Page 1: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

Are contractors ready to build a 21th century railway on

Scandinavian soil?

2013-04-10 | Nicholas Lusack, Aarsleff

Page 2: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

CONTENTS BUILDABILITY

- BACKGROUND

- GEOLOGY AND GEOMETRY

- RISKS

- BRIDGE vs CONVENTIONAL RAILWAY

- LOGISTICS and LEAN PRODUCTION

- CONCLUSION

Page 3: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

BACKGROUND ECONOMIC BENEFITS

Project

Client

Floire Nathanael Daub

The Scandinavian 8 million City

Reinertsen Sverige AB:

Nicholas Lusack

Fredrik Karlsson

Stefan Krii

Anna Olsson

Steer Davies Gleave:

Charles Russell

Favorit Consult Floda:

Elke Rosiers

Page 4: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

PER AARSLEFF A/S

Page 5: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

GEOLOGY AND GEOMETRY RECENT EXPERIENCE

Page 6: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

CLAY AND HARD ROCK FORMATIONS PERPENDICULAR RIDGES AND VALLEYS

Page 7: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

CLAY AND HARD ROCK FORMATIONS ALONG RIDGES AND VALLEYS

Page 8: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

Sidefod

http:/RISK STABILITY Scene 1 from the quick clay landslide in Rissa 1978 – YouTube

Page 9: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

IMPACT

Structural damages and limitations i.e.

• Embankment deformation

• Train vibrations

• Vibrations in buildings and other structures

• Deformations in other structural foundations

• Speed limitations (230 km/h)

RISK WAVES AND VIBRATIONS

Page 10: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

Sidefod

http:/RISK SETTLEMENTS (differential)

Page 11: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

Slide 11

HARD ROCKS OBSTACLE AND RESOURCE

Page 12: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

HIGHWAY E6 EMBANKMENT

• PILED EMBANKMENT

• LENGTH 180 m

• HEIGHT 12 – 16 m

• CREST WIDTH 22 m

• WIDTH AT TOE 65 M

• REINFORCED WITH 58 000 m

PILES

• COST OF INSTALLED PILES 22

MILLION SEK (1998)

• APPROXIMATED TOTAL COST

50+ MSEK

• EQUALS 2.8 BILLION SEK / 10KM

GROUND WORKS EMBANKMENTS AND CUTTINGS

Page 13: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

Slide 13

GIANT LEAP HSR vs CONVENTIONAL RAILWAY

Page 14: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

Dias 14

LOGISTICS UNCONVENTIONAL METHODS

Page 15: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

Slide 15

PRODUCTION INDUSTRIAL

Page 16: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

PILED BRIDGE FOUNDATIONS BENEFITS

• LESS INVASIVE

• REDUCED LAND CLAIM

• NO SETTLEMENTS (DIFFERENTIAL)

• CONTROLLED STABILITY

• PRECAST MATERIALS ENHANCES LEAN PRODUCTION

• OTHER BENEFITS SUCH AS SNOW DRIFT, NO BARRIER ETC.

Page 17: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

Are contractors ready to build a 21th century railway on

Scandinavian soil?

Page 18: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,

Are contractors ready to build a 21th century railway on

Scandinavian soil?

Yes, I believe we are.