artist’s impression...artist’s impression 3 and 4 bedroom homes high-rise towers of 18 & 19...

24
88A

Upload: others

Post on 04-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

88A

Page 2: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

Artist’s impression

Page 3: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

a residential complex encompassing a beautiful landscape and a refreshing boulevard alongside a large waterbody. With a perfect view of the Tollygunge Club Golf Course, a pleasant walkway and a jogging

track, there is an abundance of greenery and open space around.

Page 4: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

B.L.SAHA ROAD

DRIVEWAY

DR

IVE

WA

Y

DRIVEWAY

DR

IVE

WA

Y

WATER BODYLANDSCAPE

GREEN

LAWN

BLOCK A4(G+19)

BLOCK A3(G+19)

BLOCK B1(G+18)

BLOCK B2(G+18)

PHASE 2

PHASE 1

An eco-friendly, proposed IGBC Gold Development project with ample open space and apartments that face the South and Tollygunge Club.

N

Page 5: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

Artist’s impression

3 and 4 bedroom homes

High-rise towers of 18 & 19 floors in Phase 1

Vaastu compliant homes

Well-ventilated and fully air-conditioned apartments

Golf course view from almost every apartment

Page 6: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

Spread across 5.2 acres and located in the heart of the city – the complex is conveniently situated near New Alipore and Tollygunge Club and is in close proximity to the Rabindra Sarovar

and Tollygunge Metro.

Page 7: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

*NOT TO SCALE

SRI SRI ACADEMY

KALIGHAT METROSTATION ALIPORE

RABINDRA SAROVAR LAKE

RSVHOSPITAL

PRINCE ANVAR SHAH ROAD

TOLLYGUNGEHEAD

POST OFFICE

ISKON TEMPLENEW ALIPORE

TOLLYGUNGE CIRCULAR ROAD NEW ALIPORE ROAD

RABINDRASAROVARMETRO STATION

SOUTH CITYGARDENS

NSHM KNOWLEDGE

CAMPUS

KALIMANDIR

KA

LA B

AG

AN

PO

ST

OF

FIC

E

RAJA RAM MOHAN ROY ROAD

NATIONALPUBLIC SCHOOL B

.L. S

HA

H R

OA

DC

HE

TLA

RO

AD

M R BANGURHOSPITAL APOLLO

NURSING HOMESOUTH CITY

INTERNATIONAL SCHOOL

SOUTH CITY MALL

TOLLYGUNGEMETRO STATION

ROYALCALCUTTAGOLF CLUB

DE

SH

AP

RA

N S

AS

MA

L R

OA

D

TOLL

Y C

AN

AL

SOUTHERN AVENUE

TOLLYGUNGE

SURUCHISANGHA

DIAMOND CITY (SOUTH)

TOLL

YG

UN

GE

CLU

B

88ABL SAHA

DU

RG

AP

UR

B

RID

GE

STATION ROAD

Page 8: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

RSV HOSPITAL

MR BANGUR

CMRI/KOTHARI/BM BIRLA

1.7 KM

2.3 KM

5.5 KM

1.9 KM

2.5 KM

3.5 KM

NATIONAL PUBLIC SCHOOL

SRI SRI ACADEMY

MP BIRLA FOUNDATION

SOUTH CITY INTERNATIONAL

0.2 KM

3.2 KM

3.4 KM

3.9 KM

ISKCON

SURUCHI SANGHA

SRI GURU SINGHSABHA GURUDWARA

Page 9: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

1.9 KM

2.0 KM

3.2 KM

3.6 KM

RABINDRA SAROBAR METRO

TOLLYGUNGE METRO

UPCOMING BEHALA CHOWRASTA

KALIGHAT

0.5 KM

2.8 KM

3.9 KM

TOLLYGUNGE CLUB

ROYAL CALCUTTA GOLF CLUB

SOUTH CITY MALL

Artist’s impression

Page 10: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned
Page 11: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

MULTIPURPOSECOURT

GYMSWIMMING POOL

BANQUETHALL

GAMESROOM

CAFETERIA HOME THEATREROOM

AND MANYMORE..

