arrowhead - weston transmission line project dave van house minnesota power

Download Arrowhead - Weston Transmission Line Project Dave Van House Minnesota Power

If you can't read please download the document

Upload: asa

Post on 15-Jan-2016

47 views

Category:

Documents


2 download

DESCRIPTION

Arrowhead - Weston Transmission Line Project Dave Van House Minnesota Power. Description & Overview. 220 mile 345,000 volt electric transmission line Approved by the Minnesota and Wisconsin regulators in 2001 Construction Began in Minnesota February 2004 - PowerPoint PPT Presentation