Page 1: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

A0A104 A59 ARMY ENGINEER DISTRICT ST LOUIS MO F/S 13/13NATIONAL DAM SAFETY PROGRAM. FRONTIER LAKE DAM (MO 30007). LOWE-ETC(U)

UNCLASSIFIED AUN7 Lt

mEEEEEEEEEEEIEEEEEEEEEIIIII

Page 2: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

- ~LE VEL

Page 3: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

Y UNCLASSIFIEDSECURITY CLASSIFICATION OF THIS PAGE (Whren Date Entered)

REPORT DOCUMENTATION PAGE RED CLsETINORS1. REPORT NUMBER 2. GOVT ACCESSION NO. 3. RECIPIENT'S CATALOG NUMBER

4. TITLE (and Subtitle) S. TYPE OF REPORT & PERIOD COVERED

Phase I Dam Inspection ReportNational Dam Safety Program Final /eport.Frontier Lake Dam (MO 30007) 6. PERFORMING ORG. REPORT NUMBER

Wayne County, Missouri7. AUTHOR(a) S. CONTRACT OR GRANT NUMBER(e)

Corps of Engineers, Memphis District

N/A

9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT, PROJECT. TASKU.S. Army Engineer District, St. Louis AREA & WORK UNIT NUMBERS

Dam Inventory and Inspection Section, LMSED-PD210 Tucker Blvd., North, St. Louis, Mo. 63101

It. CONTROLLING OFFICE NAME AND ADDRESS 2._FtPORT DATEU.S. Army Engineer District, St. Louis Augue"978Dam Inventory and Inspection Section, LMSED-PD II. .UMBER OF PAGES210 Tucker Blvd., North, St. Louis, Mo. 63101 Approximately 35

14. MON[TORtN; AGENCY NAME & ADORESS( i different fra Controllinfi Office) IS. SECURITY CLASS. (of this report)

i-'> National Dam Safety Program. FrontierLake Dam (MO 30007), Lower Mississippi UNCLASSIFIED

St. Francis Basin, Wayne County, 1sa. DECLASSIFICATION/DOWNGRADING

Missouri. Phase I Inspection Report. L C_ __U___1S. DISTRIBUTION STATEMENT (ot tintie Xpor)

Approved for release; distribution unlimited.

17. DISTRIBUTION STATEMENT (of the abtract emtered In Block 20, If different from Report)

1I. SUPPLEMENTARY NOTES

11. KEY WOROS (Continue an reverse aide if noce..Y and identiy by block number)

Dam Safety, Lake, Dam Inspection, Private Dams

SAUSTRACT (CestfiU -Onm~w &ta Nneeinp mod idenify by block number)This report was prepared under the National Program of Inspection ofNon-Federal Dams. This report assesses the general condition of the dam withrespect to safety, based on available data and on visual inspection, todetermine if the dam poses hazards to human life or property.

J ANm S 1473 EWTIoISoF'NorsSisOSO.ETE UNCLASSIFIED

SECURITY CLASSFICATION OF THIS PAGE (WIhn Dae Ent-red)

L ow- ----

Page 4: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

SKCURITY CLASSIFICATION OF THIS PAGZCWIIo Date Uftt

SIECU MITY CLASSIFICATION OF THIS PAGI(ften Date Kni.,.d)

Page 5: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

FR(Y1TIER LAKE PA11':AYr COlf,1TY, N!ISSO11RI

MISSOURI INVFITORY NO. 30007

PHASE I INSPECTION REPORTNATIO'AL DA'lI SAFETY PROGRAM

Plr:PARED BY: ST. LOUIS DISTRICT Co)RPS 07 rXI':r-ERSFOR: (GOVER.NOR OF MISSOUIT

AUGUST 1973

Page 6: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

PHASE I REPORT

NATIONAL DAM SAFETY PROGRAM

Name of Dam Frontier Lake DamState Located MissouriCounty Located Wayne CountyStream Camp CreekDate of Inspection 12 July 1978

Frontier Lake Dam was inspected by an interdisciplinary teamof engineers from the Memphis District, U.S. Army Corps of Engineers.The purpose of the inspection was to make an assessment of thegeneral condition of the dam with respect to safety, based uponavailable data and visual inspection, in order to determine if thedam poses hazards to human life or property.