Page 12: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

Artist’s impression

Page 13: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

24x7 CCTV surveillance

Modern firefighting system

Team of well-trained security sta�

Video-door phones

Intercoms in every apartment

Page 14: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

super structure

wall finish

flooring

RCC frames structure with pile foundation

Putty finish on walls

Vitrified tiles in bed rooms andliving/dining room

kitchenGranite platform

Stainless steel sink Dado of ceramic tiles upto 2 ft above kitchen counter

Exhaust point Flooring: Anti-skid ceramic tiles

doors and windowsDoor frame: Made of wood

Main door: Polished solid core flush doors Main door fittings:

Reputed make with night latch & eyepiece Internal doors:

Laminated flush doors with stainless steel fittings Windows: Fully glazed anodized/power

coated aluminium/UPVC windowsBranded hardware fitting and lock of reputed make

toiletFlooring: Anti-skid ceramic tiles

Toilet walls: Ceramic tiles on the walls Sanitary ware of reputed make

CP fittings of reputed make Electrical point for geyser & exhaust fan

Plumbing provision for hot/cold water line

Page 15: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

common lighting Overhead illumination for compound

and street lighting Necessary illumination in all lobbies

Staircases and common areas

electricalsConcealed copper wiring of reputed brands

Telephone and internet wiring in living or dining areaElectrical points in all bedrooms, living/dining, kitchen, toilets

Modular switches of reputed brands DTH/Cable TV cabling in all bedrooms and living room

elevatorsModern high speed automatic elevators of

OTIS/Kone or of equivalent make Each tower to have a stretcher elevator

common areasWell-designed common lobbies

Su�cient power back up facilities Air-conditioned ground floor

Designer lobby with marble finish

security features and fire fighting Video door phone in each unit Intercom facility in each unit

CCTV surveillance in the complex Modern fire fighting systems as per WBFS Act

(Provisional NOC)

air-conditioningAir-conditioned bedrooms, living & dining

water supply and generator24 hours filtered water supply

Provision for standby supply in every unit

Page 16: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

Artist’s impression

PHASE 2

PHASE 1

BLOCK A4(G+19)

BLOCK A3(G+19)

BLOCK B1(G+18)

BLOCK B2(G+18)

Page 17: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

BLOCK B1 & B2

FLAT A *BUA : 1687 sq.ft. | *TA : 180 sq.ft./179 sq.ft./182 sq.ft.FLAT B BUA : 1688 sq.ft. | TA : 179 sq.ft./180 sq.ft./180 sq.ft.

M. BED ROOM

BED ROOM BED ROOM

BED ROOM

FOYER

KITCHENTLT.

DRESS DRESS DRESS

UTILITY

W.C

.

BALC

ON

Y

KITCHEN

BED ROOM

BED ROOM

BED ROOM

TLT.

TLT.

TLT.

LIV

ING

DINING

DIN

ING

LIVING

UTILITY

W.C.

BA

LCO

NY

TLT

LIFT

LIFT

LOBBY

UPDN

UPDN

FOYER

FIRE REFUGE PLATFORM

TLT.

M. B

ED R

OO

M

SERVICE DUCT

DRESS

OPEN TERRACEAT 3rd, 6th, 9th, 12th, 15th, 18th FLOORS

181 sq.ft.

OPEN TERRACEAT 3rd, 6th, 9th, 12th, 15th, 18th FLOORS

180 sq.ft.

OPEN TERRACE AT 4th, 7th, 10th, 13th, 16th FLOORS

180 sq.ft.

OPEN TERRACEAT 4th, 7th, 10th, 13th, 16th FLOORS

179 sq.ft.

OPEN TERRACEAT 5th, 8th, 11th, 14th, 17th FLOORS

179 sq.ft.

OPEN TERRACEAT 5th, 8th, 11th, 14th, 17th FLOORS

180 sq.ft.

SER

VIC

E D

UC

T

15'-8"x12'6'-9"x8'-5"

5'x9'-1"

15'-8"x16'-5"15'-3"x10'-7"

11'-6"x7'-7"

6'-2"x7'-5"

5'-8

"x3'

-10"

5'x3

'-2"

5'-5"x8'-5"

10'-6

"x13

'

8'-6"x4'-7"

15'-8"x12'

6'-10"x6'-7"

5'x7'

11'-6"x8'

6'-4"x7'-7"

5'-8

"x4'

-3"

5'x3'

12'-1"x11'-1"

8'-6"x4'-7"

12'-1"x10' 12'-1

0"x

10'-7

"

7'-5"

x4'-7

"

12'-1"x11'-7"

12'-1"x10'

10'-8"x11'

4'-9"x5'-4"

5'-3"x6'-2"

8 PASS

13 PASS

15'-3"x7'-10"

5'x7'-4"

7'-3"

x7'-3

"

15'-8

"x13

'-9"

A B

N

4 BHK

1st to 18th Floor

*BUA - Built-up area. TA - Terrace area

Page 18: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

BLOCK A3

FLAT A & B *BUA : 1047 sq.ft. FLAT C & D BUA : 988 sq.ft.

