arch + urb // portfolio // bettisabel lamelo

70
1 BETTISABEL LAMELO PORTFOLIO SELECTED WORKS _ ARCHITECTURE + URBANISM 2009 - 2015

Upload: bettisabel-lamelo

Post on 26-Jul-2016

219 views

Category:

Documents


1 download

DESCRIPTION

Complete Portfolio

TRANSCRIPT

Page 1: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

1

B E T T I S A B E L L A M E L O

P O R T F O L I OS E L E C T E D W O R K S _ A R C H I T E C T U R E + U R B A N I S M

2009 - 2015

Page 2: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

2

B E T T I S A B E L L A M E L O V I Ñ A

+ I N F OC V [email protected] | 03.03.89

+34 617691135 | Barcelona, España

E D U C AT I O N

P R O F E S S I O N A L E X P E R I E N C E

T E A C H I N G E X P E R I E N C E

L A N G U A G E S

R E C O G N I T I O N S & A W A R D S

Universitat Politècnica de Catalunya / TU Delft | EMU European Postgraduate Master in UrbanismNational University of Singapore | IFoU International Forum of Urbanism - Winter School 2015Università IUAV di Venezia | Recycling City 3 WorkshopUniversitat Politècnica de Catalunya | Summer International Workshop TE’ETSAB.11 BeSIDES TOURISMUniversidad Simón Bolívar | Architect - CumLaude Mention

Best Student 2011 | Universidad Simón BolívarHonorable Mention | Final Bachelor Project: Inhabitating the limit Best Projects USB 2012 | Final Bachelor Project: Inhabitating the limit Best Projects USB 2011 | Projects: Abonador Mirador & Cosiendo el TerritorioBest Projects USB 2010 | Project: Office Tower Best Projects USB 2009 | Project: Cultural House in Choroní

Urbanism & Public Space Project - Oncological and Cardiological Hospital | Architect & Urban PlannerLAB.PRO.FAB | Architect | http://www.labprofab.com/Puchetti Arquitectos | Architecture Intern | http://www.puchettiarquitectos.com/Good Urban Practices (GUP) | Founder & Editor in Chief

Chair of Design - Level II - Universidad Simón Bolívar | Visiting Professor

Spanish | Native English | Advanced, TOEFL 111/120 Catalán | Basic

2013-2015Jan 2015

Jun-Jul 2014 Jul 2011

2006-2011

2012-2013Dec 2011-Jul 2013

Mar-May 2011Dec 2015-present

Apr-Jul 2013

Page 3: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

3

P U B L I C AT I O N S

S E M I N A R S A N D E V E N T S

C O M P E T I T I O N S

S K I L L S A N D C O M P E T E N C E S

Projecting the Territory publication | European Postgraduate Master in UrbanismIdea Proyecto Obra (Idea Project Work), Recent architecture in Venezuela, Project: Tiuna el FuerteEntreRayas Magazine | Final Bachelor Project with honorable mention: Inhabitating the limit SAI Salón de Arquitectura Interior | Final Bachelor Project Exhibition - USB StandEntreRayas Magazine | Best Projects USB 2009 | Project: Cultural House in Choroní

Social and Organizational Skills | Excellent Communication skills - Multitasking - Teamwork - Ability to lead groups - Solid time management skills

Artistic | Freehand drawing, painting, sculpture, dancing and singingStudies: Singing (2004-2012) - Electric guitar (2004-2007) - Drums (2006-2007)

Computer Skills | Advanced: Autocad 2015 - Photoshop, Illustrator and Indesign CS7 - Sketchup Pro - Space Syntax - Movie Maker - Office | Good: ArcGIS - Revit 2015

VII International Seminar on Urban Research SpeakerForum “Footprint in architectural competitions,” 40th Anniversary of Architecture Department SpeakerIAC Iberoamerica: Architecture and City, Maracaibo VII Iberoamerican Biennial of Architecture, Medellín

Participation in Kymfield Schools CompetitionParticipation in ArchMedium Medellín Experimental Social Housing competition Participation in YAC Space to Culture competition4th Place | Caracas a Pedal competition - Bike-path design category Participation in International Competition of Ideas Brasilia +502nd Place | National Competition of Design in Steel ILAFA 2010

20152013201220122010

Jun 2015Nov 2011Feb 2011Oct 2010

201520142014201220112010

Page 4: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

4

B E T T I S A B E L L A M E L O V I Ñ A

G R A P HC V [email protected] | 03.03.89

+34 617691135 | Barcelona, Spain

‘06 ‘07‘07 ‘08 ‘09 ‘10 ‘11‘08 ‘09 ‘10

B A C H E LO R ARCHITECT_CUMLAUDE UNIVERSIDAD SIMÓN BOLÍVAR | VENEZUELA

P R O F E S S I O N A L E X P E R I E N C E

R E C O G N I T I O N S & AWA R D S

C O M P E T I T I O N S

P U B L I C AT I O N S

S E M I N A R S & E V E N T S

T E A C H I N G E X P E R I E N C E

PA

ILAFA 2010

ENTRERAYAS

VII BIAU IAC

I N T E R N AT I O N A L W O R K S H O P S

2ND PLACE

BEST PROJECTS: CASA CULTURAL

BEST PROJECTS: OFFICE TOWER

F O U N D E R A N D E D I T O R I N C H I E F O F G O O D U R B A N P R A C T I C E S ( G U P ) , A P L A T F O R M F O R T H E D I S C U S S I O N O F C O N T E M P O R A R Y T O P I C S R E G A R D I N G C I T I E S , F E A T U R I N G A S E L E C T I O N O F U R B A N P R O J E C T S , P L A N S A N D P O L I C I E S F R O M A L L A R O U N D T H E G L O B E

I N T E R E S T E D I N D E V E L O P I N G B O T H U R B A N A N D A R C H I T E C T U R A L P R O J E C T S O F S M A L L A N D L A R G E S C A L E , P A R T I C I P A T I N G I N A L L P R O J E C T S T A G E S , T E A C H I N G A N D R E S E A R C H I N G , A S W E L L A S P A R T I C I P A T I N G I N A R C H I T E C T U R E A N D U R B A N I S M C O M P E T I T I O N S

P E R S O N A L I N T E R E S T S

Page 5: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

5

S PA

E N G

C AT

L A N G U A G E S

A U T O C A D *

P S D | A I | I N D D

S K E T C H U P P R O

S PA C E S Y N TA X

A R C G I S

R E V I T *

* A U T O D E S K O F F I C I A L C E R T I F I C AT ES K I L L S

‘11 ‘12 ‘13 ‘14 ‘15 ‘16‘12 ‘13 ‘14 ‘15

M A S T E R EUROPEAN MASTER IN URBANISM UPC & TUDELFT

T E A C H I N G E X P E R I E N C E

LAB.PRO.FAB

CHAIR OF DESIGN

PA

IAC USB 40 AÑOS VIISIIU

ENTRERAYAS IDEA PROYECTO OBRA EMUSAI

YAC MESHBRASILIA +50 CARACAS A PEDAL

SELF-EMPLOYED

BESIDES TOURISM REC YCLING CITY 3 IFOUUPC

USB

SPEAKER SPEAKER

4TH PLACE

BEST PROJECTS: FINAL PROJECT

BEST PROJECTS X 2FINAL PROJECT HONORABLE MENTIONBEST STUDENT USB

NUSIUAV

# S T R E E T A S P U B L I C S P A C E # R E C Y C L I N G I N D U S T R I A L S P A C E S # R E T H I N K I N G I N F R A S T R U C T U R E # I N H A B I T A T I N G U R B A N L I M I T S # W O R K I N G W I T H I N F O R M A L S E T T L E M E N T S A N D P R A C T I C E S # U R B A N M O R P H O L O G I E S # S U S T A I N A B L E D E V E L O P M E N T # U R B A N R E G E N E R A T I O N # P A R T I C I P A T O R Y P R O J E C T S # S O C I A L A N D S P A T I A L J U S T I C E # S O C I A L , E C O N O M I C A N D E N V I R O N M E N T A L S U S T A I N A B I L I T Y # M U L T I - P U R P O S E S P A C E S # A R C H I T E C T U R A L C O M P O N E N T S # M O D U L A R A R C H I T E C T U R E # M O B I L I T Y A N D F L O W S # A R C H I T E C T U R E A N D E C O N O M Y

