AREVA: Experience in Dismantling and Packing of Pressure Vessel and Core Internals
Jan Hendrik BruhnAREVA NP GmbH/ IBRZ-GVarna, June 10th 2010
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.3
All rights reserved
AREVA NP
Content
►Stade NPP PWRRPV Internals Segmentation and Packing
►Wuergassen NPP BWRRPV and Internals Segmentation and Packing
►General Requirementsfor Dismantling Projects
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.5
All rights reserved
AREVA NP
Engineering RequirementsRadiation protection requirements
� Optimized dismantling, cutting and packing performance
� Appropriate design of the equipment
� Provision of shielding due to high radiation
Selection of appropriate cutting techniques
� Fulfillment of segmentation and packing requirements
� Minimization of secondary waste
Time scheduling
� Production control
� Detailled work sequences
� Parallel activities
Detailed planning
� Preparation & mock-up tests
� Cutting & packing plan
� On-site performance
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.6
All rights reserved
AREVA NP
Cold cutting processes
�Mechanical• Sawing• Milling• Shearing• Nibbling• Unscrewing• Grinding• Drilling• Wire sawing (rope, diamond)• Etc.
�Hydraulic• Water abrasive suspension
slicing (WASS)• Nitrojet cutting• Etc.
Thermal cutting processes�Thermal
• Torch cutting• Powder flame cutting• Laser cutting• Plasma cutting• Oxygen lance• Petrogen cutting (gasoline-oxygen)• Etc.
�Electro-thermal• Electric discharge machining (EDM)• Contact arc metal cutting (CAMC)• Etc.
Cutting Techniques (1)
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.7
All rights reserved
AREVA NP
Main advantages of cold cutting
� No considerable generation of secondary waste
� No generation of aerosols and hydrosols
� Appropriate cutting speeds
� Reliable technologies
� Radiation resistant applications
� Generated chips can be collected easily
Cutting Techniques (2)
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.8
All rights reserved
AREVA NP
Concrete Example:Water Abrasive Suspension Slicing
Advantages of Water Abrasive Suspension Slicing
� Cutting simple as well as complex geometries
� Easy to operate and reliable cutting technique
� Cutting up to 200 mm stainless steel
� Independent of water depth and oxide layer
� No generation and release of aerosols
� Generates easy to handle and packable fragments
� Proven and effective water purification system in use
� Replacement of single filter cartridges is not required
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.10
All rights reserved
AREVA NP
Dismantling Projects – Stade NPP PWRGeneral Information
Dismantling and packing of RPV Internals (2007-2009)
� Remote controlled underwater segmentation and packing
� Parallel dismantling on 3 locations
� Total mass of 85 tons
� Primary waste characterization
� Packing and conditioning for final storage
� Water purification
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.11
All rights reserved
AREVA NP
Components to be Cut and Packed
Core Barrel with Upper Core Internals
Upper Core Internals
Core Barrel
Core Support Structure
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.12
All rights reserved
AREVA NP
Pool Layout
Survey of the working area at Stade NPP
Mobile Aux.Bridge Storage Rack UCI
Storage Rack
Storage Cask
Water Purification System
Working Platform
Mobile Bridge withJib Cranes
RPV
Mobile Crane Bridge
Water Purification
SystemStorage cask
Baskets
LCI
Turn Table
Crosscut Saw
Water PotBaskets
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.13
All rights reserved
AREVA NP
Dismantling and Cutting operationsin the Spent Fuel Pool
Crosscut Saw
Basket
Upper Core Internals
Interim Storage Rack
View at Support Columns and Upper Core Plate
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.14
All rights reserved
AREVA NP
Cutting and Packing of Control Rod Guide Assemblies
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.15
All rights reserved
AREVA NP
Loading of a MOSAIK Cask
Copyright by GNS
Copyright by GNS
Copyright by GNS
Copyright by GNS
Transport of the Cask into the Spent Fuel Pool
Positioning of the cask at the pool bottom
Loading of the Cask
Mounting of the Cask Cover
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.17
All rights reserved
AREVA NP
Dismantling Projects – Wuergassen NPP BWRGeneral Information
04/2006
12/2008
Order for dismantling of remaining RPV-internals
Project completion
02/2008
04/2010
Order for dismantling of cylindrical part of RPV
Project completion
10/2005
11/2006
Order for dismantling of cyclones of the steam separator
Project completion
05/2004
01/2005
Order for dismantling of hook bolts of the steam separator
Project completion
11/2003
12/2004
Order for dismantling of control rod guide tubes & jet pumps
Project completion
09/1995Application for shut down and decommissioning by phases
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.18
All rights reserved
AREVA NP
Control Rod Guide Tubes & Jet Pumps
Order: 11/2003
On-site performance: 09 – 12/2004
Total material: 22 tons
Disposal in 200-l drums
Nibbling of cut tubes
