As presented on 15 July 2013
Arborfield Relief RoadTechnical Recommendation
Not Adopted Council Policy
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
2/37
Background WSP was appointed to identify the most appropriate
scheme to mitigate Arborfield Garrison SDLdevelopment (3,500 houses)
Stage 1A Scheme Identification
Stage 1B will gain certainty of delivery and costs of therecommended scheme
Stage 2 will complete the Planning Application Stage 3 will prepare Construction Drawings and Tenderdocuments for construction
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
3/37
Stage 1A Scheme Identification
The study considered fourgeneral relief
road options In total, 21 option variations were tested
for a Design Year of 2026
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
4/37
Stage 1A The analysis considered:
Traffic Policy
Environmental impacts
Property impacts
Land requirements
Engineering design
Deliverability
Public and political refinement
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
5/37
Stage 1A Progress The draft report has been reviewed by officer
disciplines It has been reported to local Councillors and
Members (09 July)
Land owners directly affected have been contacted
This event provides details of the technicalrecommendation (15 July)
It will be discussed at Executive (July 2013)
()
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
6/37
Stage 1A Progress (continued) A presentation to Arborfield SDL developers is to be
arranged Public consultation is planned from September 2013
The preferred scheme requires formal Executiveapproval (anticipated January 2014)
Only then will WBC commission Stage 1B
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
7/37
Indicative Cross Section
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
8/37
Arborfield Relief RoadOptions
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
9/37
Options
Modelled link
Riseley
Swallowfield
Spencers
Wood
Arborfield
Cross
Finchampstead
R E A D I N G
This map is based on Ordnance Survey material with the permission of Ordnance Surveyon behalf of theController of HMSO (c) Cr own Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to
prosecution or civil proceedings. Wokingham Borough Council Licence No. 100019592.
N
Wokingham
Modelled link
Riseley
Swallowfield
Spencers
Wood
Arborfield
Cross
Finchampstead
R E A D I N G
This map is based on Ordnance Survey material with the permission of Ordnance Surveyon behalf of theController of HMSO (c) Cr own Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to
prosecution or civil proceedings. Wokingham Borough Council Licence No. 100019592.
NN
Wokingham
Schematic Options
C
B
DA
DM
N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
10/37
C
B
DA
Options
Overview
Plan
Groundwater
Source Protection
Zone
Public Right of
Way
Listed Building
Ancient Woodland
Local Wildlife Site
Local NatureReserve
Tree Protection
Orders
1 in 30yr Flood
Level
1 in 20yr FloodLevel
N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
11/37
Environmental
Constraints
Plan
Groundwater
Source Protection
Zone
Public Right of
Way
Listed Building
Ancient Woodland
Local Wildlife Site
Local NatureReserve
Tree Protection
Orders
1 in 30yr Flood
Level
1 in 20yr FloodLevel
N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
12/37
Main traffic
movements
Groundwater
Source Protection
Zone
Public Right of
Way
Listed Building
Ancient Woodland
Local Wildlife Site
Local NatureReserve
Tree Protection
Orders
1 in 30yr Flood
Level
1 in 20yr FloodLevel
Generally satisfies objectives
Generally fails to meet objectives
N
Hampshire
Reading Winnersh
Wokingham
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
13/37
Arborfield Relief RoadOption C
(Long Route)
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
14/37
River Loddon
Ancient
Woodland
Kennys Farm SAM
Engineering Impacts CGroundwater
Source Protection
Zone
Public Right of
Way
Listed Building
Ancient Woodland
Local Wildlife Site
Local NatureReserve
Tree Protection
Orders
1 in 30yr Flood
Level
1 in 20yr FloodLevel
Attracts more trafficto the A327
Speed Limit N
Generally satisfies objectives
Generally fails to meet objectives
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
15/37
Arborfield Relief RoadOption B
(Middle Route)
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
16/37
B
Generally satisfies objectives
Generally fails to meet objectives
N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
17/37
Ancient Woodland
Greensward Lane Noise and Visual
Engineering Impacts
BGroundwater
Source Protection
Zone
Public Right of
Way
Listed Building
Ancient Woodland
Local Wildlife Site
Local NatureReserve
Tree Protection
Orders
1 in 30yr Flood
Level
1 in 20yr FloodLevel
Generally satisfies objectives
Generally fails to meet objectives
40Speed Limit N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
18/37
B1Groundwater
Source Protection
Zone
Public Right of