P R O F E S S I O N A L I N T E R E S T S

GUP

Page 6: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

6

40+

1

1

1

3

The fact of having studied my bachelor in Latin America, master degree studies in Europe, having worked in an office with projects in different countries, as well as the workshops and international competitions, has helped me to familiarize with different contexts, practices and techniques, in terms of construction, urbanism and society.

LIVING URBS

INHABITATING THE LIMIT

DELTA CULTURALTERRITORIAL PROJECT FOR THE CARDENER RIVER

THE CITY AFTER THE GAMES

CROSSED LINES+

SEWING THE TERRITORY

A RESCUE FOR LA PERLA

P R O J E C T S2 0 0 7 - 2 0 1 5

3 C O N T I N E N T S 9 C O U N T R I E S 5 0 + P R O J E C T S

Page 7: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

7

2

1

1

1

1

THE KNOWLEDGE ECOSYSTEM

URBS IN HORTO

KYMFIELD SCHOOLS

THE OPEN BUILDING

CONTAINER CREATIVE CARNIVAL

PRODUCTIVE SINGAPORE 2050

Page 8: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

8

S E L E C T E D W O R K _ A R C H I T E C T U R E2 0 0 9 - 2 0 1 5

1 0

1 2

1 4

1 6

2 2

2 6

2 0

3 0

L I V I N G U R B SExperimental Social Housing in Medellin

International Competition | ArchMedium | Medellin, Colombia | 2014

S A N T A R O S A S P O R T S C E N T E RSports Facility, social architecture

Professional Work | Lab.Pro.Fab. | Caracas, Venezuela | 2014

I N H A B I T A T I N G T H E L I M I TInhabitable Bridge over the Albarregas River

Bachelor’s degree Final Project | Honorable Mention | Merida, Venezuela | 2011

T H E V I E W P O I N T F E R T I L I Z E R The study of the unknown territory

Academic Project | Best Projects 2011 USB receiver | Caracas, Venezuela | 2011

U R B A N E N T E R T A I N M E N T C E N T E R O F C A R A B A L L E D A Metropolitan Facility and Public Space

2nd Place | Steel Design National Competition ILAFA 2010 | Caraballeda, Venezuela | 2010

T H E O P E N B U I L D I N GA space to culture

International Competition | Young Architects Competition | Bologna, Italy | 2014

T H E H E L I X

S I M Ó N R O D R Í G U E Z C U L T U R A L H O U S E

Prototype school for the tropical savanna climate in Africa

Cultural facility, social architecture

Competition Kymfield Schools | Africa | 2015

Professional Work | Lab.Pro.Fab. | Caracas, Venezuela | 2014

Page 9: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

9

S E L E C T E D W O R K _ U R B A N I S M 2 0 1 1 - 2 0 1 5

4 8

5 2

4 4

5 4

6 2

6 6R E V I T

5 8

4 0

3 6C R O S S E D L I N E SRe-thinking infrastructure in the search for urbanity

Master’s Degree Final Project | European Postgraduate Master in Urbanism EMU | Merida, Venezuela | 2015

T H E K N O W L E D G E E C O S Y S T E M“A Knowledge-based spatial development”

Academic Project | European Postgraduate Master in Urbanism EMU | Westland Greenport, NL | 2015

P R O D U C T I V E S I N G A P O R E 2 0 5 0Re-inventing the industrial urban model

International Workshop | IFoU Winter School Jurong Vision 2050 | Jurong, Singapur | 2015

T H E C I T Y A F T E R T H E M E D I T E R R A N E A N G A M E S Plan for Tarragona 2017

Academic Project | European Postgraduate Master in Urbanism EMU | Tarragona, Spain | 2014

P R O J E C T I N G T H E T E R R I T O R YHand by hand: From recognizing the differences to the construction of linking spaces

Academic Project | European Postgraduate Master in Urbanism EMU | Bages, Spain | 2013

H P AUrban design of the Public Space of the Oncology and Cardiology Hospital of Caracas

Professional Project | Caracas, Venezuela | 2012

P E D A L I N G C A R A C A S

Artisan’s Market and Residential Block

Metropolitan Bike Path Network

4th Place | Caracas a Pedal Competition | Caracas, Venezuela | 2012

T H E C U L T U R A L D E L T AA review over Les Rambles

International Workshop | Besides Tourism ETSAB UPC | Barcelona, Spain | 2011

Page 10: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

10

The way the informal city builds itself over time has determined how its elements and individuals relate to each other. These elements make possible the building particular experiences; where the streets and pedestrian pathways function as spaces for social exchange, the flexible housing units can grow according to the needs and possibilities of the family, and the mixing of program and activities keep the neighborhood active at different times.

This project combines these elements in a residential building for the city center, capturing the spatial, social and economic benefits of the model of informality.

L I V I N G U R B SExperimental Social Housing in Medellin

International Competition | ArchMedium | Medellin, Colombia | 2014 | B. Lamelo, N. Covarrubia

Sketchup + Photoshop

Sketchup + Photoshop

Page 11: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

11

Preserved buildings

Commerce and Facilities

Structure

Internal mobility

Dwelling Units Public and Shared Space

3rd floor

Colombia Av.

Ground floor

1st floor

4th floor

2nd floor

Flexibility in dwelling units

Elements of the proposal

Page 12: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

12

T H E O P E N B U I L D I N GA space to culture

International Competition | Young Architects Competition | Bologna, Italy | 2014 | B. Lamelo, N. Covarrubia

Faced with the possibility of transforming an industrial building into a cultural center, we thought about how an old factory could mutate into a work space for creativity.

In that sense and considering the current dynamics of society (start-ups, cooperatives, collectives) a concept of an “Open Building” is proposed; an option where the skeleton and main construction elements of the building are preserved, as they are understood as Italian industrial heritage. To this it is added the use of modular structures that will enable the building for the new cultural activities. The flexibility in the use of these structures will allow the transformation of the space into different setups, allowing the users to change the space according to their needs, adapting to different situations (art galleries, theater performances and films, workshops and offices, hotel and apartments for artists, etc). It is a proposal that promotes individual freedom within the collective space that is the “Open Building”.