The guidelines used in the assessment were furnished by theDepartment of the Army, Office of the Chief of Engineers and devel-oped with the help of several Federal and State agencies, profes-sional engineering organizations, and private engineers. Based onthese guidelines, this dam is classified as a intermediate size damwith a high downstream hazard potential. Failure would threaten thelife and property fo approximately 6 families downstream of the damand cause appreciable damage to highway N, approximately 1 1/4 milesdownstream of the dam.

The inspection and evaluation indicate that the spillway doesnot meet the criteria set forth in the guidelines for a dam havingthe above mentioned size classification and hazard potential.According to the guidelines, the spillway is required to pass theProbable Maximum Flood (PMF) without the dam embankment beingovertopped. The spillway will only pass 15 percent of the PMFbefore the dam embankment is overtopped. Because the spillwaywill not pass 1/2 of the PMF without overtopping, the dam isclassified as "unsafe non-emergency." Also the spillway will notpass the 100-year flood without overtopping, which is a flood thathas a 1 percent chance of being exceeded in any given year.

Other deficiencies visually observed by the inspection teamwere bushes and small trees on the downstream embankment slope, noerosion protection on the upstream embankment slope and no erosionprotection on the emergency spillway guide dike near the spillwayoutfall. Another deficiency found was the lack of seepage andstability analysis records.

Page 7: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

It is recommended that the owner take action to correct orcontrol the deficiencies described. Corrective works should bein accordance with analyses and design performed by an engineerexperienced in the design and construction of dams.

Y*ANDERSON4Hydraulic EngineerMemphis DistrictCorps of Engineers

Accessli ro- .. ROBERT M. DAVIS

Geologist

,- Memphis DistrictCorps of Engineers

D tribu--_ ,

AVfl±1TbA' " 't C. :.$

iO[ E. MONROESoils EngineerMemphis DistrictCorps of Engineers

SUM1E BY: SIGNED 22SEP EPChief, Engineering Division Date

APPROVED BY: SIGN 22 SEP 1911(JColonel, CE, District Engineer Date

I -o-

Page 8: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

- - Ij~EE- -------.. liii,

Page 9: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

PHASE I INSPECTI' REPORTNATIONAL DXI SAFETY PROGRX!FRONTIER LAKE DXI - ID NO. 30007

TABLE OF CONTE:NTS

Paragraph "o. Title Page No.

SECTION 1 - PROJECT I:I2.TIO.

1I General 11.2 Description of Project 11.3 Pertinent Data 3

SECTION 2 - ENGINEERIMTX DATA

2.1 Desi'n 62.2 Construction 62.3 Operation 62.4 Evaluation 6

SECTIO' 3 - VrSUAL INISPECTION

3.1 Findinfgs 83.2 Evaluation 9

SECTION 4 - OPERATIO:;AL PROCEDIPES

4.1 Procedures 104.2 :faintenanee oF Dar 104.3 'aintenance or Operatin!a Facilities 104.4 Description of Any Warning System in Effect 104.5 Evaluation 10

SECTION 5 - IIYDAIIIC/,YD,,OLO.IC

5.1 Evaluation of Features 11

SECTION, 6 - STRICTURAL STABILITY

6.1 Evaluation of Structural Stability 12

SECTION 7 - ASSESS71ENT/REHlEDIAL 1EAS[URFS

7.1 Dam Assessment 137.2 Remedial 'leasures 13

APPENDIX

A lydrolo! ic Computations A-1

k6-.

Page 10: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

TABIE OF CMITENTS (Cont'd)

LIST OF PL.\TES

Plato '.o. Title

1 Location '!a-

2 Vicinity Topography

3 Dar Plan View

4 Centerline Profile

S Cross-Section (Sta. 1 + 63) - 1964 Drawings

6 Cross-Section - Existing Conditions (Sta. 0 + S')

7 Cross-Section - Existin! Conditions (Sta. 1 + 63)

S Cross-Section - Existing Conditions (Sta. 2 + 45)

Photo :1o. Title

1 Overview of Lake and Dam

Upstrean Slope - 'ave v7as%

3 Downstream Slope - Erush and small Trees

4 Inlet o.f Vertical Structure

S Discharg.e o' Vertical Structure

6 Eergenc; Sp i llway - Upstream Viow

7 1::rgeac, 3pj 1 lv.uy Out C. 11 - Spil1 ,a'. ,he Di, Eros ion

,hnr';;,mc gpill way - !Jpstreaa View (M1arch 1977)