Way
Listed Building
Ancient Woodland
Local Wildlife Site
Local NatureReserve
Tree Protection
Orders
1 in 30yr Flood
Level
1 in 20yr FloodLevel
Generally satisfies objectives
Generally fails to meet objectives
40Speed Limit N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
19/37
Arborfield Relief RoadOption D
(Short, Eastern Route)
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
20/37
D1Groundwater
Source Protection
Zone
Public Right of
Way
Listed Building
Ancient Woodland
Local Wildlife Site
Local NatureReserve
Tree Protection
Orders
1 in 30yr Flood
Level
1 in 20yr FloodLevel
Generally satisfies objectives
Generally fails to meet objectives
40Speed Limit N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
21/37
D2
Engineering
Noise
Groundwater
Source Protection
Zone
Public Right of
Way
Listed Building
Ancient Woodland
Local Wildlife Site
Local NatureReserve
Tree Protection
Orders
1 in 30yr Flood
Level
1 in 20yr FloodLevel
Generally satisfies objectives
Generally fails to meet objectives
40Speed Limit N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
22/37
Arborfield Relief RoadOption A
(Short, Western Route)
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
23/37
A
Main River
Groundwater
Source Protection
Zone
Public Right of
Way
Listed Building
Ancient Woodland
Local Wildlife Site
Local NatureReserve
Tree Protection
Orders
1 in 30yr Flood
Level
1 in 20yr FloodLevel
Generally satisfies objectives
Generally fails to meet objectives
40Speed Limit N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
24/37
A1
Main River
Groundwater
Source Protection
Zone
Public Right of
Way
Listed Building
Ancient Woodland
Local Wildlife Site
Local NatureReserve
Tree Protection
Orders
1 in 30yr Flood
Level
1 in 20yr FloodLevel
Generally satisfies objectives
Generally fails to meet objectives
40Speed Limit
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
25/37
A2
Main River
Groundwater
Source Protection
Zone
Public Right of
Way
Listed Building
Ancient Woodland
Local Wildlife Site
Local NatureReserve
Tree Protection
Orders
1 in 30yr Flood
Level
1 in 20yr FloodLevel
Generally satisfies objectives
Generally fails to meet objectives
40Speed Limit N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
26/37
A3
Main River
Groundwater
Source Protection
Zone
Public Right of
Way
Listed Building
Ancient Woodland
Local Wildlife Site
Local NatureReserve
Tree Protection
Orders
1 in 30yr Flood
Level
1 in 20yr FloodLevel
Generally satisfies objectives
Generally fails to meet objectives
40Speed Limit N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
27/37
Arborfield Relief RoadShortlisted Options
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
28/37
A3
D1
B1
Generally satisfies objectives
Generally fails to meet objectives
40Speed Limit N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
29/37
A3
Environmental
Improvement
Best
Performing
Traffic Option
Technical
Recommendation
Groundwater
Source Protection
Zone
Public Right of
Way
Listed Building
Ancient Woodland
Local Wildlife Site
Local Nature
Reserve
Tree Protection
Orders
1 in 30yr Flood
Level
1 in 20yr Flood
Level
Generally satisfies objectives
Generally fails to meet objectives
40Speed Limit N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
30/37
A3
Arborfield Cross
village centre in1999
Technical
Recommendation
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
31/37
Arborfield Relief RoadTechnical Recommendation
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
32/37
A3Technical
Recommendation
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
33/37
Conservation
Area
A3Technical
Recommendation
Conservation
Area
Listed Building
Yew Tree Farm
Chamberlains
Farm
Ducks Nest
Farmhouse
Main river
Possible impact
from noise and
visual intrusion
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
34/37
Conservation
Area
Listed Building
Yew Tree Farm
Chamberlains
Farm
Ducks Nest
Farmhouse
Main river
Possible impact
from noise and
visual intrusion
Conservation
Area
A3Technical
Recommendation
40Speed Limit
Severance of
Lockey Farm fields
1. Crossing of Main
River.
2. Impact on
Playing Fields.
Consider alignmentchange?
Pinch point.
Significant impact
on listed buildings
Cutting
Impact on listed
building
or
or
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
35/37
A3Technical
Recommendation
Land
Ownership
Note: Land parcels indicate different ownership.
Two parcels of the same colour does not inferthe same land owner.
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
36/37
Process Stage 1A completed in draft
Member and Public Consultation underway
Confirm or modify Stage 1A scheme
Executive approval Spring 2014?
Commission Stage 1B for design and costing
Stage 2 prepares the scheme for PlanningApplication
Stage 3 prepares scheme drawings to enable
construction
N
-
7/28/2019 Arborfield Relief Road Technical Recommendation 15 July 2013
37/37
Questions?