Base StructureSteel frame structure 2.40m x 2.40m

Multimedia Module Projection, exhibition and classroom boards

Work space Modulewith integrated furniture

Storage and Bedroom ModuleIntegrated bed and storage space

Sketchup + Photoshop

Page 13: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

13

Ground FloorServicesFood CourtDaycareExhibition GalleryOfficesOffices / Workshops

3rd levelArt HotelDwellings for artists2nd levelServices and Maintenance

1st levelTheatre / Cinema Multipurpose RoomsGames & Media RoomOffices / WorkshopsServices and Maintenance

Recommended Layout

Workshops / Offices

Food Court

Exhibition Gallery

Dwellings and Workshops for artists

Possible Setups

Page 14: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

14

T H E H E L I XPrototype school for the tropical savanna climate in Africa

Competition Kymfield Schools | Africa | 2015

Helix is an economically and environmentally sustainable prototype that follows 5 main pillars: self-sufficiency in terms of water management, supplies, ventilation and lighting; efficiency in the distribution of space; the proposal of an ecological and participatory architecture and the possibility of adapting furniture.

Sketchup + VRay + Photoshop

CONSTRUCTION METHODS & MATERIALS

BASE

ESTRUCTURE

WALLS, DOOR & WINDOWS

FURNITURE

ROOF

Page 15: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

15

FLOOR PLAN - DETAILED

AA SECTION BB SECTION SOUTH FAÇADE

LAYOUT PLAN

PROPOSAL PERIMETER

FLOOR PLAN - AREAS & DISTRIBUTION

BB

EAST FAÇADE NORTH FAÇADE WEST FAÇADE

Page 16: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

16

S I M Ó N R O D R Í G U E Z C U L T U R A L H O U S E Cultural facility, social architecture

Professional Work | Lab.Pro.Fab. | Caracas, Venezuela | 2014

This cultural hub and multipurpose room was constructed after the recovery and rehabilitation of an unused unfinished structure.

The reuse of existing elements and a focus for efficiency in the design increased the feasibility of the building, and as a proof of this, it was constructed in few weeks.

Local community and participation played a relevant role in the project, as the project represents one of the few cultural spaces available for this area.

* All images and plans are property of Lab.Pro.Fab.

Working as an architect in Lab.Pro.Fab, I participated in all phases of this project, having done a large part of its documentation and graphic material.

Sketchup + VRay + Photoshop3D model

Photo of the building

Page 17: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

17Photo of the building

Elements of the proposal Ground Floor First Level

Page 18: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

18

S I M Ó N R O D R Í G U E Z C U L T U R A L H O U S E Cultural facility, social architecture

Professional Work | Lab.Pro.Fab. | Caracas, Venezuela | 2014

Facade construction diagrams Facade construction diagrams

Facade construction details

Page 19: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

19

Cross Section

Example of furniture construction details

Page 20: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

20

Located in an area of scarcity of public and recreational spaces, this sports center aims to give the community a space for the enjoyment of sport and leisure activities. By layering the sport courts from the ground floor to the roof top, the building enables maximum soil occupancy, and at the same time, it allows to have a major square in front of the building that will serve as an iconic public space for the surroundings. The proposal of this project is to foment social cohesion in this low income area and to provide the community with spaces for the enjoyment of urban life.

* All images and plans are property of Lab.Pro.Fab.

Working as an architect in Lab.Pro.Fab, I participated in all phases of this project, having done a large part of its documentation and graphic material.

S A N T A R O S A S P O R T S C E N T E RSports Facility, social architecture

Professional Work | Lab.Pro.Fab. | Caracas, Venezuela | 2014

View from the exterior

Page 21: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

21

View from the interior

2nd level

Ground floor

Page 22: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

22

U R B A N E N T E R T A I N M E N T C E N T E R O F C A R A B A L L E D A Metropolitan Facility and Public Space

2nd Place | Steel Design National Competition ILAFA 2010 | Caraballeda, Venezuela | 2010 B. Lamelo, M. Ramos, J. García

Problem Statement: Caraballeda is part of the Venezuelan Port System. It is an area with high touristic potential and a source for entertainment and recreation for the capital city. Unfortunately, it is also a highly seismic and landslide-prone area, which has been affected in recent years by natural disasters and that after over 10 years hasn’t been recovered.

Objective: The aim of this proposal is the urban renewal of the area, while putting into value the touristic assets of Caraballeda and providing the incorporation of new services and equipment to assist the community.

Master Plan: For the Caraballeda Port Master Plan, six points for intervention were defined. Together they will constitute an architectural and urban complex intended for public use. These six intervention points are: Fishermen’s Port (1), Access to the bathing area (2), the rehabilitation of the urban front (3) the Bus Terminal (4) the Sports Complex (5) and the access to the Main Port (6).

Page 23: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

23

Master Plan

Page 24: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

24

As a proposal for the rehabilitation of the access to the Main Port (6) and the formalization of it as a new center that promotes tourism in the area, it is proposed to link the area with cultural activities (cinemas, art galleries , outdoor amphitheaters) which is practically absent in the area. Thus, the Urban Entertainment Center of Caraballeda is born.

B. Lamelo, M. Ramos, J. García

Cross section

Urban scale model Architectural proposal model Structural model

U R B A N E N T R E T A I N M E N T C E N T E R O F C A R A B A L L E D A Metropolitan Facility and Public Space

2nd Place | Steel Design National Competition ILAFA 2010 | Caraballeda, Venezuela | 2010

Page 25: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

25

Basement Level

Longitudinal Facade - South

Longitudinal Facade - North

Longitudinal Section - South

Page 26: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

26

The study of the unknown territory

Academic Project | Best Projects 2011 USB receiver | Caracas, Venezuela | 2011 Collaboration in the analysis stage: M. Ramos, L. Ruiz

Projecting the unknown territory has its advantages. When analyzing a case, it can be seen with a first time critical eye. There are no preconceptions and this helps getting to more accurate conclusions and possibilities of intervention that are specific for the case study.

In order to understand the unknown territory, we proceeded to study its elements, to understand how they have determined the qualities of the site; in particular, attention is paid to the fine and fuzzy lines between different areas: the limits, which allow us to understand the dynamics and vocation of the territory. In this case study, the existence of a risk zone, located in one of the topographical limits, separates the natural landscape from the urban area, and shows continuous attempts of invasion by the latter, which worsens existing problems of landslides and soil erosion.

Functional diagram of the sample Tridimensional study of the sample View of the risk area

Page 27: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

27

Landslide as a natural event

Natural and Constructed limits

Flows intensity Action of the water in the terrain

To consolidate limits through a constructed element

jan-mar

jul-sep oct-dec

apr-jun

To recognize the event by intervening on the area

To reforest the area by nourishing the land

To reorganize activities by densifying

Inva

sion

Risk

zon

eer

osio

nno

n gr

adua

l in

tens

ity

Page 28: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

28

Strategy: It is decided to consolidate the risk zone limit through a constructed element that would change the character of the area but that would also respect and recognize the landslide as a natural event. At the same time, it is intended to reorganize the activities of the area through densification, in order to stop further invasions and to try to reforest the area by taking advantage of the landslides for spreading nutrients.

Thus arises the idea of a fertilizer building. However, in order to consolidate the intervention, it is necessary to foment new spatial situations that would change the spatial dynamics of the place. For this matter it is proposed that the element operates also as a viewpoint, taking advantage of the natural balcony condition it has, facing the landscape.