9 .Th:ergency Spillway Outfall (M!arch 1977)

1) lfmergency Spillway Outfall (March 1977)

11 Fmergency Spillway Outfall (Mlarch 1977)

-. -'

Page 11: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

SECTION 1 PROJECT INFORMATION

1.1 GER L,

a. Authority. The National Dam Inspection Act, Public Law92-367, authorized the Secretary of the Army, through the Corps ofEngineers, to initiate a program of safety inspection of clamsthroughout the United States. Pursuant to the above, the St. LouisDistrict, Corps of Engineers, District En -ineer directed that asafety inspection of the Frontier Lake Dam be made.

b. Purnose of Inspection. The purpose of the inspection wasto make an assessment of the general condition of the dam withrespect to safety, based unon available data and visual inspection,in order to determine if the dam poses hazards to huan life orproperty.

c. Evaluation Criteria. Criteria used to evaluate the damwere furnished by the Depart-ment of the Army, Office of the Chiefof Enngineers, in "Recommended Guidelines for Safety Insnection orDams." These guidelines were developed with the help of- severalFeferal a-oencies an ', s"any State a:encics, prokessional enqincerin!'organizations, and Private engineers.

1.2 DESC.,PTI?,, OF PROJECT

a. Descrintion of Dar and A,,urtenances.

(1) The dam is an earth structure built in a narrow. valleyin the unlands which border the '!ississilpi FmbaNent. Tonoirailhvadjacent to the valley is rolling to steep. Soils in the area areforced of sandy clays with rock fragments. Topograplhy in thevicinity of the dan is sho,n on Plate 2.

(2) A vertical inlet constructed of 12-inc', dinet er, s!:,oothiron pipe ijunctioned with a 3n-linch smooth iron pipe is the primarymeans of dischar: e. A vilve control led lake drain consistin!', of an1-inch jia:%eter i pie is also connected to the 42-inch inlet nine.An emergecy spillway is cut into rock on the left abutment. Thesnillwav is a trapezoidal section with a 55-root botto width andside slopes of approxi'mately 1V on .11. The s-nillwav is 1211 feetlong from the crest of the spillway.

(3) Pertinent physical data are given in paragranh 1.3 below.

Page 12: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

b . Locat ion. The dari is located in the central portion of,'dayne County, Mlissouiri, as shown on Plate 1. The lale formed bythe dam is shovan on tie Patterson, Nissouri nluadrati(le sheet inSections 26, .27, 34, and 35; Township 30 North; Rqanfe 41 Fast.

c. Siz-e Classification. Criteria for determining the sizeclassification of damas and impoundments are presented in the guvide-lines referenced in parag-raph 1.1 c above. Based on these criteria,

this dam and inpoundments is in the intermediate size cateilory.

d. Hazard Classification. Guidelines for determiningj hazardclassification are presented in the same fguidelines as referencedin para-ranh c above. Based on referenced guidelines, this damiis in the Iligh Hazard Classification.

e. Ownrship-. This dam is owned by Mrs. Diana Ih'ard ofFrontier Lake, Patterson, Missouri 63056.

f. Purnose of Dami. The dam. forms a 62-acre recreational

g. esic-n and Construction !Iistor\v. The dam was desig-ned by,.he U. S. Decpartment of' Agriculture Soil Conservation -Service. Read-ily available desigln data were linitcdl to a set of drawings datedAugust 1964. The drawings consist of a hydraulic and hydrolo 'icdesign, a location Tn-ian, a typnical embankment cross-section (seePlate 5) and a section through daimi centerline (see Plate -1). 'Mietheror not slove stability' and seemag e analyses were performed usin.,suitable load!ing condition is unknown. A cnntractor from PoplarBluff, "issouri constrLICted the dam during7 1965. Location of' borrowareas and! tli, effort utilized! in compactin7g the borro..: I-aterial is