N

3 BEDROOMS, 2 TOILETS

3rd to 18th Floor

*BUA - Built-up area. TA - Terrace area

REFUGE AREA AT+22900 LEV,

+35500 LEV &+51250 LEV.

UPDN

UPDN

LIVING/DINING

LIVING/DINING1M WIDE PASSAGE

1M WIDE PASSAGE

L O B B Y

STRETCHERLIFT

LIFTLIFT

LIFT LOBBY

GA

RB

AG

E C

HU

TE

C.B.

FLA

T A

FLA

T D

FLA

T B

FLA

T C

LIVING/DINING

LIVING/DINING1M WIDE PASSAGE

1M WIDE PASSAGE

C.B.

C.B. C.B.

C.B.

SER.VND.

BED ROOM

BEDROOM

KITCHEN

BED ROOM

BED ROOM

BEDROOM

KITCHEN

BED ROOM

SER.VND.

SER.VND.

BED ROOM

BEDROOM

KITCHEN

BED ROOMTOILET

BED ROOM

BEDROOM

KITCHEN

BED ROOMTOILET

SER.VND.

TERRACE AT 10TH,

13TH, 16TH FLR.S

TERRACE AT 10TH,

13TH, 16TH FLR.S

11'-1"x13'

10'x14'7'-1"x4'

11'-1"x10'-1"

10'x22'

22'-5"x10'-1"

6'-5"x10'-1"

11'-1"x10'-1"11'-1"x13'

10'x12'

11'-1"x13'

10'x14'

7'x4'-8"

7'-1"x4'

11'-1"x10'-1"

10'x22'

22'-5"x10'-1"

6'-5"x10'-1"

11'-1"x10'-1"

7'-5"x5'11'-1"x13'

10'x12'

6'-5"x9'-7"

6'-5"x9'-7"

TERRACE AT 9TH,

12TH, 15TH FLR.S

TERRACE AT 9TH,

12TH, 15TH FLR.S

TERRACE AT 9TH,

12TH, 15TH FLR.S

TERRACE AT 9TH,

12TH, 15TH FLR.S

TERRACE AT 8TH,

11TH, 14TH, 17TH

FLR.S

TERRACE AT 8TH,

11TH, 14TH, 17TH

FLR.S

TERRACE AT 8TH,

11TH, 14TH, 17TH

FLR.S

TERRACE AT 8TH,

11TH,14TH, 17TH

FLR.S

5'x4'-7"

5'x4'-7"

TOILET6'-5"x6'-1"

TOILET6'x5'-8"

DU

CT

TOILET6'-5"x6'-1"

C.B.

TOILET7'x4'-8"

TOILET6'x5'-8"

C.B.

C.B.

TOILET7'-5"x5'

ELEC

.DU

CT

ELEC

.DU

CT

TA : 42 sq.ft./43 sq.ft./38 sq.ft.

Page 19: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

FLAT A & B *BUA : 1047 sq.ft. FLAT C & D BUA : 988 sq.ft.

BLOCK A4

N

3 BEDROOMS, 2 TOILETS

3rd to 18th Floor

*BUA - Built-up area. TA - Terrace area

REFUGE AREA AT+22900 LEV,

+35500 LEV &+51250 LEV.

UPDN

UPDN

LIV

ING

/DIN

ING

LIVING/DINING 1M WIDE PASSAGE

1M WIDE PASSAGE

L O B B Y

STRETCHERLIFT

LIFT LIFT

LIFT LOBBY

GA

RB

AG

E C

HU

TEFL

AT

AFLA

T D

FLA

T B

FLA

T C

LIVING/DINING

LIVING/DINING1M WIDE PASSAGE

1M WIDE PASSAGE

SER.VND.

BED ROOM

BEDROOM

KITCHEN

BED ROOM

BED ROOM

BEDROOMBED ROOM

SER.VND.

BED ROOM

BEDROOM

KITCHEN

BED ROOM

BED ROOM

BEDROOM

BED ROOM

SER.VND.