Both ideas are embodied in a spatial proposal, where the existing natural event that defines the place is complemented and reinforced by interesting spatial situations that reconstruct the landscape and therefore construct the city.

organic waste decomposition rain - moisture landslide nutrients go into the soil reconstruction

View of the proposal

Fertilizer cycle

T H E V I E W P O I N T F E R T I L I Z E R The study of the unknown territory

Academic Project | Best Projects 2011 USB receiver | Caracas, Venezuela | 2011

Cardboard Model Photos + Photoshop

Page 29: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

29

Fertilizer floor plan

Viewpoint floor plan

Cross section

Page 30: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

30

I N H A B I T A T I N G T H E L I M I TInhabitable Bridge over the Albarregas River

Bachelor’s degree Final Project | Honorable Mention | Merida, Venezuela | 2011

His

tori

cal G

rid

|

Rive

r |

Mod

ern

City

Objective: The city of Merida is divided by the Albarregas River, a topographic inaccessible limit, ignored by the inhabitants as it is occupied by trash and informal settlements. The proposal aims to connect both sides of the river through a inhabitable bridge that will transform the river into an integrating element for the city and will act as an exchange area between both sides of the city.The proposal seeks to integrate the historical grid, the river and the modern city, so that the activities of the city can expand into the park, the park as a public space is recognized, admired and enjoyed and new ways of living the city for the community are generated.

Existing situation Proposed situation

Page 31: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

31

View from the Park

Aerial view

Sketchup + Photoshop

Page 32: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

32

In order to avoid a zoning configuration in the use of space and to ensure maximum occupancy of the bridge, a normative on gradual occupation is set, which determines a gradual mix of uses, in the horizontal and vertical sense.

In existing, proposed and recovered typologies, the spirit of the proposal can be appreciated: the inhabitable bridge must provide the connection between both sides of the river, and also it should enable activities to happens in its own structure. It is a square and a gallery, it is a viewpoint and a residence, and it is the platform where all the local elements meet and mingle to produce rich experiences.

Park Level

Residential Level 1

Street Level - South

Residential Level 2

Street Level - North

Roof Plan

I N H A B I T A T I N G T H E L I M I TInhabitable Bridge over the Albarregas River

Bachelor’s degree Final Project | Honorable Mention | Merida, Venezuela | 2011

Page 33: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

33

Functional Scheme for the proposal

Existing Program in the Cross Section

Proposed Program in the Cross Section

Page 34: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

34

The key elements of the project (the program, the bridge and the landscape) are present in the architectural proposal. Each level of the building presents a program that is related to the immediate context, and also, the proposal introduces urban operations that benefit the existing spatial relationships and enable functional and spatial development. As for the landscape, the three main courtyards of the building allow the interaction between the users and the park.

In addition, the inhabitable bridge introduces new dwelling typologies and new ways of inhabiting the city: the Urban Block, which proposes the reconstruction of a continuous urban front in the old town; the Suspended Building, which enjoys the spatial qualities of living suspended over the river; and the Terraced Building, which reinterprets the informal settlements that adapt to the topography and that has strong connections with the park.

View from the corridors

Longitudinal Section

View from the main square view from the central courtyard

I N H A B I T A T I N G T H E L I M I TInhabitable Bridge over the Albarregas River

Bachelor’s degree Final Project | Honorable Mention | Merida, Venezuela | 2011

Autocad + Photoshop

Page 35: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

35

Urban Block Typology

Suspended Building Typology

Terraced Building Typology

Standard Layout - Urban Block

Standard Layout - Suspended Building

Standard Layout - Terraced Building

Sketchup + Photoshop

Page 36: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

36

C R O S S E D L I N E SRe-thinking infrastructure in the search for urbanity

Master’s Degree Final Project | European Postgraduate Master in Urbanism EMU | Merida, Venezuela | 2015

Objective: The aim of this thesis is to create a strategy for the urban regeneration and development of Merida, on the premise of rethinking the infrastructure space in the search of urbanity. It is an opportunity to structure the transformation of the city into a consolidated touristic and student town, as well it is an opportunity to propose a new paradigm for the contemporary city where the relationship between nature, city and infrastructure is rebuilt.

Strategy: A strategy of crossing the lines between infrastructure and nature is set, in order to tackle the problems of the city and at the same time, to create the conditions that promote urbanity. The strategy consists of three main actions: to increase the transversal connections; to redefine the longitudinal axes and to cross these lines, in order to generate new points of maximum interaction in the city.

Testing ground: To test the strategy, 3 interventions are proposed in an area chosen as case study, each responding to an action of the strategy. Besides being examples, these are strategic interventions and intend to be triggers of the transformation of the city.

Transversal axesPotential for urbanity found in the historical analysis

Case Study

Hand drawing + Photoshop

Hand drawing + Photoshop

Page 37: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

37

Vision: A new realityA regenerated urban space

Strategy: Crossed LinesMaximum interaction between city and nature

The most severe case of urban discontinuity

This discontinuity affects the integration of the street network

Analysis of the case study

T 2T H E R I V E R P A R K

R E D E F I N E T H E L O N G I T U D I N A L

C R O S S T H E L I N E S

I N T E N S I F Y T H E T R A N S V E R S A L

T 13 W A Y S O F C R O S S I N G

T 3T H E C R O S S I N G

3 Actions that conform the strategy3 Key Interventions (T1, T2, T3)

Hand drawing + Photoshop Autocad + Photoshop Autocad + PhotoshopSpace Syntax

Dense Mix between residential and non-residential areas

Major clusters of services and University facilities

Page 38: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

38

C R O S S E D L I N E SRe-thinking infrastructure in the search for urbanity

Master’s Degree Final Project | European Postgraduate Master in Urbanism EMU | Merida, Venezuela | 2015

T1 “Three ways of crossing”: For this intervention, it is proposed to create more transversal axes to give priority to slow mobility and public transportation systems, with the intention of generating different spatial situations that enrich urban experience and give the inhabitant different options for moving around the city. The proposal also promotes the cross between different uses, especially between urban programs and the ones associated to nature. Finally, the intervention aims to improve the urban space, looking to improve the overall quality of the city and to bring benefits to all residents.

For the complete information on this project, please visit issuu.com/bettilamelo

3 ways of crossingIsometric view

Scheme of the Intervention

Recovery of a historical pathLongitudinal Section Autocad + Photoshop

Page 39: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

39

Crossed ProgramsBetween natural and built environment

Intensified use of urban spaceLongitudinal Section

New slow mobility axis Longitudinal Section Autocad + Photoshop

Sketch Up + VRay

Page 40: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

40

CLUSTERING CONNECTING INTERTWINING++ = THE KNOWLEDGE ECOSYSTEM

T H E K N O W L E D G E E C O S Y S T E M“A Knowledge-based spatial development”

Academic Project | European Postgraduate Master in Urbanism EMU | Westland Greenport, NL | 2015B. Lamelo, N. Covarrubia, G. de Neuville, A. Ergamina, W. Park

South WingEconomic Areas full of knowledge and Innovation

Objective: The aim of this project is to develop a strategic plan for the spatial development of the South Wing of the Randstad Region in the Netherlands, based on the theories of knowledge economy. It is chosen to work with the economic area of the Greenports, specifically in the Westland Greenport, as this case study gathers the best knowledge qualities to be strengthened and consolidated, therefore it is a suitable area for Knowledge Development.