unno;n.A core trench was reportedly placed beneaith the embhankm-.ent.A tvmical emban!kment cros.-se-ction from the 1964 (1rawin'-s shov.in(the primary features of the vertical inlet and Jiscllar~w ystom is5presented On Plate, S. aSedI Onl tile inspect ion survey, in ;Vr"1V on 2.111 downst reari embanklment s lore ,-.as used instead o- IV oil .,I!s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u,St rea2 embanIkMent -1') lon,'aS used instead of the spoc i.fi ed IV Oil 31i

li. :,orma i- 1 11 erat in': Procedure. Normal rain fall , runoff,transriration, andI evanoration all coFmine to Imintain1 a relat ivelyvstale wa,,ter surface elevation. The emiergenicy spil1lwav was renor1t -

cdlv iused several times with the maximum experienced depth of approx -

imately one half of a foot occurina in 'larch In77. A Lake draiin is pro-vide'd to dIraw1 doian thec Like level duringf the winiter iionths for bio-lo,',ical lake maintenance.

2

Page 13: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

1.3 PFRTI)V NT DATA

a. Drainage Area - 3350 acres (1973 inventory).3237 acres (1964 drawings).3206 acres (TopogIraphic nziadran:le).

b. Discharge at Darsite.

(1) Discharg'e can take place both through a vertical pipe

inlet and an emergency spillway.

(2) Estimated exeierienced :;iaimu flood at the damsite -

1N cfs.

c. Elevation (Feet above 'I.S. L.)

(1) Top oF dan - 671.5 + (TExistin7, see Plate 4).669.6 + (164 Design, see Plate 4).

(2) Top of vertical inlet - 661.9.

(3) Invert of discharge pine at the stilling basin - 631.7.

(4) Spillway crest - 67.0 + (Fxisting).666.3 + (1964 Desi(,n).

(5) Streambed at centerline of dam - 631.5 (1964 drawings).

(6) : axim~um tai lwater - unknon.

d. Reservoir. Lenrgth of naxinum pool - 3700 + feet (1964drawings).

e. Storage (Acre-feet).

(1) M!aximum- 992 (1973 inventory).

165,' (1961 (rawin,s and 30.3 acre-feet as normaIstorage).

(2) Normal - 343 (1973 inventory).

f. Reservoir Surface (Acres).

(1) Top of dam - 102.5.

(2) Spillway crest - 13.1

(3) Invert of vertical inlet - 62.3.

3

Page 14: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

g.Dan.

()Type -earth embankment.

(2) Length - 375 + feet.

(3) Height - 40 feet maximum.

(4) Top width - 13 + feet.

(5) Side sloirws -

(a) Downstream - IV on 2.21! (Averagec).

(b) lUnstrean - IV on 3.31! (Average).

(6) Downstream berm - el. 654 + feet m.s.l. and S feet widle(All Average exi-in.- conditions.)

(7) Upstream berm - dimensions no longer definable.

(8) Zoningj - unknown.

(9) Imperious corc - unknown.

(10) Cutoff - Reportedly placed beneath emibankment.

(11) Grout curtain - unk-nown.

h. Diversion and. Regulatin'o Tunnel. None.

i Primary Di schar!e- Sys tem.

(1) Type - An uncontrolled 42-inch dliameter inlet pine junctionodwith a 30-inch diameter discharge nilie (see para(Tranil 1 .2 a).

(2) Length of 42-inch d1innotor )i "c - 16 Feet (196.1 rill,-) .

(1.) Len(gth of 30-inchi diameter nipe - 1.16 feet (190-. drawin~ls).

(4) Top elevation of vertical inlet - 661.0 feet asl

(5) Invert of discharge pipe at stilling basin -631.7 feetn.s. 1.

j. Erner! cricy Si ~I -,y.

(1) Type - Uincontrol led (rock).

4

Page 15: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

(2) Width of weir - 55 Feet (Pottom width).

(3) Len!gth of iweir - 120 + feet (From crest of Spillway).

(4) Crest elevation - 667.0 + feet n.s.l.

k. Reaulating Outlet.

(1) Tyne - valve controlled 18-inch diameter pipe.

(2) Pine Lentth - 30 feet (Estimate).

(3) Invert of nine in lake - unknown.

(4) Dischar7e Invert - 655.0 feet m.s.l. (Discharges into42-inch diameter inlet pipe).

