ARC’s Strategic Thoroughfare Plan
Bridging the Gap from Travel Demand Model to Micro-Simulation
GPA ConferenceFall 2012
Presented By:David Pickworth, PE
![Page 2: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/2.jpg)
The Project
• Arterials are the most challenged facilities in Atlanta
• Competing travel interests• Cohesive planning, operations, and
management
EFFICIENT PROJECT IMPLEMENTATION
![Page 3: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/3.jpg)
Overall Project Goals
• Prioritized arterial roadway network• Develop guidelines on management and
design• Create a Geographic Database• Perform case studies to test concept
designs
![Page 4: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/4.jpg)
Case Studies
• Transportation Assessment for MMCS• 5 Case Study Corridors• Case Studies selected based on differing
developments, area types, and roadway configurations
![Page 5: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/5.jpg)
Case StudiesStrategic Regional Thoroughfare Plan Case Studies
Aviation Blvd./Conley Rd. – Clayton CountyMoreland Ave. – Fulton CountyMemorial Dr. – DeKalb CountyRoswell Rd. (SR 9) – Sandy Springs/RowsellMcDonough Rd. (SR 155) – Henry County
![Page 6: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/6.jpg)
The Problem
Regional
Subarea
CorridorDevelop An Analysis Process That Maintains, And Is Consistent With, The Overall Travel Pattern Relationships Established In The Regional Travel Demand Model Through Several Levels of Analyses
![Page 7: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/7.jpg)
Analysis Provided
Regional
Subarea
Corridor
Regional Travel Patterns
Establish Peak Period Travel Routes (DTA)
Detailed Transportation System Operations During Peak Hours
Highway Transit Pedestrians
![Page 8: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/8.jpg)
The ProcessRegional TravelDemand Model
Application(Daily Trips)
Matrix VariegationProcedure
(Hourly Trips)
Peak Period(AM and PM)
Traffic Assignments
Extract Peak Period(AM and PM)
Subarea Networkand Trip Tables
MatrixEstimationProcedure
(If Required)
Subarea DTAAM and PMPeak Period
Assignments
TrafficCounts
VISSIM ModelNetwork
Development
VISSIM ModelApplication
Extract AM and PMPeak Period
Trip Tables ForCorridor
EvaluationMeasures
![Page 9: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/9.jpg)
Evauation Measures
Study Area (AM & PM Peak Period)Vehicle Miles of Travel (VMT)Vehicle Hours of Travel (VHT)Average Peak Period SpeedsVehicle Hours of Delay
Corridor (AM & PM Peak Hour)Average Speeds Average Vehicle Delay (Seconds)Approach & Intersection Level of Service (LOS)Transit Boardings (Daily)Queue Lengths
By Facility Type
![Page 10: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/10.jpg)
Example StudyArea NetworkRoswell Road (SR9)
![Page 11: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/11.jpg)
Example CorridorNetwork (VISSIM)
N. H
airs
ton
Rd.
N. H
airs
ton
Rd.
INTERSTATE
285INTERSTATE
285
Memorial Drive Corridor
VISSIM Network
![Page 12: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/12.jpg)
Example CorridorNetwork (VISSIM)
Memoria
l Driv
e N. H
airston Raod
Memorial Drive Corridor
![Page 13: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/13.jpg)
Example Roswell Rd. Study AreaDTA Assignment Animation
![Page 14: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/14.jpg)
Roswell Rd. CorridorContinuous Flow Intersection
Concept Animation
![Page 15: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/15.jpg)
Roswell Road (SR 9) atRiverside Road/Azalea Drive
2040 PM Peak HourRTP
2040 PM Peak HourScenario Improvement
(Continuous Flow Intersection)
![Page 16: ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816410550346895dd5bc70/html5/thumbnails/16.jpg)
Conclusion
• Use regional travel demand model• Bridge the gap between different local
agencies for consensus in development strategies
• Using the appropriate tools to “funnel” travel demand down to peak hour microsimulation-level traffic
• More information: www.atlantaregional.com