Vision: the Westland Greenport will become a Knowledge Ecosystem, where the dimensions of knowledge will coexist and make synergy consolidating itself as the Top City of the Greenports.

Strategy: To achieve the vision, a strategy of three actions is set: clustering, in order to strengthen the current facilities and infrastructure of knowledge; connecting, by creating better physical connections between the clusters and with the surrounding environment; and intertwining, to articulate these social and economic activity along a Knowledge Corridor.

Photoshop

Page 41: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

41

THE KNOWLEDGE ECOSYSTEMTOP CIT Y OF THE GREENPORTS

Illustrator

Page 42: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

42

T H E K N O W L E D G E E C O S Y S T E M“A Knowledge-based spatial development”

Academic Project | European Postgraduate Master in Urbanism EMU | Westland Greenport, NL | 2015B. Lamelo, N. Covarrubia, G. de Neuville, A. Ergamina, W. Park

Intermodal Logistics

Westland Horticampus

Bio-based Tech Park

Horti-Showcase

Photoshop

The strategy is implemented through five strategic projects, which face the main problems of Westland and work in complementarity to achieve the transformation of the area into a Knowledge Ecosystem.

These projects are: The Horti-Showcase, the cluster to attract business and tourism, the Bio-based tech Park, which encourages production in a sustainable environment, the Westland Horticampus, the cluster of knowledge and innovation, Inter-modal Logistics, a multi-modal cargo transport system, and finally, the Westland Light-rail, the new public transportation system.

Page 43: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

43

Wes

tland

Light

Railw

ay

Know

ledge

Show

case

Bio-

based Te

ch P

ark

Wes

tland

Hor

ticam

pus

Inte

rmod

al Log

istic

s

Pha

se 1

Layi

ng F

oun

da

tions

Pha

se 2

Ma

in C

ons

truc

tion

Pha

se 3

Co

nne

ctio

n&

Inte

rgra

tion

Stakeholders & GovernanceL: Local GovernmentR/N: Regional/National GovernmentG: GrowersR: ResidentsI: InvestorsE: Entrepreneurs

L R/N

G

RI

E

L R/N

G

RI

E

L R/N

G

RI

E

Tra

mlin

e fr

om

De

n H

aa

g to

Na

alw

ijk

We

lco

me

po

int &

Kno

wle

dg

e H

ubG

ree

npo

rt u

nive

rsity

Inte

gra

tion

with

urb

an

are

a

Alte

rna

tive

pa

thw

ay

Turn

nel t

o e

xist

ing

ca

rgo

line

Inte

rmo

da

l sta

tion

and

ac

ilitie

s

Sho

wc

ase

’s p

avi

llions

& B

usin

ess

clu

ste

rLi

nk w

ith e

xist

ing

pa

rk

Rec

yclin

g p

ow

erp

lant

s w

ith G

ree

n p

ark

Tra

mlin

e fr

om

Na

ald

wijk

to o

the

r to

wns

Pip

e li

ne

inte

rcha

nge

tra

m s

tatio

n

Wes

tland

Light

Railw

ay

Know

ledge

Show

case

Bio-

based Te

ch P

ark

Wes

tland

Hor

ticam

pus

Inte

rmod

al Log

istic

s

Pha

se 1

Layi

ng F

oun

da

tions

Pha

se 2

Ma

in C

ons

truc

tion

Pha

se 3

Co

nne

ctio

n&

Inte

rgra

tion

Stakeholders & GovernanceL: Local GovernmentR/N: Regional/National GovernmentG: GrowersR: ResidentsI: InvestorsE: Entrepreneurs

L R/N

G

RI

E

L R/N

G

RI

E

L R/N

G

RI

E

Tra

mlin

e fr

om

De

n H

aa

g to

Na

alw

ijk

We

lco

me

po

int &

Kno

wle

dg

e H

ubG

ree

npo

rt u

nive

rsity

Inte

gra

tion

with

urb

an

are

a

Alte

rna

tive

pa

thw

ay

Turn

nel t

o e

xist

ing

ca

rgo

line

Inte

rmo

da

l sta

tion

and

ac

ilitie

s

Sho

wc

ase

’s p

avi

llions

& B

usin

ess

clu

ste

rLi

nk w

ith e

xist

ing

pa

rk

Rec

yclin

g p

ow

erp

lant

s w

ith G

ree

n p

ark

Tra

mlin

e fr

om

Na

ald

wijk

to o

the

r to

wns

inte

rcha

nge

tra

m s

tatio

n

Pip

e li

ne

Wes

tland

Light

Railw

ay

Know

ledge

Show

case

Bio-

based Te

ch P

ark

Wes

tland

Hor

ticam

pus

Inte

rmod

al Log

istic

s

Pha

se 1

Layi

ng F

oun

da

tions

Pha

se 2

Ma

in C

ons

truc

tion

Pha

se 3

Co

nne

ctio

n&

Inte

rgra

tion

Stakeholders & GovernanceL: Local GovernmentR/N: Regional/National GovernmentG: GrowersR: ResidentsI: InvestorsE: Entrepreneurs

L R/N

G

RI

E

L R/N

G

RI

E

L R/N

G

RI

E

Tra

mlin

e fr

om

De

n H

aa

g to

Na

alw

ijk

We

lco

me

po

int &

Kno

wle

dg

e H

ubG

ree

npo

rt u

nive

rsity

Inte

gra

tion

with

urb

an

are

a

Alte

rna

tive

pa

thw

ay

Turn

nel t

o e

xist

ing

ca

rgo

line

Inte

rmo

da

l sta

tion

and

ac

ilitie

s

Sho

wc

ase

’s p

avi

llions

& B

usin

ess

clu

ste

rLi

nk w

ith e

xist

ing

pa

rk

Rec

yclin

g p

ow

erp

lant

s w

ith G

ree

n p

ark

Tra

mlin

e fr

om

Na

ald

wijk

to o

the

r to

wns

Pip

e li

ne

inte

rcha

nge

tra

m s

tatio

n

A timeline in terms of development and governance is proposed, in order to set priorities and to give a logical order for the implementation of the proposal.

At each stage the level of participation of specific actors is highlighted in order to emphasize collaborations that should be encouraged and to divide the responsibilities of the project.

Page 44: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

44

P R O J E C T I N G T H E T E R R I T O R YAn strategic territorial project for the valley of Cardener River

Academic Project | European Postgraduate Master in Urbanism EMU | Bages, Spain | 2013B. Lamelo, M. Carrillo, N. Covarrubia, L. Ciccu, D. Zelayarán, G. Millán, F. Michailidou, B. Guedes, G. de Neuville

The Baix Cardener, a unique and diverse territory

Activities and dynamics of the Baix Cardener

Layered AnalysisNatural Support

Context: The project is located in a unique territory with great morphological and landscape diversity, the Bages Area; specifically in the valley of the Cardener, one of its main river structures. As a physical unit, the valley of the Cardener River evidences the historical occupation of the territory, especially in the activities of mining and industry that in some cases are still functioning. It is also a corridor where urban settlements have evolved throughout history and today set different dynamics together.

Page 45: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

45

Layered AnalysisInfrastructures

Methodology: The area was analyzed according to a 3 layers system (natural support, infrastructure and settlements). The interplay between these layers revealed the existence of different logics that affect the territory. These logics correspond to the way the Cardener Valley has been occupied and used considering its morphology.