. .... .. .. .- . . .. .... I - - .. ' """ - i 11 - . .. ,1 1 - ' '

. .. '' .- ., . .. . . Iri

Page 16: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

SECTION 2 -Nni:EERING DATA

2.1 DESIGN

The dam was designed by the Ul.S. Deartment of A.ricultureSoil Conservation Service. Readily available dcsign data werelimited to a set of drawings dated Aucust 1964. The drawingsconsist of a hydraulic and hydrologic design, a location nlan,a tynical embankment cross-section (see Plate 5), and a center-line section throuTh the Jam (see Plate -4). '2aether or notslope stability and seepage analyses were ncrformed using suit-able loading conditions is uninown.

2.2 CONSTRUCTION

The dam was constructed in 1965 by a construction comnany fromPonlar B;luff, Mlissouri. The earth embankment was nrobably constructedof a red sandy clay with varyin.- amounts of rock fragments. The locationof the borrow areas and the effort utilized in comacting the borrowmaterial is unknown. A core trench was reportedly placed below theembankment. A typical embankment cross-section from the 1964 drawingsshowing the primary features of the vertical inlet and dischargesystem is presented on Plate 5. Based on the insnection survey anaverage IV on 2.211 downstream embankment slope was used instead ofthe 1V on 211 slope specified in the 1964 drawings and an average IVon 3.311 upstream embankment slope was used instead o- the snecifiedlV on 3U.

2.3 OPERATION

The emerg-ency spillway was reportedly used several times whenthe vertical inlet pipe becane obstructed. The emergency snillwaywas reportedly used only once when the inlet pipe was not obstructed.This occurred in :arch 1977 when the emergency siiillway flow wasapproximately 0.S feet deep (see Photos 8, 9, 10, and 11).

2.4 EVAIIATI(OIN

a. Availability. The only engineering data available werementioned in paragraphs 2.1 - 2.3 above.

b. Adequacy. The 1961 hydraulic and hydrologic desio.n wasinadequate to assess if the dam could pass the probable maximum flood(PN'!F) without overtopping. The design nresented on the 196.1 drawing.was for a SO-year frequency storm which is much smaller than the P'F.

6

Page 17: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

Seepage and stability analyses comparable to the requirementsof the "Recommended Guidelines for Safety Inspection of Dams" werenot available, which is considered a deficiency. These seepageand stability analyses should be performed for appropriate loadingconditions (including earthquake loads) and made a matter of record.

c. Validity. The engineering data presented appeared to bevalid.

I7

Page 18: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

Sr.CTION 3 - VISUAL I'~SPECTIM*

3.1 FINDINGS

a. General. Visual inspection of Frontier Lake Darni was per-formed on 12- July 197S. Personnel making- the inspection were em-ployees of thc MIemphis District, Corps of En!gineers, and includ!cda geologist, hydraulic engZineer, and soils en(,ineer. Specific obser-vations are discussed hoclow.

b. Project CGeology. Thc da-i is located on the unlards %whichborder tlie *!ississiv),ni EmbarMent and lies onl the Prc-C.arbrian gr:initebedrock. In this area the rock is a red and gyray g!ranite withn graniteporphivries. Outcrons oF the g ranite occur in both abutments andboulders and outcrops are exposed in the spillway arca. Based onthe soil typecs in the area and exposed soils in the emihankmcnt, thedami is prob~aly com-.posed oF sandyv clav with roc!, fra-gments. Thedarn is located in Seismic Zone 2.

c. Dar). N~o detrimental settlemient, crackina) slides or anirialburrows were observed in or near the earthi embankment. Typicalexisting, cross-sections of the cnlbankme(,nt are shown on Plates 6, 7,and S. These sections are consistent with the cross-section pre-sented in the Soil Conservation Service 1964 drawings (see Plate5) . Vertical erosion faces 2-3 feet hig~h, were observed alonp theoUn)Stremembakmen slope (see Photo 2). Several S to S-foot high!bushes and trees were growing on the dwo-astrcam,' slone (see Photo 3)

d. Anujrtenant Structures. A vertical inlet construicted of42-inch diameter, sm,,ooth iron pine junctioned wvithi a 30-inch dhai-eter, srnoot!h iron pire is the u~rirnary means of dischargeo. A metalbaffle is mouinted Onl the vertical inlet. A trash rack cnnsisting of awelcded cage of reinForcemeont rods suirrounds the inlet (see Photo 4).The out let pire discharges into ; Stllling basin prot ected with athick ripran blanket (seec Photo 5).

