to expedite

decision by 16.08.2016.

On the request of

applicant GoR issued

sanction for further

prospecting in the area

by the applicant. (A2)

5 M/s Shree Cement

Ltd.

Limestone 532.8585 Sundo Ki dadi/

Jhunjunu

23.08.2007 Proposal has been sent

to the Government on

13.10.2016. (A2)

Tamilnadu

1

Tvl Ultratech

Cement Ltd

Limestone 24.63.5 Kairulabad, Ariyalur 22.02.2012 AMP & EC submitted

also obtained in 2015.

Section 6(1)(b)

relaxation is required

from GOI, which is to

be finalized within 10

days. Pending lease

grant order by CGM,

State Govt. and lease

execution by DC.

Applicants to submit

compliance under rule

8(1) within 1 week.

Lease grant to be

expedited by the SG by

Oct, 2016. (A3)

2

Tvl Ultra

techCement Ltd

Limestone 74.38.0 Ottakovil Ariyalur 22.02.2012

3

Tvl Ultra

techCement Ltd

Limestone 54.68.0 Varagupadi

Perambalur

23.02.2012 AMP & EC submitted

also obtained in 2015.

Section 6(1)(b)

relaxation is required

from GOI, which is to

be finalized within 10

days. Pending lease

grant order by

Secretariat of State

Govt. and lease

execution by DC.

Applicants to submit

compliance under rule

8(1) within 1 week.

Lease grant to be

expedited by the SG by

Oct, 2016. (A3)

4 Tvl Dalmia

Cement (B) Ltd

Limestone 15.48.0 Ariyalur,

Periyanagalur and

Kairulabad

12.07.2005 AMP

& EC obtained in 2006

& 2007, respectively.

Section 6(1)(b)

relaxation from GOI

obtained in 2007. The

area earlier given

administrative for PSU

to start purchase of

land, but later

administratively

cancelled these areas

as the PSU had not

started any land

procurement process

which was even

mentioned to the

Central govt for

obtaining 6(1)(b)

relaxation. Now,

Pending decision of

State Govt., for which

they were advised to

form a committee of

officials from CGM,

State Secretariat, IBM

& PSU representatives

if required. The CGM

officials informed that

final decision will be

expedited in this case

within 15 days. In the

meanwhile, applicants

to submit compliance

under rule 8(1) within

1 week. Lease grant to

be done by the SG by

Oct, 2016. (A3)

5 Tvl Dalmia

Cement (B) Ltd

Limestone 26.94.0 Ariyalur,

Periyanagalur

Ameenabad and

Kairulabad

12.07.2005

6. Chhetinad Cement

Corporation ltd.

Limestone 26.145 Karuppur, senapati,

Ariyalur

4.7.2012 Approved MP & EC

submitted in 2015. The

Grant order to be

passed by State

Government and lease

execution to be

expedited by Oct,

2016. In the

meanwhile, applicants

to submit compliance

under rule 8(1) within

1 week. (A2)

7. Tvl. Chettinad

Cement

Corporation

Limestone 32.29.5 Periyathirukonam,

Ariyalur

17.07.2012

8.

Tvl. The Ramco

Cements Ltd.

Limestone 16.22.5 Virudhunagar,

Srupukkottai,

Amanakunatham

11.09.2012 To be considered after

general relaxation for

Limestone for TN.

Section 6(1)(b)

relaxation is required

from GOI, which is to

be finalized within 10

days. The applicant to

give application of MP

& EC subsequent to

Feasibility by Sep,

2016 end. (A3)

Telangana

1

M/s Pioneer

Torsteel Mills Pvt.

Ltd

Limestone,

Iron Ore and

Dolomite

22.460 Nawabpet, Chityal

Mandal, Warangal

24.10.2008 Pending with SG, to be

expedited decision by

15 Sep, 2016. (B4)

2

M/s My Home

Industries Ltd

Limestone 156.586 Choutapally,

Mattampally,

Mandal, Nalgonda

1.11.2013 Pending with MoEF

for final orders to be

issued. Presentation

and

recommendation

already done on

22.03.2016. May be

expedited by 15Sep,

2016. EC Granted

14.10.2016 (A2)