Task: The current process of socioeconomic re-activation of the Baix Cardener Area demands for a territorial project for this section of the valley, as this will serve as an instrument to ensure a sustainable development where its main resources are put in value.

Logic of compression and decompression - In the territorial map of the Baix Cardener

Layered AnalysisNatural Support

Logic of human / natural - In the cross sections of the Baix Cardener

Analysis Conclusions: The area is seen as the encounter between two logics that coexist: the natural and the human logic. In this reading, attention is paid to the interstices between these two logical sets, as they are meeting spots between different entities. In addition, the territory is seen as a set of compression and decompression, as the river has shaped the landscape of the valley and this has conditioned human activity and landscape value. With these readings, fragments with individual identities were defined, in relation to both logics.

Page 46: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

46

1

2

3

4

5

B. Lamelo, M. Carrillo, N. Covarrubia, L. Ciccu, D. Zelayarán, G. Millán, F. Michailidou, B. Guedes, G. de Neuville

Logic of human / natural Interaction between natural and human Baix Cardener Valley ViewsDifferentiated Fragments

P R O J E C T I N G T H E T E R R I T O R YHand by hand: From recognizing the differences to the construction of linking spaces

Academic Project | European Postgraduate Master in Urbanism EMU | Bages, Spain | 2013

Hand drawing Hand drawing

5

4

3

2

1

Page 47: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

47

Differentiated Unitsthat connect to enhance

territorial identity

The linesThe braid that intertwines

The pointsSpaces of encounter

Objective: After the recognition of five units that operate by contiguity and complementarity, it is established as main objective to connect these units, in order to achieve territorial cohesion, acknowledging the differences and working with the identity and diversity of each unit. These units have two elements in common: the lines (roads and systems of mobility that intertwine and reinforce the large unit idea) and the points (flexible spaces for the development of multiple activities). One of the points was developed as a personal project.

Hand drawing

Arrival to diversityPoint of Intervention

Views: Sequence of the entrance to the city

View of the encounter space

Page 48: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

48

T H E C I T Y A F T E R T H E M E D I T E R R A N E A N G A M E S Plan for Tarragona 2017

Academic Project | European Postgraduate Master in Urbanism EMU | Tarragona, Spain | 2014

Objective: Considering that the Mediterranean Games will take place in the city of Tarragona in 2017 and that the city is preparing for the event, this was an opportunity to rethink the city and develop an urban plan for “after the games”, against the bad practice of planning for the immediacy, the intention was to create the conditions for the city to develop successfully even after the event has passed.

Methodology: Among the aspects analyzed of the area, particular attention was given to the system of open and public spaces & facilities, as it was key to secure the habitability of the future development. Parting from this map, a plan for Tarragona 2017 was designed.

Open Spaces & Public Facilities SystemProposed guidelines

Hand drawing

Page 49: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

49

Urban Axis & associated activities Definition of units

Hand drawing

Page 50: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

50

T H E C I T Y A F T E R T H E M E D I T E R R A N E A N G A M E S Plan for Tarragona 2017

Academic Project | European Postgraduate Master in Urbanism EMU | Tarragona, Spain | 2014

Master Plan

View of the new urban axis Public transportation & commercial areas

La Floresta, chosen case study

Autocad + Photoshop

Page 51: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

51

The master plan for Tarragona 2017 proposed a master proposal for the open spaces system and facilities, and 7 strategic areas for development. The guidelines for each area were the integration of the proposal with the open space system, a mix of uses and activities, and the strengthening of the main urban axes. As a personal project, the area of “La Floresta” was developed.

Park TipologyLocal Park Commercial Boulevard Secondary street Community Patio

New residential development

New residential development

Proposed Section

Residential Block Prototype

Clean industry Autocad + Photoshop

Page 52: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

52

H P AUrban design of the Public Space of the Oncology and Cardiology Hospital of Caracas

Professional Project | Caracas, Venezuela | 2012 | B. Lamelo, R. Guerra, N. Covarrubia para AGUA & AREPA

Objective: The aim of the project is to strengthen the spatial and functional organization of the open spaces of the hospital, through the formalization of a system of parallel bands representing the main public and collective spaces, which are perpendicular to the main circulation systems and mobility; as well as to characterize the public and semi-puiblic spaces, by using 3 groups of elements: Barriers, Articulators and Scenarios.

Cross Section

A North & South Public Promenades B North & South Patios C North & South Elevated Terraces D Central Patio E Lineal Park

Degrees of privacy - +

E

AB

CDC

BA

Landscape PatternTypes of open spaces

Page 53: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

53

A view from the exterior

Source: AREPA

Barriers, articulators and Scenarios

Technical Sheet of articulator

Cross Section - Proposal

Page 54: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

54

T H E C U L T U R A L D E L T A

B. Lamelo, K. Sabirli, M. Jordan, Y. Wang, D. Carballo, Y. Sik Moon, A. Sanz

Problem Statement: The proposal envisions Les Rambles, an area of great urban and touristic importance in Barcelona, as a river that is born in Catalunya Square, flows through the historical center and finally ends in a large delta, the port area. Unfortunately, the ending of this river is a dispersed urban space.

The commercial and cultural activities in the area award it with great potential as a cultural and touristic node, however the existing roads interrupt the flow of public space and become a problem for pedestrian flows that arrive to this space and scatter because of the lack of clear urban space.

Objective: The aim of the proposal is the creation of a defined space for the arrival of Les Rambles and the other paths that arrive to the Cultural Delta. A traffic redefinition is proposed, to prioritize pedestrians over the vehicle. The unification of the pavement in the area of intervention will facilitate pedestrian traffic and at the same time, will reduce car speed.

Analysis of the intervention area

A review over Les Rambles

International Workshop | Besides Tourism ETSAB UPC | Barcelona, Spain | 2011

Page 55: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

55

Proposed public space

General and Specific site of interventionViews and Sections of the intervention

Page 56: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

56

T H E C U L T U R A L D E L T A

B. Lamelo, K. Sabirli, M. Jordan, Y. Wang, D. Carballo, Y. Sik Moon, A. Sanz

Strategy: To consolidate the area it is proposed to rethink public space and integrate the ground floors of existing buildings with the urban space, thus enriching the pedestrian experience and providing continuity of pedestrian flows. With the opening of the ground floors, the relationship between the city and the sea that is now discontinued but that is the natural condition of the site is recovered.

A review over Les Rambles

International Workshop | Besides Tourism ETSAB UPC | Barcelona, Spain | 2011

Page 57: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

57

Page 58: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

58

M O N O F U N C T I O N A L A R E A

FROM

The heart of the industrial economy of the past

“ Z O N I N G ” P L A N

PRODUCTIONRESIDENTIALCOMMERCIAL

P R O D U C T I V E S I N G A P O R E 2 0 5 0Re-inventing the industrial urban model

International Workshop | IFoU Winter School Jurong Vision 2050 | Jurong, Singapur | 2015B. Lamelo, A. Astrup, D. Ferrer, L. Lin Qing, N. Agarwal, O. Serra, Riberd, S. Sudhindra, Z. Nan Xin

Task: The theme of the workshop addresses the area of Jurong West, a monofunctional, segregated and fragmented industrial area, which has been designed after a zoning strategy and represents the heart of the industrial economy of the past. The aim of the workshop was to structure and envision Jurong’s transformation into an area for possible urban development and clean industry that could integrate with the existing green and residential areas.