Ali emergenicy sni llway onl the left abutment is citt into rockconsisting prim-,arily w' granite. The spil lway iS a tj-anezo idaljsection with a 55-foot bottom width and! side sloines of approximatelyIV on 311. The spillway is 120 feet long from the crest of, thespillway (see Photo 6).

The pillay is oaralloled by a guiide dikec or berm which divertsthe Spill way outfall fro!, the darn emibankmenit (see Plate 3) . Trhe endof the spil iway guide (like has beeon eroded toward the damn embankment

8

Page 19: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

by flow through the emergency spillway (see Photo 7). 1';ater flowingthrouIgh the emergency spillway outfall and attacking the spillwayguide dike is shown on Photos 9, 10, and 11 which were taken by theSoil Conservation Service in MIarch 1977. The emergency spillway wasflowing at an approximate depth of 0.5 feet.

A valve controlled lake drain consisting of an 13-inch diameterpipe is junctioned to the 42-inch diameter vertical inlet pipe (seePlate 7). Because of the unaccessible location of the drain, itcould not be inspected. Reportedly the lake is drawn down severalfeet every winter for biological lake maintenance.

e. Reservoir Area. No excessive erosion or slides wereobserved along the shore oF the reservoir. But wave wash haseroded a 2-3 foot vertical face along the shore.

f. Downstream Channel. The downstream channel is not over-grown with vegetation and is protected with a rock blanket.

3.2 EVALUATION

None of the conditions observed are significant enough to in-dicate a need for immediate remedial action or a serious potentialof failure. Erosion on the upstream embankment slope and on theerergency snillway !uide dike, and vegetation on the downstreamslope are deficiencies ,.which, left uncontrolled or uncorrected,could lead to the development of potential problems.

9

Page 20: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

SECTION 4 - OPERATIO:AL PROCEDURES

4.1 PROCEDURES

The primary discharge system and the emergency snillway areuncontrolled; therefore, no rcgulatinj, procedures exist for thesestructures. The valve controlled lake drain described in paragraph3.1 d is used for biological lake maintenance. Reportedly the lakeis drawn down several feet every winter.

4.2 :.AI:T,."YXNCE OF DA'1

The dam enbankment and appurtenant structures apnear wellmaintained, except for the erosion on t',!e untrea-i e:'ak:tslopie and on the emer-ency spillway guide dikes, and the bushesand small trees on the downstra:7 slope.

4.3 '1lAI:TF;TANCE OF OPE.R\TI,G FACILITIES

No information is available concerning maintenance of thelake drain.

4.4 DESCRIPTION OF X:Y .AMIN'G SYSTEN IN EFFECT

The insnection teari is not aware of any existinw warninc, systemnfor this (lam.

.. 5 EVALUATION

If the erosion on the unstream eri.hankont slone and on the cmer encyspillway ,uide dikes, and the tree and brush growth on the dovnstreame:ihan!:v'ent slone are all o.ed to continlue, a serious motent i;al ofailure may (I\0C0lope.

10

Page 21: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

SECTIO]N 5 - HYDRAULIC/HYDROLOGIC

5.1 EVALUATION OF FEATURES

a. Design Data. The available hydraulic and hydrologicaldesign appears accurate and is discussed in SECTION 2.

b. Experience Data. The drainage area was developed usingUSGS Patterson Quadrangle. The lake surface area and storagevalues were determined using the 1964 drawings furnished by theSoil Conservation Service. The spillway and dam layout are madefrom surveys conducted by the inspecting team. Comparisons weremade with the 1964 drawings and the inspection surveys. All relat-ive elevations are compatable with the elevations on the 1964drawings.

c. Visual Observations.

(1) The vertical shaft and rock spillway are in excellentcondition.

(2) The vertical shaft is located approximately 163 feet fromthe right abutment while the spillway is located in the left abut-ment. Releases from either structure will not endanger the integ-rity of the dam.

d. Overtopping Potential. The spillway will pass 15 percentof the Probable Maximum Flood (PMF), without overtopping the dam.The Probable Maximum Flood (PMF) is defined as the flood dischargethat may be expected from the most severe combination of criticalmeteoyrologic and hydrologic conditions that are reasonably possiblein the region. For its size and hazard category, this dam isrequired by the guidelines to pass the PMF. Because the spillwaywill not pass one-half of the PMF without overtopping, the damis classified as "unsafe non-emergency." The spillway will notpass the 100-year flood without overtopping, which is a floodthat has a one percent chance of being exceeded in any given year.