TERRACE AT 10TH,

13TH, 16TH FLR.S

TERRACE AT 10TH,

13TH, 16TH FLR.S

11'-1"x13'

10'x14'7'-1"x4'

11'-1"x10'-1"

10'x22'

22'-5

"x10

'-1"6'-5"x10'-1"

11'-1"x10'-1"11'-1"x13'

10'x12'

11'-1"x13'

10'x14'

7'-1"x4'

11'-1"x10'-1"

10'x22'

22'-5"x10'-1"

6'-5"x10'-1"

11'-1"x10'-1"

11'-1"x13'

10'x12'

TERRACE AT 9TH,

12TH, 15TH FLR.S

TERRACE AT 9TH,

12TH, 15TH FLR.S

TERRACE AT 9TH,

12TH, 15TH FLR.S

TERRACE AT 9TH,

12TH, 15TH FLR.S

TERRACE AT 8TH,

11TH, 14TH, 17TH

FLR.S

TERRACE AT 8TH,

11TH, 14TH, 17TH

FLR.S

TERRACE AT 8TH,

11TH, 14TH, 17TH

FLR.S

TERRACE AT 8TH,

11TH, 14TH, 17TH

FLR.S

5'x4'-7"

C.B.

C.B.

TOILET6'x5'-8"

TOILET7'-5"x5'

TOILET7'x4'-8"

C.B.

C.B.

TOILET6'-5"x6'-1"

KITCHEN6'-5"x9'-7"

KITCHEN6'-5"x9'-7"

TOILET6'-5"x6'-1"

C.B.

C.B.

TOILET7'x4'-8"

TOILET7'-5"x5'

C.B.

C.B.

TOILET6'x5'-8"

SER.VND.5'x4'-7"

ELEC

.DU

CT

DU

CT

ELEC

.DU

CT

TA : 42 sq.ft./43 sq.ft./38 sq.ft.

Page 20: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

The Diamond Group holds the reputation for turning trust into belief with their sheer transparency regarding the development of their projects. With a strategic perception of planning and detailing, the Diamond Group have such successful projects like Diamond City North (Jessore Road), Diamond City West (Behala), Diamond City South (B L Saha Road, Tollygunge), Diamond Heritage (Strand Road), Diamond Plaza Mall (Jessore Road) among many others to their name. Some ongoing projects include Navita (Madhyamgram), 12 Diamonds (Alipore

Road), The 42 (J L Nehru Road)

Page 21: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

In the last three decades, the joy of creating homes out of houses has captured Sugam in all its grand beauty. Weaving spaces with sheer imagination with a foresight and vision to touch lives even 20 years in the future, Sugam Group has earned the title of being the ‘Pioneers in A�ordable Housing in Eastern India.’ With love and tradition that complements design and structure, it reputes in the trust of converting homes into

memories and memories into happy communities.

Renowned for projects like Sugam Habitat, Sugam Serenity, Sugam Sudhir, Sugam Park (Narendrapur) and Sugam Business Park (Sector V), it believes in celebration-

the celebration of togetherness.

3 Decades • 20 Projects Completed • 5000 Happy Residents • Developing 8 million sq.ft.

Page 22: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

Anirban Bhaduri formed Architect Innate in 2005 and since then, has bestowed the country with some unique design and eloquent expression of his innovative mind which has earned him several accolades and awards. His consultancy in terms of designing and architecture is unparalleled.

LEAD ARCHITECT

ANIRBAN BHADURIArchitect Innate

Page 23: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

MN Consultant's Utpal Santra has an unparalleled experience of 25 years with projects like Apollo Gleneagles Hospital, Kolkata and Ideal Heights to his name.

After doing Post Graduation in Landscape Architecture in 1978 from School of Planning & Architecture, New Delhi, Mr. Krisan Singal worked on variety of planning projects related to tourism development, master plans, environmental improvement schemes and beautification proposals of immense value. With his international experience in Kuwait with Kuwaiti Engineers O�ce, he has received immense reputation for his celebrated work and has been practicing in Delhi since 1990.

UTPAL SANTRAMN Consultants

KRISAN C. SINGALSingal Associates

STRUCTURAL CONSULTANTLANDSCAPE ARCHITECT

Page 24: Artist’s impression...Artist’s impression 3 and 4 bedroom homes High-rise towers of 18 & 19 floors in Phase 1 Vaastu compliant homes Well-ventilated and fully air-conditioned

Site Address: 88A BL Saha RoadKolkata 700053

Disclaimer: This brochure is not a legal document. It describes the concept of the project & details furnished are subject to change.

CO-OWNERS & DEVELOPERS CO-OWNER

A SUGAM DIAMOND ABASAN LLP PROJECT