I N D U S T R I A LJ U R O N G

2 0 1 5

Page 59: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

59

H O R I Z O N T A LI N T E G R A T E D

R A D I C A L M I X U S E

RESIDENTIALPRODUCTIONCOMMERCIAL

TO

P R O D U C T I V E S I N G A P O R E

2 0 5 0A resilient structure for a post-

industrialized society

Strategy: To achieve this “Habitable Jurong” it is proposed to decentralize productivity, thereby achieving Productive Singapore 2050, and thus freeing space for inputting habitability in Jurong. Decentralization is recognized as an emerging process in industry today, which will be empha-sized by current trends, including miniaturization of production.

C LU S T E R S , I N D U S T R I E S A N D CO M PA N I E S E M E R G I N G S E C TO R S

LO G I S T I C S E L E C T R O N I C

C H E M I C A LB I O M E D I C A L S C I E N C E S

P R E C I S I O N E N G I N E E R I N GA E R O S PAC E

Some current trends driving the proposal ...Smart Clusters Digital communication Smart mobility Miniaturization Decentralization Automation

Page 60: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

60

P R O D U C T I V E S I N G A P O R E 2 0 5 0Re-inventing the industrial urban model

International Workshop | IFoU Winter School Jurong Vision 2050 | Jurong, Singapur | 2015B. Lamelo, A. Astrup, D. Ferrer, L. Lin Qing, N. Agarwal, O. Serra, Riberd, S. Sudhindra, Z. Nan Xin

Master Plan

Thus, it is proposed that by 2050, Jurong represents the reinvention of the urban industrial model: a model where it will be possible to achieve high levels of productivity and livability at the same time.

It is therefore proposed to re-think the water and green systems, the infrastructure and the old industrial buildings, in order to transform these into the base structure for implementing livability in Jurong.

Prototypesfor urban regeneration

water + green industrial monuments

Autocad + Illustrator + Photoshop

Page 61: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

61

W A T E R T R A N S F O R M A T I O N

G R E E NT R A N S F O R M A T I O N

I N F R A S T R U C T U R ET R A N S F O R M A T I O N

R E C Y C L I N G O F L A R G E I N D U S T R I E S

Water enters into port industries Green lung infiltrates Green Areas interact with infrastructure

Large structures connect to infrastructure

Port industry miniaturizesUrban Industrial tissue is soften

with greenInfrastructure becomes a green

arteryLarge structures become useful

and flexible

Current waterfront situation Existing Parks Existing Infrastructure Existing large scale industry

Page 62: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

62

P E D A L I N G C A R A C A SMetropolitan Bike Path Network

4th Place | Caracas a Pedal Competition | Caracas, Venezuela 2012 | B. Lamelo, N. Covarrubia, C. Levy

Page 63: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

63

Autocad + Photoshop

Page 64: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

64

2012 | B. Lamelo, N. Covarrubia, C. Levy

Objective: The aim of the proposal is to promote urban cycling as a possible solution for the problems of mobility of Caracas through the implementation of a bikepath network and its associated services. It is a proposal that focuses on the progressive change of infrastructure and civic culture. In each phase of the project it is intended to have enough strength to change mindsets and make urban cycling a new reality for citizens.

Methodology: To establish the main routes, the main points that generate urban dynamics were studied, and in that way, the bike path network is based on real flows and is adjusted to the current needs of the population. Nodes were also established, and were categorized in major and minor nodes, in order to determine the function of each. The nodes were also used to provide the city of urban infrastructure.

Phases: In terms of short- and medium-term feasibility of the project, it is intended that the first stage of formalizing the network involves minimal impact on existing roads. This involves initiatives such as the redeployment of wide roads, the use of separation elements, the improvement or creation of pavements, the treatment of intersections, among others.

Integrated Street bike path Sidewalk integrated bike path with protection

Wide roads are restructured to include the minimum bike path space (1.5m), It is marked on the pavement and in some cases shared with the bus lane

The road infrastructure supports the incorporation of the bike path without changing lanes or sidewalks dimensions. It is marked on the pavement and protection elements and demarcation of the channel are placed

P E D A L I N G C A R A C A SMetropolitan Bike Path Network

4th Place | Caracas a Pedal Competition | Caracas, Venezuela

Sketchup + Photoshop

Page 65: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

65

Independent bike path

Prototype No. 03Prototype No. 01-02 Prototype No. 04

Sidewalk integrated bike path - unprotected

The bike path is included in residual spaces of existing roads. Dimensions of lanes or sidewalks are not altered.

Bike parking ModuleSeating Module

Trash can and drinking fountain Module

Bike rack devices in public transportation

The bike path is incorporated into the sidewalk and is normally related to an urban park or linear public space

Page 66: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

66

A R T I S A N ’ S G A L L E R Y A N D M A R K E TR E V I T Cultural & Commercial Facility

Revit Project | Choroní, Venezuela

External view

3D section

Page 67: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

67

Internal view Internal view

South ElevationCross Section

Ground Floor

East Elevation

West Elevation

UP

UP

1 2 3 4 5 6 7

A

B

C

D

E

0.10

4.50

4.50

4.50

4.50

4.50 4.50 4.50 4.50 4.50 4.50

1 2 3 4 5 6 7

A

B

C

D

E

Scale (@ A4)

Checked by

Drawn by

Datewww.autodesk.com/revit

Code Status

SUITABILITY DESCRIPTION PURPOSE OF ISSUE

CLIENTPROJECT

SHEET

Project Number

DRAWING NUMBER

REV 1 : 200

24/3/2016 11:48:04 p. m.

UnnamedProject Number

Casa CulturalChoroní Owner

Issue Date

Author

CheckerA101

Ground Floor

0.00

Level 1

4.00

ABCDE

Ground Floor

0.00

Level 1

4.00

1 2 3 4 5 6 7

Scale (@ A4)

Checked by

Drawn by

Datewww.autodesk.com/revit

Code Status

SUITABILITY DESCRIPTION PURPOSE OF ISSUE

CLIENTPROJECT

SHEET

Project Number

DRAWING NUMBER

REV 1 : 200

25/3/2016 1:04:08 a. m.

UnnamedProject Number

Casa CulturalChoroní Owner

Issue Date

Author

CheckerA103

Ground Floor

0.00

Level 1

4.00

ABCDE

Ground Floor

0.00

Level 1

4.00

1 2 3 4 5 6 7

Ground Floor

0.00

Level 1

4.00

A B C D E

Scale (@ A4)

Checked by

Drawn by

Datewww.autodesk.com/revit

Code Status

SUITABILITY DESCRIPTION PURPOSE OF ISSUE

CLIENTPROJECT

SHEET

Project Number

DRAWING NUMBER

REV 1 : 200

25/3/2016 12:30:36 a. m.

UnnamedProject Number

Casa CulturalChoroní Owner

Issue Date

Author

CheckerA102

Ground Floor

0.00

Level 1

4.00

ABCDE

Ground Floor

0.00

Level 1

4.00

1 2 3 4 5 6 7

Ground Floor

0.00

Level 1

4.00

A B C D E

Scale (@ A4)

Checked by

Drawn by

Datewww.autodesk.com/revit

Code Status

SUITABILITY DESCRIPTION PURPOSE OF ISSUE

CLIENTPROJECT

SHEET

Project Number

DRAWING NUMBER

REV 1 : 200

25/3/2016 12:30:36 a. m.