The effect from rupture of ize dam could extend approximately10 miles downstream of the dam. There are 5 inhabited homes down-stream of the dam which could be severly damaged and lives of theinhabitants could be lost, should failure of the dam occur.

11

Page 22: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

SECTION 6 - STRUCTURAL STABILITY

6.1 EVALUATION OF STRUCTURAL STABILITY

a. Vis-ial Observations. Visual observations of the dam andappurtenant structures are discussed and evaluated in SECTIONS3 and 5.

b. Design and Construction Data. The design and constructiondata were limited to that information discussed in SECTION 2.

c. Operating Records. There have been no known operationswhich have af ected the structural stability of the dam.

d. Post Construction Changes. No post construction changesexist which will affect the structural stability of the dam.

e. Seismic Stability. This dam is located in Seismic Zone 2.However, it is located very near the boundary between Seismic Zones 2and 3. Since this dam is located in Seismic Zone 2 and the proximityof Seismic Zone 3, it is possible that an earthquake could occur ofsufficient intensity to cause severe damage or failure of the dam.

12

Page 23: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

SECTION 7 - ASSESSMENT/REMEDIAL MEASURES

7.1 DAM ASSESSMENT

a. Safety. Several items were noted during the visual inspectionby the inspection team which should be corrected or controlled. Theseitems are erosion on the upstream embankment slope and on the emergencyspillway guide dike, and brush and small trees on the downstreamembankment slope. Seepage and stability analyses comparable to therequirements of the "Recommended Guidelines for Safety inspection ofDams" were not available which is considered a deficiency. Theseseepage and stability analyses should be performed for appropriateloading conditions (including earthquake loads) and made a matterof record. Also these analyses should be utilized to detail thecorrective actions called for in paragraph 7.2. The probablemaximum design flood (PMF) and 1/2 PMF will overtop the dam.

b. Adequacy of Information. Due to the lack of applicableengineering design and construction data, the conclusions in thisreport were based on performance history and external visual con-ditions. The inspection team considers that these data are suffi-cient to support the conclusions herein.

c. Urgency. The remedial measures recommended in paragraph7.2 should be accomplished in the near future. If the deficiencieslisted in paragraph 7.1a are not corrected in a timely manner,they could lead to the development of potential problems.

d. Necessity for Phase II. Based on the results of the PhaseI inspection, no Phase II inspection is recommended.

e. Seismic Stability. This dam is located in Seismic Zone 2.However, s located very near the boundary between Seismic Zones2 and 3. Since this dam is located in Seismic Zone 2 and the proximityof Seismic Zone 3, it is possible that an earthquake could occur ofsufficient intensity to cause severe damage or failure of the dam.

7.2 REMEDIAL MEASURES

a. Alternatives. Spillway size and/or height of dam should beincreased to pass the Probable Maximum Flood without overtoppingthe dam.

b. Perform seepage and stability analyses comparable to therequirements of the "Recommended Guidelines for Safety Inspectionof Dams." These seepage and stability analyses should be performed

13

Page 24: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

for appropriate loading conditions (including earthquake loads)and made a matter of record. Use the results of these analysesto design appropriate corrective measures.

c. 0 & M Maintenance and Procedures. The following 0 & Mmaintenace and procedures are recommended:

(1) Remove the bushes and trees growing on the downstreamslope. Care should be taken during removal not todestroy the existing condition of the downstream slope.

(2) Protect the upstream embankment slope with an adequateriprap blanket to prevent wave wash erosion.

(3) Protect the emergency spillway guide dike near the spill-way outfall with an adequate riprap blanket to preventerosion caused by water flowing through the emergencyspillway outfall.

(4) A detailed inspection of the dam should be made at leastevery 5 years by an engineer experienced in design andconstruction of dams.

14

Page 25: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

APPENIDIX A

1!YPROfLOCIC C(YIP!TATIPN!S

Page 26: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

LY!fnLO, IC CCY !'PLTATIPXS

I . IFC-I was used to dovelo'.. t1he inflow hydro-rap' for P'IF andhydrologic characteristic of drainage basin.