Storage of cut pieces into drums
Cut through a jet pumpby band saw
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.19
All rights reserved
AREVA NP
T-BoltsSegmentation & Disposal
� 40 pieces T-bolts (8 t)• Dismantling from the steam separator
• Cutting into segments by use of band saw equipment
• Disposal into 200-l drums
40pcs.; length 5,70 m
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.20
All rights reserved
AREVA NP
Steam Separator Cyclones
Order receipt: 10/2005
Engineering, procurement of tools:
� 7 months
Cutting & packing:
� 7 months
Total mass :
� 35 tons
� Volume reduction:The cut segments were flattened down by an underwater press
� Disposal of cut segments into 200-l drums
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.21
All rights reserved
AREVA NP
Remaining RPV Internals
Phase 2 - Arrangement
Sawing platform
Post processing platform
Additional cranes
HousingWorking platform
Order receipt: April 2006
End of project: Dec. 2008
Total mass: About 55 tons
On-site dismantling in two phases:
� Phase 1: Movable internals inside the set down pool (Dec. 2006 – Oct. 2007)
� Phase 2: Rigidly mounted internals in situ (Mar. – Dec. 2008)
Revolving stage on RPV flange with adhered post segmentation platform
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.22
All rights reserved
AREVA NP
On-site ImpressionsDismantling of remaining RPV Internals
Loaded drum
WASS operation inside working tank
Sawing platform and mast
Final cutting of an ejector pump retainer
First cut on core shroud
Diffusor separator
Cutting of core spray tube by jigsaw
Postsegmentation of core spray tube
Loaded drum
Phase 1 Phase 2
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.23
All rights reserved
AREVA NP
RPV DismantlingTechnical Data
RPV data� Total weight of cylindrical part: 320 Mg
� Height: 15m
� Cut segments: 252 pcs.
� Packing for final storage• Konrad Container Type II: 19• Konrad Container Type III: 10
Applied cutting techniques
� Water Abrasive Suspension Slicing
• Water pressure: 2000 bar• Jet diameter: 0,8 mm• Material thickness: 137 mm
• Cutting speed: 20mm/min
� Band saw (for RPV flange)
• Cutting height: 1100mm
• Flange thickness: 425 mm
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.24
All rights reserved
AREVA NP
Cutting Sequence
Decontamination, post segmentation and recycling
Packing intoKonrad container
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.25
All rights reserved
AREVA NP
Optimized Packing Plan
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.26
All rights reserved
AREVA NP
Overview on installed Infrastructure
• Shielding plate
• Complex RPV crane (handling tools and dismantled pieces)
• Rail systems and cranes for transportation (remote-operated)
• Rail system and cranes for container loading and conditioning (remote-operated)
►Installation of cranes and auxiliary equipment (e.g. steel structure) for transportation of RPV segments and packing into containers
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.27
All rights reserved
AREVA NP
On-site ImpressionsRPV Dismantling
Vertical segmentation of RPV flange
Gripper removing RPV segment
Positioning of RPV segment for transport to container loading station
Packing of RPV segment into Konrad container
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.28
All rights reserved
AREVA NP
Reference List
2007-2009GermanyStadeDismantling, cutting and packing of RPV internals12
2008-2010GermanyWuergassenDismantling, cutting and packing of RPV (cylindrical part)11
2006-2008GermanyWuergassenDismantling, cutting and packing of RPV internals10
2006GermanyWuergassenDismantling, cutting and packing of cyclones and stand pipes
9
2005GermanyWuergassenDismantling, cutting and packing of T-bolts8
2004GermanyWuergassenDismantling, cutting and packing of control rod guide tubes and jet pumps
7
2002SpainTrilloCutting of windows into the set down ring of RPV internals6
2000, 2001South AfricaKoeberg 1 and 2Dismantling of PTR tubes inside the fuel pool,Unblocking of a stuck fuel bundle,Placing of blind hole bores at the fuel pool liner
5
1993, 2000,2003
GermanyBiblis A and BDismantling and packing of core instrumentation assemblies
4
1993BelgiumBR 3 MolCutting of a thermal shield3
1997GermanyGundremmingen CSeparation of a core flux measuring casing2
1978 - 1985GermanySeveral plants Dismantling and cutting of commissioning instrumentations 1
YearCountryNP PlantActivityNr
Dismantling Projects
AREVA: Experience in Dismantling and Packing of Pre ssure Vessel and Core Internals - Bulgarian Nuclear Energy - J.H.Bruhn - Varna, June 10th 2010 - AREVA NP GmbH Proprietary - © AREVA NP - p.29
All rights reserved
AREVA NP
Any reproduction, alteration, transmission to any third party or publication in whole or in part of this document and/or its content is prohibited unless AREVA has provided its prior and written consent.
This document and any information it contains shall not be used for any other purpose than the one for which they were provided. Legal action may be taken against any infringer and/or any person breaching the aforementioned obligations.