UnnamedProject Number

Casa CulturalChoroní Owner

Issue Date

Author

CheckerA102

Ground Floor

0.00

Level 1

4.00

ABCDE

Ground Floor

0.00

Level 1

4.00

1 2 3 4 5 6 7

Ground Floor

0.00

Level 1

4.00

A B C D E

Scale (@ A4)

Checked by

Drawn by

Datewww.autodesk.com/revit

Code Status

SUITABILITY DESCRIPTION PURPOSE OF ISSUE

CLIENTPROJECT

SHEET

Project Number

DRAWING NUMBER

REV 1 : 200

25/3/2016 12:30:36 a. m.

UnnamedProject Number

Casa CulturalChoroní Owner

Issue Date

Author

CheckerA102

Ground Floor

0.00

Level 1

4.00

ABCDE

Ground Floor

0.00

Level 1

4.00

1 2 3 4 5 6 7

Ground Floor

0.00

Level 1

4.00

A B C D E

Scale (@ A4)

Checked by

Drawn by

Datewww.autodesk.com/revit

Code Status

SUITABILITY DESCRIPTION PURPOSE OF ISSUE

CLIENTPROJECT

SHEET

Project Number

DRAWING NUMBER

REV 1 : 200

25/3/2016 12:32:31 a. m.

UnnamedProject Number

Casa CulturalChoroní Owner

Issue Date

Author

CheckerA102

Ground Floor

0.00

Level 1

4.00

ABCDE

Ground Floor

0.00

Level 1

4.00

1 2 3 4 5 6 7

Ground Floor

0.00

Level 1

4.00

A B C D E

Scale (@ A4)

Checked by

Drawn by

Datewww.autodesk.com/revit

Code Status

SUITABILITY DESCRIPTION PURPOSE OF ISSUE

CLIENTPROJECT

SHEET

Project Number

DRAWING NUMBER

REV 1 : 200

25/3/2016 12:32:31 a. m.

UnnamedProject Number

Casa CulturalChoroní Owner

Issue Date

Author

CheckerA102

Page 68: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

68

B R I S A S D E C Ú A R E S I D E N T I A L B L O C KR E V I T Multifamily Housing Project

Revit Project | Cúa, Venezuela

A B C D E G H

1

2

3

4

5

6

7

FA' B' C' D' E'

8

1'

2'

3'

F' G' H'

Scale (@ A4)

Checked by

Drawn by

Datewww.autodesk.com/revit

Code Status

SUITABILITY DESCRIPTION PURPOSE OF ISSUE

CLIENTPROJECT

SHEET

Project Number

DRAWING NUMBER

REV 1 : 200

27/3/2016 5:10:26 p. m.

UnnamedProject Number

Brisas de Cúa OwnerIssue Date

Author

CheckerA103

y 1

UP

A B C D E G H J K L

1

2

3

4

5

6

7

F IA' B' C' D' E'

8

1'

2'

3'

F' G' H' I' J' K'

Scale (@ A4)

Checked by

Drawn by

Datewww.autodesk.com/revit

Code Status

SUITABILITY DESCRIPTION PURPOSE OF ISSUE

CLIENTPROJECT

SHEET

Project Number

DRAWING NUMBER

REV 1 : 500

27/3/2016 5:18:08 p. m.

UnnamedProject Number

Brisas de Cúa OwnerIssue Date

Author

CheckerA102

1 : 500Level 11

A B C D E G H J K L

1

2

3

4

5

6

7

F IA' B' C' D' E'

8

1'

2'

3'

F' G' H' I' J' K'

Scale (@ A4)

Checked by

Drawn by

Datewww.autodesk.com/revit

Code Status

SUITABILITY DESCRIPTION PURPOSE OF ISSUE

CLIENTPROJECT

SHEET

Project Number

DRAWING NUMBER

REV 1 : 500

27/3/2016 5:17:46 p. m.

UnnamedProject Number

Brisas de Cúa OwnerIssue Date

Author

CheckerA101

1 : 500Ground Floor1

External view

Level 1

Ground Floor

Standard Layout Sectioned Isometric View

Page 69: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

69

Ground Floor

0.00

Level 1

3.00

Level 2

6.00

Level 3

9.00

Level 4

12.00

A B C D E G H J K LF IA' B' C' D' E' F' G' H' I' J' K'

Roof Base

15.00

Roof Top

15.90

Scale (@ A3)

Checked by

Drawn by

Date Project numberwww.autodesk.com/revit

STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION DRWAING NUMBER REV

PROJECT CLIENT

SHEET 1 : 200

27/3

/201

6 7:

07:3

2 p.

m.

UnnamedProject Number

Brisas de Cúa OwnerIssue Date

Author

CheckerA106

No. Description Date

1 : 200Section 41

Ground Floor

0.00

Level 1

3.00

Level 2

6.00

Level 3

9.00

Level 4

12.00

A B C D E G H J K LF IA' B' C' D' E' F' G' H' I' J' K'

Roof Base

15.00

Roof Top

15.90

Scale (@ A3)

Checked by

Drawn by

Date Project numberwww.autodesk.com/revit

STATUS PURPOSE OF ISSUECODE SUITABILITY DESCRIPTION DRWAING NUMBER REV

PROJECT CLIENT

SHEET 1 : 200

27/3

/201

6 7:

06:0

8 p.

m.

UnnamedProject Number

Brisas de Cúa OwnerIssue Date

Author

CheckerA106

No. Description Date

1 : 200Section 41

Ground Floor

0.00

Level 1

3.00

Level 2

6.00

Level 3

9.00

Level 4

12.00

12345678 1'2'3'

Roof Base

15.00

Roof Top

15.90

Scale (@ A4)

Checked by

Drawn by

Datewww.autodesk.com/revit

Code Status

SUITABILITY DESCRIPTION PURPOSE OF ISSUE

CLIENTPROJECT

SHEET

Project Number

DRAWING NUMBER

REV 1 : 200

27/3/2016 10:53:52 p. m.

UnnamedProject Number

Brisas de Cúa OwnerIssue Date

Author

CheckerA104

Ground Floor

0.00

Level 1

3.00

Level 2

6.00

Level 3

9.00

Level 4

12.00

12345678 1'2'3'

Roof Base

15.00

Roof Top

15.90

Scale (@ A4)

Checked by

Drawn by

Datewww.autodesk.com/revit

Code Status

SUITABILITY DESCRIPTION PURPOSE OF ISSUE

CLIENTPROJECT

SHEET

Project Number

DRAWING NUMBER

REV 1 : 200

27/3/2016 10:53:30 p. m.

UnnamedProject Number

Brisas de Cúa OwnerIssue Date

Author

CheckerA104

Longitudinal Section

View from the gallery Cross Section

South Elevation

North Elevation

Isometric view

Page 70: ARCH + URB // PORTFOLIO // Bettisabel Lamelo

70

2 0 1 6

A R C H _ U R B

Cover Photo: Mayor Square, Ourense - 2012 [email protected]+34 617 69 11 35

B E T T I S A B E L L A M E L O