2. ITEC-l uses Snyder 'ethod for develoing synthetic unit hydro-graphs with Clarks Modification.

Final Variables

Draina, e Area 5.01 sq. mii.Travel Tine o- Runo"f 1.26 hr.Initial Loss of Rainfall 0.5 in.Averac'e Loss Rate 0.05 in./hr.

Ct 0. IC) 0. 604

PMF Rainfall 26.7 in.PMF Percentages 6.hr. 102

12 hr. 12024 hr. 130

3. The inflow hyroveraph was routed thirou,-,h the reservoir usin-:C-l 's :'od.i ied Puls o0'tiou. ,clases were calculated for both

the )ipe anJ spillway. The pipe was assumed flowing full and thebro'dcrested weir equation was used to calculate sillway dis-charges. Variables for the pipe and sinillway dischares arelisted below.

Horizontal Pipe Vertical Pipe

n .013 n .013L 146 ft. L 16 ft.

D 2.5 ft. D 3.5 ft.

C 2.2L 55 ft. *

SUJsed actual area of cross section at depth under consideration.

A-1

- . - h . .. . "

Page 27: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

1

Ton of Dam

C 2.5L 300 ft.

4. PIF rainfall distribution, inflow hydrograph, and outflowhydrograph are shown on Plate Al.

A-2

Page 28: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

o5 10 15 20 25

- IIRairvfcL II ExCe55

rrNL

:cM Otfow

Uvrop a

7-O~5 15- 20 --- -- --------- -

0-ie ft--e I F O tr

Page 29: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

L~~MVo M TAIN

Frotir ak

a A<

~' ~ ~A,

zi .

16"4

'fir ~V

Page 30: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

a m ) w-1-

.-.. " , -- 9> C reek , g

-I-

44

-.- .. . -----. I

" ' .. .. 1 t

\t

L4-_ N,7 7\ ' "

I,"" .. - / . , "

-.- /-1 J

_ _ £ ..L ,.. :% ;-*- -- _ -. o-

N -. 1 " .. - A -

7I ' ' - !_-'

'_ 7 C_ _, - , . , ........

lii

Page 31: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

C QJ ,

+4- 0

-J-

4) 0

L)L

) i

0 ko

coLlL

LL

C Ido I

-4-

A--l

CD CD

00

Page 32: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

GVI

L 4)

Low -- to-

Page 33: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

to_+

. 8 . - ~ '~ Q

0 z '

I . < p

__ _ __ _ _ _ _ _ __ _ _ _ __ _ __cN+ _ _ _ _ _ _ __ _- _ _ _

ODi

AI

C"3

F ~ ~ ~ ( __ v._ .. * C

Page 34: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

I .

t - * c Z- -

In_ _ _ _ __T Iq . .

LO (D O

IC,;W4 IE-+CAal

Page 35: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

V.)

-I -- -------

CC C

.. .... ..

... .. . . . . . . .. .._v I__ __ ._ D _O_

- j I

Page 36: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

I..~~C .,..

- -I

-..--- + LO

- -- c-J

I +i- j

I~ ~~ ~ G -L011A;1

Page 37: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

:'i1: rview of !,akc zind D)an

4 ' h~t ear' S~e~c -'hivmumY

Page 38: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

M!OTO 3:Pownstroam Slope - Drish an(! Smail Trees

11111)""0 .: Inlet of' Vert ical Structture

Page 39: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

11111TO 5: Dischare of V'ertical Structure

PI OTO 6: Vncr'jency Spillway' Upstreamn View

Page 40: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

PIH1TO 7: Ejncrf~eiicy Spillway' Outfall -Spillway C'uide Dike Erosionl

PHOTO s: Emergency Spillway - tpstreain Vivw ('larch 1977)

Page 41: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

nl'r lo: >~r~ c S')iilwav Outi. ll (';arCi I,)--)

Page 42: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead

PHOTO 11: Emrerency Spillway Outfall (larch 1977)

Page 43: ARMY ENGINEER DISTRICT ST LOUIS MO F/S NATIONAL DAM … · 2014. 9. 27. · s lon e sIfe inte ( rawings 'Ind an avera"'O lV on0 . 11u, St rea2 embanIkMent -1') lon,'aS used instead